CN214466634U - Pipeline construction erecting device for municipal works - Google Patents
Pipeline construction erecting device for municipal works Download PDFInfo
- Publication number
- CN214466634U CN214466634U CN202120476011.2U CN202120476011U CN214466634U CN 214466634 U CN214466634 U CN 214466634U CN 202120476011 U CN202120476011 U CN 202120476011U CN 214466634 U CN214466634 U CN 214466634U
- Authority
- CN
- China
- Prior art keywords
- fixedly arranged
- fixed
- columns
- fixed plate
- column
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000010276 construction Methods 0.000 title claims abstract description 22
- 239000011241 protective layer Substances 0.000 claims description 11
- 230000000149 penetrating effect Effects 0.000 claims description 5
- 230000007246 mechanism Effects 0.000 claims description 4
- 230000003139 buffering effect Effects 0.000 claims 1
- 238000009434 installation Methods 0.000 claims 1
- 238000000034 method Methods 0.000 abstract description 3
- 239000010865 sewage Substances 0.000 description 2
- XLYOFNOQVPJJNP-UHFFFAOYSA-N water Substances O XLYOFNOQVPJJNP-UHFFFAOYSA-N 0.000 description 2
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000000694 effects Effects 0.000 description 1
- 238000010438 heat treatment Methods 0.000 description 1
- 238000009440 infrastructure construction Methods 0.000 description 1
Images
Landscapes
- Supports For Pipes And Cables (AREA)
Abstract
The utility model relates to a pipeline construction technical field specifically is a pipeline construction handing equipment for municipal works, the fixed slide bar that is provided with in inside of fixed plate, and the inside of fixed plate is located being provided with accommodate the lead screw on the slide bar, accommodate the lead screw's outside symmetry has cup jointed and has run through the fixed plate and extend to its outside foundation, two the top of foundation all is provided with first erection column, two the inside of first erection column all is provided with the cushion column that links to each other with the foundation, and the top of two first erection columns all imbeds and is provided with fixed establishment. The utility model relates to a novelty drives the removal of two foundation columns through rotatory accommodate the lead screw, finally drives two splint and presss from both sides the tight fixedly with the pipeline, avoids it to take place to remove at the in-process that erects, and through two card posts with the help of the second erection column outside in fixed establishment, the dismantlement of splint that can be convenient for has increased the practicality.
Description
Technical Field
The utility model relates to a pipeline construction technical field specifically is a pipeline construction erects device for municipal works.
Background
In China, municipal infrastructure refers to various buildings, structures, equipment and the like which are arranged in planning and construction ranges of urban areas and towns (villages) and provide paid or unpaid public products and services for residents based on government responsibilities and obligations, and various public infrastructure constructions matched with urban life belong to the municipal engineering category, such as common urban roads, bridges, subways, underground pipelines, tunnels, river channels, rail transit, sewage treatment, garbage treatment and disposal and other projects, and such as various pipelines closely related to life: rainwater, sewage, water supply, reclaimed water, electric power (parts except red lines), telecommunication, heating power, gas and the like, and construction of squares, urban greening and the like belong to the municipal engineering category.
When laying the pipeline in present municipal works, need fix the pipeline through the overhead mounting device, current overhead mounting device is firm inadequately to the fixed of pipeline, makes it take place to remove easily, and current overhead mounting device can not carry out buffer protection to the pipeline, when the pipeline is suffered from external force carelessly, probably cause the damage to it to can cause the influence to the construction, consequently, technical personnel in the field provide a pipeline construction overhead mounting device for municipal works, in order to solve the problem that proposes among the above-mentioned background art.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a pipeline construction overhead device for municipal works to solve the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a pipeline construction erecting device for municipal engineering comprises a fixed plate, wherein a sliding rod is fixedly arranged inside the fixed plate, a rotating part is fixedly arranged inside the fixed plate and above the sliding rod, an adjusting screw rod penetrating through the fixed plate and extending to the outside of the fixed plate is rotatably connected inside the rotating part, foundation columns penetrating through the fixed plate and extending to the outside of the fixed plate are symmetrically sleeved outside the adjusting screw rod, first limiting blocks connected with the fixed plate in a sliding manner are fixedly arranged below the two foundation columns, slide ways are fixedly arranged at positions, corresponding to the two foundation columns, above the fixed plate, first mounting columns are respectively arranged above the two foundation columns, first springs are fixedly arranged inside the two first mounting columns, second limiting blocks are fixedly arranged on one sides of the two first springs, and buffer columns penetrating through the first mounting columns and extending to the outside of the two second limiting blocks and connected with the foundation columns are fixedly arranged on one sides of the two second limiting blocks, and fixing mechanisms are embedded into the upper parts of the first mounting columns.
As a further aspect of the present invention: the fixing mechanism comprises two second mounting columns which are embedded into two first mounting columns respectively, two grooves are symmetrically and fixedly formed in the inner portions of the second mounting columns, four second springs are fixedly formed in the inner portions of the grooves, four third limiting blocks are fixedly formed in one sides of the second springs, four clamping columns which penetrate through the second mounting columns and the first mounting columns in sequence and extend to the outer sides of the second mounting columns are fixedly formed in one sides of the third limiting blocks, two bases are fixedly arranged above the second mounting columns, two clamping plates are fixedly arranged above the bases, two protective layers are fixedly arranged on one sides of the clamping plates, one protective layer is fixedly arranged on one side of the base, an embedded groove is fixedly formed in one side of the base, and an embedded plate matched with the embedded groove is fixedly arranged on one side of the other base.
As a further aspect of the present invention: the protective layer is a rubber component, and the thickness of the protective layer is 0.5 cm.
As a further aspect of the present invention: one side of the foundation column is located at the joint of the foundation column and the adjusting screw rod and is fixedly provided with a hole, and the inner side of the hole is fixedly provided with an inner thread matched with the outer thread of the adjusting screw rod.
As a further aspect of the present invention: the positions, corresponding to the two clamping columns, of the outer side of the first mounting column are fixedly provided with clamping grooves, and the diameters of the clamping grooves are the same as those of the clamping columns.
As a further aspect of the present invention: and one end of the adjusting screw rod is fixedly provided with a handle, and the outer side of the handle is fixedly provided with an anti-skidding sleeve.
Compared with the prior art, the beneficial effects of the utility model are that: the utility model relates to a novelty, it is nimble convenient, can drive the removal of two foundation columns through the rotation regulation lead screw, it is fixed with the pipe clamp tight finally to drive two splint, avoid it to take place to remove at the in-process of laying the stringing, and through two card posts with the help of the second erection column outside in fixed establishment, the dismantlement of the splint of can being convenient for, thereby it changes or receive and release to be convenient for, in addition, first spring and cushion column can play the effect of buffer protection to the pipeline, prevent that the pipeline from damaging because of receiving the collision carelessly, the practicality has been increased.
Drawings
FIG. 1 is a schematic structural view of a pipeline construction erection device for municipal engineering;
FIG. 2 is a schematic sectional view of a pipeline construction erection device for municipal engineering;
fig. 3 is an enlarged schematic view of a pipeline construction erection device for municipal engineering at a position a in fig. 2.
In the figure: 1. a fixing plate; 2. a slide bar; 3. a rotating member; 4. adjusting the screw rod; 5. a base pillar; 6. a first stopper; 7. a slideway; 8. a first mounting post; 9. a first spring; 10. a second limiting block; 11. a buffer column; 12. a second mounting post; 13. a groove; 14. a second spring; 15. a third limiting block; 16. clamping the column; 17. a base; 18. a splint; 19. a protective layer; 20. a fitting groove; 21. a tabling plate.
Detailed Description
Referring to fig. 1-3, in the embodiment of the present invention, a pipeline construction erection device for municipal engineering comprises a fixed plate 1, a slide rod 2 is fixedly disposed inside the fixed plate 1, a rotating member 3 is fixedly disposed above the slide rod 2 inside the fixed plate 1, an adjusting screw rod 4 extending through the fixed plate 1 and to the outside of the rotating member 3 is rotatably connected inside the rotating member 3, base posts 5 extending through the fixed plate 1 and to the outside of the adjusting screw rod 4 are symmetrically sleeved outside the adjusting screw rod 4, first stoppers 6 slidably connected to the fixed plate 1 are fixedly disposed below the two base posts 5, a slideway 7 is fixedly disposed above the fixed plate 1 at positions corresponding to the two base posts 5, first mounting posts 8 are disposed above the two base posts 5, first springs 9 are fixedly disposed inside the two first mounting posts 8, a second stopper 10 is fixedly disposed at one side of the two first springs 9, one side of two second stopper 10 all is fixed to be provided with and runs through first erection column 8 and extend to its outside buffer column 11 that links to each other with foundation column 5, and the top of two first erection columns 8 all imbeds and is provided with fixed establishment.
In fig. 2 and 3: the fixing mechanism comprises second mounting columns 12 respectively embedded in the two first mounting columns 8, grooves 13 are symmetrically and fixedly arranged in the two second mounting columns 12, second springs 14 are fixedly arranged in the four grooves 13, third limiting blocks 15 are fixedly arranged on one sides of the four second springs 14, clamping columns 16 sequentially penetrating through the second mounting columns 12 and the first mounting columns 8 and extending to the outer sides of the second mounting columns are fixedly arranged on one sides of the four third limiting blocks 15, bases 17 are fixedly arranged above the two second mounting columns 12, clamping plates 18 are fixedly arranged above the two bases 17, protective layers 19 are fixedly arranged on one sides of the two clamping plates 18, one side of one of the bases 17 is fixedly provided with a tabling groove 20, and one side of the other base 17 is fixedly provided with a tabling plate 21 matched with the tabling groove 20, so as to prevent the pipeline from moving.
In fig. 1: the protective layer 19 is a rubber member, and the thickness of the protective layer 19 is 0.5cm, so as to prevent the pipeline from being pinched.
In fig. 2: one side of the base pillar 5 is located at the joint of the adjusting screw rod 4 and is fixedly provided with a hole, and the inner side of the hole is fixedly provided with an internal thread matched with the external thread of the adjusting screw rod 4, so that the base pillar 5 can move along with the rotation of the adjusting screw rod 4.
In fig. 3: the position department that the outside of first erection column 8 corresponds two card posts 16 all fixedly is provided with the draw-in groove, and the diameter of draw-in groove is the same with the diameter of card post 16, is convenient for fixed between first erection column 8 and the second erection column 12.
In fig. 1: the fixed handle that is provided with of one end of accommodate the lead screw 4, and the fixed antiskid cover that is provided with in the outside of handle, the person of facilitating the use rotates accommodate the lead screw 4.
The utility model discloses a theory of operation is: when the pipeline fixing device is used, the fixing plate 1 is fixed on the ground firstly, then the distance between the two clamping plates 18 is adjusted to fix a pipeline, when the pipeline fixing device is adjusted, the handle is rotated by hands, so that the adjusting screw rod 4 rotates, the two base columns 5 move oppositely, the buffer columns 11 are driven to move by the movement of the two base columns 5, so that the two first mounting columns 8 are driven to move, the two second mounting columns 12 are driven to move by the movement of the two first mounting columns 8, so that the two bases 17 are driven to move, and finally the two clamping plates 18 are driven to move until the two clamping plates clamp and fix the pipeline, when the two clamping plates 18 need to be disassembled, the two clamping columns 16 on the outer side of one of the second mounting columns 12 are extruded by two hands, the two clamping columns 16 are stressed on the third limiting blocks 15, the two third limiting blocks 15 are stressed to move towards the inside of the groove 13 until the two clamping columns 16 are retracted into the inside of the groove 13, at this time, the second mounting column 12 is pulled out upwards, the clamping plate 18 can be detached, and then the other clamping plate 18 can be detached by the same method, so that the operation is simple, and the practicability is improved.
The above-mentioned, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.
Claims (6)
1. The utility model provides a pipeline construction erecting device for municipal works, includes fixed plate (1), its characterized in that, the inside of fixed plate (1) is fixed and is provided with slide bar (2), and the inside of fixed plate (1) is located the top of slide bar (2) and is fixed and be provided with rotation piece (3), the inside rotation of rotation piece (3) is connected with and runs through fixed plate (1) and extend to its outside accommodate the lead screw (4), the outside symmetry of accommodate the lead screw (4) has cup jointed and has run through fixed plate (1) and extend to its outside foundation column (5), two the below of foundation column (5) all is fixed and is provided with first stopper (6) that slide with fixed plate (1) links to each other, the position department that corresponds two foundation columns (5) in the top of fixed plate (1) all is fixed and is provided with slide (7), two the top of foundation column (5) all is provided with first erection column (8), two the inside of first erection column (8) is all fixed and is provided with first spring (9), two one side of first spring (9) is all fixed and is provided with second stopper (10), two one side of second stopper (10) is all fixed and is provided with and runs through first erection column (8) and extend to its outside buffering post (11) that link to each other with foundation pillar (5), two the top of first erection column (8) all imbeds and is provided with fixed establishment.
2. The pipeline construction erecting device for the municipal engineering according to claim 1, wherein the fixing mechanism comprises second mounting columns (12) embedded in the two first mounting columns (8), grooves (13) are symmetrically and fixedly arranged in the two second mounting columns (12), second springs (14) are fixedly arranged in the four grooves (13), third limiting blocks (15) are fixedly arranged on one sides of the four second springs (14), clamping columns (16) sequentially penetrating through the second mounting columns (12) and the first mounting columns (8) and extending to the outer sides of the second mounting columns and the first mounting columns (8) are fixedly arranged on one sides of the four third limiting blocks (15), bases (17) are fixedly arranged above the two second mounting columns (12), clamping plates (18) are fixedly arranged above the two bases (17), protective layers (19) are fixedly arranged on one sides of the two clamping plates (18), a tabling groove (20) is fixedly arranged on one side of one base (17), and a tabling plate (21) matched with the tabling groove (20) is fixedly arranged on one side of the other base (17).
3. The municipal pipeline construction erection device of claim 2, wherein the protective layer (19) is a rubber member, and the thickness of the protective layer (19) is 0.5 cm.
4. The pipeline construction erection device for municipal engineering according to claim 1, wherein one side of the foundation column (5) is fixedly provided with a hole at the joint with the adjusting screw rod (4), and the inner side of the hole is fixedly provided with an internal thread matched with the external thread of the adjusting screw rod (4).
5. The pipeline construction erection device for municipal engineering according to claim 1, characterized in that the outside of the first installation column (8) is fixedly provided with a slot at the position corresponding to the two clamping columns (16), and the diameter of the slot is the same as that of the clamping column (16).
6. The pipeline construction erection device for municipal engineering according to claim 1, wherein a handle is fixedly arranged at one end of the adjusting screw rod (4), and an anti-slip sleeve is fixedly arranged at the outer side of the handle.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120476011.2U CN214466634U (en) | 2021-03-05 | 2021-03-05 | Pipeline construction erecting device for municipal works |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202120476011.2U CN214466634U (en) | 2021-03-05 | 2021-03-05 | Pipeline construction erecting device for municipal works |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214466634U true CN214466634U (en) | 2021-10-22 |
Family
ID=78153016
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202120476011.2U Expired - Fee Related CN214466634U (en) | 2021-03-05 | 2021-03-05 | Pipeline construction erecting device for municipal works |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214466634U (en) |
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114737660A (en) * | 2022-05-21 | 2022-07-12 | 北京市政建设集团有限责任公司 | Municipal works rain sewage pipeline construction is with strutting arrangement with buffer function |
-
2021
- 2021-03-05 CN CN202120476011.2U patent/CN214466634U/en not_active Expired - Fee Related
Cited By (1)
Publication number | Priority date | Publication date | Assignee | Title |
---|---|---|---|---|
CN114737660A (en) * | 2022-05-21 | 2022-07-12 | 北京市政建设集团有限责任公司 | Municipal works rain sewage pipeline construction is with strutting arrangement with buffer function |
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN214466634U (en) | Pipeline construction erecting device for municipal works | |
CN112814462A (en) | Support stabilising arrangement with correct slope wire pole | |
CN218375780U (en) | Municipal works are with adjustable nodal pattern safety device against wind | |
CN209923985U (en) | Well lid lock structure | |
CN215950592U (en) | Civil engineering pipeline pre-embedding device | |
CN116480213A (en) | Protection guardrail embedded pile pit and U-shaped guardrail | |
CN213869704U (en) | Municipal works are with pile device convenient to remove | |
CN215467733U (en) | Municipal works cable device of flare-outing | |
CN214737477U (en) | Road and bridge crack reinforcing apparatus | |
CN215254381U (en) | Safety protection supporting platform for municipal engineering construction | |
CN215107926U (en) | Fender is enclosed in municipal works construction | |
CN207064843U (en) | A kind of municipal construction line holder | |
CN108755515B (en) | Municipal road line protection device and construction method thereof | |
CN112664049A (en) | Municipal construction is with protection isolating device | |
CN214467331U (en) | Subway shield tunnel earth surface soil body vibration test sensor fixing device | |
CN215801212U (en) | Municipal works are with portable warning device | |
CN214879119U (en) | Municipal works cable interlude device | |
CN215441310U (en) | Concrete vibrating device for municipal highway engineering | |
CN215564969U (en) | Rail guard is kept apart to portable | |
CN216788019U (en) | Municipal works that portability is good are with protection rail | |
CN215907616U (en) | Safety device for municipal works management | |
CN221194559U (en) | Municipal construction safety device | |
CN220619847U (en) | Warning sign for road maintenance | |
CN205822071U (en) | A kind of municipal road construction assembly all-in-one | |
CN216585981U (en) | Road surface pre-buried type pipeline crossing structure |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20211022 |