CN214301737U - Constructional engineering pile device - Google Patents

Constructional engineering pile device Download PDF

Info

Publication number
CN214301737U
CN214301737U CN202120087152.5U CN202120087152U CN214301737U CN 214301737 U CN214301737 U CN 214301737U CN 202120087152 U CN202120087152 U CN 202120087152U CN 214301737 U CN214301737 U CN 214301737U
Authority
CN
China
Prior art keywords
pile
baffle
strut
limiting
air compressor
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202120087152.5U
Other languages
Chinese (zh)
Inventor
葛慧峰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202120087152.5U priority Critical patent/CN214301737U/en
Application granted granted Critical
Publication of CN214301737U publication Critical patent/CN214301737U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a building engineering pile driver, including the engine, the bottom of engine is installed air compressor, air compressor's one end is installed the breather pipe, the one end welding at air compressor top has the backup pad, the pile head is installed to the one end of breather pipe, the fixed pillar is installed at the top of pile head, the removal board groove has been seted up to fixed pillar inside, the baffle has been installed at the top of removal board groove; this pile driver is when using, has installed the shock strut at the top of pile head, and when this pile driver is at the in-process of assembling the use, if the user uses the pile driver for a long time, the shock strut of installing can alleviate the vibrations that the pile head transmitted, alleviates the fatigue of user's hand, has the backup pad in the one end welding at air compressor top, and the bull stick has been installed to backup pad one end, and before this pile driver uses, can take out the breather pipe of receipts on the bull stick, is convenient for access the breather pipe, has increased the practicality of this pile driver.

Description

Constructional engineering pile device
Technical Field
The utility model belongs to the technical field of the building engineering pile device, concretely relates to building engineering pile device.
Background
The pile driver is a piling machine which utilizes impact force to drive pile into stratum and is formed from pile hammer, pile frame and auxiliary equipment. The basic technical parameters of the pile driver are impact part weight, impact kinetic energy and impact frequency, the pile hammer can be divided into a drop hammer, a steam hammer, a diesel hammer, a hydraulic hammer and the like according to the power source of motion, and the general pile driver can be divided into a drop hammer pile driver, a diesel hammer pile driver, an air hammer pile driver, a hydraulic hammer pile driver and the like.
The pile driver is characterized in that a pile head is arranged on the pile driving device, a handle is arranged on the pile driving device, a pile is arranged on the pile driving device, and a pile driving device is arranged on the pile driving device.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a building engineering pile driver device to solve the current building engineering pile driver device that proposes in the above-mentioned background art, when the pile driver was used usually, can beat the underground with the stake through the striking of pile head, at the in-process that uses the device, if use the pile driver for a long time, the vibrations of pile head can lead to user's hand fatigue, is difficult to hold the handle, appears the stake and is beaten askew problem.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a building engineering pile device, includes the engine, air compressor has been installed to the bottom of engine, the breather pipe has been installed to air compressor's one end, the one end welding at air compressor top has the backup pad, the pile head has been installed to the one end of breather pipe, fixed stay has been installed at the top of pile head, the removal plate groove has been seted up to fixed stay's inside, the baffle has been installed on the top in removal plate groove, the spring has been installed to fixed stay's inboard, shock strut has been installed at the top of spring, shock strut's bottom welding has the removal pillar, limit bottom has been installed to the bottom of removal pillar, the removal pillar is connected with the inside spacing block in removal plate groove of fixed stay, shock strut passes through the spring and is connected with the pile head, the handle has been installed at shock strut's both ends.
Preferably, the welding of the one end of backup pad has the support frame, the spacing groove has been seted up to one side of support frame, the bull stick has been installed to the one end of support frame, the commentaries on classics board has been installed to the one end of bull stick, the commentaries on classics board passes through the bull stick and installs on the support frame, the shelves pole has been installed at the top of commentaries on classics board, the bottom plate has been installed to the one end of commentaries on classics board, limit baffle has been installed to the one end of bottom plate, limit baffle and the spacing block of shelves pole, the bottom plate passes through limit baffle and installs on the commentaries on classics board.
Preferably, the limiting baffle is internally provided with a limiting opening, the limiting baffle is clamped with the stop lever through the limiting opening, and only the limiting baffle arranged at the top and the bottom of the bottom plate is provided with the limiting opening.
Preferably, one side of the support frame is provided with a limiting groove, and the limiting baffle is clamped with the limiting groove in a limiting manner.
Preferably, the surface of the handle is provided with a buffer pad, and the handles at two ends of the shock absorption strut are provided with buffer pads.
Preferably, the top of the handle is welded with a connecting rod, and the connecting rod is also provided with a cushion pad.
Preferably, screws are arranged at two ends of the fixing support, and the fixing support is arranged on the pile head through the screws.
Compared with the prior art, the beneficial effects of the utility model are that:
(1) when the pile driver is used, the vent pipe is installed at one end of the air compressor, the pile head is installed at one end of the vent pipe, the shock absorption support column is installed at the top of the pile head, and when the pile driver is used in an assembling mode, if a user uses the pile driver for a long time, the shock absorption support column can reduce the vibration transmitted by the pile head, so that the fatigue of hands of the user can be conveniently relieved, and the practicability of the device is improved.
(2) The welding of the one end at air compressor top has the backup pad, and the support frame has been installed to the one end at backup pad top, and the bull stick has been installed to the one end of support frame, and before this pile driver uses, can take out the breather pipe of receiving on the bull stick, and the bull stick rotates and makes the breather pipe take off more easily, is convenient for access the breather pipe, has increased this pile driver's practicality.
Drawings
Fig. 1 is a schematic structural view of the present invention;
fig. 2 is an enlarged schematic structural view of the pile head of the present invention;
fig. 3 is a schematic top view of the fixing support according to the present invention;
FIG. 4 is a schematic cross-sectional view of the fixing support according to the present invention;
FIG. 5 is a schematic top sectional view of the support frame of the present invention;
FIG. 6 is an enlarged schematic view of the bottom plate of the present invention;
in the figure: 1. an engine; 2. an air compressor; 3. a support plate; 4. a breather pipe; 5. a support frame; 6. pile head; 7. a shock strut; 8. a handle; 9. moving the strut; 10. a spring; 11. fixing a strut; 12. a baffle plate; 13. moving the strut groove; 14. a limiting bottom plate; 15. a limit baffle; 16. a rotating rod; 17. a limiting groove; 18. a base plate; 19. a gear lever; 20. and (6) rotating the plate.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1, fig. 2, fig. 3, fig. 4, fig. 5 and fig. 6, the present invention provides a technical solution: the utility model provides a pile driver for building engineering, includes engine 1, air compressor 2 has been installed to the bottom of engine 1, breather pipe 4 has been installed to air compressor 2's one end, the one end welding at air compressor 2 top has backup pad 3, pile head 6 has been installed to the one end of breather pipe 4, fixed stay 11 has been installed at the top of pile head 6, moving plate groove 13 has been seted up to fixed stay 11's inside, baffle 12 has been installed at the top of moving plate groove 13, spring 10 has been installed to fixed stay 11's inboard, shock strut 7 has been installed at spring 10's top, shock strut 7's bottom welding has removed the pillar 9, limiting floor 14 has been installed to the bottom of removing pillar 9, remove the spacing block in moving plate groove 13 inside with fixed stay 11, shock strut 7 is connected with pile head 6 through spring 10, handles 8 are arranged at two ends of the shock absorption supporting column 7.
In order to facilitate retraction and extension, in this embodiment, it is preferable that one end of the supporting plate 3 is welded with a supporting frame 5, one side of the supporting frame 5 is provided with a limiting groove 17, one end of the supporting frame 5 is provided with a rotating rod 16, one end of the rotating rod 16 is provided with a rotating plate 20, the rotating plate 20 is installed on the supporting frame 5 through the rotating rod 16, the top of the rotating plate 20 is provided with a stopper rod 19, one end of the rotating plate 20 is provided with a bottom plate 18, one end of the bottom plate 18 is provided with a limiting baffle 15, the limiting baffle 15 is in limiting clamping with the stopper rod 19, the bottom plate 18 is installed on the rotating plate 20 through the limiting baffle 15, for better installation, in this embodiment, it is preferable that a limiting opening is formed inside the limiting baffle 15, the limiting baffle 15 is in limiting clamping with the stopper rod 19 through the limiting opening, and only the limiting baffle 15 installed at the top and the bottom of the bottom plate 18 is provided with a limiting opening, for more convenient fixing, in this embodiment, preferably, 8 limiting grooves 17 are formed in one side of the support frame 5, the limiting baffle 15 is in limiting engagement with the limiting grooves 17, for better shock absorption, in this embodiment, preferably, a cushion pad is mounted on the surface of the handle 8, and the handle 8 at both ends of the shock absorption strut 7 are both mounted with cushion pads, for better use, in this embodiment, preferably, a connecting rod is welded to the top of the handle 8, and a cushion pad is also mounted on the connecting rod, for more stable installation, in this embodiment, preferably, screws are mounted at both ends of the fixing strut 11, and the fixing strut 11 is mounted on the pile head 6 through screws.
The utility model discloses a theory of operation and use flow: when the pile driver is used, the top of the pile head 6 is provided with the fixed support column 11, the inside of the fixed support column 11 is provided with the movable support column 9, the movable support column 9 is limited and arranged inside the fixed support column 11, the top of the movable support column 9 is provided with the shock absorption support column 7, the bottom of the shock absorption support column 7 is provided with the spring 10, the shock absorption support column 7 is connected with the pile head 6 through the spring 10, the two ends of the shock absorption support column 7 are provided with the handles 8, the surface of the handles 8 is provided with the shock absorption pad which can further reduce the shock, the top of the handle 8 is provided with the connecting rod, the surface of the connecting rod is also provided with the shock absorption pad, when the pile driver is used for assembling, a user holds the handles for a long time, the arranged spring 10 can reduce the shock transmitted by the pile head 6, the fatigue of the hand of the user is reduced, the pile driver is convenient to use for a long time, and the practicability of the device is improved, the air pipe 4 is installed at one end of the air compressor 2, the supporting plate 3 is welded at one end of the top of the air compressor 2, the supporting frame 5 is welded at one side of the supporting plate 3, the rotating rod 16 is installed at one end of the supporting frame 5, the rotating plate 20 is installed at one end of the rotating rod 16, the limiting baffle 15 is installed at one end of the rotating plate 20, the installed limiting baffle 15 cannot influence the retraction and release of the air pipe 4, the air pipe 4 can be taken down from the rotating rod 16 before the pile driver is assembled and used, the rotating rod 16 can rotate to facilitate the taking out of the air pipe 4, the air pipe 4 can be taken up on the rotating rod 16 after the pile driver is used, the limiting baffle 15 is moved to limit and fix the air pipe 4, the air pipe 4 is prevented from scattering, the air pipe 4 can be conveniently taken out and taken out, and the practicability of the pile driver is improved.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a building engineering pile driver device, includes engine (1), air compressor (2) have been installed to the bottom of engine (1), breather pipe (4) have been installed to the one end of air compressor (2), backup pad (3), its characterized in that have been welded to the one end at air compressor (2) top: pile head (6) have been installed to the one end of breather pipe (4), fixed stay (11) have been installed at the top of pile head (6), floating plate groove (13) have been seted up to the inside of fixed stay (11), baffle (12) have been installed on the top of floating plate groove (13), spring (10) have been installed to the inboard of fixed stay (11), shock strut (7) have been installed at the top of spring (10), the bottom welding of shock strut (7) has floating strut (9), stop plate (14) have been installed to the bottom of floating strut (9), floating strut (9) and the inside floating plate groove (13) of fixed stay (11) spacing block, shock strut (7) are connected with pile head (6) through spring (10), handle (8) have been installed at the both ends of shock strut (7).
2. A construction piling device according to claim 1, wherein: the welding of the one end of backup pad (3) has support frame (5), spacing groove (17) have been seted up to one side of support frame (5), bull stick (16) have been installed to the one end of support frame (5), commentaries on classics board (20) have been installed to the one end of bull stick (16), commentaries on classics board (20) are installed on support frame (5) through bull stick (16), shelves pole (19) have been installed at the top of commentaries on classics board (20), bottom plate (18) have been installed to the one end of commentaries on classics board (20), limit baffle (15) have been installed to the one end of bottom plate (18), limit baffle (15) and the spacing block of shelves pole (19), bottom plate (18) are installed on commentaries on classics board (20) through limit baffle (15).
3. A construction piling device according to claim 2, wherein: the limiting baffle (15) is internally provided with a limiting opening, the limiting baffle (15) is in limiting clamping with the stop lever (19) through the limiting opening, and only the limiting baffle (15) arranged at the top and the bottom of the bottom plate (18) is provided with the limiting opening.
4. A construction piling device according to claim 2, wherein: 8 spacing grooves (17) have been seted up to one side of support frame (5), spacing baffle (15) and spacing block in spacing groove (17).
5. A construction piling device according to claim 1, wherein: the surface of the handle (8) is provided with a buffer pad, and the handles (8) at the two ends of the shock absorption strut (7) are provided with buffer pads.
6. A construction pile driving device according to claim 5, characterised in that: the top of the handle (8) is welded with a connecting rod, and the connecting rod is also provided with a cushion pad.
7. A construction piling device according to claim 1, wherein: screws are arranged at two ends of the fixed supporting column (11), and the fixed supporting column (11) is arranged on the pile head (6) through the screws.
CN202120087152.5U 2021-01-13 2021-01-13 Constructional engineering pile device Active CN214301737U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202120087152.5U CN214301737U (en) 2021-01-13 2021-01-13 Constructional engineering pile device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202120087152.5U CN214301737U (en) 2021-01-13 2021-01-13 Constructional engineering pile device

Publications (1)

Publication Number Publication Date
CN214301737U true CN214301737U (en) 2021-09-28

Family

ID=77824691

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202120087152.5U Active CN214301737U (en) 2021-01-13 2021-01-13 Constructional engineering pile device

Country Status (1)

Country Link
CN (1) CN214301737U (en)

Similar Documents

Publication Publication Date Title
CN111139813A (en) Adobe tamping device in building engineering field
CN214301737U (en) Constructional engineering pile device
CN213448471U (en) Road and bridge engineering is with effectual vibration pile driver of antidetonation
CN109580273A (en) A kind of detritus device suitable for asteroid
CN210684687U (en) Pile driver for bridge construction
CN212104072U (en) Constructional engineering pile device
CN211713959U (en) Bridge construction is with pile device
CN111604855B (en) Shock absorber and dismounting tool thereof
CN214883638U (en) Stable pile driver capable of adapting to different fields
CN112575650A (en) Hammering noise reduction device for road construction convenient to maintain
CN213683931U (en) Dust keeper that pile driver drilling was used
CN212958612U (en) Multifunctional stone breaking impactor
CN219281728U (en) Drilling equipment for controlling water based on coal mine ground survey
CN217180917U (en) Drilling device for detecting concrete carbonization depth of road and bridge
CN220286632U (en) Water supply and drainage pipeline protection device for road construction
CN218148334U (en) Building pile driver
CN214738038U (en) Construction pile driving device that stability is good
CN215258665U (en) Environment-friendly mounting bracket for hydraulic pump with shock-absorbing function
CN212568001U (en) Soil sampling device for soil compaction test in railway building
CN212878074U (en) Mapping equipment box
CN212154642U (en) Swift pile device of construction
CN213897110U (en) Mechanical hydraulic piling equipment
CN217128217U (en) Pile driver
CN214194526U (en) Green engineering is with high-efficient pile foundation pile device
CN215179909U (en) Hollowing detection device for building engineering

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant