CN214245694U CN202023101942.9U CN202023101942U CN214245694U CN 214245694 U CN214245694 U CN 214245694U CN 202023101942 U CN202023101942 U CN 202023101942U CN 214245694 U CN214245694 U CN 214245694U
Authority
CN
China
Prior art keywords
pile
concrete
reinforcement cage
casing
forming system
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023101942.9U
Other languages
Chinese (zh)
Inventor
王新泉
刁红国
崔允亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang University City College ZUCC
Original Assignee
Zhejiang University City College ZUCC
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang University City College ZUCC filed Critical Zhejiang University City College ZUCC
Priority to CN202023101942.9U priority Critical patent/CN214245694U/en
Application granted granted Critical
Publication of CN214245694U publication Critical patent/CN214245694U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Piles And Underground Anchors (AREA)

Abstract

The utility model discloses a karst area major diameter bored concrete pile becomes stake system belongs to the pile foundation and pours technical field. The utility model comprises a lower short protective cylinder part, a middle sleeve part and an upper long protective cylinder part which are connected in sequence; the middle sleeve part comprises a PVC sleeve, a main reinforcement and a stirrup, the main reinforcement is arranged in a circle along the stirrup, the main reinforcement and the stirrup form a reinforcement cage, and the middle section of the reinforcement cage is fixed in the PVC sleeve through concrete; the upper long protection cylinder part is an upper concrete column mainly formed by pouring concrete at the upper end of the reinforcement cage; the lower part short protection barrel part comprises a lower part short protection barrel and a lower part concrete column formed by pouring concrete at the upper end of a steel reinforcement cage, a circle of connecting T-shaped ribs are arranged on the steel reinforcement cage, and the connecting T-shaped ribs are abutted to the inner wall of the PVC sleeve. The utility model discloses when the solution cavity district is become the stake and is pour, need not punishment or fill underground solution cavity, especially the solution cavity of big volume, little to the solution cavity environmental impact, reduce the cost.

Description

Pile forming system for large-diameter cast-in-situ bored pile in karst area
Technical Field
The utility model belongs to the technical field of the pile foundation is pour, especially relate to karst area major diameter bored concrete pile becomes stake system.
Background
Karst landforms are widely distributed in China, especially in the southwest region. Karst areas develop a plurality of karst caves and underground rivers, so when the industrial and agricultural construction planning is carried out in the areas, the karst caves and the underground rivers need to be avoided as much as possible, and if the karst caves and the underground rivers cannot be avoided, anti-seepage measures and the like need to be taken. With the comprehensive promotion of the national infrastructure construction, karst geological conditions are often encountered during engineering construction, and the engineering quality and the construction progress are restricted by the problems of the stability and the collapse of the foundation.
In order to overcome the problems of foundation stability and collapse in engineering construction in karst areas, measures for reinforcing the foundation are usually adopted. The most common foundation form is a pile foundation, and when the thickness of a covering layer on the upper part of a karst cave does not meet the requirement of the bearing capacity, a pile body needs to penetrate through the karst cave so as to meet the requirement of the bearing capacity of the pile foundation. The traditional construction method needs to carry out landfill treatment on the karst cave, or adopts a steel casing to be placed in the karst cave to play a role in enclosing the pouring of concrete. The former needs to consume a large amount of landfill materials, and the latter is easy to leak slurry during construction and the used steel casing cannot be recycled, so that the two measures have the problems of environmental pollution, high manufacturing cost and the like.
Therefore, the pile forming system and the construction method of the large-diameter cast-in-situ bored pile in the karst region, which have small influence on the environment of the karst cave, do not need to be buried and can recover the steel casing, are needed to be found out urgently.
SUMMERY OF THE UTILITY MODEL
The utility model aims at overcoming the defects and providing a pile forming system for the large-diameter cast-in-situ bored pile in the karst area.
In order to solve the technical problem, the utility model discloses a realize through following technical scheme:
the utility model relates to a pile forming system of a large-diameter cast-in-situ bored pile in a karst area, which comprises a lower short protective cylinder part, a middle sleeve part and an upper long protective cylinder part which are sequentially connected;
the middle sleeve part comprises a PVC sleeve, a main reinforcement and a stirrup, the main reinforcement is arranged in a circle along the stirrup, the main reinforcement and the stirrup form a reinforcement cage, and the middle section of the reinforcement cage is fixed in the PVC sleeve through concrete;
the upper long protection cylinder part is an upper concrete column mainly formed by pouring concrete at the upper end of the reinforcement cage;
the lower short pile casing part comprises a lower short pile casing and a lower concrete column formed by pouring concrete at the upper end of the reinforcement cage.
Furthermore, one end of the PVC sleeve is connected with the upper long protection cylinder part, and the other end is connected with the lower short protection cylinder part.
Furthermore, a circle of connecting T-shaped ribs are arranged on the reinforcement cage and abut against the inner wall of the PVC sleeve.
Furthermore, a main rib is correspondingly connected with one connecting T-shaped rib.
Furthermore, the outside cover of PVC sleeve pipe is equipped with and meets water inflation sealing washer.
Furthermore, the outer surface of the end part of the lower short protection cylinder is welded with a protection cylinder support frame.
The utility model discloses following beneficial effect has:
the utility model discloses it need not fill subaerial solution cavity region to pour the pile body in solution cavity district, and then the construction speed of very high pile foundation and corresponding construction spill the cost, when being directed at the solution cavity of large size very much, wherein the long pile casing in upper portion that uses before pouring the pile body can also retrieve and recycle, sets up the PVC sleeve at the steel reinforcement cage middle part, not only can prevent that the concrete from flowing into the solution cavity in, can also prevent that dado mud from flowing into the solution cavity and causing environmental pollution.
Of course, it is not necessary for any particular product to achieve all of the above-described advantages at the same time.
Drawings
In order to more clearly illustrate the technical solutions of the embodiments of the present invention, the drawings used in the description of the embodiments will be briefly introduced below, and it is obvious that the drawings in the following description are only some embodiments of the present invention, and it is obvious for those skilled in the art that other drawings can be obtained according to these drawings without creative efforts.
FIG. 1 is a schematic diagram of a pile forming process of a large-diameter cast-in-situ bored pile in a karst area;
FIG. 2 is a schematic structural view of a reinforcement cage;
FIG. 3 is a schematic structural view of a reinforcement cage and a PVC sleeve;
in the drawings, the components represented by the respective reference numerals are listed below:
1-ground; 2-annular angle steel clamps; 3-a wedge-shaped ground ring beam; 4-upper long protecting cylinder; 5-karst cave; 6-PVC sleeves; 7-protecting the cylinder supporting frame; 8-lower short protecting cylinder; 9-wall protection slurry; 10-a reinforcement cage; 11-cable wires; 12-a water-swellable seal ring; 13-a camera; 14-a lighting lamp; 15-main reinforcement; 16-a stirrup; 17-connecting T-shaped ribs; 18-stake hole.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments of the present invention, all other embodiments obtained by a person of ordinary skill in the art without creative efforts belong to the protection scope of the present invention.
In the description of the present invention, it is to be understood that the terms "open hole", "upper", "lower", "thickness", "top", "middle", "length", "inner", "around", and the like, indicate positional or positional relationships, are merely for convenience in describing the present invention and to simplify the description, and do not indicate or imply that the components or elements referred to must have a particular orientation, be constructed and operated in a particular orientation, and therefore should not be construed as limiting the present invention.
Welding technical requirement between the reinforcing bar, concrete placement main points, plain soil tamp, pile foundation construction quality standard etc, the utility model discloses do not describe again tiredly, the key explanation the utility model discloses the embodiment of structure.
Referring to fig. 1-3, the present invention relates to a pile-forming system for large-diameter bored concrete piles in karst areas, which comprises a lower short protective cylinder, a middle sleeve and an upper long protective cylinder connected in sequence, wherein the concrete is poured from bottom to top.
The pile forming system is a pile foundation improved corresponding to a karst area special terrain, and is a pile foundation corresponding to an area with a cavity under the ground surface, wherein a lower short pile casing part is arranged under a construction foundation under the cavity, a middle sleeve part is arranged in the cavity area, and an upper long pile casing part is arranged in the ground surface area above the cavity.
Firstly, a pile hole 18 is drilled on the ground 1, then an annular wedge-shaped foundation pit is excavated on the outer ring of the pile hole 18, then reinforcing steel bars are bound and concrete is poured to form a wedge-shaped ground ring beam 3, a steel casing with a proper size is selected according to the size of the pile hole 18, an upper long casing 4 is manufactured in sections, then the hole is dug, the steel casing is driven in sections to a required depth, an annular angle steel fixture 2 is welded on the top of the long casing 4, and the integral upper long casing 4 is clamped and fixed on the wedge-shaped ground ring beam 3.
And (3) continuing drilling until the karst cave 5 in the stratum is penetrated, replacing a small-size drill bit, drilling along the direction of the long pile casing 4, installing a lower short pile casing 8 at the hole opening part below the karst cave 5, manually discharging, welding pile casing support frames 7 around the top of the outer wall of the lower short pile casing 8, fixing the pile casing support frames on rock mass of the peripheral karst cave 5, and performing slurry circulation wall protection on holes below the lower end of the other lower short pile casing 8.
Specifically, the middle sleeve part comprises a PVC sleeve 6, a main reinforcement 15 and a stirrup 16, the main reinforcement 15 is arranged in a circle along the stirrup 16, and the main reinforcement 15 and the stirrup 16 form the reinforcement cage 10.
The lower short pile casing part comprises a lower short pile casing 8 and a lower concrete column formed by pouring concrete at the upper end of a reinforcement cage 10.
When concrete is poured in the lower short protection tube 8, auxiliary pouring can be performed through the cable 11 hanging illuminating lamp 14 and the camera 13, and when concrete is prevented from being poured, the upper port of the lower short protection tube 8 is prevented from being filled with concrete.
Specifically, the middle section of the reinforcement cage 10 is fixed in the PVC casing 6 by concrete.
Be equipped with the round on steel reinforcement cage 10 and connect T shape muscle 17, connect T shape muscle 17 and support in PVC sleeve pipe 6's inner wall, it is specific, connect the one end of T shape muscle 17 and connect in main muscle 15, another section position strip muscle end, strip muscle end supports and leans on PVC sleeve pipe 6, solidifies in PVC sleeve pipe 6 after concreting.
Preferably, a main rib 15 is correspondingly connected to a connecting T-shaped rib 17.
The upper long protection cylinder part is mainly an upper concrete column formed by pouring concrete at the upper end of the reinforcement cage 10.
And (3) intensively mixing the commercial concrete, installing a downward guide pipe in the pile hole 18 for concrete pouring, gradually recovering the wall protection slurry 9, withdrawing the illuminating lamp 14 and the camera 13 in time when the height of the concrete reaches the top of the lower short protection cylinder 8, and then continuously pouring the concrete until the height of the concrete reaches the ground 1.
And then pouring the middle sleeve part and the upper long protective barrel part in sequence.
When the upper half section of the upper long protection cylinder part is poured, the upper long protection cylinder 4 is slowly pulled out, and concrete is supplemented to complete the construction of the large-diameter cast-in-situ bored pile forming system in the karst region.
According to the above casting method, one end of the PVC casing 6 formed after casting is connected to the upper long shroud section and the other end is connected to the lower short shroud section 8.
Preferably, the PVC sleeve 6 is externally sleeved with a water-swellable seal ring 12.
In the description herein, references to the description of "one embodiment," "an example," "a specific example," etc., mean that a particular feature, structure, material, or characteristic described in connection with the embodiment or example is included in at least one embodiment or example of the invention. In this specification, the schematic representations of the terms used above do not necessarily refer to the same embodiment or example. Furthermore, the particular features, structures, materials, or characteristics described may be combined in any suitable manner in any one or more embodiments or examples.
The preferred embodiments of the present invention disclosed above are intended only to help illustrate the present invention. The preferred embodiments are not intended to be exhaustive or to limit the invention to the precise embodiments disclosed. Obviously, many modifications and variations are possible in light of the above teaching. The embodiments were chosen and described in order to best explain the principles of the invention and its practical applications, to thereby enable others skilled in the art to best understand the invention for and utilize the invention. The present invention is limited only by the claims and their full scope and equivalents.

Claims (6)

1. Karst area major diameter bored concrete pile becomes stake system, protects section of thick bamboo portion, middle part sleeve pipe portion and the long section of thick bamboo portion of protecting in upper portion including the lower part that links to each other in proper order short, its characterized in that:
the middle sleeve part comprises a PVC sleeve (6), a main reinforcement (15) and a stirrup (16), the main reinforcement (15) is arranged in a circle along the stirrup (16), the main reinforcement (15) and the stirrup (16) form a reinforcement cage (10), and the middle section of the reinforcement cage (10) is fixed in the PVC sleeve (6) through concrete;
the upper long protection cylinder part is an upper concrete column mainly formed by pouring concrete at the upper end of the reinforcement cage (10);
the lower short pile casing part comprises a lower short pile casing (8) and a lower concrete column formed by pouring concrete at the upper end of the reinforcement cage (10).
2. The pile forming system for the large-diameter cast-in-situ bored pile in the karst area as claimed in claim 1, wherein one end of the PVC casing (6) is connected with the upper long protection barrel part, and the other end is connected with the lower short protection barrel part.
3. The pile forming system for the large-diameter cast-in-situ bored pile in the karst area as claimed in claim 2, wherein a circle of connecting T-shaped rib (17) is arranged on the reinforcement cage (10), and the connecting T-shaped rib (17) abuts against the inner wall of the PVC casing (6).
4. The pile forming system for the large-diameter cast-in-situ bored pile in the karst area as claimed in claim 3, wherein a connecting T-shaped rib (17) is correspondingly connected with a main rib (15).
5. The karst area large-diameter cast-in-situ bored pile forming system according to claim 1, wherein a water-swelling sealing ring (12) is sleeved outside the PVC sleeve (6).
6. The pile forming system for the large-diameter cast-in-situ bored pile in the karst area according to claim 1, wherein the pile casing support frame (7) is welded to the outer surface of the end of the lower short pile casing (8).
CN202023101942.9U 2020-12-21 2020-12-21 Pile forming system for large-diameter cast-in-situ bored pile in karst area Active CN214245694U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023101942.9U CN214245694U (en) 2020-12-21 2020-12-21 Pile forming system for large-diameter cast-in-situ bored pile in karst area

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023101942.9U CN214245694U (en) 2020-12-21 2020-12-21 Pile forming system for large-diameter cast-in-situ bored pile in karst area

Publications (1)

Publication Number Publication Date
CN214245694U true CN214245694U (en) 2021-09-21

Family

ID=77740483

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023101942.9U Active CN214245694U (en) 2020-12-21 2020-12-21 Pile forming system for large-diameter cast-in-situ bored pile in karst area

Country Status (1)

Country Link
CN (1) CN214245694U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114232615A (en) * 2021-12-10 2022-03-25 中国一冶集团有限公司 Cast-in-place pile steel casing
CN115262563A (en) * 2022-08-19 2022-11-01 中铁二局集团有限公司 Construction method and device for penetrating closed karst cave layer through pile foundation engineering

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114232615A (en) * 2021-12-10 2022-03-25 中国一冶集团有限公司 Cast-in-place pile steel casing
CN115262563A (en) * 2022-08-19 2022-11-01 中铁二局集团有限公司 Construction method and device for penetrating closed karst cave layer through pile foundation engineering

Similar Documents

Publication Publication Date Title
CN112627172B (en) Pile forming system and construction method for large-diameter cast-in-situ bored pile in karst area
US20140026518A1 (en) Construction method for root-type foundation anchorage and bored, root-type cast in-situ pile with anchor bolts
CN102383431B (en) Middle pick prestressed centrifugally pile tube pile-sinking device and pile sinking method thereof
CN214245694U (en) Pile forming system for large-diameter cast-in-situ bored pile in karst area
CN110735600B (en) Mechanical pore-forming pile construction process for karst geology
CN106930276A (en) The deep hole blasting of rotary digging bored concrete pile and the construction method of conduit rotary digging removing obstacles
CN110629747A (en) Full-casing full-rotation construction process for pile foundation under complex geological conditions
CN112761188A (en) Construction structure and construction method of concrete inverted hanging well suitable for mucky soil
CN102359112A (en) Method for bracing foundation pit by using steel box piles
CN113605383A (en) A steel protects a section of thick bamboo is transferred in merogenesis for bored concrete pile construction
CN113174988A (en) Double-wall concrete open caisson structure and construction method
CN103485347A (en) Batter pile used for building foundation pit support and construction method thereof
CN102383428B (en) Middle pick reverse drawing method prestressed centrifugally pile tube pile-sinking device and pile-sinking method thereof
CN106480878A (en) A kind of upper and lower part expansion type soil cement is combined pile tube
CN104074197A (en) Large-diameter thin-walled tubular pile composite anchor rod type foundation pit support structure and construction method thereof
CN109610473A (en) A kind of construction method of the large-scale pool structure foundation pit supporting system of municipal administration
CN212175815U (en) Deep foundation pit supporting structure
CN212052725U (en) Karst cave area stake construction structures
CN101161947A (en) Integration method of lagging pile and dewatering well for foundation ditch support
CN109989346B (en) Bridge large-diameter precast concrete tubular column foundation and construction method thereof
CN111877321A (en) Cast-in-place pile applied to underground reinforced concrete structure and construction method thereof
CN217870505U (en) Excavation supporting construction of tunnel top foundation ditch excavation
CN102758434B (en) Middle pick prestressed centrifugally pile tube pile-sinking device and pile sinking method thereof
CN112943256B (en) Construction method of prefabricated pipe-jacking working well
CN114635450A (en) Construction method for permanent steel pipe structural column of covered and excavated station

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant