CN214168089U - Production device for hot galvanizing of steel wire - Google Patents

Production device for hot galvanizing of steel wire Download PDF

Info

Publication number
CN214168089U
CN214168089U CN202022558164.XU CN202022558164U CN214168089U CN 214168089 U CN214168089 U CN 214168089U CN 202022558164 U CN202022558164 U CN 202022558164U CN 214168089 U CN214168089 U CN 214168089U
Authority
CN
China
Prior art keywords
steel wire
workbench
hot
conveying device
galvanize
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022558164.XU
Other languages
Chinese (zh)
Inventor
何可可
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Deqing Lishun Auto Parts Co ltd
Original Assignee
Deqing Lishun Auto Parts Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Deqing Lishun Auto Parts Co ltd filed Critical Deqing Lishun Auto Parts Co ltd
Priority to CN202022558164.XU priority Critical patent/CN214168089U/en
Application granted granted Critical
Publication of CN214168089U publication Critical patent/CN214168089U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Coating With Molten Metal (AREA)

Abstract

The utility model discloses a apparatus for producing for steel wire hot-galvanize relates to hot-galvanize technical field, including galvanizing bath, zinc liquid, compression roller and flexible post, the inside of galvanizing bath is provided with zinc liquid, be provided with the compression roller in the zinc liquid, the both ends movable mounting of compression roller is on flexible post, the output of the one end fixedly connected with hydraulic press of compression roller is kept away from to flexible post, be provided with the lifter plate directly over the galvanizing bath, the hydraulic press runs through lifter plate fixed mounting in the install bin. The utility model discloses a mutually supporting of first conveyor and second conveyor has solved the steel wire and has need the manual work to go to put into the steel wire when carrying out the hot-galvanize and take out after the galvanizing bath, has improved the production efficiency of steel wire galvanization, has reduced artificial amount of labour simultaneously, through mutually supporting of cooling body and alignment mechanism, can directly carry out the intercept work in later stage after the steel wire cooling alignment after making the hot-galvanize.

Description

Production device for hot galvanizing of steel wire
Technical Field
The utility model relates to a steel wire relates to hot-galvanize technical field, concretely relates to a apparatus for producing for steel wire hot-galvanize.
Background
Hot galvanizing is to make molten metal react with an iron matrix to generate an alloy layer, so that the matrix and the coating are combined, and then the surface coating is carried out on some steel parts, so that the steel parts have the characteristics of corrosion resistance, rust resistance, long service life and the like, but most of the existing steel wires are manually placed into a galvanizing bath and taken out of the galvanizing bath after a certain time, and the method has the advantages of low production efficiency of the hot galvanizing of the steel wires, large labor capacity of workers, straightening and cutting the steel wires into sections after the steel wires are galvanized, and long waiting time of the later sections due to the manual galvanizing speed and the liquid zinc cooling time on the surface of the steel wires, thereby affecting the production efficiency of the hot galvanizing steel wires; therefore, a production device for hot galvanizing of steel wires is needed to solve the problems in the prior art.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a apparatus for producing for steel wire hot-galvanize has solved the problem that proposes in the above-mentioned background art.
In order to achieve the above object, the utility model adopts the following technical scheme:
a production device for hot galvanizing of steel wires comprises a galvanizing pool, zinc liquid, a sink roller and a telescopic column, wherein the zinc liquid is arranged in the galvanizing pool, the sink roller is arranged in the zinc liquid, two ends of the sink roller are movably arranged on the telescopic column, one end of the telescopic column, which is far away from the sink roller, is fixedly connected with an output end of a hydraulic machine, a lifting plate is arranged right above the galvanizing pool, the hydraulic machine penetrates through the lifting plate and is fixedly arranged in an installation box, the installation box is fixedly arranged at the top of the lifting plate, the two ends of the lifting plate are both provided with supporting legs, one side of the bottom end of each supporting leg is fixedly provided with a motor, the output end of the motor is fixedly connected with a first gear, the first gear is connected with a second gear in a meshing manner, the middle part of the second gear is vertically connected with a lead screw arranged in the supporting leg, one end, which is far away from the second gear, is rotatably connected in the lifting plate, one side of supporting leg is provided with first workstation, the top fixed mounting of first workstation has first conveyor, be provided with the steel wire on the first conveyor, another one side of supporting leg is provided with the second workstation, the top of second workstation is provided with second conveyor, one side of second conveyor is provided with cooling body, one side that cooling body kept away from second conveyor is provided with the coalignment, coalignment fixed mounting is at the top of second workstation.
The utility model discloses technical scheme's further improvement lies in: the cooling mechanism comprises a cooling box, a supporting bracket is fixedly mounted on the outer wall of the cooling box, the bottom end of the supporting bracket is fixedly mounted at the top of the second workbench, an air inlet pipe is hermetically communicated with the bottom of the cooling box, the other end of the air inlet pipe is hermetically communicated with the output end of a fan, and the fan is arranged below the second workbench.
The utility model discloses technical scheme's further improvement lies in: and a transverse plate is fixedly arranged between the leg columns of the second workbench, and the fan is fixedly arranged on the transverse plate.
The utility model discloses technical scheme's further improvement lies in: the cooling box is characterized in that wire passing holes are formed in two ends of the cooling box and are located on the same horizontal line, and air holes are formed in the inner wall of the cooling box.
The utility model discloses technical scheme's further improvement lies in: the top of the supporting leg is movably inserted with a lifting column, and the inside of the lifting column is in threaded connection with a screw rod.
The utility model discloses technical scheme's further improvement lies in: the inside of lifter plate is provided with the bearing, just the outer wall of lead screw is fixed connection to the inner circle of bearing.
The utility model discloses technical scheme's further improvement lies in: the steel wire passes through a first conveying device, a sinking and pressing roller, a second conveying device, a cooling mechanism and a straightening device in sequence.
Owing to adopted above-mentioned technical scheme, the utility model discloses relative prior art, the technological progress who gains is:
1. the utility model provides a apparatus for producing for steel wire hot-galvanize, through mutually supporting of first conveyor and second conveyor, solved the steel wire and need the manual work to go to put into the steel wire when carrying out the hot-galvanize and take out after the galvanizing bath, improved the production efficiency of steel wire galvanize, reduced artificial amount of labour simultaneously.
2. The utility model provides a apparatus for producing for steel wire hot-galvanize, through mutually supporting of cooling body and alignment mechanism, can directly carry out the truncation work in later stage after the steel wire cooling alignment after making the hot-galvanize, avoid artifical steel wire cooling of waiting to carry out the alignment truncation to the cooling that has reduced artifical steel wire outer wall zinc liquid is often, has improved the production efficiency after the steel wire hot-galvanize.
3. The utility model provides a apparatus for producing for steel wire hot-galvanize, through mutually supporting of lift post and lifter plate, make the coalignment can adjust the height according to the steel wire of different diameters to make the coalignment carry out the alignment to the steel wire of different straight diameters, increased the utility model discloses an adaptability.
Drawings
Fig. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic sectional view of the cooling box of the present invention;
fig. 3 is the internal structure diagram of the supporting leg of the present invention.
In the figure: 1. a galvanizing pool; 2. zinc liquid; 3. a sinking roller; 4. a telescopic column; 5. a hydraulic press; 6. a lifting plate; 7. installing a box; 8. supporting legs; 9. a motor; 10. a first gear; 11. a second gear; 12. A lead screw; 13. a first table; 14. a first conveying device; 15. a steel wire; 16. a second table; 17. a second conveying device; 18. a cooling mechanism; 19. a straightening device; 20. a transverse plate; 21. a lifting column; 22. a bearing; 101. a cooling tank; 102. a support bracket; 103. an air inlet pipe; 104. a fan; 105. A wire passing hole; 106. and (4) air holes.
Detailed Description
The present invention will be described in further detail with reference to the following examples:
example 1
As shown in figures 1-3, the utility model provides a production device for hot galvanizing of steel wires, which comprises a galvanizing pool 1, a zinc liquid 2, a sink roller 3 and a telescopic column 4, wherein the zinc liquid 2 is arranged in the galvanizing pool 1, the sink roller 3 is arranged in the zinc liquid 2, two ends of the sink roller 3 are movably arranged on the telescopic column 4, one end of the telescopic column 4 far away from the sink roller 3 is fixedly connected with the output end of a hydraulic machine 5, a lifting plate 6 is arranged right above the galvanizing pool 1, the hydraulic machine 5 is fixedly arranged in a mounting box 7 through the lifting plate 6, the mounting box 7 is fixedly arranged at the top of the lifting plate 6, two ends of the lifting plate 6 are respectively provided with a support leg 8, one side of the bottom end of the support leg 8 is fixedly provided with a motor 9, the output end of the motor 9 is fixedly connected with a first gear 10, the first gear 10 is engaged with a second gear 11, the middle part of the second gear 11 is vertically connected with a support leg 12 arranged in the supporting leg 8, one end of the screw 12, which is far away from the second gear 11, is rotatably connected inside the lifting plate 6, one side of one supporting leg 8 is provided with a first workbench 13, the top of the first workbench 13 is fixedly provided with a first conveying device 14, the first conveying device 14 is provided with a steel wire 15, one side of the other supporting leg 8 is provided with a second workbench 16, the top of the second workbench 16 is provided with a second conveying device 17, one side of the second conveying device 17 is provided with a cooling mechanism 18, one side, which is far away from the second conveying device 17, of the cooling mechanism 18 is provided with a straightening device 19, and the straightening device 19 is fixedly installed at the top of the second workbench 16.
In this embodiment, the steel wire 15 passes through the first conveying device 14 and the second conveying device 17, so that the steel wire 15 is pressed into the galvanizing pool 1 by the sinking roller 3 to galvanize the steel wire 15, and the galvanized steel wire 15 is not required to be manually processed by the driving of the conveying devices, thereby reducing the manual labor amount.
As shown in fig. 1 and 2, in the present embodiment, preferably, the cooling mechanism 18 includes a cooling box 101, a support bracket 102 is fixedly mounted on an outer wall of the cooling box 101, a bottom end of the support bracket 102 is fixedly mounted on a top of the second worktable 16, a bottom of the cooling box 101 is hermetically communicated with an air inlet pipe 103, another end of the air inlet pipe 103 is hermetically communicated with an output end of a fan 104, the fan 104 is disposed below the second worktable 16, and the cooling box 101 can perform surface cooling on the galvanized steel wire 15 by using the operation of the fan 104.
As shown in figures 1 and 3, preferably, the top of the supporting leg 8 is movably inserted with a lifting column 21, the inside of the lifting column 21 is connected with the screw 12 by screw thread, the lifting column 21 can drive the lifting plate 6 to lift when the screw 12 rotates, thereby adjusting the space between the straightening devices 19 and facilitating the straightening of the steel wires 15 with different diameters after galvanization.
Example 2
As shown in fig. 1 and 2, on the basis of embodiment 1, the utility model provides a technical solution: fixed mounting has diaphragm 20 between the leg of second workstation 16, fan 104 fixed mounting is on diaphragm 20, wire hole 105 has all been seted up at the both ends of cooling box 101, wire hole 105 is in on the same water flat line, the inner wall of cooling box 101 is provided with wind hole 106, its main effect is that the wind of fan 104 carries out forced air cooling to steel wire 15 through wind hole 106, and makes the wind of fan 104 be difficult to leak outward, has improved refrigerated efficiency, reduces refrigerated time.
Example 3
As shown in fig. 1 and 3, on the basis of embodiment 1, the utility model provides a technical solution: preferably, the inside of lifter plate 6 is provided with bearing 22, and the outer wall of lead screw 12 is connected to the inner circle fixed connection of bearing 22, and steel wire 15 is through being first conveyor 14, counter roll 3, second conveyor 17, cooling body 18 and coalignment 19 in order, and its main effect is that bearing 22 is convenient for lead screw 12's rotation, so makes lift post 21 rise, and steel wire 15 can guarantee through the order that steel wire 15 galvanization does not need the artifical amount of labour can also normally produce hot-galvanize steel wire 15.
The working principle of the production device for hot galvanizing of steel wires is described in detail below.
As shown in fig. 1-3, when in use, the steel wire 15 is placed on the first conveying device 14 and the second conveying device 17, and passes through the cooling mechanism 18 and the straightening device 19, after the steel wire 15 passes through and is fixed, the hydraulic press 5 is started to drive the telescopic column 4 to drive the sink roll 3 to press the steel wire 15 downwards into the galvanizing bath 1, the first conveying device 14 continuously conveys the steel wire 15 while pressing, when the steel wire 15 is pressed into the galvanizing bath 2 to form a V shape, the steel wire 15 can be hot-galvanized in the galvanizing bath 2, after the steel wire 15 is galvanized, the sink roll 3 and the telescopic column 4 are movably installed, so that the steel wire 15 can be pulled out of the galvanizing bath 1 when the second conveying device 17 is driven, after the steel wire 15 is pulled out, the cooling mechanism 18 enables the air of the fan 104 to cool the galvanizing bath 2 on the surface of the steel wire 15 through the air holes 106, when the cooled steel wire 15 passes through the straightening device 19, the straightening device 19 can perform bending on the steel wire 15 during galvanizing, thereby be convenient for later stage steel wire 15's intercept work, and drive first gear 10 and second gear 11 through motor 9, threaded connection's lift post 21 can rise and lifter plate 6 also risees when making lead screw 12 rotate to adjust the height between the coalignment 19, make the utility model discloses can carry out the alignment after the galvanization to the steel wire 15 of different diameters, improve the utility model discloses a multiple suitability.
The present invention has been described in detail with reference to the above general description, but it will be apparent to one of ordinary skill in the art that modifications and improvements can be made to the invention. Therefore, modifications or improvements without departing from the spirit of the invention are within the scope of the invention.

Claims (7)

1. The utility model provides a apparatus for producing for steel wire hot-galvanize, includes galvanizing bath (1), zinc liquid (2), sink pressure roller (3) and flexible post (4), its characterized in that: the zinc plating bath is characterized in that zinc liquid (2) is arranged inside the zinc plating bath (1), a sinking roller (3) is arranged in the zinc liquid (2), two ends of the sinking roller (3) are movably mounted on a telescopic column (4), one end, far away from the sinking roller (3), of the telescopic column (4) is fixedly connected with an output end of a hydraulic machine (5), a lifting plate (6) is arranged right above the zinc plating bath (1), the hydraulic machine (5) penetrates through the lifting plate (6) and is fixedly mounted in a mounting box (7), the mounting box (7) is fixedly mounted at the top of the lifting plate (6), supporting legs (8) are arranged at two ends of the lifting plate (6), a motor (9) is fixedly mounted at one side of the bottom end of each supporting leg (8), a first gear (10) is fixedly connected with an output end of the motor (9), and a second gear (11) is meshed with the first gear (10), the middle part of the second gear (11) is vertically connected with a screw rod (12) arranged in the supporting leg (8), one end of the screw rod (12) far away from the second gear (11) is rotatably connected inside the lifting plate (6), one side of one support leg (8) is provided with a first workbench (13), a first conveying device (14) is fixedly arranged at the top of the first workbench (13), a steel wire (15) is arranged on the first conveying device (14), a second workbench (16) is arranged on one side of the other supporting leg (8), a second conveying device (17) is arranged at the top of the second workbench (16), a cooling mechanism (18) is arranged on one side of the second conveying device (17), a straightening device (19) is arranged on one side of the cooling mechanism (18) far away from the second conveying device (17), the straightening device (19) is fixedly arranged at the top of the second workbench (16).
2. The production device for hot galvanizing of steel wires according to claim 1, characterized in that: the cooling mechanism (18) comprises a cooling box (101), a supporting support (102) is fixedly mounted on the outer wall of the cooling box (101), the bottom end of the supporting support (102) is fixedly mounted at the top of the second workbench (16), the bottom of the cooling box (101) is hermetically communicated with an air inlet pipe (103), the other end of the air inlet pipe (103) is hermetically communicated with an output end of a fan (104), and the fan (104) is arranged below the second workbench (16).
3. The production device for hot galvanizing of steel wires according to claim 2, characterized in that: and a transverse plate (20) is fixedly installed between the leg columns of the second workbench (16), and the fan (104) is fixedly installed on the transverse plate (20).
4. The production device for hot galvanizing of steel wires according to claim 2, characterized in that: wire passing holes (105) are formed in the two ends of the cooling box (101), the wire passing holes (105) are located on the same horizontal line, and air holes (106) are formed in the inner wall of the cooling box (101).
5. The production device for hot galvanizing of steel wires according to claim 1, characterized in that: lifting columns (21) are movably inserted into the tops of the supporting legs (8), and the insides of the lifting columns (21) are in threaded connection with the screw rods (12).
6. The production device for hot galvanizing of steel wires according to claim 1, characterized in that: a bearing (22) is arranged inside the lifting plate (6), and the inner ring of the bearing (22) is fixedly connected with the outer wall of the lead screw (12).
7. The production device for hot galvanizing of steel wires according to claim 1, characterized in that: the steel wire (15) passes through a first conveying device (14), a sinking roller (3), a second conveying device (17), a cooling mechanism (18) and a straightening device (19) in sequence.
CN202022558164.XU 2020-11-07 2020-11-07 Production device for hot galvanizing of steel wire Active CN214168089U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022558164.XU CN214168089U (en) 2020-11-07 2020-11-07 Production device for hot galvanizing of steel wire

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022558164.XU CN214168089U (en) 2020-11-07 2020-11-07 Production device for hot galvanizing of steel wire

Publications (1)

Publication Number Publication Date
CN214168089U true CN214168089U (en) 2021-09-10

Family

ID=77599568

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022558164.XU Active CN214168089U (en) 2020-11-07 2020-11-07 Production device for hot galvanizing of steel wire

Country Status (1)

Country Link
CN (1) CN214168089U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114892116A (en) * 2022-05-05 2022-08-12 唐山国丰第一冷轧镀锌技术有限公司 Processing device and processing technology for cold-rolled steel strip

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114892116A (en) * 2022-05-05 2022-08-12 唐山国丰第一冷轧镀锌技术有限公司 Processing device and processing technology for cold-rolled steel strip

Similar Documents

Publication Publication Date Title
CN214168089U (en) Production device for hot galvanizing of steel wire
CN115971287A (en) Multi-station pay-off rack of small drawing machine and pay-off method thereof
CN210059361U (en) Metal draws in succession self-adaptation regulation draw-off gear
CN206731835U (en) A kind of uncoiler suitable for different size color steel tiles
CN212223075U (en) Steel pipe galvanizing machine capable of achieving multi-stage speed regulation
CN214841870U (en) Cooling device is used in copper pole processing
CN210995833U (en) Metallurgical steel wire roller drawing device
CN207756642U (en) A kind of ductile iron pipe coalignment
CN113564657A (en) Anodic oxidation device of die casting
CN112108318A (en) Gear immersion oil device
CN221289050U (en) Wire drawing machine for iron wire production
CN221295662U (en) Galvanized pipe production blowing frock
CN220216265U (en) Wire drawing machine that production quality is high
CN216919452U (en) Electroplating device of tin-plated copper stranded wire
CN212304512U (en) Full-automatic hydraulic cable hot patching machine
CN220371920U (en) Rolling device for fastener machining
CN216891302U (en) Suspension device for electroplating
CN219568109U (en) Splash-proof electrogalvanizing equipment
CN213770073U (en) Automatic round steel feeding device
CN210215447U (en) Stress relieving device for winding iron wire
CN216039777U (en) Steel construction electric power iron tower is with channel-section steel mould that prevents galvanized workpiece deformation
CN217077802U (en) Pickling bath for preparing cold heading finished wire
CN221254676U (en) Hot galvanizing booster unit
CN214289083U (en) Gear immersion oil device
CN217831268U (en) High-speed wire stretching machine

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A production device for hot galvanizing of steel wire

Effective date of registration: 20230220

Granted publication date: 20210910

Pledgee: Zhejiang Deqing Rural Commercial Bank Co.,Ltd. Xin'an sub branch

Pledgor: Deqing Lishun Auto Parts Co.,Ltd.

Registration number: Y2023330000409

PE01 Entry into force of the registration of the contract for pledge of patent right