CN214298988U CN202022821305.2U CN202022821305U CN214298988U CN 214298988 U CN214298988 U CN 214298988U CN 202022821305 U CN202022821305 U CN 202022821305U CN 214298988 U CN214298988 U CN 214298988U
Authority
CN
China
Prior art keywords
tower
tower body
interior
crane
joint
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022821305.2U
Other languages
Chinese (zh)
Inventor
孙田
陈莉萍
才冰
王明鑫
吴静
白晶
姜利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fushun Yongmao Construction Machinery Co ltd
Original Assignee
Fushun Yongmao Construction Machinery Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fushun Yongmao Construction Machinery Co ltd filed Critical Fushun Yongmao Construction Machinery Co ltd
Priority to CN202022821305.2U priority Critical patent/CN214298988U/en
Application granted granted Critical
Publication of CN214298988U publication Critical patent/CN214298988U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a tower crane double tower body, including the lower extreme through interior tower body lower margin fix the interior tower body on the basis, including tower body outside cover be equipped with outer tower body, this outer tower body lower end is fixed on the basis through outer tower body lower margin, the upper end is equipped with the attached festival that inboard and interior tower body are connected. The utility model discloses an increase the outer body of tower that bending resistance is stronger in the outside of body of tower including, connect into an organic whole through adhering to the festival and form two body of tower structures, part the atress transmission route of body of tower, the main transmission tower machine moment of tumbling of body of tower promptly, the main vertical power of transmission tower machine of interior body of tower, and then alleviate the atress of former single body of tower, increase whole body of tower bearing capacity, the intensity and the rigidity of whole body of tower have been improved greatly, thereby improve tower crane's the biggest free height, in order to satisfy the actual work requirement. The utility model discloses simple structure, design are ingenious, have not only improved the biggest free height of tower body, but also improved the anti typhoon ability and the rate of equipment utilization of tower machine, have filled the blank of this type of tower body, are worth extensive popularization and application.

Description

Double-tower body of tower crane
Technical Field
The utility model belongs to the technical field of tower crane, a tower crane double tower body is related to.
Background
At present, tower cranes are widely applied to construction projects such as industrial plants, civil buildings, nuclear power, thermal power, bridges and the like. High safety engineering construction (such as nuclear power construction) and high free height engineering (such as operation but not attachment of stadiums and large theatre group towers) are gradually increased. The rated height of the tower crane in the non-attachment state is called the free height for short, and the free heights of tower cranes with different grades and models are also different. How to safely and reliably solve the problems on the basis of less increased cost is a development direction of tower crane application technology. Due to the complicated site conditions of the construction project, some situations are quite special, such as: in order to avoid existing buildings, trees, high-voltage lines and the like, the initial installation height of the tower crane must exceed the height of an obstacle, but the buildings are not constructed to a certain height at the moment, and attachment points cannot be arranged on the buildings to enhance the stability of the tower crane. Some building projects are tower group operation, a certain safety distance is required to be ensured between tower cranes, and some tower cranes must avoid adjacent tower cranes, so that the tower cranes with high free height are required to complete the work, and the conventional methods for increasing the free height of the tower cranes comprise the following steps: 1. a mode 2 of a large-size standard section, a conversion section and a small-size standard section is adopted, and the whole tower body adopts the large-size standard section. Both of these forms are costly to manufacture, install and transport. Especially, the cost is greatly increased under the condition that a user carries out transformation on the existing tower crane. Meanwhile, in view of the fact that the strength and rigidity of the tower body are the main reasons influencing the increase of the height of the tower crane, the maximum free height of the tower crane can be improved only by increasing the strength and rigidity of the tower body, and the two modes only increase the height of the tower body, so that the tower crane cannot reach the maximum free height due to the fact that the strength and rigidity of the tower body cannot be further enhanced, and actual working requirements are difficult to meet.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a simple structure, design are ingenious, can effectively overcome the tower crane double tower body that current increase tower crane free height mode weak point.
The utility model adopts the technical proposal that: this two towers include that the lower extreme passes through the interior tower body of interior tower body lower margin fixed on the basis, and its characteristics are: the outer tower body is sleeved outside the inner tower body, the lower end of the outer tower body is fixed on the foundation through outer tower body ground feet, and the upper end of the outer tower body is provided with an attachment section connected with the inner tower body.
The utility model discloses an increase the outer body of tower that bending resistance is stronger in the outside of body of tower including, connect into an organic whole through adhering to the festival and form two body of tower structures, part the atress transmission route of body of tower, the main transmission tower machine moment of tumbling of body of tower promptly, the main vertical power of transmission tower machine of interior body of tower, and then alleviate the atress of former single body of tower, increase whole body of tower bearing capacity, the intensity and the rigidity of whole body of tower have been improved greatly, thereby improve tower crane's the biggest free height, in order to satisfy the actual work requirement. The utility model discloses simple structure, design are ingenious, have not only improved the biggest free height of tower body, but also improved the anti typhoon ability and the rate of equipment utilization of tower machine, have filled the blank of this type of tower body, are worth extensive popularization and application.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of the connection between the outer tower body and the adjustment and attachment sections of the present invention;
FIG. 3 is a schematic structural view of an attachment section of the utility model;
fig. 4 is a schematic structural view of the outer tower body of the present invention;
FIG. 5 is a schematic structural view of the adjustment joint of the present invention;
FIG. 6 is a top view of the attachment section of the present invention;
FIG. 7 is a view A-A of FIG. 6;
fig. 8 is a view B-B of fig. 6.
Detailed Description
As shown in figure 1, the utility model comprises an inner tower 6 whose lower end is fixed on the foundation through an inner tower foot 5. The outer tower body 2 is sleeved outside the inner tower body 6, the lower end of the outer tower body 2 is fixed on the foundation through an outer tower body foot 4, and the upper end of the outer tower body is provided with an attachment section 1, the inner side of which is connected with the inner tower body 6.
As shown in fig. 1 and 2, an adjusting joint 3 is provided between the lower end of the outer tower 2 and the outer tower anchor 4, and the adjusting joint 3 is used for adjusting the height of the outer tower 2, thereby ensuring that the attachment joint 1 is installed at the horizontal web member of the inner tower 6. The upper end and the lower end of the outer tower body 2 are respectively connected with the upper ends of the attachment section 1 and the adjusting section 3 through bolts 12. The lower end of the adjusting joint 3 is connected with an outer tower body anchor 4. As shown in fig. 3, 4 and 5, the attachment section 1, the outer tower body 2 and the adjustment section 3 are all H-shaped main limbs, 6 bolt holes are arranged on the upper end surface and the lower end surface of each main limb for connecting with each other, and the adjustment section 3 is of an integral welding structure.
As shown in fig. 3, 6, 7 and 8, the attachment joint 1 is formed by connecting two half frames 7 by a first bolt 10 in the middle. The two sides of each inner angle of the attachment section 1 are respectively provided with a large wedge block 8 and a small wedge block 9 which are used for wedging and fixing the main limb of the inner tower body 6, and the large wedge block 8 and the small wedge block 9 are limited and fixed by a second bolt 11 connected with an inner climbing section of the attachment section 1 and a pressing plate 14, so that the attachment section 1 is connected with the inner tower body 6.
As shown in FIG. 4, the outer tower body 2 is formed by connecting a front main piece 1-1 and a rear main piece 1-2 and side pieces 1-2 at two sides through a third bolt 13, and the split structure is adopted, so that the installation and the transportation are convenient.
The utility model discloses an installation as follows: in the initial installation stage, the inner tower body foot margin 5 and the outer tower body foot margin 4 are embedded into the foundation, then the inner tower body 6 is installed, the adjusting joint 3 is installed together, then the whole tower crane is installed, after the installation of the tower crane is completed, the installation of the outer tower body 2 is started, one main piece 1-1 and two side pieces 1-2 are connected on the ground, then the main piece is hoisted and sleeved on the outer side of the inner tower body 6, and then the other main piece 1-1 is hoisted and connected with the rest three pieces through a plurality of groups of high-strength bolts. And then a plurality of groups of high-strength bolts are connected with the adjusting joints 3. And (3) installing the attaching joint 1, hoisting and attaching a half frame 7, and connecting the half frame with the outer tower body 2 by using a plurality of groups of high-strength bolts. And hoisting the other corresponding half frame 7, connecting the other half frame with the outer tower body 2 by using a plurality of groups of high-strength bolts, and simultaneously connecting the two half frames 7 by using a plurality of groups of high-strength bolts. The attachment section 1 is clamped, the large and small wedge irons 8 and 9 are driven into the gap between the attachment section 1 and the main limb of the inner tower body 6, and after being tightened, the attachment section is fixed with a pressing plate 14 by using bolts 11. The height of the outer tower body 2 can be calculated according to the free height required by different tower types in actual projects.

Claims (5)

1. The utility model provides a tower crane double tower body, includes that the lower extreme passes through interior tower body lower margin (5) and fixes interior tower body (6) on the basis, characterized by: an outer tower body (2) is sleeved outside the inner tower body (6), the lower end of the outer tower body (2) is fixed on a foundation through an outer tower body foot (4), and the upper end of the outer tower body is provided with an attachment joint (1) the inner side of which is connected with the inner tower body (6); the attachment joint (1) is formed by connecting two half frames (7) through a first bolt (10) in the middle; the two sides of each inner angle of the attachment joint (1) are respectively provided with a large wedge block and a small wedge block (8 and 9) which are used for wedging and fixing the main limb of the inner tower body (6), and the large wedge block and the small wedge block (8 and 9) are limited and fixed by a second bolt (11) connected with the inner climbing joint of the attachment joint (1) and a pressing plate (14).
2. The twin tower crane body of claim 1, wherein: the outer tower body (2) is formed by connecting a front main piece (1-1) and a rear main piece (1-1) and side pieces (1-2) at two sides through a third bolt (13).
3. The twin tower of claim 1 or claim 2, wherein: an adjusting joint (3) is arranged between the lower end of the outer tower body (2) and the outer tower body anchor (4).
4. The twin tower of claim 1 or claim 2, wherein: the attachment joint (1) and the outer tower body (2) both adopt H-shaped main limbs, and the upper end surface and the lower end surface of each main limb are provided with 6 bolt holes.
5. The twin tower crane body of claim 4, wherein: the adjusting joint (3) adopts H-shaped main limbs, and the upper end surface and the lower end surface of each main limb are provided with 6 bolt holes.
CN202022821305.2U 2020-11-30 2020-11-30 Double-tower body of tower crane Active CN214298988U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022821305.2U CN214298988U (en) 2020-11-30 2020-11-30 Double-tower body of tower crane

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022821305.2U CN214298988U (en) 2020-11-30 2020-11-30 Double-tower body of tower crane

Publications (1)

Publication Number Publication Date
CN214298988U true CN214298988U (en) 2021-09-28

Family

ID=77845109

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022821305.2U Active CN214298988U (en) 2020-11-30 2020-11-30 Double-tower body of tower crane

Country Status (1)

Country Link
CN (1) CN214298988U (en)

Similar Documents

Publication Publication Date Title
CN108193607A (en) Fabricated prestressed truss for reinforcement and construction method thereof
CN107806273B (en) Be applied to assembled node of individual layer steel construction cooling tower
CN206785083U (en) A kind of combined pole with high firm support performance
CN105625795A (en) Adjustable leading rope spreading arm frame
CN215160469U (en) Climbing type wind power generation hoisting crane
CN214298988U (en) Double-tower body of tower crane
CN202785387U (en) Indoor cantilever crane
CN202913338U (en) Steel truss full-welded truss piece
CN205713401U (en) A kind of adjustable messenger unfolding jib
CN208430851U (en) A kind of steel tube concrete column feet node
CN214614570U (en) Assembled steel truss beam column connection part
CN204475150U (en) Assembly type steel bridge pier column
CN212358012U (en) Widening platform device of hydraulic creeping formwork for quickly constructing double-limb cable tower
CN207244453U (en) A kind of suspension bridge light anchorage mast apparatus
CN217921190U (en) Double-tower body of tower crane
CN112127620A (en) Silo conical shell formwork support platform and erection method thereof
CN202245789U (en) Special typhoon prevention device for gantry crane
CN215561957U (en) Cable-stayed bridge steel tower type vertical rotation installation construction device
CN215048233U (en) Wall-attached steel beam fixing structure of internal climbing tower crane
CN207330181U (en) Mechanical device integrating climbing frame of tower crane and structural support beam
CN109956395A (en) A kind of steel vestibule integrally promotes shackle structure
CN217232982U (en) Four return circuit 10kV overhead line's tower of acting as go-between
CN216339650U (en) Tower crane foundation mounting structure for construction
CN220950954U (en) Tower crane wall attaching device for section steel tower