Prior art keywords
barrel
cylinder
series connection
pump station
filter screen
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202023175570.4U
Other languages
Chinese (zh)
Inventor
沈明
杜富强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Shanghai Kelei Fluid Automatic Control Equipment Manufacturing Co ltd
Original Assignee
Shanghai Kelei Fluid Automatic Control Equipment Manufacturing Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Shanghai Kelei Fluid Automatic Control Equipment Manufacturing Co ltd filed Critical Shanghai Kelei Fluid Automatic Control Equipment Manufacturing Co ltd
Priority to CN202023175570.4U priority Critical patent/CN214574552U/en
Application granted granted Critical
Publication of CN214574552U publication Critical patent/CN214574552U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Structures Of Non-Positive Displacement Pumps (AREA)

Abstract

The utility model discloses a prevent blockking up prefabricated pump station of two pit shafts series connection, concretely relates to prefabricated pump station technical field, including base, first barrel, second barrel, immersible pump and control box, first barrel inside is equipped with the water receiving tank, the fixed spiral pipeline that is equipped with of water receiving tank bottom, first barrel inside is equipped with crushing grid, the fixed inlet tube that is equipped with of first barrel opposite side, the standing groove has been seted up to the inlet tube other end, the inside connecting block that is equipped with of standing groove, the fixed filter screen that is equipped with in connecting block one side. The utility model discloses a set up the convenient filter screen of dismantling, can filter sewage, avoided the condition emergence of bold flotage and gravel jam and damage immersible pump, prolonged the life of immersible pump, and dismantle the comparatively convenient and fast of clearance filter material, through establishing the inlet tube on first barrel, avoided the condition emergence of rivers impact immersible pump.

Description

Prevent blockking up prefabricated pump station of twin-well section of thick bamboo series connection
Technical Field
The embodiment of the utility model provides a relate to prefabricated pump station technical field, concretely relates to prevent blockking up prefabricated pump station of twin-well section of thick bamboo series connection.
Background
The prefabricated pump station is an integrated product integrating a submersible pump, pump station equipment, decontamination grid equipment, a control system and a remote monitoring system. The prefabricated pump station has the characteristics of flexibility, short construction period and simple and convenient installation. At present, the method becomes a new pump station construction development trend in the domestic municipal industry.
The easy sand and stone soil sediment or the suspended solid of aquatic of being easy when the work is taken water of water pump in the prefabricated pump station of current blocks up, influences the water pump and uses and lead to damaging even, has reduced the life of water pump, and the rivers are great from the impact force when falling into the barrel bottom in the inlet tube, and direct impact also causes the damage of water pump easily to the water pump.
SUMMERY OF THE UTILITY MODEL
Therefore, the embodiment of the utility model provides a prevent blockking up prefabricated pump station of twin-well section of thick bamboo series connection, through setting up the filter screen of convenient dismantlement, can filter sewage, the condition of having avoided bold flotage and gravel to block up and damage the immersible pump takes place, the life of immersible pump has been prolonged, and dismantle the clearance and filter comparatively convenient and fast of thing, through establishing the inlet tube on first barrel, the condition of having avoided the rivers impact immersible pump takes place, with solve among the prior art because the water pump in the prefabricated pump station is blockked up to lead to influencing the water pump to use or lead to damaging by the suspended solid of gravel and sand soil sediment or the aquatic of aquatic when the work is pumped water, the life of water pump has been reduced, and the impact force is great when rivers fall into the barrel bottom from the inlet tube, direct impact also causes the problem of the damage of water pump easily.
In order to achieve the above object, the embodiment of the present invention provides the following technical solutions: an anti-blocking double-well-cylinder series prefabricated pump station comprises a base, a first cylinder, a second cylinder, a submersible pump and a control box, wherein the first cylinder and the second cylinder are fixedly arranged on the top end of the base, the second cylinder is fixedly arranged on one side of the first cylinder, the submersible pump is arranged at the bottom end inside the second cylinder, the control box is fixedly arranged on the inner wall of the second cylinder, a water receiving tank is arranged inside the first cylinder, the outer end of the water receiving tank is fixedly connected with the inner wall of the first cylinder, a spiral pipeline is fixedly arranged at the bottom end of the water receiving tank, one end of the spiral pipeline penetrates through the bottom end of the water receiving tank and is communicated with the inside of the water receiving tank, a crushing grid is arranged inside the first cylinder, the outer end of the crushing grid is fixedly connected with the inner wall of the first cylinder, the crushing grid is arranged at the bottom of the spiral pipeline, an inlet pipe is fixedly arranged at the other side of the first cylinder, one end of the inlet pipe penetrates through the other side of the first cylinder and is communicated with the inner wall of the first cylinder, the standing groove has been seted up to the inlet tube other end, the inside connecting block that is equipped with of standing groove, the fixed filter screen that is equipped with in connecting block one side, the filter screen outer end contacts with the inlet tube inner wall, inside filter screen one end extended into first barrel, the filter screen was established at the water receiving tank top.
Further, first intercommunication mouth has been seted up to first barrel bottom one side, first intercommunication mouth is established in crushing grid bottom, second barrel bottom one side has been seted up the second intercommunication mouth, the second intercommunication mouth is established in first intercommunication mouth one side and is linked together with first intercommunication mouth.
Furthermore, a water outlet pipe is fixedly arranged at the water outlet end of the submersible pump, one end of the water outlet pipe penetrates through the other side of the second cylinder and extends to the outside of the second cylinder, and a valve is fixedly arranged on the water outlet pipe.
Further, the inside workstation that is equipped with of second barrel, the workstation is established between immersible pump and control box, workstation outer end and second barrel inner wall fixed connection, the workstation is passed to outlet pipe one end.
Further, a liquid level meter is fixedly arranged at the bottom end of the workbench and is arranged on one side of the water outlet pipe, and the liquid level meter is arranged on one side of the submersible pump.
Furthermore, a crawling ladder is fixedly arranged on the inner wall of the second barrel and arranged at the top end of the workbench, the crawling ladder is arranged on one side of the water outlet pipe, and the crawling ladder is arranged on one side of the control box.
Furthermore, a vent is formed in the other side of the second cylinder, and a ventilation fan is fixedly arranged in the vent.
Furthermore, the top end of the second cylinder body is provided with a cover plate, and one side of the cover plate is connected with the top end of the second cylinder body through a hinge.
The embodiment of the utility model provides a have following advantage:
1. the utility model discloses a filter screen filters the sewage that gets into first barrel, when the filter cake of filter screen inside is more, pull out the connecting block from the standing groove, the connecting block area filter screen breaks away from first barrel inside and inlet tube, then clear up the filter cake of filter screen inside, compared with the prior art, can filter sewage, avoided the condition emergence that the immersible pump is blockked up and damaged to bulky floater and grit, the life of immersible pump has been prolonged, and dismantle the filter cake of clearing up comparatively convenient and fast, through setting up the inlet tube on first barrel, the condition emergence of the immersible pump has been avoided rivers impact;
2. the utility model discloses a water receiving tank and helical pipeline again get into crushing grid after unloading power to the sewage that gets into, the little suspended solid that flows out in the follow filter screen etc. can be smashed by crushing grid, and sewage flows into the inside of second barrel after first intercommunication mouth and second intercommunication mouth, compares with prior art, has reduced rivers to the impulsive force of smashing the grid, has prolonged the life of smashing the grid.
Drawings
In order to more clearly illustrate the embodiments of the present invention or the technical solutions in the prior art, the drawings used in the description of the embodiments or the prior art will be briefly described below. It should be apparent that the drawings in the following description are merely exemplary, and that other embodiments can be derived from the drawings provided by those of ordinary skill in the art without inventive effort.
The structure, ratio, size and the like shown in the present specification are only used for matching with the content disclosed in the specification, so as to be known and read by people familiar with the technology, and are not used for limiting the limit conditions which can be implemented by the present invention, so that the present invention has no technical essential significance, and any structure modification, ratio relationship change or size adjustment should still fall within the scope which can be covered by the technical content disclosed by the present invention without affecting the efficacy and the achievable purpose of the present invention.
Fig. 1 is a schematic view of the overall structure provided by the present invention;
fig. 2 is a schematic view of the overall top cross-sectional structure provided by the present invention;
fig. 3 is an enlarged schematic structural diagram of a in fig. 1 according to the present invention;
fig. 4 is an enlarged schematic structural diagram of B in fig. 1 according to the present invention;
in the figure: the device comprises a base 1, a first barrel 2, a second barrel 3, a submersible pump 4, a control box 5, a water receiving tank 6, a spiral pipeline 7, a crushing grating 8, a water inlet pipe 9, a placing groove 10, a connecting block 11, a filter screen 12, a first communication port 13, a second communication port 14, a water outlet pipe 15, a workbench 16, a liquid level meter 17, a ladder 18, a ventilation port 19, a ventilation fan 20 and a cover plate 21.
Detailed Description
The present invention is described in terms of specific embodiments, and other advantages and benefits of the present invention will become apparent to those skilled in the art from the following disclosure. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to the attached drawings 1-4 of the specification, the anti-clogging double-well-cylinder series prefabricated pump station comprises a base 1, a first cylinder 2, a second cylinder 3, a submersible pump 4 and a control box 5, wherein the first cylinder 2 and the second cylinder 3 are both fixedly arranged at the top end of the base 1, the second cylinder 3 is fixedly arranged at one side of the first cylinder 2, the submersible pump 4 is arranged at the bottom end inside the second cylinder 3, the control box 5 is fixedly arranged on the inner wall of the second cylinder 3, a water receiving tank 6 is arranged inside the first cylinder 2, the outer end of the water receiving tank 6 is fixedly connected with the inner wall of the first cylinder 2, a spiral pipeline 7 is fixedly arranged at the bottom end of the water receiving tank 6, one end of the spiral pipeline 7 penetrates through the bottom end of the water receiving tank 6 and is communicated with the inside of the water receiving tank 6, a crushing grid 8 is arranged inside the first cylinder 2, the outer end of the crushing grid 8 is fixedly connected with the inner wall of the first cylinder 2, smash grid 8 and establish in 7 bottoms of helical piping, the fixed inlet tube 9 that is equipped with of 2 opposite sides of first barrel, inlet tube 9 one end is passed 2 opposite sides of first barrel and is linked together with 2 insides of first barrel, standing groove 10 has been seted up to the inlet tube 9 other end, the inside connecting block 11 that is equipped with of standing groove 10, the fixed filter screen 12 that is equipped with in connecting block 11 one side, filter screen 12 outer end contacts with the inner wall of inlet tube 9, inside filter screen 12 one end extended into 2 of first barrel, filter screen 12 was established at 6 tops of water receiving tank.
Further, first intercommunication mouth 13 has been seted up to 2 bottom one sides of first barrel, first intercommunication mouth 13 is established in 8 bottoms of crushing grid, second intercommunication mouth 14 has been seted up to 3 bottom one sides of second barrel, second intercommunication mouth 14 is established in first intercommunication mouth 13 one side and is linked together with first intercommunication mouth 13, and the water that is convenient for 2 inside first barrels flows into inside the second barrel 3.
Furthermore, the outlet end of the submersible pump 4 is fixedly provided with an outlet pipe 15, one end of the outlet pipe 15 penetrates through the other side of the second cylinder 3 and extends to the outside of the second cylinder 3, and the outlet pipe 15 is fixedly provided with a valve for facilitating the discharge of sewage into the second cylinder 3.
Further, the inside workstation 16 that is equipped with of second barrel 3, workstation 16 establishes between immersible pump 4 and control box 5, 16 outer ends of workstation and the 3 inner wall fixed connection of second barrel, workstation 16 is passed to outlet pipe 15 one end, the maintenance control box 5 of being convenient for.
Further, 16 bottom mounting of workstation is equipped with level gauge 17, level gauge 17 establishes in outlet pipe 15 one side, level gauge 17 establishes in immersible pump 4 one side, is convenient for monitor the liquid level.
Furthermore, a ladder 18 is fixedly arranged on the inner wall of the second cylinder 3, the ladder 18 is arranged at the top end of the workbench 16, the ladder 18 is arranged on one side of the water outlet pipe 15, and the ladder 18 is arranged on one side of the control box 5, so that the second cylinder 3 can conveniently enter and exit.
Furthermore, a vent 19 is formed in the other side of the second cylinder 3, and a ventilation fan 20 is fixedly arranged inside the vent 19, so that the inside of the second cylinder 3 can be ventilated conveniently.
Further, the top end of the second cylinder body 3 is provided with a cover plate 21, and one side of the cover plate 21 is connected with the top end of the second cylinder body 3 through a hinge, so that people can conveniently enter and exit.
The implementation scenario is specifically as follows: sewage enters the first cylinder 2 from the water inlet pipe 9, falls into the water receiving tank 6 after being preliminarily filtered by the filter screen 12, then enters the crushing grid 8 through the spiral pipeline 7, small suspended matters and the like flowing out of the filter screen 12 can be crushed by the crushing grid 8, the sewage flows into the second cylinder 3 through the first communicating port 13 and the second communicating port 14, then the submersible pump 4 is started, the sewage enters the submersible pump 4 from the second cylinder 3, and then is discharged out of the second cylinder 3 through the water outlet pipe 15, when more filtered matters are in the filter screen 12, the connecting block 11 is pulled out of the placing groove 10, the connecting block 11 drives the filter screen 12 to be separated from the first cylinder 2 and the water inlet pipe 9, and then the filtered matters in the filter screen 12 are cleaned and then put back to the original position, the utility model discloses a filter screen 12 which is convenient to disassemble can be used for filtering sewage, the condition of having avoided bold flotage and grit to block up and damage immersible pump 4 takes place, the life of immersible pump 4 has been prolonged, and dismantle the clearance and filter the thing comparatively convenient and fast that crosses, through establishing inlet tube 9 on first barrel 2, the condition of having avoided rivers to strike immersible pump 4 takes place, through setting up water receiving tank 6 and helical pipeline 7, the impulsive force of rivers to smashing grid 8 has been reduced, the life of smashing grid 8 has been prolonged, this embodiment has specifically solved among the prior art water pump in the prefabricated pump station easy when the work is pumped up be blocked by the grit soil sediment of aquatic or the suspended solid in the aquatic, influence the water pump use and lead to damaging even, the life of water pump has been reduced, and the impact force is great when rivers fall into the barrel bottom from the inlet tube, direct impact also causes the problem of the damage of water pump easily to the water pump.
Although the invention has been described in detail with respect to the general description and the specific embodiments, it will be apparent to those skilled in the art that modifications and improvements can be made based on the invention. Therefore, such modifications and improvements are intended to be within the scope of the invention as claimed.

Claims (8)

1. The utility model provides a prevent blockking up prefabricated pump station of twin-well section of thick bamboo series connection, includes base (1), first barrel (2), second barrel (3), immersible pump (4) and control box (5), first barrel (2) and second barrel (3) are all fixed to be established on base (1) top, second barrel (3) are fixed to be established in first barrel (2) one side, immersible pump (4) are established in the inside bottom of second barrel (3), control box (5) are fixed to be established on second barrel (3) inner wall, its characterized in that: a water receiving groove (6) is arranged in the first barrel (2), the outer end of the water receiving groove (6) is fixedly connected with the inner wall of the first barrel (2), a spiral pipeline (7) is fixedly arranged at the bottom end of the water receiving groove (6), one end of the spiral pipeline (7) penetrates through the bottom end of the water receiving groove (6) and is communicated with the inside of the water receiving groove (6), a crushing grating (8) is arranged in the first barrel (2), the outer end of the crushing grating (8) is fixedly connected with the inner wall of the first barrel (2), the crushing grating (8) is arranged at the bottom of the spiral pipeline (7), a water inlet pipe (9) is fixedly arranged at the other side of the first barrel (2), one end of the water inlet pipe (9) penetrates through the other side of the first barrel (2) and is communicated with the inside of the first barrel (2), a placing groove (10) is formed in the other end of the water inlet pipe (9), and a connecting block (11) is arranged in the placing groove (10), connecting block (11) one side is fixed and is equipped with filter screen (12), filter screen (12) outer end contacts with inlet tube (9) inner wall, filter screen (12) one end extends into inside first barrel (2), establish at water receiving tank (6) top filter screen (12).
2. The anti-clogging double-well-cylinder series connection prefabricated pump station according to claim 1, characterized in that: first intercommunication mouth (13) have been seted up to first barrel (2) bottom one side, establish in crushing grid (8) bottom first intercommunication mouth (13), second intercommunication mouth (14) have been seted up to second barrel (3) bottom one side, second intercommunication mouth (14) are established in first intercommunication mouth (13) one side and are linked together with first intercommunication mouth (13).
3. The anti-clogging double-well-cylinder series connection prefabricated pump station according to claim 1, characterized in that: the water outlet end of the submersible pump (4) is fixedly provided with a water outlet pipe (15), one end of the water outlet pipe (15) penetrates through the other side of the second barrel body (3) and extends to the outside of the second barrel body (3), and a valve is fixedly arranged on the water outlet pipe (15).
4. The anti-clogging double-well-cylinder series connection prefabricated pump station according to claim 3, characterized in that: the utility model discloses a submersible pump, including second barrel (3), second barrel (3) inside is equipped with workstation (16), establish between immersible pump (4) and control box (5) workstation (16), workstation (16) outer end and second barrel (3) inner wall fixed connection, workstation (16) are passed to outlet pipe (15) one end.
5. The anti-clogging double-well-cylinder series connection prefabricated pump station according to claim 4, characterized in that: workstation (16) bottom mounting is equipped with level gauge (17), establish in outlet pipe (15) one side level gauge (17), immersible pump (4) one side is established in level gauge (17).
6. The anti-clogging double-well-cylinder series connection prefabricated pump station according to claim 4, characterized in that: a ladder (18) is fixedly arranged on the inner wall of the second barrel (3), the ladder (18) is arranged at the top end of the workbench (16), the ladder (18) is arranged on one side of the water outlet pipe (15), and the ladder (18) is arranged on one side of the control box (5).
7. The anti-clogging double-well-cylinder series connection prefabricated pump station according to claim 1, characterized in that: the other side of the second cylinder (3) is provided with a ventilation opening (19), and a ventilation fan (20) is fixedly arranged in the ventilation opening (19).
8. The anti-clogging double-well-cylinder series connection prefabricated pump station according to claim 1, characterized in that: the top end of the second cylinder body (3) is provided with a cover plate (21), and one side of the cover plate (21) is connected with the top end of the second cylinder body (3) through a hinge.
CN202023175570.4U 2020-12-25 2020-12-25 Prevent blockking up prefabricated pump station of twin-well section of thick bamboo series connection Expired - Fee Related CN214574552U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023175570.4U CN214574552U (en) 2020-12-25 2020-12-25 Prevent blockking up prefabricated pump station of twin-well section of thick bamboo series connection

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023175570.4U CN214574552U (en) 2020-12-25 2020-12-25 Prevent blockking up prefabricated pump station of twin-well section of thick bamboo series connection

Publications (1)

Publication Number Publication Date
CN214574552U true CN214574552U (en) 2021-11-02

Family

ID=78366108

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023175570.4U Expired - Fee Related CN214574552U (en) 2020-12-25 2020-12-25 Prevent blockking up prefabricated pump station of twin-well section of thick bamboo series connection

Country Status (1)

Country Link
CN (1) CN214574552U (en)

Similar Documents

Publication Publication Date Title
CN209144975U (en) A kind of automatic elimination sludgd deposition device of prefabricated integrated pump station
CN205954812U (en) Rainwater drainage pumping station structure
CN214574552U (en) Prevent blockking up prefabricated pump station of twin-well section of thick bamboo series connection
CN211200620U (en) Dry-wet separation type integrated intelligent intercepting well
CN208934945U (en) A kind of Submersible Pump filter device
CN211080520U (en) Anti-sedimentation-silting sewage pump station
CN214551509U (en) Intelligence thing networking integration pump station water quality testing filter equipment
CN211536663U (en) Sedimentation tank waste fitting discharging for industrial sewage treatment
CN210419306U (en) High-efficient integration sewage treatment complete sets
CN206027219U (en) Filter for flowmeter
CN219471183U (en) Drainage device for building engineering
CN212866282U (en) Novel optimize prefabricated pump station
CN105130155A (en) Vehicle-mounted swinging annular-sheet type sludge processing apparatus
CN217759169U (en) Anti-blocking basement drainage device
CN214551578U (en) Large-aperture pipeline filter
CN217080755U (en) Water pump capable of automatically isolating and collecting precipitated silt
CN2664756Y (en) Dismantle-free filter
CN220572867U (en) Two-stage filtering dirt recovery type full-automatic water filter
CN108729538B (en) Sewage lifting device convenient to maintain
CN211665906U (en) Integrated sewage lifting device
CN211328325U (en) Sewage solid impurity treatment device
CN214738671U (en) High-efficient back flush sewage hoisting device
CN217578485U (en) Electroplating effluent retrieves and uses environmental protection treatment facility
CN213416542U (en) Integrated water plant purification treatment equipment
CN221218861U (en) Water guide device for foundation pit construction