CN214401335U - Kerbstone installation fixture for central parting strip - Google Patents

Kerbstone installation fixture for central parting strip Download PDF

Info

Publication number
CN214401335U
CN214401335U CN202022882260.XU CN202022882260U CN214401335U CN 214401335 U CN214401335 U CN 214401335U CN 202022882260 U CN202022882260 U CN 202022882260U CN 214401335 U CN214401335 U CN 214401335U
Authority
CN
China
Prior art keywords
frame
handle
kerbstone
walking
hook
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022882260.XU
Other languages
Chinese (zh)
Inventor
陈冬宇
谢连仲
倪景军
杜永朝
何宏海
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
CCCC First Harbor Engineering Co Ltd
No 5 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Original Assignee
CCCC First Harbor Engineering Co Ltd
No 5 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by CCCC First Harbor Engineering Co Ltd, No 5 Engineering Co Ltd of CCCC First Harbor Engineering Co Ltd filed Critical CCCC First Harbor Engineering Co Ltd
Priority to CN202022882260.XU priority Critical patent/CN214401335U/en
Application granted granted Critical
Publication of CN214401335U publication Critical patent/CN214401335U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model discloses a kerbstone mounting fixture for a central separation belt, which comprises a handle, a frame, a walking wheel, a walking shaft, a clamp, a connecting rod, a chain and a hook; the handle is installed in the frame upper end, and the lower extreme of frame is installed on the walking axle, and the both ends and the walking wheel of walking axle are connected, the hook is installed to the front end of handle, and the hook is connected with the chain, and the lower extreme and two connecting rods of chain link to each other, and every connecting rod is articulated with the clip, and two clips are articulated each other, and the rubber gasket is installed to the lower extreme of every clip. The utility model discloses a kerbstone sectional fixture can effectively reduce the cost of labor, improves installation effectiveness and installation quality.

Description

Kerbstone installation fixture for central parting strip
Technical Field
The utility model relates to a curbstone sectional fixture for central authorities' median belongs to curbstone installation field.
Background
The division strip refers to a strip-shaped facility for dividing a roadway and arranged along the longitudinal direction of the roadway, and is called a central division strip positioned at the center line of the roadway; and the outer separation belts are positioned on two sides of the road center line. The curbstone is arranged on two sides of a road surface or around a separation zone and a safety island and is higher than the road surface to separate a roadway from structures such as a sidewalk, a green belt, the separation zone, the safety island and the like, and the roadway range is calibrated to maintain traffic safety and longitudinally guide and drain rainwater on the road surface.
At present, the kerbstone installation efficiency of the central dividing belt is low, and the labor cost is high; when the curbstone is installed, the accuracy is low, the curbstone is not easy to adjust, and the line type is poor after the curbstone is installed.
Disclosure of Invention
To the problem that above-mentioned prior art exists, the utility model provides a curbstone sectional fixture for central authorities' division zone reduces the cost of labor, improves installation effectiveness and installation quality.
In order to achieve the purpose, the utility model discloses a kerbstone mounting fixture for a central dividing strip, which comprises a handle, a frame, a walking wheel, a walking shaft, a clamp, a connecting rod, a chain and a hook;
the handle is installed in the frame upper end, and the lower extreme of frame is installed on the walking axle, and the both ends and the walking wheel of walking axle are connected, the hook is installed to the front end of handle, and the hook is connected with the chain, and the lower extreme and two connecting rods of chain link to each other, and every connecting rod is articulated with the clip, and two clips are articulated each other, and the rubber gasket is installed to the lower extreme of every clip.
As an improvement, the handle is made of a steel pipe.
As an improvement, a plurality of reinforcing rib plates are arranged between the frame and the handle and between the frame and the walking shaft.
As an improvement, a reinforcing frame is further arranged between the frame and the walking shaft.
Compared with the prior art, the utility model discloses a curbstone sectional fixture can effectively reduce the cost of labor, improves installation effectiveness and installation quality.
Drawings
Fig. 1 is a schematic structural view of the present invention;
in the figure: 1. the device comprises a handle, 2, a frame, 3, a reinforcing rib plate, 4, a traveling wheel, 5, a traveling shaft, 6, a reinforcing frame, 7, a rubber gasket, 8, a clamp, 9, a connecting rod, 10, a chain, 11 and a hook.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clear, the present invention is further described in detail below. It should be understood, however, that the description herein of specific embodiments is only intended to illustrate the invention and not to limit the scope of the invention.
Unless defined otherwise, all technical and scientific terms used herein have the same meaning as commonly understood by one of ordinary skill in the art to which this invention belongs, and the terms used herein in the specification of the present invention are for the purpose of describing particular embodiments only and are not intended to limit the present invention.
As shown in fig. 1, a kerbstone installation jig for a central dividing strip comprises a handle 1, a frame 2, a walking wheel 4, a walking shaft 5, a clamp 8, a connecting rod 9, a chain 10 and a hook 11;
handle 1 installs in 2 upper ends of frame, and the lower extreme of frame 2 is installed on walking axle 5, and the both ends and the walking wheel 4 of walking axle 5 are connected, hook 11 is installed to the front end of handle 1, and hook 11 is connected with chain 10, and the lower extreme and two connecting rods 9 of chain 10 link to each other, and every connecting rod 9 is articulated with clip 8, and two clips 8 are articulated each other, and rubber gasket 7 is installed to the lower extreme of every clip 8.
As the improvement of the embodiment, the handle 1 is made of a steel pipe, so that the cost of raw materials is low, and the processing is convenient.
As an improvement of the embodiment, a plurality of reinforcing rib plates 3 are arranged between the frame 2 and the handle 1 and between the frame 2 and the walking shaft 5, and a reinforcing frame 6 is arranged between the frame 2 and the walking shaft 5, so that the strength of the whole structure is improved.
First, the utility model discloses a kerbstone sectional fixture mainly includes handle 1, frame 2 etc. through using the lever support principle, utilizes the conversion, the balance of moment, with the great gravity of kerbstone self, through the change of moment, converts the less pressure of workman into for 144 kilograms heavy kerbstones originally convert into only about 19 kilograms (do not consider the steel pipe dead weight temporarily, weight after concrete conversion is different according to the size of handle, frame etc. slightly there is the difference) pressure can be balanced. The construction difficulty is reduced, the construction efficiency is increased, the installation number of the curbstones is increased from the original 30-40 blocks/(3 people day) to 60-80 blocks (3 people day), and the labor cost is directly reduced.
The utility model discloses a kerbstone sectional fixture still includes iron clip 8 and rubber gasket 7, when two clips 8 and 7 clamps of rubber gasket got the kerbstone, uses frictional resistance for be in stable state when the kerbstone hangs, can accurately put to design position during the kerbstone installation, can satisfy the designing requirement after the fine setting, greatly reduced the rate of doing over again, thereby indirect increase the efficiency of construction, reduce the cost of labor.
The above description is only exemplary of the present invention and should not be taken as limiting the scope of the present invention, as any modification, equivalent replacement or improvement made within the spirit and principle of the present invention should be included in the present invention.

Claims (4)

1. A kerbstone mounting fixture for a central separation belt is characterized by comprising a handle (1), a frame (2), a travelling wheel (4), a travelling shaft (5), a clamp (8), a connecting rod (9), a chain (10) and a hook (11);
install in frame (2) upper end handle (1), the lower extreme of frame (2) is installed on walking axle (5), and the both ends and the walking wheel (4) of walking axle (5) are connected, hook (11) are installed to the front end of handle (1), and hook (11) are connected with chain (10), and the lower extreme and two connecting rods (9) of chain (10) link to each other, and every connecting rod (9) are articulated with clip (8), and two clips (8) are articulated each other, and rubber gasket (7) are installed to the lower extreme of every clip (8).
2. Kerbstone installation jig for center divider according to claim 1, characterized in that said handle (1) is a steel pipe.
3. The kerbstone installation jig for the central separation strip according to claim 1, wherein a plurality of reinforcing rib plates (3) are installed between the frame (2) and the handle (1) and between the frame (2) and the walking shaft (5).
4. A kerbstone setting jig for a center bank according to claim 1, wherein a reinforcing frame (6) is further installed between the frame (2) and the traveling axle (5).
CN202022882260.XU 2020-12-04 2020-12-04 Kerbstone installation fixture for central parting strip Active CN214401335U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022882260.XU CN214401335U (en) 2020-12-04 2020-12-04 Kerbstone installation fixture for central parting strip

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022882260.XU CN214401335U (en) 2020-12-04 2020-12-04 Kerbstone installation fixture for central parting strip

Publications (1)

Publication Number Publication Date
CN214401335U true CN214401335U (en) 2021-10-15

Family

ID=78036778

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022882260.XU Active CN214401335U (en) 2020-12-04 2020-12-04 Kerbstone installation fixture for central parting strip

Country Status (1)

Country Link
CN (1) CN214401335U (en)

Similar Documents

Publication Publication Date Title
CN110700119A (en) Upper traveling system of assembled Bailey beam hanging basket and design method thereof
CN214401335U (en) Kerbstone installation fixture for central parting strip
CN202176343U (en) Self-propelled multifunctional template trolley combining device
KR20110086498A (en) Girder assembly with approved bending resistibility
CN113074006A (en) Highway tunnel engineering is with preventing square device that collapses
CN211547313U (en) Bridge deck expansion joint pavement structure
CN205778929U (en) A kind of for arch form culvert, the sleiding form device of passage construction
CN110258771B (en) Vestibule
CN202559241U (en) Universal displacement telescopic device
CN209555971U (en) Prefabricated assembled pipe gallery fitting machine
CN2077877U (en) New steel cable bridge
CN204475099U (en) A kind of assembly concrete traffic
CN216658368U (en) Prefabricated small box girder template composite device for expressway
CN211256646U (en) Bridge expansion joint structure
CN210395127U (en) Assembled Bailey beam hanging basket upper walking system
CN112695652B (en) Web-shaped suspender arch bridge framing construction method for highway reconstruction and extension project
CN208455484U (en) A kind of high-pier large-span steel box-girder translating device
CN211523513U (en) More effective string pipe truss structure that opens that reduces vertical displacement
CN211171595U (en) Highway bridge telescoping device
CN111119067B (en) Concrete pouring template for outer packing bottom plate of arch bridge and construction method thereof
CN210657978U (en) Temporary passing device for replacing expansion joint under heavy-load traffic environment
CN2571824Y (en) Composite road engineering cover plate
CN207484299U (en) A kind of grade separation bridge steel structural shielding canopy
CN216688860U (en) Highway with prevent empting function
JPWO2005083182A1 (en) Lane separation unit, its components and mobile lane separation device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant