CN214204731U - Cable bridge convenient to adjust installation for electric power construction - Google Patents

Cable bridge convenient to adjust installation for electric power construction Download PDF

Info

Publication number
CN214204731U
CN214204731U CN202022995463.XU CN202022995463U CN214204731U CN 214204731 U CN214204731 U CN 214204731U CN 202022995463 U CN202022995463 U CN 202022995463U CN 214204731 U CN214204731 U CN 214204731U
Authority
CN
China
Prior art keywords
support frame
slide rail
adjust
electric power
power construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022995463.XU
Other languages
Chinese (zh)
Inventor
冯伟杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Xinhan Power Installation Engineering Co ltd
Original Assignee
Anhui Xinhan Power Installation Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Anhui Xinhan Power Installation Engineering Co ltd filed Critical Anhui Xinhan Power Installation Engineering Co ltd
Priority to CN202022995463.XU priority Critical patent/CN214204731U/en
Application granted granted Critical
Publication of CN214204731U publication Critical patent/CN214204731U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model discloses a cable crane span structure for electric power construction convenient to adjust installation, including the mounting panel, the top and the bottom of mounting panel are through on the first bolt fixed connection wall, the mounting panel is kept away from the fixed first slide rail that is provided with in wall one side, fixed plate top and bottom swing joint have the second bolt, the fixed plate is kept away from the fixed support frame that is provided with in mounting panel one side, the activity of support frame top is provided with places the board, the fixed second slide rail that is provided with in support frame top, it is provided with two standing grooves to place board top symmetry, it has a plurality of spacing holes to place the fixed of board bottom, it is provided with the dead lever to place board bottom activity, the activity of dead lever bottom is passed support frame fixedly connected with adjustment handle, the fixed stopper that is provided with in dead lever top. The utility model discloses simple structure, convenient to use can adjust the height and the horizontal position of cable crane span structure after the installation of cable crane span structure.

Description

Cable bridge convenient to adjust installation for electric power construction
Technical Field
The utility model relates to a cable crane span structure technical field for the electric power construction specifically is a cable crane span structure for electric power construction convenient to adjust installation.
Background
The cable bridge is divided into structures of a groove type, a tray type, a ladder type, a grid type and the like, and comprises a support, a supporting arm, an installation accessory and the like. The inner bridge frame of the building can be independently erected and also can be laid on various buildings and pipe gallery supports, the characteristics of simple structure, attractive appearance, flexible configuration, convenient maintenance and the like are reflected, all parts need to be galvanized, and the inner bridge frame is arranged outside the building in the open air.
The cable bridge frame for the common electric power construction has the following defects: general cable bridge for electric power construction can not adjust the height of cable bridge after the installation, has restricted the suitability of cable bridge, and the trench position of placing of cable bridge after the installation is fixed, can't adjust, influences the angle of erectting of both sides cable.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a cable crane span structure for electric power construction convenient to adjust the installation to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a cable bridge for electric power construction convenient to adjust and install comprises an installation plate, wherein a first slide rail is fixedly arranged on one side of the installation plate, a fixed plate is movably connected in the first slide rail, a second bolt is movably connected at the top and the bottom of the fixed plate, a plurality of bolt holes are fixedly arranged at the top and the bottom of one side of the first slide rail, a support frame is fixedly arranged on one side of the fixed plate away from the installation plate, a placing plate is movably arranged at the top of the support frame, a second slide rail is fixedly arranged at the top of the support frame, the placing plate is slidably arranged in the second slide rail, two placing grooves are symmetrically arranged at the top of the placing plate, a plurality of limiting holes are fixedly arranged at the bottom of the placing plate, a fixed rod is movably arranged at the bottom of the placing plate, the top of the fixed rod is embedded with the limiting holes, and an adjusting handle is fixedly connected at the bottom of the fixed rod through the support frame, the fixed stopper that is provided with in dead lever top, the stopper with fixedly connected with spring between the support frame, spring movable sleeve is established on the dead lever.
Preferably, the bolt holes in the top and the bottom of one side of the first slide rail are uniformly and symmetrically arranged.
Preferably, the second bolt is engaged with the bolt hole.
Preferably, a protective pad is fixedly arranged in the placing groove.
Preferably, the bottom of the mounting plate is fixedly connected with a supporting rod, and the top of the supporting rod is fixedly connected with the bottom of the supporting frame.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses a when using fix the cable conductor on the standing groove, then stimulate the regulation handle downwards when needing to adjust and placing the board lateral position, drive the stopper and extrude the spring downwards and move downwards, the dead lever breaks away from the gomphosis downwards with spacing hole simultaneously, then can make and place the board and slide in the second slide rail, loosen the regulation handle when adjusting to suitable position, the stopper moves upwards under the effect of spring, drive the dead lever upwards and resume the gomphosis with spacing hole, make and place the board and fix in the second slide rail, conveniently adjust and place the board position, avoid influencing the angle of erection of both sides cable;
2. the utility model discloses when needs height-adjusting, demolish the second bolt of mounting panel top and bottom earlier, then follow the height of first slide rail regulation mounting panel, after the mounting panel is adjusted to suitable height, it is fixed with the mounting panel through second bolt and bolt hole, conveniently adjust the height of placing the board, increased the suitability of cable crane span structure.
Drawings
Fig. 1 is a schematic view of the overall structure of a cable bridge for electric power construction, which is convenient to adjust and install;
fig. 2 is the utility model relates to a A department enlargies structure schematic diagram in cable crane span structure for electric power construction convenient to adjust installation.
In the figure: 1. a wall surface; 2. mounting a plate; 3. a first bolt; 4. a first slide rail; 5. a fixing plate; 6. A second bolt; 7. bolt holes; 8. a support frame; 9. placing the plate; 10. a second slide rail; 11. a placement groove; 12. a limiting hole; 13. fixing the rod; 14. adjusting the handle; 15. a limiting block; 16. a spring; 17. A protective pad; 18. a support rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-2, the utility model provides a cable bridge rack technical scheme for electric power construction convenient to adjust installation: a cable bridge for electric power construction convenient to adjust and install comprises a mounting plate 2, the top and the bottom of the mounting plate 2 are fixedly connected with a wall surface 1 through first bolts 3, one side of the mounting plate 2, which is far away from the wall surface 1, is fixedly provided with a first slide rail 4, the inside of the first slide rail 4 is movably connected with a fixed plate 5, the top and the bottom of the fixed plate 5 are movably connected with second bolts 6, the top and the bottom of one side of the first slide rail 4 are fixedly provided with a plurality of bolt holes 7, one side of the fixed plate 5, which is far away from the mounting plate 2, is fixedly provided with a support frame 8, the top of the support frame 8 is movably provided with a placing plate 9, the top of the support frame 8 is fixedly provided with a second slide rail 10, the placing plate 9 is slidably arranged in the second slide rail 10, the top of the placing plate 9 is symmetrically provided with two placing grooves 11, the bottom of the placing plate 9 is fixedly provided with a plurality of limiting holes 12, and the bottom of the placing plate 9 is movably provided with a fixed rod 13, the top of the fixed rod 13 is embedded with the limiting hole 12, the bottom of the fixed rod 13 movably penetrates through the supporting frame 8 and is fixedly connected with the adjusting handle 14, the top of the fixed rod 13 is fixedly provided with a limiting block 15, a spring 16 is fixedly connected between the limiting block 15 and the supporting frame 8, and the spring 16 is movably sleeved on the fixed rod 13.
The bolt holes 7 at the top and the bottom of one side of the first slide rail 4 are uniformly and symmetrically arranged.
The second bolt 6 engages with the bolt hole 7.
A protective pad 17 is fixedly arranged in the placing groove 11.
The bottom of the mounting plate 2 is fixedly connected with a support rod 18, and the top of the support rod 18 is fixedly connected with the bottom of the support frame 8.
The working principle is as follows: the utility model discloses a when using fix the cable conductor on standing groove 11, then stimulate adjustment handle 14 downwards when needing to adjust and placing board 9 lateral position, drive stopper 15 and push down spring 16 and move down, dead lever 13 breaks away from the gomphosis downwards with spacing hole 12 simultaneously, then can make and place board 9 and slide in second slide rail 10, loosen adjustment handle 14 when adjusting to the suitable position, spacing block 15 moves up under the effect of spring 16, drive dead lever 13 upwards and resume the gomphosis with spacing hole 12, make and place board 9 fix in second slide rail 10, conveniently adjust and place board 9 position, avoid influencing the angle of erectting of both sides cable, when needing to adjust the height, first dismantle second bolt 6 at mounting panel 2 top and bottom, then adjust the height of mounting panel 2 along first slide rail 4, after mounting panel 2 adjusts to the suitable height, through second bolt 6 and bolt hole 7 with mounting panel 2 fixed, conveniently adjust the height of placing board 9, increased the suitability of cable crane span structure.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a cable crane span structure for electric power construction convenient to adjust installation, includes mounting panel (2), its characterized in that: a first slide rail (4) is fixedly arranged on one side of the mounting plate (2), a fixing plate (5) is movably connected in the first slide rail (4), a second bolt (6) is movably connected to the top and the bottom of the fixing plate (5), a plurality of bolt holes (7) are fixedly arranged on the top and the bottom of one side of the first slide rail (4), a support frame (8) is fixedly arranged on one side, away from the mounting plate (2), of the fixing plate (5), a placing plate (9) is movably arranged on the top of the support frame (8), a second slide rail (10) is fixedly arranged on the top of the support frame (8), the placing plate (9) is slidably arranged in the second slide rail (10), two placing grooves (11) are symmetrically arranged on the top of the placing plate (9), a plurality of limiting holes (12) are fixedly arranged on the bottom of the placing plate (9), and a fixing rod (13) is movably arranged on the bottom of the placing plate (9), dead lever (13) top with spacing hole (12) looks gomphosis, dead lever (13) bottom activity is passed support frame (8) fixedly connected with regulation handle (14), dead lever (13) top is fixed and is provided with stopper (15), stopper (15) with fixedly connected with spring (16) between support frame (8), spring (16) activity cover is established on dead lever (13).
2. The cable bridge for electric power construction, convenient to adjust and install, as claimed in claim 1, wherein: the bolt holes (7) at the top and the bottom of one side of the first slide rail (4) are uniformly and symmetrically arranged.
3. The cable bridge for electric power construction, convenient to adjust and install, as claimed in claim 1, wherein: the second bolt (6) is meshed with the bolt hole (7).
4. The cable bridge for electric power construction, convenient to adjust and install, as claimed in claim 1, wherein: a protective pad (17) is fixedly arranged in the placing groove (11).
5. The cable bridge for electric power construction, convenient to adjust and install, as claimed in claim 1, wherein: the mounting panel (2) bottom fixedly connected with bracing piece (18), bracing piece (18) top fixed connection support frame (8) bottom.
CN202022995463.XU 2020-12-14 2020-12-14 Cable bridge convenient to adjust installation for electric power construction Expired - Fee Related CN214204731U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022995463.XU CN214204731U (en) 2020-12-14 2020-12-14 Cable bridge convenient to adjust installation for electric power construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022995463.XU CN214204731U (en) 2020-12-14 2020-12-14 Cable bridge convenient to adjust installation for electric power construction

Publications (1)

Publication Number Publication Date
CN214204731U true CN214204731U (en) 2021-09-14

Family

ID=77652389

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022995463.XU Expired - Fee Related CN214204731U (en) 2020-12-14 2020-12-14 Cable bridge convenient to adjust installation for electric power construction

Country Status (1)

Country Link
CN (1) CN214204731U (en)

Similar Documents

Publication Publication Date Title
CN214204731U (en) Cable bridge convenient to adjust installation for electric power construction
CN109256733B (en) Bridge convenient to disassemble
CN207073247U (en) Metope heat-insulating decorative composite board anchoring piece and metope heat-insulating decorative composite board mounting structure
CN214100676U (en) Bridge support with auxiliary supporting structure
CN213741969U (en) Color steel tile roof tiling is with installation guide rail
CN210297117U (en) High-strength open type grid bridge
CN211313053U (en) Fast-assembling stand for interior decoration
CN218586818U (en) Cable bridge
CN206667683U (en) Assure support
CN207053118U (en) A kind of high load-bearing aluminum cable tray
CN209847059U (en) Fixed window machine of wiping of parapet
CN217406096U (en) Tubular combined cable bracket
CN211201079U (en) Suspended ceiling elevation control level gauge base
CN204721285U (en) Adjustable combination type hanger
CN215600958U (en) Corrosion-resistant cable bridge
CN214696062U (en) Platform frame modular structure of green steel construction
CN220203149U (en) Pre-buried furred ceiling structure
CN220319183U (en) Safety protection equipment for building engineering
CN219909867U (en) Good scaffold frame for construction of stability
CN214034297U (en) Novel glass of hidden frame of curtain wall prevents falling device
CN214248503U (en) Multi-pipeline pre-positioning anti-seismic support for building construction
CN216121636U (en) Cable bridge convenient to cable installation
CN209963671U (en) Combined cable bridge
CN214402640U (en) Installation mechanism of steel frame for building
CN220395139U (en) Building lifting hanging basket

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210914