CN214169470U - Multidirectional linking piece between scaffold and mould - Google Patents
Multidirectional linking piece between scaffold and mould Download PDFInfo
- Publication number
- CN214169470U CN214169470U CN202023128811.XU CN202023128811U CN214169470U CN 214169470 U CN214169470 U CN 214169470U CN 202023128811 U CN202023128811 U CN 202023128811U CN 214169470 U CN214169470 U CN 214169470U
- Authority
- CN
- China
- Prior art keywords
- baffle
- buckle
- fixture
- steel pipe
- fixed establishment
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 229910000831 Steel Inorganic materials 0.000 claims abstract description 44
- 239000010959 steel Substances 0.000 claims abstract description 44
- 239000004568 cement Substances 0.000 claims abstract description 17
- 238000009415 formwork Methods 0.000 claims description 7
- 238000010276 construction Methods 0.000 abstract description 6
- 238000009434 installation Methods 0.000 abstract description 3
- 238000000034 method Methods 0.000 description 2
- 239000002699 waste material Substances 0.000 description 2
- 235000017166 Bambusa arundinacea Nutrition 0.000 description 1
- 235000017491 Bambusa tulda Nutrition 0.000 description 1
- 241001330002 Bambuseae Species 0.000 description 1
- 235000015334 Phyllostachys viridis Nutrition 0.000 description 1
- 239000011425 bamboo Substances 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000009194 climbing Effects 0.000 description 1
- 230000007547 defect Effects 0.000 description 1
- 239000000463 material Substances 0.000 description 1
- 238000007493 shaping process Methods 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
- 239000002023 wood Substances 0.000 description 1
Images
Landscapes
- Mutual Connection Of Rods And Tubes (AREA)
Abstract
The utility model discloses a multidirectional chain link in the middle of scaffold frame and mould, including first baffle, fixture and fixed establishment, fixed establishment is installed to one side of first baffle, fixture is installed to one side of fixed establishment, fixture keeps away from one side of fixed establishment and installs first buckle. The utility model discloses an install fixture in one side of fixed establishment, when the position of staff's first steel pipe need be changed, through the position of adjustment connecting seat in the locating hole outside, just can realize turning to, thereby carry out multi-direction installation steel pipe, and can dismantle fixture through the threaded rod, thereby the staff of being convenient for reuses fixture and installs fixed establishment through one side at first baffle, can fix inside first baffle through first dog and second baffle, avoid the staff when pouring the cement of one side, the skew because of first baffle causes cement to reveal, thereby influence staff's construction quality.
Description
Technical Field
The utility model relates to a building field especially relates to scaffold frame and mould, specifically is a multidirectional chain link in the middle of scaffold frame and mould.
Background
The scaffold is a working platform which is erected for ensuring that each construction process is smoothly carried out. The scaffold is divided into an outer scaffold and an inner scaffold according to the erected positions; the scaffold can be divided into a wood scaffold, a bamboo scaffold and a steel pipe scaffold according to different materials; the scaffold is divided into a vertical rod type scaffold, a bridge type scaffold, a door type scaffold, a suspension type scaffold, a hanging type scaffold, a lifting type scaffold and a climbing type scaffold according to the structural form.
In the prior art, the link between the scaffold and the mould has the following defects:
1. the link is welded on the steel pipe, and the link welded on the steel pipe is not only inconvenient to disassemble, but also people can not repeatedly use the connecting link, thereby causing resource waste;
2. the chain joint does not set up template limit structure, at the in-process of installing the template, not only inconvenient and very waste time, when the staff is pouring cement, make the position of cement baffle take place the skew easily to the messenger pours cement and reveals, thereby influences construction quality.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a multidirectional linking piece in the middle of scaffold frame and the mould to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a multidirectional chain link in middle of scaffold frame and mould, includes first baffle, fixture and fixed establishment, fixed establishment is installed to one side of first baffle, fixture is installed to one side of fixed establishment, fixed establishment includes first dog and second dog, the second dog is installed to one side of first dog, and installs first baffle between first dog and the second dog, fixture is installed to one side of fixed establishment, fixture includes first anchor clamps, locating hole, threaded rod and second anchor clamps, first anchor clamps are installed through the threaded rod to the both sides that fixed establishment was kept away from to the second anchor clamps, the inside of first anchor clamps is equipped with the multiunit locating hole, fixture keeps away from one side of fixed establishment and installs first buckle.
Preferably, the second buckle is installed to one side of first buckle, and the both sides of first buckle and second buckle all are equipped with first through-hole, and the internally mounted of first through-hole has first stopper.
Preferably, the base is installed on one side of the clamping mechanism far away from the first buckle, and the boss is installed on one side of the base close to the clamping mechanism.
Preferably, the connecting seat is installed to one side that first buckle is close to fixture, and the inside of connecting seat is equipped with the mounting hole, and the internally mounted of mounting hole has the gag lever post.
Preferably, a connecting rod is installed on one side, away from the clamping mechanism, of the first baffle plate, a second baffle plate is installed on one side, away from the first baffle plate, of the connecting rod, and cement is poured between the first baffle plate and the second baffle plate.
Preferably, the inside of fixture has the second steel pipe, and the first steel pipe is installed to one side of first buckle.
Preferably, one side of the boss, which is far away from the clamping mechanism, is provided with a second through hole, and a fixing mechanism is installed in the second through hole through a second limiting block.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses an install fixture in one side of fixed establishment, when the staff need be fixed the second steel pipe, through rotatory first anchor clamps and the inside threaded rod of second anchor clamps, just can fix the second steel pipe, when the position of first steel pipe is changed to needs, through the position of adjustment connecting seat in the locating hole outside, just can realize turning to carry out multi-direction installation steel pipe, and can dismantle fixture through the threaded rod, thereby the personnel of being convenient for reuse fixture.
2. The utility model discloses an install fixed establishment in one side of first baffle, can fix the first baffle of inside through first dog and second dog, avoid the staff when pouring the cement of one side, cause cement to reveal because of the skew of first baffle to influence staff's construction quality.
Drawings
Fig. 1 is a schematic top view of the present invention;
fig. 2 is a schematic top view of the present invention;
FIG. 3 is a schematic side view of the fixing mechanism of the present invention;
FIG. 4 is a schematic side view of the clamping mechanism of the present invention;
fig. 5 is a schematic view of a first buckle structure of the present invention.
In the figure: 1. cement; 2. a first baffle plate; 201. a connecting rod; 202. a second baffle; 3. a clamping mechanism; 301. a first clamp; 302. positioning holes; 303. a threaded rod; 304. a second clamp; 4. a fixing mechanism; 401. a first stopper; 402. a second stopper; 5. a first buckle; 501. a second buckle; 502. a first through hole; 503. a first stopper; 6. a first steel pipe; 7. a connecting seat; 701. mounting holes; 702. a limiting rod; 8. a second steel pipe; 9. a boss; 901. a second through hole; 902. a second limiting block; 903. a base.
Detailed Description
The technical solution of the present invention will be described clearly and completely with reference to the embodiments of the present invention and the accompanying drawings, and obviously, the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "upper", "lower", "inner", "outer", "front end", "rear end", "both ends", "one end", "the other end" and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element to which the reference is made must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention. Furthermore, the terms "first" and "second" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance.
In the description of the present invention, it is to be noted that, unless otherwise explicitly specified or limited, the terms "mounted," "disposed," "connected," and the like are to be construed broadly, and for example, "connected" may be either fixedly connected or detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-5, the utility model relates to a multidirectional link in middle of scaffold frame and mould, including first baffle 2, fixture 3 and fixed establishment 4, fixed establishment 4 is installed to one side of first baffle 2, fixture 3 is installed to one side of fixed establishment 4, fixed establishment 4 includes first dog 401 and second dog 402, second dog 402 is installed to one side of first dog 401, install first baffle 2 between first dog 401 and the second dog 402, can fix inside first baffle 2 through first dog 401 and second dog 402, avoid the staff when pouring cement 1 of one side, cause cement 1 to reveal because of the offset of first baffle 2, thereby influence staff's construction quality, fixture 3 is installed to one side of fixed establishment 4, fixture 3 includes first anchor clamps 301, locating hole 302, The steel pipe fixing device comprises a threaded rod 303 and a second clamp 304, wherein the two sides of the second clamp 304, which are far away from a fixing mechanism 4, are provided with a first clamp 301 through the threaded rod 303, a plurality of groups of positioning holes 302 are formed in the first clamp 301, one side of a clamping mechanism 3, which is far away from the fixing mechanism 4, is provided with a first buckle 5, the first buckle 5 aligns a mounting hole 701 in a connecting seat 7 with a proper positioning hole 302, then the first buckle 5 penetrates through the mounting hole 701 and the positioning hole 302 through a limiting rod 702 to fix the first buckle 5 on one side of the clamping mechanism 3, when a worker needs to fix a second steel pipe 8, the second steel pipe 8 can be fixed by rotating the threaded rod 303 in the first clamp 301 and the second clamp 304, on the contrary, when the worker needs to dismantle the second steel pipe 8, only the threaded rod 303 needs to be operated reversely, when the worker needs to replace the position of the first steel pipe 6, the position of the connecting seat 7 outside the positioning hole 302 is adjusted, it is possible to realize steering to carry out multidirectional installation of the steel pipe, and the fixture 3 can be disassembled by the threaded rod 303, thereby facilitating reuse of the fixture 3 by a person.
Further, second buckle 501 is installed to one side of first buckle 5, first buckle 5 and the both sides of second buckle 501 all are equipped with first through-hole 502, the internally mounted of first through-hole 502 has first stopper 503, when the staff need install first steel pipe 6, through placing first buckle 5 and second buckle 501 in the both sides of first steel pipe 6, because of first stopper 503 has a helicitic texture, the staff only need rotate first stopper 503 and just can adjust the position of first buckle 5 and second buckle 501, thereby fix inside first steel pipe 6, when the staff need not use first steel pipe 6, only need take out first steel pipe 6 from the inside of first buckle 5 and second buckle 501 through rotating first stopper 503.
Further, fixture 3 keeps away from one side of first buckle 5 and installs base 903, and base 903 is close to one side of fixture 3 and installs boss 9, and through base 903 with boss 9 welded mounting in one side of fixed establishment 4, boss 9 can make things convenient for the staff to install fixed establishment 4 to fix first baffle 2 through fixed establishment 4.
Further, connecting seat 7 is installed to one side that first buckle 5 is close to fixture 3, the inside of connecting seat 7 is equipped with mounting hole 701, the internally mounted of mounting hole 701 has gag lever post 702, one side welded mounting of first buckle 5 has connecting seat 7, when the staff needs the concatenation steel pipe, connecting seat 7 needs to be installed in one side of fixture 3, align suitable locating hole 302 with the inside mounting hole 701 of connecting seat 7, then pass mounting hole 701 and locating hole 302 through gag lever post 702, because of gag lever post 702 has a helicitic texture, the staff can install connecting seat 7 in one side of fixture 3 through rotatory gag lever post 702.
Further, connecting rod 201 is installed to one side that fixture 3 was kept away from to first baffle 2, second baffle 202 is installed to one side that first baffle 2 was kept away from to connecting rod 201, cement 1 has been pour between first baffle 2 and the second baffle 202, fix first baffle 2 through fixed establishment 4, first baffle 2 passes through connecting rod 201 and connects second baffle 202, when fixing first baffle 2 and second baffle 202, just formed the template, the staff of being convenient for of template pours cement 1.
Further, the inside of the clamping mechanism 3 is provided with a second steel pipe 8, one side of the first buckle 5 is provided with a first steel pipe 6, the second steel pipe 8 is arranged through the clamping mechanism 3, the first steel pipe 6 is arranged through the first buckle 5 and the second buckle 501, the first steel pipe 6 and the second steel pipe 8 are spliced to finally form a scaffold, the scaffold is a temporary supporting member of a cast-in-place member and is a support of a formwork, the concrete is dismantled after reaching the age and the strength, the scaffold is recycled, various supports are erected for workers to operate and solve vertical and horizontal transportation on the construction site, and when the scaffold is not used by workers, the first steel pipe 6 and the second steel pipe 8 inside can be dismantled through rotating threaded rods 303 on two sides of the clamping mechanism 3 and first limit blocks 503 on two sides of the first buckle 5.
Further, one side that fixture 3 was kept away from to boss 9 is equipped with second through-hole 901, fixed establishment 4 is installed through second stopper 902 in the inside of second through-hole 901, second stopper 902 has a helicitic texture, through installing second stopper 902 in the inside of second through-hole 901, can fix fixed establishment 4, thereby be convenient for personnel install first baffle 2, can be convenient for the staff through first baffle 2 and pour, when cement 1 pours the shaping, the staff can dismantle fixed establishment 4 from one side of boss 9 through rotatory second stopper 902, thereby dismantle first baffle 2, the personnel of being convenient for use next time.
The working principle is as follows: the first baffle plate 2 inside can be fixed through the first baffle plate 401 and the second baffle plate 402, so that when a worker pours cement 1 on one side, the cement 1 is prevented from leaking due to the position deviation of the first baffle plate 2, when the worker needs to fix the second steel pipe 8, the second steel pipe 8 can be fixed by rotating the first clamp 301 and the threaded rod 303 inside the second clamp 304, on the contrary, when the worker needs to disassemble the second steel pipe 8, only the threaded rod 303 needs to be operated reversely, when the worker needs to replace the position of the first steel pipe 6, the steering can be realized by adjusting the position of the connecting seat 7 outside the positioning hole 302, so that the steel pipe can be installed in multiple directions, the clamping mechanism 3 can be disassembled through the threaded rod 303, so that the worker can conveniently use the clamping mechanism 3 again, and then the first buckle 5 and the second buckle 501 are placed on two sides of the first steel pipe 6, the staff just need rotate first stopper 503 and just can adjust the position of first buckle 5 and second buckle 501 to fix inside first steel pipe 6, finally form the scaffold through first steel pipe 6 and the concatenation of second steel pipe 8.
The details of the present invention are well known to those skilled in the art.
Finally, it is to be noted that: the above embodiments are only used for illustrating the technical solutions of the present invention and not for limiting, and although the present invention has been described in detail with reference to the examples, it should be understood by those skilled in the art that the technical solutions of the present invention can be modified and replaced with equivalents without departing from the spirit and scope of the technical solutions of the present invention, which should be covered by the scope of the claims of the present invention.
Claims (7)
1. A multidirectional link intermediate a scaffold and a mould, comprising a first baffle (2), a clamping mechanism (3) and a fixing mechanism (4), characterized in that: one side of the first baffle (2) is provided with a fixing mechanism (4), one side of the fixing mechanism (4) is provided with a clamping mechanism (3), the fixing mechanism (4) comprises a first stop block (401) and a second stop block (402), the second stop block (402) is arranged on one side of the first stop block (401), a first baffle plate (2) is arranged between the first baffle plate (401) and the second baffle plate (402), one side of the fixing mechanism (4) is provided with a clamping mechanism (3), the clamping mechanism (3) comprises a first clamp (301), a positioning hole (302), a threaded rod (303) and a second clamp (304), the two sides of the second clamp (304) far away from the fixing mechanism (4) are provided with a first clamp (301) through a threaded rod (303), the inside of first anchor clamps (301) is equipped with multiunit locating hole (302), fixture (3) are kept away from one side of fixed establishment (4) and are installed first buckle (5).
2. A scaffolding and formwork intermediate multidirectional link as set forth in claim 1 wherein: second buckle (501) is installed to one side of first buckle (5), and the both sides of first buckle (5) and second buckle (501) all are equipped with first through-hole (502), and the internally mounted of first through-hole (502) has first stopper (503).
3. A scaffolding and formwork intermediate multidirectional link as set forth in claim 1 wherein: one side of the clamping mechanism (3) far away from the first buckle (5) is provided with a base (903), and one side of the base (903) close to the clamping mechanism (3) is provided with a boss (9).
4. A scaffolding and formwork intermediate multidirectional link as set forth in claim 1 wherein: one side of the first buckle (5) close to the clamping mechanism (3) is provided with a connecting seat (7), a mounting hole (701) is formed in the connecting seat (7), and a limiting rod (702) is arranged in the mounting hole (701).
5. A scaffolding and formwork intermediate multidirectional link as set forth in claim 1 wherein: connecting rod (201) are installed to one side that fixture (3) were kept away from in first baffle (2), and second baffle (202) are installed to one side that first baffle (2) were kept away from in connecting rod (201), and cement (1) has been pour between first baffle (2) and second baffle (202).
6. A scaffolding and formwork intermediate multidirectional link as set forth in claim 1 wherein: the inside mounting of fixture (3) has second steel pipe (8), and first steel pipe (6) are installed to one side of first buckle (5).
7. A scaffolding and formwork intermediate multidirectional link as set forth in claim 3 wherein: one side of the boss (9) far away from the clamping mechanism (3) is provided with a second through hole (901), and a fixing mechanism (4) is installed inside the second through hole (901) through a second limiting block (902).
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202023128811.XU CN214169470U (en) | 2020-12-23 | 2020-12-23 | Multidirectional linking piece between scaffold and mould |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202023128811.XU CN214169470U (en) | 2020-12-23 | 2020-12-23 | Multidirectional linking piece between scaffold and mould |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214169470U true CN214169470U (en) | 2021-09-10 |
Family
ID=77607799
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202023128811.XU Expired - Fee Related CN214169470U (en) | 2020-12-23 | 2020-12-23 | Multidirectional linking piece between scaffold and mould |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214169470U (en) |
-
2020
- 2020-12-23 CN CN202023128811.XU patent/CN214169470U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN202390843U (en) | Fixing platform of guide pipe for pouring cast pile | |
CN109869153A (en) | The whole of rapid construction vertical shaft lining cutting promotes cantilever form device and construction method | |
CN214169470U (en) | Multidirectional linking piece between scaffold and mould | |
CN210887278U (en) | Fixing device for cup mouth type concrete foundation pit stand column | |
CN110409800B (en) | High-precision formwork construction method for cast-in-situ bare concrete wind tunnel | |
CN112458905A (en) | Splicing adjustment method for prefabricated capping beam and prefabricated stand column | |
CN205955197U (en) | A fixing device that be used for prefabricated non - design of bench, can all rotary die boards | |
CN214214169U (en) | Quick-drying pouring mold for special concrete box-shaped beam for bridge | |
CN210256615U (en) | Tower crane counter weight making devices | |
CN108797350B (en) | Tower column inner and outer stiff skeleton device and construction method thereof | |
CN209990152U (en) | Opening-closing type pouring opening structure | |
CN109332430B (en) | Mast lifting and straightening device | |
CN217782879U (en) | Adjustable clip supports formula beam type template strutting arrangement | |
CN218438245U (en) | Vertical supporting device for structural column height large template | |
CN113898195B (en) | Assembled concrete structure wall column hoisting guiding and positioning device and construction method | |
CN215208184U (en) | Adjustable fixing base for tower crane installation | |
CN214531975U (en) | Turnover type steel bar positioning bracket for cylinder | |
CN217810514U (en) | Pier inner supporting frame capable of being used for binding pier body steel bars and being used for turnover | |
CN216141156U (en) | Prefabricated door and window lintel hanger | |
CN214462558U (en) | Frame post template reinforcing apparatus | |
CN212927017U (en) | Light steel and light concrete template | |
CN219824777U (en) | Non-joint cutting cement concrete pavement structure | |
CN215889381U (en) | Construction system for carrying out concrete pouring on steel pipe column in advance without dismantling sealing plate | |
CN217353586U (en) | Bracing subassembly for aluminum mould board | |
CN217630932U (en) | Light-duty bench board of assembled prefabricated stair |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210910 |