CN214153853U - Green pipeline laying device - Google Patents

Green pipeline laying device Download PDF

Info

Publication number
CN214153853U
CN214153853U CN202023101464.1U CN202023101464U CN214153853U CN 214153853 U CN214153853 U CN 214153853U CN 202023101464 U CN202023101464 U CN 202023101464U CN 214153853 U CN214153853 U CN 214153853U
Authority
CN
China
Prior art keywords
bracing piece
bearing box
support
supporting
laying apparatus
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202023101464.1U
Other languages
Chinese (zh)
Inventor
刘欣
高龙浩
李保军
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Beijing Hongyu Environmental Engineering Co ltd
Original Assignee
Beijing Hongyu Environmental Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Beijing Hongyu Environmental Engineering Co ltd filed Critical Beijing Hongyu Environmental Engineering Co ltd
Priority to CN202023101464.1U priority Critical patent/CN214153853U/en
Application granted granted Critical
Publication of CN214153853U publication Critical patent/CN214153853U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model relates to a device is laid to green pipeline, relate to the pipeline and lay the technical field, including a plurality of bearing box and a plurality of supports, the top of bearing box is provided with places the mouth, the border of placing the mouth articulates there is the lid, the both ends of bearing box are not sealed, the support includes the installed part, bracing piece and supporting seat, the vertical setting of bracing piece, the installed part is installed on the top of bracing piece, the supporting seat is installed in the bottom of bracing piece, bearing box and support are laid in turn, the tip of bearing box is taken and is established on the installed part of support, and pass through the bolt fastening between bearing box and the installed part. The application has the advantage that the pipeline can be protected.

Description

Green pipeline laying device
Technical Field
The application relates to the field of pipeline laying technology, in particular to a green pipeline laying device.
Background
In the process of foundation pit construction, the arrangement of cables and pipelines is often involved because the use of a plurality of electric construction equipment is involved. In the related art, cables and pipelines are often directly laid on the ground during the laying process.
Aiming at the related technologies, the inventor finds that in the construction process of the foundation pit, the environment in the foundation pit is severe, and when the cables and the pipelines are directly placed on the ground, the cables and the pipelines are often subjected to unnecessary collision, so that the cables and the pipelines are often damaged.
SUMMERY OF THE UTILITY MODEL
In order to improve the problem that appears the damage easily when cable and pipeline are laid in the foundation ditch, this application provides a green pipeline and lays device.
The application provides a device is laid to green pipeline adopts following technical scheme:
the utility model provides a device is laid to green pipeline, including a plurality of bearing box and a plurality of supports, the top of bearing box is provided with places the mouth, the border of placing the mouth articulates there is the lid, the both ends of bearing box are not sealed, the support includes installed part, bracing piece and supporting seat, the vertical setting of bracing piece, the installed part is installed on the top of bracing piece, the supporting seat is installed in the bottom of bracing piece, bearing box and support are laid in turn, the tip of bearing box is taken and is established on the installed part of support, and pass through the bolt fastening between bearing box and the installed part.
Through adopting above-mentioned technical scheme, the support supports the bearing case subaerial, and a plurality of bearing case concatenations are rectangular form installation passageway, and the cable or the pipeline can be laid in the installation passageway, and the installation passageway can be protected cable and pipeline.
Optionally, the installed part includes integrative diaphragm and two risers that set up, and the bearing case is taken and is established on the diaphragm, and the bearing case is located between two risers.
Through adopting above-mentioned technical scheme, two risers can carry on spacingly to the bearing case, more stable when making the bearing case take to establish on the diaphragm.
Optionally, a connecting piece is arranged between the mounting piece and the supporting rod, and the mounting piece and the supporting rod are detachably connected through the connecting piece.
Through adopting above-mentioned technical scheme, the connecting piece has realized being connected dismantled between installed part and the bracing piece, makes things convenient for the modularization transportation of staff to the support more.
Optionally, the connecting piece includes that the cross section is circular shape spliced pole to and the cover is established the sleeve pipe on the spliced pole, the sleeve pipe slides with the spliced pole and is connected, the spliced pole is connected with the installed part, set up the recess of laying along sleeve pipe length direction on the outer peripheral face of spliced pole, fixedly connected with overlap joint edge on the sleeve pipe, the overlap joint is connected in the recess along sliding, sheathed tube bottom cover is established on the top of bracing piece, and set up to threaded connection between sleeve pipe and the bracing piece.
Through adopting above-mentioned technical scheme, the staff sets up the spliced pole on the bracing piece, then with sleeve pipe threaded connection on the bracing piece until the lower wall butt that makes locating part and recess, the spliced pole was fixed on the bracing piece this moment, and then makes the installed part installed on the bracing piece.
Optionally, the upper surface rigid coupling of bracing piece has the connecting rod, and the connecting rod is laid along the length direction of bracing piece, and the spread groove has been seted up to the lower surface of the spliced pole that corresponds, and the connecting rod slides and connects in the spread groove.
Through adopting above-mentioned technical scheme, when the installed part received the power of horizontal direction, the cooperation of connecting rod and spread groove made the installed part more stable.
Optionally, the cross sections of the connecting rod and the connecting groove are both polygonal.
Through adopting above-mentioned technical scheme, when the installed part received the moment of torsion power, because the cooperation of connecting rod and spread groove makes the more stable of installed part.
Optionally, the supporting seat includes backup pad and many spinal branchs pole, and many spinal branchs pole equidistant rigid coupling is on the outer peripheral face of backup pad.
Through adopting above-mentioned technical scheme, many spinal branchs pole can increase the stability of backup pad.
Optionally, one end of the supporting rod, which is far away from the supporting plate, is fixedly connected with a fixing ring.
By adopting the technical scheme, the worker can wear to establish the foundation bolt in the fixed ring according to the requirement, so that the support is more stable.
Optionally, an adjusting assembly for adjusting the height of the mounting part is arranged on the supporting seat.
Through adopting above-mentioned technical scheme, when facing different operating modes, the staff can adjust the height of installed part through adjusting part.
Optionally, the adjusting part comprises a connecting pipe, a limiting block and a limiting nut, a connecting hole is formed in the supporting seat, the connecting pipe is arranged in the connecting hole in a penetrating mode, the limiting block is fixedly connected to the connecting pipe, the limiting nut is in threaded connection with the connecting pipe, and the limiting block and the limiting nut clamp the supporting seat tightly.
Through adopting above-mentioned technical scheme, at first realized being connected dismantled between adjusting part and the supporting seat, realized again through adjusting part simultaneously and be connected dismantled between bracing piece and the supporting seat to the staff can realize the adjustment of installed part height through rotatory bracing piece.
In summary, the present application includes at least one of the following beneficial technical effects:
1. through the arrangement of the bearing boxes and the support for supporting the bearing boxes on the ground, the cables pass through the installation channels formed by the bearing boxes through pipelines, so that the cables or the pipelines can be better protected;
2. by arranging each part on the bracket in a detachable connection mode, on one hand, the bracket is convenient for workers to transport, and on the other hand, when each part on the bracket is damaged, the workers can replace each part independently, so that the cost is saved;
3. through setting up adjusting part on the support for the staff adjusts the height of installed part according to the operating mode.
Drawings
FIG. 1 is a schematic structural diagram of an external shape of a pipeline laying device in an embodiment of the present application.
Fig. 2 is a schematic structural diagram of the outer shape of the bracket in the embodiment of the application.
Fig. 3 is a schematic view showing a connection structure between the protruding mounting member and the support rod in the embodiment of the present application.
Fig. 4 is a partially enlarged schematic view of a portion a in fig. 3.
Fig. 5 is a schematic view of the installation structure of the adjusting assembly on the supporting seat in the embodiment of the present application.
Description of reference numerals: 1. a support; 11. a mounting member; 111. a transverse plate; 112. a vertical plate; 12. a support bar; 121. a connecting rod; 13. a supporting seat; 131. a support plate; 1311. connecting holes; 132. a strut; 1321. a fixing ring; 2. a supporting box; 21. a tank body; 211. a placement port; 22. a cover body; 3. a connecting member; 31. connecting columns; 311. a groove; 312. connecting grooves; 32. a sleeve; 321. overlapping edges; 4. an adjustment assembly; 41. a connecting pipe; 42. a limiting block; 43. and a limiting nut.
Detailed Description
The present application is described in further detail below with reference to figures 1-5.
The embodiment of the application discloses device is laid to green pipeline. Referring to fig. 1, the laying device comprises a plurality of supports 1 and a plurality of bearing boxes 2, the bearing boxes 2 are used for bearing cables and pipelines, and the supports 1 are used for supporting the bearing boxes 2 on the ground.
Bearing case 2 is rectangular form, and bearing case 2 includes case body 21 and lid 22, and the mouth 211 of placing has been seted up at the top of case body 21, and lid 22 articulates the border of placing mouth 211 on case body 21, is provided with the lock body between lid 22 and the case body 21, and the both ends of case body 21 are all unclosed.
Referring to fig. 2, the stand 1 includes a mounting member 11, a support rod 12, and a support base 13; the installed part 11 is used for being connected with bearing box 2, and the installed part 11 includes diaphragm 111 and two risers 112, and two risers 112 are located the both ends position department of diaphragm 111 respectively, and two risers 112 all are perpendicular with diaphragm 111, and diaphragm 111 and two risers 112 constitute the installed part 11 of "U" shape jointly.
The vertical setting of bracing piece 12, bracing piece 12 and diaphragm 111 support 1 are provided with connecting piece 3, and installed part 11 passes through connecting piece 3 demountable installation in the top of bracing piece 12, and the bottom and the supporting seat 13 of bracing piece 12 are connected.
Referring to fig. 1, before carrying out the pipeline and laying, the staff sets up two bearing box 2 in the installed part 11 of two adjacent supports 1, and is together fixed through a plurality of fixing bolt between bearing box 2 and the installed part 11, and same installed part 11 is located the hookup location department of two adjacent bearing box 2, and same installed part 11 is used for supporting two bearing box 2.
Referring to fig. 3 and 4, the connecting member 3 includes a connecting column 31 and a sleeve 32; the cross sections of the connecting column 31 and the sleeve 32 are both circular, the connecting column 31 is fixedly connected with the lower surface of the transverse plate 111, an annular groove 311 is formed in the outer peripheral surface of the connecting column 31, and the groove 311 is distributed along the length direction of the connecting column 31; the sleeve 32 is sleeved on the connecting column 31, and the sleeve 32 and the connecting column 31 are in sliding connection;
an annular lapping edge 321 matched with the groove 311 is integrally arranged on the inner circumferential surface of the top of the sleeve 32, and the lapping edge 321 is connected in the groove 311 in a sliding manner. The connecting column 31 and the supporting rod 12 are coaxially arranged, the connecting column 31 is erected on the upper end face of the supporting rod 12, the bottom end of the sleeve 32 is sleeved on the supporting rod 12, and the sleeve 32 is in threaded connection with the supporting rod 12.
In the process of installing the installation member 11 on the support rod 12, the worker first sets up the connection pole 31 on the top end of the support rod 12, and then threadedly connects the sleeve 32 on the top end of the support rod 12. In order to increase the stability of the mounting member 11, the top end fixedly connected with cross section of the supporting rod 12 is a hexagonal connecting rod 121, the connecting rod 121 and the supporting rod 12 are coaxially arranged, a connecting groove 312 matched with the connecting rod 121 is formed in the lower surface of the connecting column 31, and the connecting rod 121 is connected in the connecting groove 312 in a sliding manner. The matching of the connecting column 31 and the connecting groove 312 can make the mounting member 11 more stable when being subjected to horizontal force; on the other hand, the cross-sections of the connecting rod 121 and the connecting groove 312 are both hexagonal, and when the mounting part 11 is subjected to a torque force, the matching of the connecting rod 121 and the connecting groove 312 can make the mounting part 11 more stable.
Referring to fig. 2 and 5, the supporting base 13 includes a circular supporting plate 131, four supporting rods 132 are fixedly connected to the outer circumferential surface of the supporting plate 131 at equal intervals, and the bottom end of the supporting rod 12 is connected to the supporting plate 131. In order to make the supporting seat 13 more stable, one end of the supporting rod 132 far away from the supporting plate 131 is fixedly connected with a fixing ring 1321 horizontally arranged, the fixing ring 1321 can penetrate through a foundation bolt, the foundation bolt penetrates through the fixing ring 1321 and then is inserted into the ground, so that the supporting seat 13 is more stable, and further the support 1 is more stable.
Under different working conditions, the height of the bracket 1 may need to be adjusted, for this reason, the supporting plate 131 is provided with the adjusting assembly 4, the adjusting assembly 4 comprises a connecting pipe 41 and a limiting block 42, the center of the supporting plate 131 is provided with a connecting hole 1311 matched with the connecting pipe 41, the connecting pipe 41 is connected in the connecting hole 1311 in a sliding manner, the connecting tube 41 is perpendicular to the supporting plate 131, the limiting block 42 is fixedly connected to the bottom end of the connecting tube 41, the limiting block 42 is attached to the lower surface of the supporting plate 131, the connecting tube 41 is further in threaded connection with a limiting nut 43, the limiting nut 43 is positioned right above the supporting plate 131, and a worker screws the limiting nut 43 to enable the limiting nut 43 and the limiting block 42 to form a clamping force on the supporting plate 131, the connecting tube 41 is fixed on the supporting plate 131, the bottom end of the supporting rod 12 is inserted into the connecting tube 41, and the supporting rod 12 is connected with the connecting tube 41 by a screw.
The staff can realize the adjustment of installed part 11 direction of height through revolving wrong bracing piece 12, and then makes support 1 can use under the operating mode as much as possible.
The implementation principle of the green pipeline laying device in the embodiment of the application is as follows: before laying the pipeline, a worker passes the connecting pipe 41 upwards through the connecting hole 1311 on the lower surface of the supporting plate 131 and then fixes the connecting pipe 41 by using the limiting nut 43, then the worker connects the supporting rod 12 in the connecting pipe 41 in a threaded manner, then the connecting column 31 on the mounting part 11 is erected at the top end of the supporting rod 12 and fixes the mounting part 11 by using the sleeve 32, and according to the method, the worker mounts the plurality of brackets 1.
After support 1 has been installed, the staff sets up bearing box 2 between two adjacent supports 1, and is in the same place bearing box 2 and the installed part 11 on support 1 are fixed with fixing bolt, and the fixed back staff that finishes of bearing box 2 wears to establish rag bolt in solid fixed ring 1321 on supporting seat 13 as required, then opens the lid 22 on bearing box 2, lay the cable or pipeline in bearing box 2 can.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (10)

1. The utility model provides a green pipeline lays device which characterized in that: including a plurality of bearing box (2) and a plurality of support (1), the top of bearing box (2) is provided with places mouth (211), the border of placing mouth (211) articulates there is lid (22), the both ends of bearing box (2) are not sealed, support (1) are including installed part (11), bracing piece (12) and supporting seat (13), bracing piece (12) vertical setting, install part (11) are installed in the top of bracing piece (12), the bottom in bracing piece (12) is installed in supporting seat (13), bearing box (2) are laid with support (1) in turn, the tip of bearing box (2) is taken and is established on installed part (11) of support (1), and pass through the bolt fastening between bearing box (2) and installed part (11).
2. A green line laying apparatus as defined in claim 1, wherein: installation part (11) are including integrative diaphragm (111) and two riser (112) that set up, and bearing case (2) are set up on diaphragm (111), and bearing case (2) are located between two riser (112).
3. A green line laying apparatus as defined in claim 1, wherein: the connecting piece (3) is arranged between the mounting piece (11) and the supporting rod (12), and the mounting piece (11) and the supporting rod (12) are detachably connected through the connecting piece (3).
4. A green line laying apparatus as defined in claim 3, wherein: connecting piece (3) are circular shape spliced pole (31) including the cross section, and sleeve pipe (32) on spliced pole (31) are established to the cover, sleeve pipe (32) slide with spliced pole (31) and are connected, spliced pole (31) are connected with installed part (11), set up recess (311) of laying along sleeve pipe (32) length direction on the outer peripheral face of spliced pole (31), sleeve pipe (32) are gone up an organic whole and are provided with overlap joint along (321), the overlap joint slides along (321) and connects in recess (311), the top at bracing piece (12) is established to the bottom cover of sleeve pipe (32), and set up to threaded connection between sleeve pipe (32) and bracing piece (12).
5. A green line laying apparatus as defined in claim 4, wherein: the upper surface rigid coupling of bracing piece (12) has connecting rod (121), and connecting rod (121) are laid along the length direction of bracing piece (12), and spread groove (312) have been seted up to the lower surface of spliced pole (31) that corresponds, and connecting rod (121) slide and connect in spread groove (312).
6. A green line laying apparatus as defined in claim 5, wherein: the cross sections of the connecting rod (121) and the connecting groove (312) are both set to be polygonal.
7. A green line laying apparatus as defined in claim 1, wherein: the supporting seat (13) comprises a supporting plate (131) and a plurality of supporting rods (132), and the supporting rods (132) are fixedly connected to the outer peripheral surface of the supporting plate (131) at equal intervals.
8. A green line laying apparatus as defined in claim 7, wherein: one end of the support rod (132) far away from the support plate (131) is fixedly connected with a fixing ring (1321).
9. A green line laying apparatus as defined in claim 7, wherein: the supporting seat (13) is provided with an adjusting component (4) for adjusting the height of the mounting piece (11).
10. A green line laying apparatus as defined in claim 9, wherein: adjusting part (4) are including connecting pipe (41), stopper (42) and stop nut (43), have seted up connecting hole (1311) on supporting seat (13), and connecting pipe (41) are worn to locate in connecting hole (1311), and stopper (42) fixed connection is on connecting pipe (41), and stop nut (43) threaded connection is on connecting pipe (41), and stopper (42) and stop nut (43) press from both sides tight supporting seat (13).
CN202023101464.1U 2020-12-22 2020-12-22 Green pipeline laying device Expired - Fee Related CN214153853U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023101464.1U CN214153853U (en) 2020-12-22 2020-12-22 Green pipeline laying device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023101464.1U CN214153853U (en) 2020-12-22 2020-12-22 Green pipeline laying device

Publications (1)

Publication Number Publication Date
CN214153853U true CN214153853U (en) 2021-09-07

Family

ID=77528456

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023101464.1U Expired - Fee Related CN214153853U (en) 2020-12-22 2020-12-22 Green pipeline laying device

Country Status (1)

Country Link
CN (1) CN214153853U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116971608A (en) * 2023-07-31 2023-10-31 陕西建工第三建设集团有限公司 Construction method of groove box installation system for overhauling horse way

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN116971608A (en) * 2023-07-31 2023-10-31 陕西建工第三建设集团有限公司 Construction method of groove box installation system for overhauling horse way

Similar Documents

Publication Publication Date Title
US9890876B2 (en) Method for installing a stationary support in a planned position
CN214153853U (en) Green pipeline laying device
CN114535855A (en) Heat supply pipeline butt welding tool
WO2017161931A1 (en) Structure for integrated installation of wireless communication device
CN112978589B (en) Tower crane attachment fixing device
CN211405412U (en) Support frame suitable for electric power capital construction job site interim cable supports
KR20210078118A (en) A mounting structure for supporting post of construction
CN207244648U (en) Iron tower foundation reinforced liner and steel tower supporting structure
CN113315078B (en) Engineering cable pipeline waterproof connection structure
CN110761299B (en) Bracket for mounting steel support on foundation pit purlin and construction method thereof
CN210687250U (en) Natural gas line junction supports protection device
CN212105260U (en) Supporting device for mounting assembly type building
CN114150663A (en) Anchor pile fixing frame
CN209839348U (en) A water conservancy pipeline supports connection structure for hydraulic engineering
CN209954104U (en) A tailor-welded braced mould for construction elevator standard festival
CN218148369U (en) Novel circular foundation pit supporting structure
CN220156123U (en) Auxiliary support for cable support
JP5968667B2 (en) Construction method of lightweight building foundation
CN221212121U (en) Deposit steel form for beam pedestal construction
CN211175624U (en) Supporting device for laying wire drawing oil pipeline of wire drawing machine
CN213539815U (en) A trestle for stand installation is fixed
CN216379466U (en) Construction salvage platform for river channel treatment
CN213204127U (en) Adjusting and hanging mechanism of foundation bearing column
CN216787929U (en) Back-up device for floor support
CN219827995U (en) Connecting structure of farmland passing culvert pipe interface

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210907