Prior art keywords
platform
construction operation
bottom plate
building construction
ceiling
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120092510.1U
Other languages
Chinese (zh)
Inventor
方俊杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Fu'an Construction Co Ltd
Original Assignee
Jiangsu Fu'an Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Fu'an Construction Co Ltd filed Critical Jiangsu Fu'an Construction Co Ltd
Priority to CN202120092510.1U priority Critical patent/CN214531797U/en
Application granted granted Critical
Publication of CN214531797U publication Critical patent/CN214531797U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model relates to a construction equipment technical field discloses a formula construction operation platform climbs outside building, and it includes bottom plate, platform, ceiling and the elevating system that drive platform goes up and down, the platform is located the bottom plate top, elevating system sets up between bottom plate and platform, the ceiling is erect in the platform top, the ceiling includes two roof, two the roof intersects and sets up along crossing top-down slope, the equal fixedly connected with curb plate in both sides of platform, the curb plate extends to the platform top, platform one end fixed connection is kept away from to the bottom and the curb plate of roof. This application has and stops and cushion high altitude whereabouts thing after, makes the whereabouts thing roll by oneself in order to reduce the load accumulation, reduces the effect that the platform sinks the risk.

Description

Climbing type building construction operation platform outside building
Technical Field
The application relates to the technical field of building construction equipment, in particular to an external climbing type building construction operation platform for a building.
Background
At present, need carry out high altitude construction during the building engineering construction usually, need use outside formula construction operation platform that climbs during high altitude construction, outside formula construction operation platform that climbs is one kind can replace traditional scaffold frame, possesses the novel aerial working equipment of vertical migration ability, can show improvement efficiency of construction, but current outside formula construction operation platform that climbs often does not do the protection or protects not in place to the object that falls from the height, can threaten operating personnel personal safety, there is certain potential safety hazard.
Notice No. CN209194969U discloses a formula construction operation platform climbs outside building, this operation platform includes the platform bottom plate, the first platform curb plate of one side fixedly connected with of platform bottom plate, the opposite side fixedly connected with second platform curb plate of platform bottom plate, one side fixedly connected with device casing of platform bottom plate, the inside of device casing is provided with the pneumatic cylinder, one side fixedly connected with hydraulic lifting rod of pneumatic cylinder, the one end fixedly connected with support frame of pneumatic cylinder is kept away from to the hydraulic lifting rod, one side level that hydraulic lifting rod was kept away from to the support frame is provided with shock attenuation casing.
In view of the above-mentioned related technologies, the inventor thinks that there is a defect that the high-altitude falling object remains on the damping shell after being buffered, and the load borne by the damping shell gradually increases with the accumulation of the falling object, which easily causes the platform to collapse.
SUMMERY OF THE UTILITY MODEL
In order to improve the defect that in the related art, a high-altitude falling object still remains on the damping shell after being buffered, and along with the accumulation of the falling object, the load borne by the damping shell is continuously increased, so that the platform is easily collapsed, the climbing type building construction operation platform for the outside of the building is provided.
The application provides a pair of formula building construction operation platform climbs outside building adopts following technical scheme to reachd:
the utility model provides an outside formula construction operation platform that climbs of building, includes bottom plate, platform, ceiling and the elevating system that drive platform goes up and down, the bottom plate is used for supporting subaerial, the platform is located the bottom plate top, elevating system sets up between bottom plate and platform, the ceiling is erect in the platform top, the ceiling includes two roof, two the roof intersects and sets up along crossing top-down slope, the equal fixedly connected with curb plate in both sides of platform, the curb plate extends to the platform top, platform one end fixed connection is kept away from to the bottom and the curb plate of roof.
Through above-mentioned technical scheme, constructor takes the platform, promotes the platform when elevating system and climbs appointed operation height after, constructor begins construction work, and when taking place the object that falls from the high altitude, the ceiling that the slope set up can block the object that falls, protects the constructor on the platform, then, the object that falls rolls along the inclined plane of roof, has reduced because of the object that falls piles up on the ceiling and leads to platform load overload and the risk that takes place to sink. During the rainy day operation, the ceiling keeps off the rain, can prevent platform ponding, reduces the electrified construction equipment of placing on the platform and meets the possibility of water short circuit.
Preferably: the platform is fixedly provided with a row of stand columns, a cross beam is arranged at the joint of the two top plates on one side of the top plates facing the platform, and one end, far away from the platform, of each stand column is fixedly connected with the cross beam.
Through the technical scheme, the supporting of the stand column and the cross beam to the top plate disperses the impact force applied to the top plate, and the stability of the ceiling structure is improved.
Preferably: and a metal net is arranged above the top plate, and a damping spring is fixedly arranged between the top plate and the metal net.
Through above-mentioned technical scheme, when taking place the high altitude drop thing, the drop thing falls on the metal mesh, and the spring provides the cushion effect, has played the cushioning effect to the drop thing, has increased the shock resistance of ceiling.
Preferably: the platform edge is equipped with the rail guard, the rail guard includes railing and protection network, railing fixed connection is on the platform, protection network fixed connection is in one side of railing towards the platform.
Through above-mentioned technical scheme, the railing not only can supply the fixed safety rope of constructor to use, can also block the constructor that the platform was stepped on out to the mistake, and the protection network plugs up the clearance between the railing, can block tool equipment from the platform that slides between the railing, has reduced the risk of occurence of failure.
Preferably: the lifting mechanism comprises a hydraulic cylinder and a folding lifter, the bottom ends of the hydraulic cylinder and the folding lifter are fixed on the bottom plate, the top ends of the hydraulic cylinder and the folding lifter are fixedly connected with the platform, and the hydraulic cylinder and the folding lifter are arranged in a staggered mode in the horizontal direction.
Through above-mentioned technical scheme, during construction operation, pneumatic cylinder and folding lift synchronous drive platform go up and down to support the platform jointly, be favorable to improving the stability that the platform goes up and down.
Preferably: the pneumatic cylinder includes cylinder body and hydraulic telescoping rod, the outside of cylinder body is equipped with a plurality of bracing pieces, the bracing piece slope sets up, just the one end that the pneumatic cylinder body was kept away from to the bracing piece supports subaerial.
Through above-mentioned technical scheme, when carrying out construction operation, a plurality of bracing pieces support the pneumatic cylinder jointly, support the stability of platform support through the pneumatic cylinder reinforcing.
Preferably: the one end that ground was kept away from to the bracing piece is articulated with the cylinder body of pneumatic cylinder, the one end that the pneumatic cylinder was kept away from to the bracing piece articulates there is the cushion, the cushion is inconsistent with ground.
Through above-mentioned technical scheme, when meetting the great condition of construction site fluctuation, the bracing piece can be rotatory with angle regulation round the articulated department between bracing piece and the pneumatic cylinder to the cushion can be rotatory round the articulated department of cushion and bracing piece, cushion laminating ground and inconsistent with ground, increased the stability to the platform supports.
Preferably: and one side of the bottom plate, which is far away from the platform, is provided with a roller.
Through above-mentioned technical scheme, the platform can carry out horizontal migration with the help of the gyro wheel, and the setting of gyro wheel for sliding friction between bottom plate and the ground is transformed into rolling friction, reduces frictional resistance, has increased the convenience of removal.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the ceiling can block falling objects from high altitude, and meanwhile, the falling objects can automatically roll off, so that the load born by the ceiling due to the accumulation of the falling objects is reduced, and the safety is improved;
2. through the arrangement of the metal net above the top plate and the damping spring, the high-altitude falling object is buffered.
Drawings
Fig. 1 is a schematic overall structure diagram of an embodiment of the present application.
Fig. 2 is an enlarged view of a portion a in fig. 1.
Reference numerals: 1. a base plate; 2. a roller; 3. folding the elevator; 4. a hydraulic cylinder; 41. a cylinder body; 42. a hydraulic telescopic rod; 5. a support bar; 6. cushion blocks; 7. a platform; 8. a column; 9. a side plate; 10. protecting the fence; 101. a railing; 102, and (b); a protective net 11, a ceiling; 111. a top plate; 112. a cross beam; 113 a damping spring; 114. a metal mesh.
Detailed Description
The present application is described in further detail below with reference to figures 1-2.
The embodiment of the application discloses a building outside climbing type building construction operation platform.
Referring to fig. 1 and 2, the external climbing building construction operation platform comprises a bottom plate 1, a platform 7, a ceiling 11 and a lifting mechanism for driving the platform 7 to ascend and descend, wherein the bottom plate 1 is used for supporting on the ground, rollers 2 are arranged at the bottom of the bottom plate 1, and the platform 7 can be moved to an area to be constructed through the rollers 2. The platform 7 is positioned above the bottom plate 1, and the bottom plate 1 and the platform 7 are connected by a lifting mechanism. The equal fixedly connected with curb plate 9 in both sides of platform 7, curb plate 9 extend to platform 7 top, and ceiling 11 erects in platform 7 top, and ceiling 11 includes two roof 111, and two roof 111 intersect and set up along crossing top-down slope, and platform 7 one end fixed connection is kept away from with curb plate 9 to the bottom of roof 111.
Referring to fig. 1 and 2, the lifting mechanism comprises a folding lifter 3 and a hydraulic cylinder 4, the folding lifter 3 and the hydraulic cylinder 4 are horizontally staggered, the two can climb synchronously, the hydraulic cylinder 4 comprises a cylinder body 41 and a hydraulic telescopic rod 42, the outer side of the cylinder body 41 is hinged with four support rods 5, and one ends, far away from the cylinder body 41, of the support rods 5 are hinged with cushion blocks 6. Before preparing to climb, constructor is according to the 5 angles of the height adjustment bracing piece of place topography to make 6 laminating ground of cushion and contradict with ground through the 6 angles of adjustment cushion, increase the stability that cylinder body 41 supported platform 7. Then, the constructor carries the equipment to climb on the platform 7 through a ladder, fixes the safety rope, then pushes the platform 7 to climb by adjusting the lifting mechanism, and carries out operation at the designated height.
Referring to fig. 1 and 2, the edge of the platform 7 is provided with a protective guard 10, the protective guard 10 comprises a handrail 101 and a protective guard 102, the protective guard 102 is welded on one side of the handrail 101 departing from the platform 7, the handrail 101 can be used for fixing a safety rope by a constructor and can also preliminarily block the constructor stepping out of the platform 7, the protective guard 102 can further block the platform 7 from sliding down between the handrails by a tool device except for further blocking the disabled, and the risk of falling accidents is reduced.
Referring to fig. 1 and 2, a metal mesh 112 is arranged above a top plate 111, a damping spring 113 is fixedly arranged between the top plate 111 and the metal mesh 112, one end of the damping spring 113 is welded and fixed with the top plate 111, the other end of the damping spring is welded and fixed with the metal mesh 112, the top plate 111 arranged obliquely can resist the impact of falling objects, protect constructors on the platform 7, enable the falling objects to automatically roll down along the inclined plane, and reduce the risk of unbalance of the platform 7 caused by accumulation of the falling objects on the ceiling 11. During the rainy day operation, ceiling 11 can keep off the rain, reduces 7 ponding of platform, reduces the risk of electrified construction equipment meeting water short circuit.
Referring to fig. 1 and 2, the cross beam 112 is disposed at the intersection of the two top plates 111 near one side of the platform 7, a row of equal-height upright columns 8 are fixedly disposed on the platform 7, one ends of the upright columns 8 far away from the platform 7 are fixedly connected with the cross beam 112, and the upright columns 8 support the cross beam 112, so that the stability of the ceiling 11 is improved.
Referring to fig. 1 and 2, when an object falls, the falling object is firstly blocked by the metal mesh 112 and buffered by the damping spring 113, the impact force is reduced, and then the falling object acts on the top plate 111, and the top plate 111 is supported by the cross beam 112 and the upright post 8, so that the buffered impact force is further dispersed, and the safety of construction work is improved.
The implementation principle of the climbing type building construction operation platform 7 outside the building in the embodiment of the application is as follows: during operation, remove whole platform 7 to the appointed region through gyro wheel 2 on the bottom plate 1, then constructor adjusts the angle of bracing piece 5 according to the height adjustment of place topography simultaneously to the angle of cushion 6 for cushion 6 laminates and contradicts in ground, thereby makes platform 7 can obtain comparatively firm support in the work progress. After the supporting rods are arranged, a constructor carries construction equipment to climb up the platform through a ladder, after the constructor and the construction equipment are carried out, the constructor connects the safety rope to the protective guard 10, the folding lifter 3 and the hydraulic cylinder 4 start to operate, the platform 7 is synchronously pushed to climb, and after the platform 7 climbs to a specified height, the constructor starts to work high above the ground. When falling objects in the high altitude occur in the operation process, the ceiling 11 which is obliquely arranged can block and buffer the falling objects, and the falling objects automatically roll down along the inclined plane, so that the risk of the platform 7 collapsing due to the accumulation of the load of the falling objects is reduced, and the safety of constructors on the platform 7 is guaranteed.
The present embodiment is only for explaining the present application, and it is not limited to the present application, and those skilled in the art can make modifications of the present embodiment without inventive contribution as needed after reading the present specification, but all of them are protected by patent law within the scope of the claims of the present application.

Claims (8)

1. The utility model provides a formula of climbing building construction operation platform outside building which characterized in that: elevating system who goes up and down including bottom plate (1), platform (7), ceiling (11) and drive platform (7), bottom plate (1) is used for supporting subaerial, platform (7) are located bottom plate (1) top, elevating system sets up between bottom plate (1) and platform (7), ceiling (11) erect in platform (7) top, ceiling (11) include two roof (111), two roof (111) intersect and set up along crossing top-down slope, the equal fixedly connected with curb plate (9) in both sides of platform (7), curb plate (9) extend to platform (7) top, platform (7) one end fixed connection is kept away from with curb plate (9) in the bottom of roof (111).
2. The external climbing building construction operation platform according to claim 1, wherein: the platform is characterized in that a row of stand columns (8) are fixedly arranged on the platform (7), a cross beam (112) is arranged at the joint of the two top plates (111) on one side of each top plate (111) facing the platform (7), and one end, far away from the platform (7), of each stand column (8) is fixedly connected with the cross beam (112).
3. The external climbing building construction operation platform according to claim 1, wherein: a metal net (114) is arranged above the top plate (111), and a damping spring (113) is fixedly arranged between the top plate (111) and the metal net (114).
4. The external climbing building construction operation platform according to claim 3, wherein: the platform is characterized in that a protective guard (10) is arranged at the edge of the platform (7), the protective guard (10) comprises a railing (101) and a protective net (102), the railing (101) is fixedly connected to the platform (7), and the protective net (102) is fixedly connected to one side, facing the platform (7), of the railing (101).
5. The building external climbing building construction operation platform according to claim 4, wherein: elevating system includes folding lift (3) and pneumatic cylinder (4), the bottom of folding lift (3) and pneumatic cylinder (4) is all fixed on bottom plate (1), the top of pneumatic cylinder (4) and folding lift (3) all with platform (7) fixed connection, the setting of staggering in the horizontal direction position of pneumatic cylinder (4) and folding lift (3).
6. The building external climbing building construction operation platform according to claim 5, wherein: the hydraulic cylinder (4) comprises a cylinder body (41) and a hydraulic telescopic rod (42), a plurality of supporting rods (5) are arranged on the outer side of the cylinder body (41), the supporting rods (5) are obliquely arranged, and one ends, far away from the cylinder body (41), of the supporting rods (5) are supported on the ground.
7. The external climbing building construction operation platform according to claim 6, wherein: the one end that ground was kept away from in bracing piece (5) is articulated with cylinder body (41), the one end that cylinder body (41) were kept away from in bracing piece (5) articulates there is cushion (6), cushion (6) are inconsistent with ground.
8. The external climbing building construction operation platform according to claim 1, wherein: and one side of the bottom plate (1) departing from the platform (7) is provided with a roller (2).
CN202120092510.1U 2021-01-13 2021-01-13 Climbing type building construction operation platform outside building Active CN214531797U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120092510.1U CN214531797U (en) 2021-01-13 2021-01-13 Climbing type building construction operation platform outside building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120092510.1U CN214531797U (en) 2021-01-13 2021-01-13 Climbing type building construction operation platform outside building

Publications (1)

Publication Number Publication Date
CN214531797U true CN214531797U (en) 2021-10-29

Family

ID=78300796

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120092510.1U Active CN214531797U (en) 2021-01-13 2021-01-13 Climbing type building construction operation platform outside building

Country Status (1)

Country Link
CN (1) CN214531797U (en)

Similar Documents

Publication Publication Date Title
CN212656515U (en) Adjustable movable scaffold
CN209760750U (en) Movable lifting scaffold
CN106481061A (en) Climbing frame
CN209799303U (en) A scalable platform for construction
US5394956A (en) Suspended tender box
CN214531797U (en) Climbing type building construction operation platform outside building
WO2024065963A1 (en) Intelligent construction integrated platform and use method
CN215055098U (en) Lifting movable type anti-falling device for building construction
CN111155754B (en) Automatic elevator shaft jacking platform and using method thereof
CN211341672U (en) Mobile electromechanical mounting platform in expressway tunnel
CN212225288U (en) Lower end hydraulic support for steeply inclined roadway
CN212201195U (en) Scaffold for construction
CN209670301U (en) A kind of scaffold with stress monitoring protection
CN113202280A (en) Conversion bracket type steel structure for steel structure high-altitude construction and construction method thereof
JP5291514B2 (en) Lifting type moving scaffold
CN217518109U (en) Multipurpose operation platform that encorbelments
CN220487168U (en) Safety construction protection frame for assembled stairway
CN215055095U (en) Scaffold frame convenient to remove for construction
CN220301752U (en) Lifting platform for green building construction
CN110965750A (en) Liftable full hall scaffold
CN219297103U (en) Air cooling tower broadening platform mounting tool
CN220599264U (en) Building construction outer climbing type anti-falling platform
CN219509585U (en) Underground multipurpose ascending ladder
CN219569531U (en) Construction platform for additionally installing elevator
CN220889362U (en) Height-adjustable supporting platform

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant