CN214369316U - Coal pulverizer clutch system air supply transformation system - Google Patents

Coal pulverizer clutch system air supply transformation system Download PDF

Info

Publication number
CN214369316U
CN214369316U CN202120438482.4U CN202120438482U CN214369316U CN 214369316 U CN214369316 U CN 214369316U CN 202120438482 U CN202120438482 U CN 202120438482U CN 214369316 U CN214369316 U CN 214369316U
Authority
CN
China
Prior art keywords
air
air supply
clutch
coal pulverizer
instrument
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120438482.4U
Other languages
Chinese (zh)
Inventor
王卫军
黄美峰
苗向东
赵勇
肖欢
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Pucheng Clean Energy Chemical Co Ltd
Original Assignee
Pucheng Clean Energy Chemical Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Pucheng Clean Energy Chemical Co Ltd filed Critical Pucheng Clean Energy Chemical Co Ltd
Priority to CN202120438482.4U priority Critical patent/CN214369316U/en
Application granted granted Critical
Publication of CN214369316U publication Critical patent/CN214369316U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Crushing And Grinding (AREA)

Abstract

The utility model discloses a coal pulverizer clutch system air supply transformation system, including instrument air spherical tank, will the main pipeline of the air supply export department intercommunication of instrument air spherical tank leads in the coal pulverizer factory building, be equipped with a plurality of air storage tanks that are used for coal pulverizer clutch air supply deposit in the coal pulverizer factory building, main pipeline is linked together respectively with a plurality of air supply branch roads, every the air supply branch road is linked together with air storage tank respectively, provides 1.0Mpa instrument air through instrument air spherical tank and supplies the coal pulverizer clutch as the air supply of air storage tank to use, replaces the air compressor machine with 1.0Mpa instrument air, has air supply pressure stability, and equipment operation is steady, need not to overhaul advantage such as maintenance, has overcome because of the unstable coal pulverizer system that leads to of clutch air supply pressure undulant, has played energy saving and consumption reduction's effect.

Description

Coal pulverizer clutch system air supply transformation system
Technical Field
The utility model relates to a coal pulverizer clutch system air supply reforms transform and optimizes technical field, specifically is a coal pulverizer clutch system air supply reforms transform system.
Background
The air source of the clutch operated in the earlier stage of the coal mill is compressed by an air compressor to raise the pressure to be more than 0.85Mpa and is firstly sent to an air storage tank, and the air source is supplied to the clutch of the coal mill through the air storage tank. If the pressure of an air source of an air storage tank is reduced to be below 0.85MPa due to leakage or use in the operation process of the coal mill, the air compressor is interlocked and automatically started, the pressure of the air source of the air storage tank is increased to be above 0.85MPa, the air compressor is interlocked and stopped, the air source pressure of a clutch of the coal mill is met through the circulating operation, and the phenomenon that the coal mill clutch is interlocked and jumped due to low air source pressure to influence the system operation is avoided. The air pressure of the clutch air source of the existing coal mill is increased to be more than 0.85Mpa by compressing the air compressor, and the clutch air source is used as the source of the clutch air source, and compared with the transformation optimization technology, the clutch air source has the defects that the air source pressure is unstable, the air compressor is easy to damage when being started and stopped frequently, the overhaul and maintenance cost is high, and the like.
Disclosure of Invention
An object of the utility model is to provide a coal pulverizer clutch system air supply transformation system, a serial communication port, including instrument air spherical tank, will the main pipeline of the air supply export department intercommunication of instrument air spherical tank leads in the coal pulverizer factory building, be equipped with a plurality of air storage tanks that are used for coal pulverizer clutch air supply deposit in the coal pulverizer factory building, the main pipeline is linked together respectively, every with a plurality of air supply branch roads the air supply branch road is linked together with air storage tank respectively.
Preferably, the number of the air source branches corresponds to the number of the air storage tanks.
Preferably, a self-operated pressure regulating valve is arranged on the air source main pipeline.
Preferably, an air source outlet of the instrument air spherical tank is provided with a first valve, and each air source branch is provided with a second valve.
Preferably, a manual valve positioned between the first valve and the self-operated pressure regulating valve is arranged on the air source main pipeline.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the 1.0Mpa instrument air is provided through the instrument air spherical tank to serve as an air source of the air storage tank to be used by the coal mill clutch, the 1.0Mpa instrument air is used for replacing an air compressor, and the coal mill clutch has the advantages of being stable in air source pressure, stable in equipment operation, free of maintenance and the like, overcomes fluctuation of a coal mill system caused by unstable clutch air source pressure, and achieves the effects of saving energy and reducing consumption.
2. A self-operated pressure regulating valve is arranged on a main pipeline communicated with a gas source outlet of an instrument air ball tank, so that the phenomenon that a safety valve of a coal mill is tripped due to overpressure of an air storage tank of the coal mill caused by overhigh pressure of the instrument air ball tank is prevented.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic structural diagram of an air source modification system of a coal mill clutch system according to the present invention;
description of reference numerals:
1-instrument air spherical tank, 2-main pipeline, 3-air storage tank, 4-air source branch, 5-self-operated pressure regulating valve, 6-first valve, 7-manual valve and 8-second valve.
Detailed Description
In the following, the technical solutions in the embodiments of the present invention are clearly and completely described with reference to the drawings in the embodiments of the present invention, but it should be understood that the scope of the present invention is not limited by the specific embodiments.
Example (b):
as shown in fig. 1, an air source modification system of a coal mill clutch system is characterized by comprising an instrument air ball tank 1, wherein a main pipeline 2 communicating with an air source outlet of the instrument air ball tank 1 is led into a coal mill factory building, a plurality of air storage tanks 3 for storing an air source of a coal mill clutch are arranged in the coal mill factory building, the main pipeline 2 is respectively communicated with a plurality of air source branches 4, each air source branch 4 is respectively communicated with the air storage tank 3, the instrument air ball tank 1 in the embodiment is a 281 instrument air ball tank, an air compressor is replaced by 1.0Mpa instrument air supplied from the 281 instrument ball tank, and the air source of the 281 instrument air ball tank is stable and has high pressure, so that the starting requirement of the coal mill clutch is met, the air source outlet at the top of the instrument air ball tank 1 is led to a second floor in the coal mill factory building through the main pipeline 2, the main pipeline 2 is communicated with a plurality of air source branches 4, the air source branches 4 are communicated with an air storage tank 3, and an air source is supplied to a clutch of the coal mill through the air storage tank 3.
The number of the air source branches 4 corresponds to the number of the air storage tanks 3, in order to supply the instrument air of 1.0Mpa supplied by the instrument air spherical tank 1 to the plurality of air storage tanks 3.
And a self-operated pressure regulating valve 5 is arranged on the main pipeline 2 to prevent the safety valve of the coal mill from jumping caused by overpressure of the air storage tank 3 of the coal mill due to overhigh pressure of the instrument air spherical tank 1.
The air source outlet of the instrument air spherical tank 1 is provided with a first valve 6, and in order to control the air source supply of the instrument air spherical tank 1, each air source branch 4 is provided with a second valve 8 for controlling the on-off of the air source branch 4.
And a manual valve 7 positioned between the first valve 6 and the self-operated pressure regulating valve 5 is arranged on the main pipeline 2, and plays a role in safety protection in order to control the on-off of the instrument air spherical tank 1.
The utility model discloses a theory of operation and use flow: the air source outlet at the top of the instrument air spherical tank 1 is led to the second floor in a coal mill plant through a main pipeline 2, the main pipeline is communicated with a plurality of air source branches 4, the air source branches 4 are communicated with an air storage tank 3, an air source is supplied to a coal mill clutch through the air storage tank 3, and after all pipelines are installed, the first valve 6, the manual valve 7 and the second valve 8 are respectively opened to enable the system to normally operate.
Finally, the description is as follows: the above disclosure is only one specific embodiment of the present invention, however, the present invention is not limited thereto, and any changes that can be considered by those skilled in the art should fall within the protection scope of the present invention.

Claims (5)

1. The utility model provides a coal pulverizer clutch system air supply transformation system, its characterized in that, includes instrument air ball jar (1), will main pipeline (2) of the air supply export department intercommunication of instrument air ball jar (1) lead to in the coal pulverizer factory building, be equipped with a plurality of air storage tanks (3) that are used for coal pulverizer clutch air supply deposit in the coal pulverizer factory building, main pipeline (2) are linked together respectively with a plurality of air supply branch roads (4), every air supply branch road (4) are linked together with air storage tank (3) respectively.
2. The coal mill clutch system air supply modification system of claim 1, wherein: the number of the air source branches (4) corresponds to the number of the air storage tanks (3).
3. The coal mill clutch system air supply modification system of claim 1, wherein: the main pipeline (2) is provided with a self-operated pressure regulating valve (5).
4. The coal mill clutch system air supply modification system of claim 1, wherein: the air source outlet of the instrument air spherical tank (1) is provided with a first valve (6), and each air source branch (4) is provided with a second valve (8).
5. The coal mill clutch system air supply modification system of claim 1, wherein: and a manual valve (7) positioned between the first valve (6) and the self-operated pressure regulating valve (5) is arranged on the main pipeline (2).
CN202120438482.4U 2021-03-01 2021-03-01 Coal pulverizer clutch system air supply transformation system Active CN214369316U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120438482.4U CN214369316U (en) 2021-03-01 2021-03-01 Coal pulverizer clutch system air supply transformation system

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120438482.4U CN214369316U (en) 2021-03-01 2021-03-01 Coal pulverizer clutch system air supply transformation system

Publications (1)

Publication Number Publication Date
CN214369316U true CN214369316U (en) 2021-10-08

Family

ID=77967642

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120438482.4U Active CN214369316U (en) 2021-03-01 2021-03-01 Coal pulverizer clutch system air supply transformation system

Country Status (1)

Country Link
CN (1) CN214369316U (en)

Similar Documents

Publication Publication Date Title
CN109611686B (en) Metallurgical air separation oxygen supply pipe network system and operation method thereof
CN203686580U (en) Nitrogen gas supplementing system
CN214369316U (en) Coal pulverizer clutch system air supply transformation system
CN202598130U (en) Self-gas-supplying system controlled by pressure adjusting device of compressed natural gas
CN202971129U (en) Automatic control energy-saving system
CN215522887U (en) Intelligent gas pressure regulating system
CN202302744U (en) Compressed air supply system for chemical fiber production
CN211971030U (en) Low-pressure energy-saving ash conveying system
CN103727392A (en) Important instrument air source switching device
CN103807153A (en) Automatic control energy saving system and control method thereof
CN209801145U (en) Nitrogen gas supply system
CN202532175U (en) Bridging branch subarea compressed air supply pipeline
CN114562680B (en) Energy-saving synergistic overhauling gas system and gas supply method
CN216769059U (en) Air supply system for salt cavern area actuating mechanism of compressed air energy storage power station
CN219222076U (en) Energy-saving and water-saving compressed air system for power plant instrument
CN110735784A (en) Intelligent control system of air compressor
CN207349790U (en) A kind of scene supply automatic switchover back-up system device
CN220269138U (en) Nitrogen system for chemical industry
CN111412388A (en) Novel nuclear power ship high-pressure steam automatic pressure reduction device and method
CN219102958U (en) Energy-saving and emission-reducing modular furnace system for water works
CN204533699U (en) Rectangular shape gas pressure regulator, governor
CN215061311U (en) High-low pressure compressed air pipeline mixing networking system
CN214247626U (en) Pipeline structure for maintaining pressure
CN221301016U (en) High-pressure hydrogen unloading continuous switching device
CN203159730U (en) Throttle valve of crust breaking cylinder

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant