CN214447146U - Building rubbish brickmaking device - Google Patents

Building rubbish brickmaking device Download PDF

Info

Publication number
CN214447146U
CN214447146U CN202120013072.5U CN202120013072U CN214447146U CN 214447146 U CN214447146 U CN 214447146U CN 202120013072 U CN202120013072 U CN 202120013072U CN 214447146 U CN214447146 U CN 214447146U
Authority
CN
China
Prior art keywords
crushed material
construction waste
garbage
crushed
garbage crushing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202120013072.5U
Other languages
Chinese (zh)
Inventor
李明照
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Second Engineering Bureau Co Ltd
Original Assignee
China Construction Second Engineering Bureau Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Second Engineering Bureau Co Ltd filed Critical China Construction Second Engineering Bureau Co Ltd
Priority to CN202120013072.5U priority Critical patent/CN214447146U/en
Application granted granted Critical
Publication of CN214447146U publication Critical patent/CN214447146U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Processing Of Solid Wastes (AREA)

Abstract

The utility model discloses a building rubbish brickmaking device belongs to the building engineering field, including frame, rubbish rubbing crusher structure, crushed aggregates rabbling mechanism, crushed aggregates transport mechanism, reinforced mechanism and forming mechanism. The right side of the top of the inner wall of the rack is connected with a sliding rail. The garbage crushing mechanism is arranged on the left side of the rack. The crushed material stirring mechanism is arranged on the right side below the garbage crushing mechanism. The crushed material conveying mechanism is arranged below the garbage crushing mechanism, and the right end of the crushed material conveying mechanism is arranged above the crushed material stirring mechanism. The feeding mechanism is connected with the sliding rail in a sliding manner. The forming mechanism is arranged under the feeding mechanism. The device can make the base material fragment of brick with the building rubbish after smashing, when the effective control refuse treatment cost, economic benefits promotes greatly. And simple structure, manufacturing cost is lower and the efficiency of handling the construction waste is higher, can effectively handle a large amount of construction waste, avoids the pollution of construction waste to the environment, is convenient for popularize and apply on a large scale.

Description

Building rubbish brickmaking device
Technical Field
The utility model belongs to the building engineering field specifically is a building rubbish brickmaking device.
Background
The construction waste is solid waste generated in the process of building, rebuilding, expanding or dismantling a building, has a wide erosion effect on our living environment, and has adverse effects on urban environmental sanitation, living conditions of residences, land quality assessment and the like if the construction waste is subjected to a long-term regardless attitude. After a large amount of construction waste is piled in the land, the quality of the soil is reduced, and the production capacity of the soil is reduced. The construction waste is piled in the air, which affects the air quality, and some dust particles can suspend in the air, which is harmful to human health. In the process of stacking the construction waste, the long-term stacking means that harmful substances of the construction waste permeate into underground water areas to pollute water environment. If the construction waste is piled up in the city, the urban environment and the attractiveness are not favorable. The building rubbish stacking may have some potential safety hazards, and some accidents may happen at any time.
The treatment of Chinese garbage starts late, the harmless treatment capability of the garbage is low, and the serious situation that the garbage surrounds the city appears. Since 2006, the environmental sanitation industry in China has been greatly developed, so that the treatment level of urban garbage is improved, and the phenomenon that garbage surrounds cities is relieved. However, there are some problems in that the investment of garbage disposal is still significantly insufficient compared with the demand of garbage disposal, the level of garbage disposal is still low, and the municipal solid waste disposal is still in the development stage from rough disposal to disposal. Mainly characterized in that the phenomenon of stacking garbage is ubiquitous, and the secondary pollution of a garbage disposal site is quite common. The treatment of urban construction waste in China presents the following problems: 1. the degree of classified collection of the construction wastes is not high, and only most of the construction wastes are mixed and collected; 2. the recycling rate of the construction waste is low; 3. the level of the construction waste treatment and resource utilization technology in China falls behind, and the urban construction waste treatment mostly adopts a direct landfill treatment mode, which occupies land and pollutes the environment; 4. the urban construction waste treatment investment is small, the policy and the rule measures are not sound, and the environmental awareness of construction workers is not strong. Therefore, a technical scheme capable of recycling various construction wastes and solving the problems is urgently needed in the market at present.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building rubbish brickmaking device to solve above-mentioned technical problem.
Therefore, the utility model provides a building rubbish brickmaking device, include:
the right side of the top of the inner wall of the rack is connected with a slide rail;
the garbage crushing mechanism is arranged on the left side of the rack;
the crushed material stirring mechanism is arranged on the right side below the garbage crushing mechanism;
the crushed material conveying mechanism is arranged below the garbage crushing mechanism, and the right end of the crushed material conveying mechanism is arranged above the crushed material stirring mechanism;
the feeding mechanism is connected with the sliding rail in a sliding manner;
and the forming mechanism is arranged right below the feeding mechanism.
Preferably, the left side of frame has seted up the funnel mounting hole, rubbish rubbing crusher constructs including refuse collection funnel and rubbing crusher, refuse collection funnel installs in the funnel mounting hole, rubbing crusher installs inside refuse collection funnel.
Preferably, a screening device for removing iron impurities in the crushed materials is further arranged between the garbage crushing mechanism and the crushed material conveying mechanism.
Preferably, the chaff conveyor comprises two rotating motors and a conveyor belt cooperating at the rotating motors.
Preferably, crushed aggregates rabbling mechanism includes teeter chamber, flexible rotating electrical machines and rotating vane, the vertical connection of flexible rotating electrical machines is at the inboard top of frame, rotating vane sets up in the teeter chamber and is connected with flexible rotating electrical machines's output.
Preferably, a water tank is further arranged on the machine frame above the crushed material stirring mechanism, and the water tank is communicated with the stirring chamber through a water conveying pipeline.
Preferably, the forming mechanism comprises a heating box and a model plate arranged inside the heating box, the heating box is provided with a control panel, and the model plate is provided with a model groove.
Compared with the prior art, the utility model discloses a characteristics and beneficial effect do:
(1) the utility model discloses a building rubbish brickmaking device simple structure, manufacturing cost is lower and the efficiency of handling building rubbish is higher, can effective treatment a large amount of building rubbish, avoids building rubbish to the pollution of environment, is convenient for popularize and apply on a large scale.
(2) The utility model discloses a building rubbish brickmaking device is equipped with forming mechanism, can make the substrate fragment of brick with the building rubbish after smashing, in the cost of effective control refuse treatment, economic benefits promotes greatly.
Drawings
Fig. 1 is a schematic diagram of a construction waste brick making device.
The attached drawings are marked as follows: 1-garbage crushing mechanism, 2-crushed material conveying mechanism, 3-crushed material stirring mechanism, 4-telescopic rotating motor, 5-rotating blade, 6-sliding rail, 7-feeding mechanism, 8-heating box, 9-model plate and 10-frame.
Detailed Description
In order to make the technical means, innovative features, objectives and functions realized by the present invention easy to understand, the present invention will be further described below.
The embodiments described herein are specific embodiments of the present invention, and are intended to be illustrative of the concepts of the present invention, which are intended to be illustrative and exemplary, and should not be construed as limiting the scope of the embodiments of the present invention. In addition to the embodiments described herein, those skilled in the art will be able to employ other technical solutions which are obvious based on the disclosure of the claims and the specification of the present application, and these technical solutions include technical solutions which make any obvious replacement or modification for the embodiments described herein.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, and for example, "connected" may be either fixedly connected or detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
As shown in fig. 1, a building garbage brick making device comprises a frame 10, a garbage crushing mechanism 1, a crushed material stirring mechanism 3, a crushed material conveying mechanism 2, a feeding mechanism 7 and a forming mechanism.
The right side of the top of the inner wall of the frame 10 is connected with a slide rail 6. The feeding mechanism 7 is connected with the sliding rail 6 in a sliding way. The left side of the frame 10 is provided with a funnel mounting hole.
The garbage crushing mechanism 1 is arranged on the left side of the frame 10. Garbage crushing mechanism 1 includes garbage collection funnel and rubbing crusher, and the garbage collection funnel is installed in the funnel mounting hole, and the rubbing crusher is installed inside the garbage collection funnel.
The crushed material stirring mechanism 3 is arranged on the right side below the garbage crushing mechanism 1. Crushed aggregates rabbling mechanism 3 includes teeter chamber, flexible rotating electrical machines 4 and rotating vane 5, and the vertical top of connecting in 10 inboard tops of frame of flexible rotating electrical machines 4, and rotating vane 5 sets up in the teeter chamber and is connected with flexible rotating electrical machines 4's output. A water tank is also arranged on the frame 10 above the crushed material stirring mechanism 3, and the water tank is communicated with the stirring chamber through a water pipeline.
The crushed material conveying mechanism 2 is arranged below the garbage crushing mechanism 1, and the right end of the crushed material conveying mechanism is arranged above the crushed material stirring mechanism 3. The scrap conveyor assembly 2 includes two rotating motors and belts coupled to the rotating motors.
Still be equipped with the sieving mechanism who is arranged in detaching the iron impurity in the crushed aggregates between rubbish rubbing crusher constructs 1 and crushed aggregates transport mechanism 2 for iron impurity in the crushed aggregates separates out, prevents to damage the device.
The forming mechanism is arranged right below the feeding mechanism 7. The forming mechanism comprises a heating box 8 and a model plate 9 arranged inside the heating box 8, a control panel is arranged on the heating box 8, and a model groove is arranged on the model plate 9.
The working principle of the building garbage brick making device is as follows: building rubbish is smashed into the powder in rubbish rubbing crusher constructs 1, then the powder is conveyed to in the crushed aggregates rabbling mechanism 3 by crushed aggregates transport mechanism 2, and water in the water tank gets into in the crushed aggregates rabbling mechanism 3 through water pipeline, then flexible rotating electrical machines 4 stretches into and drives rotating blades 5 stirring crushed aggregates in the teeter chamber. The worker adds the crushed aggregates after the stirring into the feeding mechanism 7, the feeding mechanism 7 adds the crushed aggregates into a mold groove on the mold plate 9, then the heating temperature and time are controlled through a control panel on the heating box 8, and finally the construction waste is made into the base material brick.
The above embodiments are merely illustrative of the preferred embodiments of the present invention, and are not intended to limit the scope of the present invention, and various modifications and improvements made by those skilled in the art without departing from the spirit of the present invention should fall within the protection scope defined by the claims.

Claims (7)

1. A building rubbish brickmaking device is characterized by comprising:
the right side of the top of the inner wall of the rack (10) is connected with a slide rail (6);
the garbage crushing mechanism (1) is arranged on the left side of the rack (10);
the crushed material stirring mechanism (3) is arranged on the right side below the garbage crushing mechanism (1);
the crushed material conveying mechanism (2) is arranged below the garbage crushing mechanism (1), and the right end of the crushed material conveying mechanism is arranged above the crushed material stirring mechanism (3);
the feeding mechanism (7) is connected with the sliding rail (6) in a sliding manner;
and the forming mechanism is arranged right below the feeding mechanism (7).
2. The construction waste brick making device according to claim 1, characterized in that: the garbage crusher is characterized in that a funnel mounting hole is formed in the left side of the rack (10), the garbage crushing mechanism (1) comprises a garbage collection funnel and a crusher, the garbage collection funnel is mounted in the funnel mounting hole, and the crusher is mounted inside the garbage collection funnel.
3. The construction waste brick making device according to claim 2, characterized in that: and a screening device for removing iron impurities in the crushed materials is further arranged between the garbage crushing mechanism (1) and the crushed material conveying mechanism (2).
4. The construction waste brick making device according to claim 1, characterized in that: the crushed material conveying mechanism (2) comprises two rotating motors and a conveying belt matched with the rotating motors.
5. The construction waste brick making device according to claim 1, characterized in that: crushed aggregates rabbling mechanism (3) are including teeter chamber, flexible rotating electrical machines (4) and rotating vane (5), the vertical connection of flexible rotating electrical machines (4) is at the inboard top of frame (10), rotating vane (5) set up in the teeter chamber and are connected with the output of flexible rotating electrical machines (4).
6. The construction waste brick making device according to claim 5, characterized in that: a water tank is also arranged on the frame (10) above the crushed material stirring mechanism (3), and the water tank is communicated with the stirring chamber through a water pipeline.
7. The construction waste brick making device according to claim 1, characterized in that: the forming mechanism comprises a heating box (8) and a model plate (9) arranged inside the heating box (8), a control panel is arranged on the heating box (8), and a model groove is formed in the model plate (9).
CN202120013072.5U 2021-01-05 2021-01-05 Building rubbish brickmaking device Expired - Fee Related CN214447146U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120013072.5U CN214447146U (en) 2021-01-05 2021-01-05 Building rubbish brickmaking device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120013072.5U CN214447146U (en) 2021-01-05 2021-01-05 Building rubbish brickmaking device

Publications (1)

Publication Number Publication Date
CN214447146U true CN214447146U (en) 2021-10-22

Family

ID=78110152

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120013072.5U Expired - Fee Related CN214447146U (en) 2021-01-05 2021-01-05 Building rubbish brickmaking device

Country Status (1)

Country Link
CN (1) CN214447146U (en)

Similar Documents

Publication Publication Date Title
CN206152871U (en) Construction waste processing device of function is retrieved to belted steel muscle
CN206676430U (en) A kind of building rubbish treatment device
CN107824314A (en) It is easy to feeding and the building waste reducing mechanism of blanking
CN107457035A (en) A kind of construction waste processing unit based on dedusting technology
CN210171655U (en) Environment-friendly rubbish breaker
CN214447146U (en) Building rubbish brickmaking device
CN211334740U (en) Building rubbish treatment device for civil engineering construction
CN201102798Y (en) Rubbish even feeder
CN110756566A (en) Green solid waste treatment recycling equipment
CN206763582U (en) A kind of sorting equipment of categorized consumer waste disposal
CN211005151U (en) Waste concrete processor
CN212189509U (en) Solid waste crushing treatment environment-friendly device
CN203598916U (en) Lead and plastic separating device and lead-acid battery fragmentized separation system comprising same
CN211515114U (en) Sand filtering device for civil engineering
CN210312595U (en) Building engineering environment-friendly garbage separation case
CN213377126U (en) Ash treatment device after environmental garbage power generation
CN201980700U (en) Feed screw device
CN221222709U (en) High-efficient dangerous waste treatment device
CN212943408U (en) Energy-concerving and environment-protective building engineering construction waste material processing apparatus
CN210023220U (en) Environment-friendly solid refuse treatment device for building engineering
CN213193968U (en) Waste concrete sand powder recycling device
CN214779376U (en) Waste recovery device for mortar processing
CN220804916U (en) Secondary chelating equipment for fly ash
CN214487100U (en) Waste concrete crushing and recycling device
CN202464146U (en) Quantitative filling and weighing device for broken plastic

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20211022

CF01 Termination of patent right due to non-payment of annual fee