CN214176685U - Simple support for preventing temporary cable of constructional engineering from dragging ground - Google Patents

Simple support for preventing temporary cable of constructional engineering from dragging ground Download PDF

Info

Publication number
CN214176685U
CN214176685U CN202022632472.2U CN202022632472U CN214176685U CN 214176685 U CN214176685 U CN 214176685U CN 202022632472 U CN202022632472 U CN 202022632472U CN 214176685 U CN214176685 U CN 214176685U
Authority
CN
China
Prior art keywords
cable
setting
wood
template base
square
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022632472.2U
Other languages
Chinese (zh)
Inventor
农卫江
徐桂琛
韦尚良
刘星然
张绮雯
曾繁军
赵斌
季杨
黄膑锐
廖文亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guangxi Construction Engineering Group No1 Construction Engineering Co ltd
Original Assignee
Guangxi Construction Engineering Group No1 Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guangxi Construction Engineering Group No1 Construction Engineering Co ltd filed Critical Guangxi Construction Engineering Group No1 Construction Engineering Co ltd
Priority to CN202022632472.2U priority Critical patent/CN214176685U/en
Application granted granted Critical
Publication of CN214176685U publication Critical patent/CN214176685U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model discloses a prevent that building engineering interim cable from dragging ground simple and easy support belongs to cable support frame field, including template base, triangle pole setting, wood tree column setting and top clamping bar, wood tree column setting bottom is fixed on the template base, and the triangle fixing base sets up at the periphery of wood tree column setting bottom and with the fixed setting of wood tree column setting and template base, and the top clamping bar sets up on the both sides at wood tree column setting top, and the wire casing is deposited in the middle formation. The utility model discloses simple structure, the processing preparation is convenient, it draws materials and comes from job site waste material timber completely, the environmental protection is practiced thrift, the concave type top groove of setting or activity arc wheel all can be fine reduction to the friction of cable, simultaneously when the initial installation cable, the effect of the fine wire that can play, buffering strutting arrangement can all the cable play the effect of support on both sides, can increase the holding surface of cable, can be better support the cable aloft, can increase the distance between the support frame simultaneously.

Description

Simple support for preventing temporary cable of constructional engineering from dragging ground
Technical Field
The utility model relates to a cable support frame field especially relates to a prevent that building engineering interim cable from dragging simple and easy support of ground.
Background
In the existing construction site, a lot of cables are directly dragged to the ground or placed on the ground and are slightly or even buried by soil, the cables are easily damaged in the construction process, and meanwhile, the cables are not easy to find in the construction process. The machine rolls, and the condition of breaking the insulating layer can appear rolling for a long time, causes electric shock accident etc. very easily like this, harms workman's life safety, can influence the construction of engineering simultaneously. Therefore, a simple support frame needs to be designed according to the actual situation of the construction site.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a prevent that building engineering interim cable from dragging simple and easy support on ground solves the technical problem who exists among the background art.
The utility model provides a prevent that building engineering interim cable from dragging ground simple and easy support, includes template base, triangle fixing base, wooden tree in square, pole setting and top clamping bar, wooden tree in square, pole setting bottom is fixed on the template base, the triangle fixing base set up in the periphery of wooden tree in square, pole setting bottom and with wooden tree in square, pole setting and template base fixed setting, the top clamping bar sets up on the both sides at wooden tree in square, pole setting top, and the middle wire casing that deposits that forms.
The upper end is provided with a cable penetrating plate, and the cable penetrating plate is provided with a hole for a cable to penetrate through. The utility model provides a prevent that engineering construction interim cable from dragging simple and easy support on ground, the cable of arranging temporarily in the construction can directly be placed between the top clamping bar of support, and this support is put according to the certain distance, can prevent that the cable from dragging on ground, solves construction interim cable and drags the ground problem, has guaranteed the power consumption safety of construction.
Furthermore, the vertical rod of the wood purlin is set to be a square wood strip and fixed on the template base through screws, and the number of the triangular fixing seats is four, and the four triangular fixing seats are respectively arranged on the periphery of the bottom of the vertical rod of the wood purlin and fixed on the template base through screws.
Further, the top of the vertical rod of the wood purlin is provided with a concave top groove, and an arc-shaped groove structure is arranged inside the concave top groove.
Furthermore, a movable arc wheel is arranged between the two top clamping rods, the movable arc wheel is movably and rotatably arranged between the two top clamping rods and arranged above the top of the vertical rod of the wood column, and the movable arc wheel is of an arc wheel structure which is sunken towards the middle.
Further, the both sides of wooden square column pole setting are provided with buffering strutting arrangement, buffering strutting arrangement includes two spinal branch vaulting poles, supporting wheel, upper end buffer spring and lower extreme towards the spring, and two spinal branch vaulting pole one end set up respectively in the both sides of wooden square column pole setting to rotatable setting, the supporting wheel sets up on the top of two spinal branch vaulting poles to rotatable setting, two spinal branch vaulting poles slope sets up, upper end buffer spring one end sets up in the upper end of bracing piece, and the other end sets up in wooden square column pole setting, lower extreme towards spring one end and sets up in the below of root bracing piece, and the other end sets up in wooden square column pole setting.
The utility model adopts the above technical scheme, the utility model discloses following technological effect has:
the utility model discloses simple structure, the processing preparation is convenient, it draws materials and comes from job site waste material timber completely, the environmental protection is practiced thrift, simultaneously can be fine support the cable of building site is aerial, the concave type top groove of setting or the friction of reduction to the cable that movable arc wheel all can be fine, simultaneously when the initial installation cable, the effect of the fine wire that can play, buffering strutting arrangement can both sides all the cable play the effect of support, can increase the holding surface of cable, can be better support the cable aloft, can increase the distance between the support frame simultaneously.
Drawings
Fig. 1 is a three-dimensional structure diagram of the present invention.
Fig. 2 is an exploded view of the present invention.
Fig. 3 is a side view of the present invention.
Fig. 4 is a schematic diagram of a second structure of the present invention.
Fig. 5 is a third schematic structural diagram of the present invention.
Fig. 6 is a top side view of a fourth embodiment of the present invention.
Fig. 7 is a schematic view of the cable storage structure of the present invention.
Reference numbers in the figures: 1-a template base; 2-a triangular fixed seat; 3-wooden square column vertical rod; 4-top clamping bar; 5-concave top groove; 6-moving the arc wheel; 7-a support bar; 8-a support wheel; 9-upper end buffer spring; and 10-punching a spring at the lower end.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clear, preferred embodiments are described in detail. It should be understood, however, that the numerous specific details set forth in the specification are merely set forth to provide a thorough understanding of one or more aspects of the present invention, which may be practiced without these specific details.
Example 1:
a simple support for preventing a temporary cable in constructional engineering from dragging the ground is shown in figures 1-3 and 7 and comprises a template base 1, a triangular fixing seat 2, a wood upright rod 3 and a top clamping rod 4. The bottom of the wood purlin vertical rod 3 is fixed on the template base 1, the triangular fixing seat 2 is arranged on the periphery of the bottom of the wood purlin vertical rod 3 and fixedly arranged with the wood purlin vertical rod 3 and the template base 1, the top clamping rod 4 is arranged on two sides of the top of the wood purlin vertical rod 3, and a wire storage groove is formed in the middle of the top clamping rod. The wood purlin vertical rod 3 is arranged to be a square wood strip and fixed to the template base 1 through screws, the number of the triangular fixing seats 2 is four, the four triangular fixing seats are respectively arranged on the periphery of the bottom of the wood purlin vertical rod 3 and fixed to the template base 1 through screws.
The template base 1 is a square glued wood template with the side length of 400mm-600 mm; the vertical rod 3 of the wood purlin is a common wood purlin used in a construction site, and the length is 400mm-500 mm; the triangular fixing seat 2 is formed by cutting a 100mm long square wood into two parts; the top clamping bar 4 is a 200mm long square wood beam obtained by dividing the section into two parts.
During manufacturing, the four triangular fixing seats 2 fix the vertical rod 2 of the wood purlin on the template base 1 through the iron nails, the top clamping rod 4 is fixed at the top of the vertical rod 2 of the wood purlin by the iron nails, and the length of the extending vertical rod is 100 mm.
In use, as shown in fig. 7. The simple support is placed on a temporary cable path between the distribution electric box and the switch box or between the switch box and the equipment and is arranged according to a proper distance that the temporary cable is not contacted with the ground, and the temporary cable is placed between the top clamping rods 4 of the simple support. The support can be according to the change of construction position, and the setting is put in the removal wantonly, can solve the interim cable of construction and drag ground problem, has guaranteed the power consumption safety of construction.
Example 2:
this embodiment is different from embodiment 1 in that, as shown in fig. 4, the top of the vertical rod 3 of wood purlin is provided with a concave top groove 5, and the inside of the concave top groove 5 is provided with an arc-shaped groove structure. Set up the top into arc groove structure, reduction both sides that can be fine are to the friction of cable, because the friction back of being of a specified duration, the insulating layer skin of cable is broken easily, electric leakage etc. easily, consequently sets up to the effect that the arc recess has the protection.
Example 3:
the difference between this embodiment and embodiment 1 is that, as shown in fig. 5, a movable arc wheel 6 is disposed between two top clamping bars 4, the movable arc wheel 6 is movably rotated between the two top clamping bars 4 and disposed above the top of the vertical rod 3 of the wood purlin, and the movable arc wheel 6 is configured as an arc wheel structure recessed toward the middle. Increase a movable arc wheel 6, also can play the effect that reduces friction, simultaneously through setting up the pulley, when the installation cable, can play gliding effect, stimulate the cable more easily.
Example 4:
the difference between this embodiment and embodiment 1 is that, as shown in fig. 6, two sides of the vertical rod 3 of wood purlin are provided with a buffering support device, the buffering support device includes two support rods 7, a support wheel 8, an upper end buffer spring 9 and a lower end impact spring 10, one end of each of the two support rods 7 is respectively disposed on two sides of the vertical rod 3 of wood purlin and is rotatably disposed, the support wheel 8 is disposed on the top end of each of the two support rods 7 and is rotatably disposed, the two support rods 7 are obliquely disposed, one end of the upper end buffer spring 9 is disposed on the upper end of the support rod 7, the other end of the upper end buffer spring is disposed on the vertical rod 3 of wood purlin, one end of the lower end impact spring 10 is disposed below the root support rod 7, and the other end of the lower end impact spring is disposed on the vertical rod 3 of wood purlin. If the single wood vertical rod 3 is used for supporting, only one supporting point is provided, the supporting effect is not good, and the density of the arranged supporting frames is large, so that three supporting points are arranged on one supporting frame after the buffering supporting device is arranged to reduce the density of the supporting frames, namely, increase the distance between the supporting frames, and the better supporting effect can be achieved.
The foregoing is only a preferred embodiment of the present invention, and it should be noted that, for those skilled in the art, a plurality of modifications and decorations can be made without departing from the principle of the present invention, and these modifications and decorations should also be regarded as the protection scope of the present invention.

Claims (5)

1. The utility model provides a prevent that building engineering interim cable from dragging simple and easy support on ground which characterized in that: including template base (1), triangle fixing base (2), wooden tree in square or column pole (3) and top clamping bar (4), wooden tree in square or column pole (3) bottom is fixed on template base (1), triangle fixing base (2) set up in the periphery of wooden tree in square or column pole (3) bottom and with wooden tree in square or column pole (3) and template base (1) fixed setting, top clamping bar (4) set up at the both sides at wooden tree in square or column pole (3) top, and the wire casing is deposited in the middle formation.
2. The easy bracket for preventing the temporary cable of the construction engineering from dragging the ground according to claim 1, which is characterized in that: the wood purlin vertical rod (3) is arranged into a square wood strip and fixed on the template base (1) through screws, and the number of the triangular fixing seats (2) is four, and the four triangular fixing seats are respectively arranged around the bottom of the wood purlin vertical rod (3) and fixed on the template base (1) through screws.
3. The easy bracket for preventing the temporary cable of the construction engineering from dragging the ground according to claim 2, which is characterized in that: the top of the wood purlin upright rod (3) is provided with a concave top groove (5), and the interior of the concave top groove (5) is provided with an arc-shaped groove structure.
4. The easy bracket for preventing the temporary cable of the construction engineering from dragging the ground according to claim 2, which is characterized in that: a movable arc wheel (6) is arranged between the two top clamping rods (4), the movable arc wheel (6) is movably and rotatably arranged between the two top clamping rods (4) and is arranged above the top of the wood column vertical rod (3), and the movable arc wheel (6) is arranged into an arc wheel structure which is sunken towards the middle.
5. The easy bracket for preventing the temporary cable of the construction engineering from dragging the ground according to claim 2, which is characterized in that: the both sides of wooden tree pole setting (3) are provided with buffering strutting arrangement, buffering strutting arrangement includes that two spinal branch vaulting poles (7), supporting wheel (8), upper end buffer spring (9) and lower extreme dash spring (10), and two spinal branch vaulting poles (7) one end set up respectively in the both sides of wooden tree pole setting (3) to rotatable setting, supporting wheel (8) set up the top at two spinal branch vaulting poles (7) to rotatable setting, two spinal branch vaulting poles (7) slope sets up, upper end buffer spring (9) one end sets up in the upper end of bracing piece (7), and the other end sets up on wooden tree pole setting (3), the lower extreme dashes spring (10) one end and sets up in the below of root branch vaulting pole (7), and the other end sets up on wooden tree pole setting (3).
CN202022632472.2U 2020-11-13 2020-11-13 Simple support for preventing temporary cable of constructional engineering from dragging ground Expired - Fee Related CN214176685U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022632472.2U CN214176685U (en) 2020-11-13 2020-11-13 Simple support for preventing temporary cable of constructional engineering from dragging ground

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022632472.2U CN214176685U (en) 2020-11-13 2020-11-13 Simple support for preventing temporary cable of constructional engineering from dragging ground

Publications (1)

Publication Number Publication Date
CN214176685U true CN214176685U (en) 2021-09-10

Family

ID=77600624

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022632472.2U Expired - Fee Related CN214176685U (en) 2020-11-13 2020-11-13 Simple support for preventing temporary cable of constructional engineering from dragging ground

Country Status (1)

Country Link
CN (1) CN214176685U (en)

Similar Documents

Publication Publication Date Title
US10597892B1 (en) Anchor device for a wooden post
CN214176685U (en) Simple support for preventing temporary cable of constructional engineering from dragging ground
CN207727441U (en) A kind of adjustable for height bent cap holder
CN204152046U (en) Cast-in-place concrete hollow building roof structure
CN211171678U (en) Reinforced slope protection device
CN212201029U (en) Support split heads that hollow floor was used
CN204876254U (en) Hollow floor centre form positioner
CN204080833U (en) A kind of layer stereo protective screening for improving domatic thickness of sowing grass seeds by duster
CN210124168U (en) Maintenance protective structure for desertification grassland vegetation
CN114023532A (en) Anti-collision protection device of transformer
CN203008946U (en) Hydraulic support
CN215484811U (en) Bored concrete pile mud pit protector
CN218624269U (en) Tunnel soft rock large deformation support reinforcing apparatus
US3910556A (en) Ground rod driving device
CN217680685U (en) High-rise civil engineering outer wall interlude prevents pounding canopy
CN216931166U (en) Landscape afforestation trees strutting arrangement
CN218893946U (en) Contact net twine protection system for construction of continuous beam of overspan electrified railway
CN216196749U (en) Building engineering construction platform
CN210985181U (en) Lightning protection device for high-rise building
CN217054640U (en) Novel building engineering safety protection device
CN218845656U (en) Surveying and mapping total station for building
CN210136696U (en) Typhoon-prevention propaganda wall capable of being rotated in turn
CN216146895U (en) Fixed simple and easy support that big tree was transplanted
CN213418547U (en) Ground safety device for building engineering
CN211396930U (en) Road construction shielding plate

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210910

CF01 Termination of patent right due to non-payment of annual fee