CN214554089U - Building rubbish recovery processing device for green building construction - Google Patents

Building rubbish recovery processing device for green building construction Download PDF

Info

Publication number
CN214554089U
CN214554089U CN202022650039.1U CN202022650039U CN214554089U CN 214554089 U CN214554089 U CN 214554089U CN 202022650039 U CN202022650039 U CN 202022650039U CN 214554089 U CN214554089 U CN 214554089U
Authority
CN
China
Prior art keywords
dust
construction waste
construction
crushing roller
guide plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022650039.1U
Other languages
Chinese (zh)
Inventor
孔令峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202022650039.1U priority Critical patent/CN214554089U/en
Application granted granted Critical
Publication of CN214554089U publication Critical patent/CN214554089U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Processing Of Solid Wastes (AREA)

Abstract

The utility model relates to a construction waste retrieves technical field, and discloses a green construction waste recovery processing device for construction, which comprises a housin, the top of casing is equipped with the feed inlet, the bottom of feed inlet is equipped with cuts the cutting roller, the bottom of cutting the cutting roller is equipped with crushing roller, the bottom of crushing roller is equipped with deflector one, the top fixedly connected with air plate of deflector one, the bottom of deflector one is equipped with crushing roller two. The utility model discloses a dust removal motor work, with the leading-in dust collecting tube of dust particle, the dust removal sack carries out filtration treatment to the dust particle, and atomizes through atomizer and subsides to the deposition incasement portion a small amount of dust particles that do not carry out the filtration, has avoided when retrieving building rubbish, and inside the dust particle passed through feed inlet eduction gear, caused the pollution to the environment to the healthy condition that causes the damage of technical staff appears.

Description

Building rubbish recovery processing device for green building construction
Technical Field
The utility model relates to a construction waste retrieves technical field, specifically is a green construction waste recovery processing device for construction.
Background
The green building means that resources are saved to the maximum extent in the whole life cycle of the building, the green building comprises energy conservation, land conservation, water conservation, material conservation and the like, the environment is protected, the pollution is reduced, a healthy, comfortable and efficient use space is provided for people, the green building coexists with the nature harmoniously, the building construction means production activities in the engineering construction implementation stage, and the green building is the construction process of various buildings.
Present green building construction equipment is when carrying out recovery processing to construction waste, crushing simple structure, crushing effect is poor, it is big to lead to construction waste to smash the not thorough recycle degree of difficulty, and the large-scale piece card of appearing constructing easily dies inside the device gap, the condition that leads to the unable normal work of device crushing roller appears, when carrying out the shredding processing to construction waste, can appear a large amount of dusts and pass through device top feed inlet discharge, cause the dust pollution to the environment, the dust is through breathing leading-in human lung, cause the damage to technical staff's health, for this reason, we release a green building construction and use building waste recovery processing device.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art, the utility model provides a green construction is with construction waste recovery processing device possesses smashes thorough advantage, has solved construction waste and has smashed the big problem of the not thorough recovery degree of difficulty, possesses the advantage of avoiding the dust to splash, has solved and has smashed the in-process dust and derive the problem that influences technical staff healthy through the feed inlet.
The utility model provides a following technical scheme: a building garbage recycling device for green building construction comprises a shell, wherein a feeding hole is formed in the top of the shell, a cutting roller is arranged at the bottom of the feeding hole, a crushing roller is arranged at the bottom of the cutting roller, a first guide plate is arranged at the bottom of the crushing roller, an air vent plate is fixedly connected to the top of the first guide plate, a second crushing roller is arranged at the bottom of the first guide plate, a plurality of first crushing rollers are arranged on the right side of the bottom of the shell, a plurality of second guide plates are arranged on the right side of the bottom of an inner cavity of the shell, the second guide plates are attached to the surface of the first crushing roller, a confluence plate is fixedly mounted on the right side of the bottom of the inner cavity of the shell and is positioned below the second guide plates, a dust collecting pipe is arranged at the bottom of the air vent plate, a water storage tank is fixedly mounted on the left side of the shell, a liquid through pipe is arranged at the bottom of the water storage tank, and an atomization nozzle is fixedly connected to the bottom of the shell, the bottom of the atomizing nozzle is provided with a dust collecting box, a dust collecting bag is arranged inside the dust collecting pipe, a dust removing fan is arranged on the left side of the dust collecting bag, a closed cover is arranged at the top of the dust collecting bag, and a central rotating shaft is arranged on the left side of the closed cover.
Preferably, the surface of the cutting roller is provided with cutting blades, and the cutting blades are uniformly arranged on the surface of the cutting roller.
Preferably, the second guide plate and the second crushing roller are arranged in a crossed manner, and a gap between the second crushing roller and the second guide plate is gradually reduced.
Preferably, the surface of the aeration plate is provided with circular apertures with the diameter of one centimeter, and the circular apertures are uniformly arranged on the top surface of the aeration plate at the same intervals.
Preferably, the inner wall of the bottom of the dust collecting pipe is provided with a flow limiting block, the flow limiting block is positioned on the right side of the dust removing cloth bag, and the inner wall of the bottom of the dust collecting pipe is fixedly connected with a semicircular pull ring.
Preferably, the bottom of the dust removal cloth bag is fixedly connected with an extension spring, the bottom of the extension spring is fixedly connected with a fixed hook, the fixed hook at the bottom of the dust removal cloth bag is clamped with a pull ring at the bottom of the dust collection pipe, and the top of the dust removal cloth bag is provided with a rectangular fixed pull handle.
Preferably, the inner wall of the closed cover is provided with a sealing ring, the sealing ring is elastic, the bottom of the closed cover is fixedly provided with a barb, and the barb is clamped with a rectangular pull handle at the top of the dust removal cloth bag.
Compared with the prior art, the utility model discloses possess following beneficial effect:
1. this green construction is with construction waste recovery processing device, through increasing cutting roller, crushing roller, deflector two and cylinder manifold, once cut construction waste and handle, avoid the too big card of construction waste volume to die at crushing roller top, further shredding advancing construction waste through crushing roller, avoided current device structure too simple, it is poor to construction waste crushing effect, smash not thoroughly to it is big to lead to the construction waste recycle degree of difficulty.
2. This green building construction is with building rubbish recovery processing device, through increasing the breather plate, the dust-collecting tube, the water storage box, the dust removal sack, dust exhausting fan and atomizer, through dust removal motor work, drive and smash the inside dust particle of intracavity and pass through in the leading-in dust-collecting tube of breather plate surface air, the dust removal sack carries out filtration treatment to the dust particle, and atomize through atomizer and subside to the deposition incasement portion a small amount of dust particles that do not carry out the filtration, when having avoided retrieving building rubbish, the dust particle passes through inside the feed inlet eduction gear, cause the pollution to the environment, thereby the condition that causes the damage to technical staff health appears.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the bottom structure of the dust-collecting cloth bag of the present invention;
fig. 3 is a schematic diagram of the top structure of the dust removal cloth bag of the present invention.
In the figure: 1. a housing; 2. a feed inlet; 3. a cutting roller; 4. a crushing roller; 5. a first guide plate; 6. a breather plate; 7. a first crushing roller; 8. a bus bar; 9. a recovery chamber; 10. a dust collecting pipe; 11. a water storage tank; 12. A liquid pipe is communicated; 13. an atomizing spray head; 14. a dust removal fan; 15. a dust accumulation box; 16. a dust removal cloth bag; 17. A central rotating shaft; 18. closing the cover; 19. a second crushing roller; 20. and a second guide plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, a construction waste recycling device for green building construction comprises a housing 1, a feed inlet 2 is arranged at the top of the housing 1, a cutting roller 3 is arranged at the bottom of the feed inlet 2, cutting blades are arranged on the surface of the cutting roller 3 and are uniformly arranged on the surface of the cutting roller 3, the cutting blades are additionally arranged on the surface of the cutting roller 3 and rotate through the cutting roller 3 to cut the surface of the construction waste, so that the construction waste is prevented from being too large in size and being incapable of being crushed by a crushing roller 4, the construction waste is prevented from being stuck at the top of the crushing roller 4, the crushing roller 4 is arranged at the bottom of the cutting roller 3, a first guide plate 5 is arranged at the bottom of the crushing roller 4, a second guide plate 20 and a second crushing roller 19 are arranged in an intersecting manner, and a gap between the second crushing roller 19 and the second guide plate 20 is gradually reduced, so as to enhance the crushing effect on the construction waste, the volume of the dust collector is gradually reduced, the problem that the construction waste is too large and is mixed in a recovery chamber 9, the follow-up construction waste is difficult to recover and poor in crushing effect is solved, the top of a guide plate I5 is fixedly connected with an air vent plate 6, the surface of the air vent plate 6 is provided with a circular hole diameter of one centimeter, the circular hole diameters are uniformly arranged on the surface of the top of the air vent plate 6 at the same interval, the top of the air vent plate 6 is additionally provided with the circular hole diameter to communicate the inner space of a dust collecting pipe 10 with a crushing cavity, a dust removal fan 14 works to guide dust particles in the inner part of the crushing cavity into the dust collecting pipe 10, the dust particles are prevented from being discharged through a feed port 2 to cause dust pollution, and the health of technical personnel is affected, the bottom of the guide plate I5 is provided with a crushing roller II 19, the right side of the bottom of a shell 1 is provided with a plurality of crushing rollers I7, the right side of the bottom of the inner cavity of the shell 1 is provided with a plurality of guide plates II 20, the guide plate II 20 is attached to the surface of the crushing roller I7, the right side of the bottom of the inner cavity of the shell 1 is fixedly provided with a collecting plate 8, the collecting plate 8 is positioned below the guide plate II 20, the bottom of the collecting plate 8 is provided with a recovery chamber 9, the bottom of the vent plate 6 is provided with a dust collecting pipe 10, the inner wall of the bottom of the dust collecting pipe 10 is provided with a flow limiting block, the flow limiting block is positioned on the right side of the dust collecting cloth bag 16, the inner wall of the bottom of the dust collecting pipe 10 is fixedly connected with a semicircular pull ring, through the flow limiting block, the direct guiding out of the air flow carrying dust particles through the connection part of the dust collecting cloth bag 16 and the inner wall of the dust collecting pipe 10 is avoided, the dust adsorption effect cannot be achieved, through the additional flow limiting block, the normal filtering effect of the dust collecting cloth bag 16 is ensured, the left side of the shell 1 is fixedly provided with a water storage tank 11, the bottom of the water storage tank 11 is provided with a liquid through pipe 12, and the bottom of the liquid through pipe 12 is fixedly connected with an atomization nozzle 13, the bottom of the atomizing nozzle 13 is provided with a dust collecting box 15, the dust collecting bag 16 is arranged inside the dust collecting tube 10, the bottom of the dust collecting bag 16 is fixedly connected with an extension spring, the bottom of the extension spring is fixedly connected with a fixed hook, the bottom fixed hook of the dust collecting bag 16 is clamped with a pull ring at the bottom of the dust collecting tube 10, the top of the dust collecting bag 16 is provided with a rectangular fixed pull handle, the dust collecting bag 16 can be reused, when the adsorption effect of the dust collecting bag 16 is saturated, the closed cover 18 is opened, the rectangular pull block at the top of the dust collecting bag 16 drives the bottom extension spring to do work by stretching, after the closed cover 18 is opened, the barb at the bottom of the closed cover 18 and the rectangular pull handle at the top of the dust collecting bag 16 are disconnected, the dust collecting bag 16 is taken down and cleaned and replaced, the secondary use is convenient, the left side of the dust collecting bag 16 is provided with a dust collecting fan 14, the top of the dust removal cloth bag 16 is provided with a closed cover 18, the inner wall of the closed cover 18 is provided with a sealing ring, the sealing ring is elastic, the bottom of the closed cover 18 is fixedly provided with a barb, the barb is connected with the rectangular pull handle at the top of the dust removal cloth bag 16 in a clamping manner, the sealing ring is arranged, when the surface dust removal cloth bag 16 is filtered, the condition that air flow is led out through the gap between the closed cover 18 and the dust collection pipe 10 occurs, and the left side of the closed cover 18 is provided with a central rotating shaft 17.
The working principle is that the construction waste is led into the device through the feed inlet 2, the cutting roller 3 rotates, the cutting blade cuts the construction waste, the situation that the construction waste is too large in size and clamped at the top of the crushing rollers 4 is avoided, the two crushing rollers 4 rotate in an occluded mode to further crush the construction waste, the crushed construction waste is led into the recycling chamber 9 through the collecting plate 8 under the action of the plurality of crushing rollers 5 and is thoroughly crushed through the collecting plate 8 under the action of the plurality of crushing rollers 19, the purpose of facilitating recycling of the construction waste is achieved, the dust removal fan 14 works while crushing the construction waste, the surface aperture of the vent plate 6 is communicated with the crushing chamber and the dust collection pipe 10, dust particles generated when the crushing rollers 4 crush the construction waste are led into the dust collection pipe 10, the dust particles are filtered through the dust collection cloth bag 16 and are adsorbed inside the dust collection cloth bag 16, the atomizing spray head 13 is communicated with the water storage tank 11 through a liquid through pipe 12, and a small amount of discharged dust particles are atomized and settled and recovered through the dust accumulation box 15.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a green construction is with construction waste recovery processing device, includes casing (1), its characterized in that: the top of the shell (1) is provided with a feed inlet (2), the bottom of the feed inlet (2) is provided with a cutting roller (3), the bottom of the cutting roller (3) is provided with a crushing roller (4), the bottom of the crushing roller (4) is provided with a guide plate I (5), the top of the guide plate I (5) is fixedly connected with a vent plate (6), the bottom of the guide plate I (5) is provided with a crushing roller II (19), the right side of the bottom of the shell (1) is provided with a plurality of crushing rollers I (7), the right side of the bottom of the inner cavity of the shell (1) is provided with a plurality of guide plate II (20), the guide plate II (20) is attached to the surface of the crushing roller I (7), the right side of the bottom of the inner cavity of the shell (1) is fixedly provided with a bus plate (8), the bus plate (8) is positioned below the guide plate II (20), the bottom of the bus plate (8) is provided with a recovery chamber (9), the bottom of breather plate (6) is equipped with dust collecting tube (10), the left side fixed mounting of casing (1) has water storage box (11), the bottom of water storage box (11) is equipped with leads to liquid pipe (12), the bottom fixedly connected with atomizer (13) that leads to liquid pipe (12), the bottom of atomizer (13) is equipped with deposition case (15), the inside of dust collecting tube (10) is equipped with dust removal sack (16), the left side of dust removal sack (16) is equipped with dust exhausting fan (14), the top of dust removal sack (16) is equipped with closed lid (18), the left side of closed lid (18) is equipped with central pivot (17).
2. The construction waste recycling device for green building construction as claimed in claim 1, characterized in that: the surface of the cutting roller (3) is provided with cutting blades, and the cutting blades are uniformly arranged on the surface of the cutting roller (3).
3. The construction waste recycling device for green building construction as claimed in claim 1, characterized in that: the second guide plate (20) and the second crushing roller (19) are arranged in a crossed manner, and a gap between the second crushing roller (19) and the second guide plate (20) is gradually reduced.
4. The construction waste recycling device for green building construction as claimed in claim 1, characterized in that: the surface of the aeration plate (6) is provided with circular apertures with the diameter of one centimeter, and the circular apertures are arranged on the top surface of the aeration plate (6) uniformly and at the same interval.
5. The construction waste recycling device for green building construction as claimed in claim 1, characterized in that: the inner wall of the bottom of the dust collecting pipe (10) is provided with a flow limiting block, the flow limiting block is positioned on the right side of the dust removing cloth bag (16), and the inner wall of the bottom of the dust collecting pipe (10) is fixedly connected with a semicircular pull ring.
6. The construction waste recycling device for green building construction as claimed in claim 1, characterized in that: the bottom of the dust removal cloth bag (16) is fixedly connected with an extension spring, the bottom of the extension spring is fixedly connected with a fixed hook, the fixed hook at the bottom of the dust removal cloth bag (16) is clamped with a pull ring at the bottom of the dust collection pipe (10), and the top of the dust removal cloth bag (16) is provided with a rectangular fixed pull handle.
7. The construction waste recycling device for green building construction as claimed in claim 1, characterized in that: the inner wall of the closed cover (18) is provided with a sealing ring, the sealing ring is elastic, the bottom of the closed cover (18) is fixedly provided with a barb, and the barb is clamped with a rectangular pull handle at the top of the dust removal cloth bag (16).
CN202022650039.1U 2020-11-17 2020-11-17 Building rubbish recovery processing device for green building construction Active CN214554089U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022650039.1U CN214554089U (en) 2020-11-17 2020-11-17 Building rubbish recovery processing device for green building construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022650039.1U CN214554089U (en) 2020-11-17 2020-11-17 Building rubbish recovery processing device for green building construction

Publications (1)

Publication Number Publication Date
CN214554089U true CN214554089U (en) 2021-11-02

Family

ID=78324501

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022650039.1U Active CN214554089U (en) 2020-11-17 2020-11-17 Building rubbish recovery processing device for green building construction

Country Status (1)

Country Link
CN (1) CN214554089U (en)

Similar Documents

Publication Publication Date Title
CN214554089U (en) Building rubbish recovery processing device for green building construction
CN113941424A (en) A recovery processing equipment for old and useless lithium cell
CN210278711U (en) Waste gas collection device for chemical products
CN209901845U (en) Coal washer
CN216261202U (en) Aluminum ash environmental protection treatment facility
CN111974780A (en) Lithium battery crushed aggregate recovery equipment
CN212167722U (en) Environment-friendly smashing device for recycling and processing colored metal waste catalyst
CN209158676U (en) Resistance to scratch acrylic material preparation facilities
CN207654816U (en) A kind of restoration of the ecosystem liquid production exclusion device
CN218775767U (en) Blade cooling device is used in production of plate shearing machine blade
CN217368558U (en) Garbage recycling device for building construction
CN218748793U (en) Waste rubber crushing device
CN219898465U (en) Energy-saving white carbon black grinding treatment device
CN220992271U (en) Environment-friendly renewable resource smashing and processing equipment
CN220386035U (en) Raw material processing preprocessing device
CN215197269U (en) Environment-friendly machine for waste crushing
CN218531199U (en) Construction waste removing mechanism
CN215311184U (en) Dust collector of low carbon cement grinding equipment
CN220825199U (en) Waste material processing apparatus is used in mechanical equipment production
CN217747367U (en) Lithium cell processing is with quick reducing mechanism
CN219943107U (en) Reducing mechanism is used in essence raw materials processing
CN210679303U (en) Plastic product crushing device for other garbage
CN219210044U (en) Broken recovery unit of rubbish is built in room
CN214390518U (en) Waste recovery device is used in highway engineering construction
CN212240612U (en) Waste collecting and treating device for die machining