CN214579664U - Water conservancy pipeline fixed knot constructs - Google Patents

Water conservancy pipeline fixed knot constructs Download PDF

Info

Publication number
CN214579664U
CN214579664U CN202023063136.7U CN202023063136U CN214579664U CN 214579664 U CN214579664 U CN 214579664U CN 202023063136 U CN202023063136 U CN 202023063136U CN 214579664 U CN214579664 U CN 214579664U
Authority
CN
China
Prior art keywords
concrete
water conservancy
fixed knot
block
conservancy pipeline
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023063136.7U
Other languages
Chinese (zh)
Inventor
马义林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhongchen Hongtai Construction Co ltd
Original Assignee
Zhongchen Hongtai Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhongchen Hongtai Construction Co ltd filed Critical Zhongchen Hongtai Construction Co ltd
Priority to CN202023063136.7U priority Critical patent/CN214579664U/en
Application granted granted Critical
Publication of CN214579664U publication Critical patent/CN214579664U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a water conservancy pipeline fixed knot constructs, including concrete and base, the internally mounted of concrete has the reinforcing bar, and the outside of reinforcing bar is provided with the iron wire and pricks the ring, the base sets up in the top of concrete, and the top laminating of base has the laminating piece, the steel sheet is installed to the top of laminating piece, and the top of steel sheet is provided with the welding piece, the top of welding piece is installed and is supported a section of thick bamboo, and the top of supporting a section of thick bamboo is provided with the telescopic link, the top of telescopic link is provided with thick core spring. This water conservancy pipeline fixed knot constructs installs horizontal track strip, through the horizontal track strip and the slider of installation, can set up the slider in horizontal track strip's inside and can cooperate the top sheave to make the removal that equipment can make the round trip freely, can convenience of customers dismantle the pipeline, and can alleviate user's physical demands when pressing from both sides tight pipeline, play laborsaving effect, and the equipment of having hung that can be stable under mutually supporting of slider and billet, the damage of vibration to equipment is difficult for taking place.

Description

Water conservancy pipeline fixed knot constructs
Technical Field
The utility model relates to a pipeline fixed knot constructs technical field, specifically is a water conservancy pipeline fixed knot constructs.
Background
Pipe fixing structures, pipes for transporting liquids, gases or loose solids and their supporting and reinforcing structures, the transport of loose solids using water or gas as medium, the pipes must be leak-proof and resistant to the temperature, pressure, corrosion and abrasion effects of the transported substances.
Along with the rapid development of the modern economic society, the demand of people on a water conservancy pipeline fixing structure is increased more and more, and the development of the pipeline fixing structure is required to meet the inevitable requirements of the rapid development of the modern economic society and the hope of people.
At the pipeline fixed knot who uses at economic construction constructs at present, general quality is relatively poor, and the cost is higher, and this use cost that has just increased the user, inconvenient installation, intelligent degree is low, does not possess the function of disassembling fast, and operating efficiency is not high-efficient, and takes place dangerous accident easily for the user handles the inefficiency of accident.
In order to solve the problems, innovative design needs to be carried out on the basis of the pipeline fixing structure, and therefore a water conservancy pipeline fixing structure is proposed to be designed for the scheme.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a water conservancy pipeline fixed knot constructs to solve the relatively poor that produces when pipeline fixed knot constructs the in-service use that proposes among the above-mentioned background art, the cost is higher, this use cost that has just increased the user, inconvenient installation, intelligent degree is low, does not possess the function of disassembling fast, and operating efficiency is not efficient, and takes place dangerous accident easily, makes the problem of the inefficiency of user's handling accident.
In order to achieve the above object, the utility model provides a following technical scheme: a water conservancy pipeline fixing structure comprises concrete and a base, wherein reinforcing steel bars are installed inside the concrete, iron wire binding rings are arranged on the outer sides of the reinforcing steel bars, the base is arranged above the concrete, a binding block is bound on the upper side of the base, a steel plate is installed above the binding block, a welding block is arranged above the steel plate, a supporting cylinder is installed above the welding block, a telescopic rod is arranged above the supporting cylinder, a thick core spring is arranged above the telescopic rod, a cross rod is installed above the thick core spring, a threaded semi-ring is arranged outside the cross rod, a fixing bolt is in threaded connection with the outer side of the threaded semi-ring, a bolt assembly plate is in threaded connection with the outer side of the cross rod, a hanging rod is installed below the bolt assembly plate, a horizontal rail strip is installed below the hanging rod, a sliding block is installed inside the horizontal rail strip, and a pulley is arranged outside the sliding block, the below of horizontal track strip is provided with the billet, and one side of billet is provided with the fixed block, one side of fixed block is provided with the semicircle ring cover, and the outside of semicircle ring cover installs the bolt to the outside threaded connection of bolt has movable nut, the internally mounted of semicircle ring cover has waterproof rubber.
Preferably, the concrete forms a steel-concrete structure through a steel bar and an iron wire tie ring, and the inner side of the concrete is tightly attached to the outer side of the steel bar.
Preferably, the base and the joint block form an integrated structure through a steel plate and a welding block, and the steel plate and the welding block are parallel to each other.
Preferably, the support cylinder and the thick-core spring form an elastic structure through a telescopic rod, and the center line of the support cylinder and the center line of the telescopic rod are overlapped.
Preferably, the cross rod and the threaded semi-ring form a detachable structure through a fixing bolt and a bolt group plate, the threaded semi-ring and the fixing bolt are symmetrical about the central axis of the cross rod, and the fixing bolt and the bolt group plate are parallel to each other.
Preferably, the horizontal rail strip and the sliding block form a sliding structure through a pulley and a steel bar, and the horizontal rail strip and the steel bar are perpendicular to each other.
Compared with the prior art, the beneficial effects of the utility model are that:
1. this water conservancy pipeline fixed knot constructs is provided with thick core spring, through the telescopic link and the thick core spring of installation, under the mutually supporting of a supporting cylinder and telescopic link, can come the length that the matching set up equipment according to user's actual need to can make equipment take place to play absorbing effect when acutely shaking under the effect of thick core spring, thereby reduced the damage that causes equipment, reduced user's loss of property.
2. This water conservancy pipeline fixed knot constructs is provided with the horizontal pole, through the horizontal pole and the screw thread semi-ring of installation, and this structure dismantles conveniently, possesses the effect of assembling of multistage, and the fixed and swift dismounting device that can be stable under screw thread semi-ring and fixing bolt's the mutually supporting to save user's time, because the quantity of bolt group board is more, therefore can make equipment possess the function of supporting heavy pipeline, the practicality is good.
3. This water conservancy pipeline fixed knot constructs is provided with horizontal track strip, through the horizontal track strip and the slider of installation, can set up the slider in the inside of horizontal track strip and can cooperate the top sheave to make the removal that equipment can make a round trip freely, can convenience of customers dismantles the pipeline, and can alleviate user's physical demands when pressing from both sides tight pipeline, play laborsaving effect, and the equipment of having hung that can be stable under mutually supporting of slider and billet, the damage of vibration to equipment is difficult for taking place.
Drawings
FIG. 1 is a schematic front view of the present invention;
FIG. 2 is a schematic side view of the present invention;
fig. 3 is the enlarged structure schematic diagram of the horizontal track strip of the present invention.
In the figure: 1. concrete; 2. reinforcing steel bars; 3. tying an iron wire; 4. a base; 5. fitting blocks; 6. a steel plate; 7. welding the blocks; 8. a support cylinder; 9. a telescopic rod; 10. a thick core spring; 11. a cross bar; 12. a threaded half ring; 13. fixing the bolt; 14. assembling a plate by using bolts; 15. a boom; 16. a horizontal track bar; 17. a slider; 18. a pulley; 19. a steel bar; 20. a fixed block; 21. a semi-circular ring sleeve; 22. a bolt; 23. a movable nut; 24. waterproof rubber.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, the present invention provides a technical solution: a water conservancy pipeline fixing structure comprises concrete 1 and a base 4, wherein a reinforcing steel bar 2 is installed inside the concrete 1, an iron wire binding ring 3 is arranged on the outer side of the reinforcing steel bar 2, the concrete 1 forms a steel concrete structure through the reinforcing steel bar 2 and the iron wire binding ring 3, the inner side of the concrete 1 is tightly attached to the outer side of the reinforcing steel bar 2, the steel concrete structure is suitable for materials and structures for large-scale water conservancy pipeline construction and has the advantages of high strength and moisture resistance, the base 4 is arranged above the concrete 1, an attaching block 5 is attached to the upper side of the base 4, a steel plate 6 is installed above the attaching block 5, a welding block 7 is arranged above the steel plate 6, the base 4 and the attaching block 5 form an integrated structure through the steel plate 6 and the welding block 7, the steel plate 6 is parallel to the welding block 7, the welding attaching connection is stable and firm, the manufacturing is simple, convenient and quick, a supporting cylinder 8 is installed above the welding block 7, an expansion link 9 is arranged above the support cylinder 8, a thick core spring 10 is arranged above the expansion link 9, a cross rod 11 is arranged above the thick core spring 10, the support cylinder 8 and the thick core spring 10 form an elastic structure through the expansion link 9, the central line of the support cylinder 8 and the central line of the expansion link 9 are superposed with each other, under the mutual matching of the support cylinder 8 and the expansion link 9, the length of the set equipment can be matched according to the actual requirement of a user, and the equipment can play a role of shock absorption when being violently vibrated under the action of the thick core spring 10, so that the damage to the equipment is reduced, the property loss of the user is reduced, a threaded semi-ring 12 is arranged outside the cross rod 11, a fixing bolt 13 is connected to the outer side of the threaded semi-ring 12, a bolt group plate 14 is connected to the outer side of the cross rod 11 through a thread, a hanger rod 15 is arranged below the bolt group plate 14, the cross rod 11 and the threaded semi-ring 12 form a detachable structure through the fixing bolt 13 and the bolt group plate 14, the structure is convenient to disassemble and has a multi-section assembling effect, the threaded semi-ring 12 and the fixing bolt 13 can be stably fixed and quickly disassembled under the mutual matching of the threaded semi-ring 12 and the fixing bolt 13, so that the time of a user is saved, the equipment can have a function of supporting a heavy pipeline due to the large number of the bolt group plates 14, the practicability is good, the horizontal rail strip 16 is installed below the suspender 15, the slider 17 is installed inside the horizontal rail strip 16, the pulley 18 is arranged outside the slider 17, the steel bar 19 is arranged below the horizontal rail strip 16, the fixing block 20 is arranged on one side of the steel bar 19, the horizontal rail strip 16 and the slider 17 form a sliding structure with the steel bar 19 through the pulley 18, and the horizontal rail strip 16 and the steel bar 19 are perpendicular to each other, can set up slider 17 in horizontal track strip 16's inside and can cooperate upper pulley 18 to make the round trip's that equipment can be freely removal, but convenience of customers dismantles the pipeline, and can alleviate user's physical demands when pressing from both sides tight pipeline, play laborsaving effect, and slider 17 can be stable under mutually supporting of billet 19 hang up equipment, the damage of vibration to equipment is difficult for taking place, one side of fixed block 20 is provided with half ring cover 21, and bolt 22 is installed in the outside of half ring cover 21, and the outside threaded connection of bolt 22 has movable nut 23, the internally mounted of half ring cover 21 has waterproof rubber 24.
The working principle is as follows: the use method of the water conservancy pipeline fixing structure comprises the steps that firstly, workers can lay and build reinforcing steel bars 2, iron wire binding rings 3 are used for fixing the reinforcing steel bars, concrete 1 is filled outside the reinforcing steel bars, after the reinforcing steel bars are solidified, a base 4 is placed, a fitting block 5 is arranged, steel plates 6 are placed outside the base, a welding block 7 is welded to fix a supporting cylinder 8, the length of a telescopic rod 9 can be set according to actual requirements, a cross rod 11 can be supported by using a thick core spring 10, the effect of reducing vibration can be achieved when equipment vibrates, a threaded semi-ring 12 can be matched with a fixing bolt 13 to achieve the effect of disassembling the equipment, a hanging rod 15 can be matched with a bolt group plate 14 to achieve fixed lifting, the hanging rod 15 can be used for supporting and lifting a horizontal track strip 16, a sliding block 17 is arranged inside the horizontal track strip 16, and the operation distance of the equipment can be flexibly adjusted by matching with an upper pulley 18, can fix slider 17 cooperation upper steel bar 19, usable billet 19 cooperation upper fixed block 20 can connect first half ring cover 21, and half ring cover 21's the outside can set up bolt 22 and utilize movable nut 23 to dismantle and fix, and convenience of customers dismantles, sets up waterproof rubber 24 in half ring cover 21's inboard and can play waterproof and absorbing effect, has avoided wearing and tearing.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a water conservancy pipeline fixed knot constructs, includes concrete (1) and base (4), its characterized in that: the concrete is characterized in that reinforcing steel bars (2) are installed inside the concrete (1), iron wire binding rings (3) are arranged on the outer sides of the reinforcing steel bars (2), the base (4) is arranged above the concrete (1), a binding block (5) is bound on the upper side of the base (4), a steel plate (6) is installed on the upper side of the binding block (5), a welding block (7) is arranged on the upper side of the steel plate (6), a supporting cylinder (8) is installed on the upper side of the welding block (7), a telescopic rod (9) is arranged on the upper side of the supporting cylinder (8), a thick core spring (10) is arranged on the upper side of the telescopic rod (9), a cross rod (11) is installed on the upper side of the thick core spring (10), thread semi-rings (12) are arranged outside the cross rod (11), a fixing bolt (13) is connected on the outer side of the thread semi-rings (12), and a bolt group plate (14) is connected on the outer side thread of the cross rod (11), and jib (15) are installed to the below of bolt group board (14), horizontal track strip (16) are installed to the below of jib (15), and the internally mounted of horizontal track strip (16) has slider (17) to the outside of slider (17) is provided with pulley (18), the below of horizontal track strip (16) is provided with billet (19), and one side of billet (19) is provided with fixed block (20), one side of fixed block (20) is provided with half ring cover (21), and the outside of half ring cover (21) installs bolt (22) to the outside threaded connection of bolt (22) has movable nut (23), the internally mounted of half ring cover (21) has waterproof rubber (24).
2. The water conservancy pipeline fixed knot of claim 1 constructs, characterized in that: concrete (1) constitutes the steel-concrete structure through reinforcing bar (2) and iron wire binder ring (3), and closely laminates between the inboard of concrete (1) and the outside of reinforcing bar (2).
3. The water conservancy pipeline fixed knot of claim 1 constructs, characterized in that: the base (4) and the attaching block (5) form an integrated structure through a steel plate (6) and a welding block (7), and the steel plate (6) and the welding block (7) are parallel to each other.
4. The water conservancy pipeline fixed knot of claim 1 constructs, characterized in that: the supporting cylinder (8) and the thick-core spring (10) form an elastic structure through the telescopic rod (9), and the central line of the supporting cylinder (8) and the central line of the telescopic rod (9) are overlapped.
5. The water conservancy pipeline fixed knot of claim 1 constructs, characterized in that: the cross rod (11) and the threaded semi-rings (12) form a detachable structure through the fixing bolts (13) and the bolt group plates (14), the threaded semi-rings (12) and the fixing bolts (13) are symmetrical about the central axis of the cross rod (11), and the fixing bolts (13) and the bolt group plates (14) are parallel to each other.
6. The water conservancy pipeline fixed knot of claim 1 constructs, characterized in that: the horizontal track strip (16) and the sliding block (17) form a sliding structure through a pulley (18) and a steel strip (19), and the horizontal track strip (16) and the steel strip (19) are perpendicular to each other.
CN202023063136.7U 2020-12-17 2020-12-17 Water conservancy pipeline fixed knot constructs Active CN214579664U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023063136.7U CN214579664U (en) 2020-12-17 2020-12-17 Water conservancy pipeline fixed knot constructs

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023063136.7U CN214579664U (en) 2020-12-17 2020-12-17 Water conservancy pipeline fixed knot constructs

Publications (1)

Publication Number Publication Date
CN214579664U true CN214579664U (en) 2021-11-02

Family

ID=78365036

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023063136.7U Active CN214579664U (en) 2020-12-17 2020-12-17 Water conservancy pipeline fixed knot constructs

Country Status (1)

Country Link
CN (1) CN214579664U (en)

Similar Documents

Publication Publication Date Title
CN201766314U (en) Insulator replacing tool
CN205777482U (en) A kind of back cord formula aluminum alloy mould plate
CN214579664U (en) Water conservancy pipeline fixed knot constructs
CN203715054U (en) 3,000t combinable lifting balance beam
CN203624808U (en) Detachable steel structure hanger
CN210710345U (en) Fixing clamp for flange stamping
CN213176282U (en) Hydraulic maintenance support rod device for bucket-wheel stacker-reclaimer
CN209413275U (en) A kind of foldable dismountable feet hand cradle of suspension type
CN210127045U (en) Movable hanging bracket for offshore platform
CN209233289U (en) A kind of 400V circuit breaker for switchboard service kit vehicle
CN220002785U (en) Iron tower operation protector
CN2441005Y (en) Load-transferred energy saving supporting/hanging stand
CN212297950U (en) Novel hoisting piece and hanging bracket
CN206693473U (en) Assembled open-type building bottom plate purlin substitutes erection support and mounting assembly
CN209177845U (en) A kind of beam type lift up rapidly device
CN215410556U (en) Rectangular air duct rigid hanging bracket
CN209163423U (en) Clasp type skirting board
CN203113340U (en) Dam body lifting pouring construction safety platform capable of being assembled
CN203499273U (en) Tube truss structure upper chord lifting fixed-point device
CN218708512U (en) Plate chain type suspender structure
CN219728835U (en) Steel bar disc round buttress
CN213596808U (en) Suspended maintenance platform at bottom of steel structure beam
CN202729561U (en) Universal flexible multifunctional suspensory rigging
CN218595299U (en) Novel belt clamping device
CN109398453B (en) Pipeline handling device for water utilization

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant