CN214143313U - Overhead bridge high hollow pier group overturning mold - Google Patents

Overhead bridge high hollow pier group overturning mold Download PDF

Info

Publication number
CN214143313U
CN214143313U CN202022453699.0U CN202022453699U CN214143313U CN 214143313 U CN214143313 U CN 214143313U CN 202022453699 U CN202022453699 U CN 202022453699U CN 214143313 U CN214143313 U CN 214143313U
Authority
CN
China
Prior art keywords
column
tripod
spring
template
sealing
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022453699.0U
Other languages
Chinese (zh)
Inventor
李军
孙庚�
李宁
刘信亮
梅神亮
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Original Assignee
Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd filed Critical Second Construction Co Ltd of China Construction Eighth Engineering Division Co Ltd
Priority to CN202022453699.0U priority Critical patent/CN214143313U/en
Application granted granted Critical
Publication of CN214143313U publication Critical patent/CN214143313U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a hollow mound group turns over mould technical field, concretely high hollow mound group turns over mould of overpass, including the tripod, one side of tripod is provided with the template, is connected with between tripod and the template and presss from both sides post and spreader, and the frame plate part of tripod protrudes to in pressing from both sides the post, and one side of pressing from both sides the post agrees with and is provided with the spreader, is provided with the fixture block on the side of spreader, the utility model discloses a repeatedly usable's steel bar installation inner support, supplementary vertical main muscle installation has simultaneously considered reinforcing bar location skeleton and construction platform, has practiced thrift the cost greatly than traditional reinforcing bar strength nature skeleton; the pier body reinforcing steel bar manufacturing method has the advantages that the original material reinforcing steel bar (9m or 12m) can be directly stripped to be installed after ribs are removed, the workload of processing a large amount of working reinforcing steel bars is reduced, the pier body reinforcing steel bar manufacturing method can be used as a construction platform for installing the hollow pier inner curtain, the construction progress is accelerated, and the cost is saved.

Description

Overhead bridge high hollow pier group overturning mold
Technical Field
The utility model relates to a hollow mound crowd turns over mould technical field specifically is overhead bridge high hollow mound crowd turns over mould.
Background
The increasingly crowded roads lead the urban demand for rail traffic to be more and more urgent, and in order to ensure that a rail main line meets the requirement of a vertical curve index, the elevated bridge section has irreplaceable functions and positions in rail traffic construction, particularly in cities with complex landforms and landforms. In recent years, the construction of rail transit is increasing in all big cities in the country. In the face of the region with complex terrain, the viaduct pier body is higher and higher. And the viaduct is influenced by the main line vertical curve, and the viaduct bodies usually appear in pieces. The construction scheme, quality, safety control and mechanical equipment configuration requirements on the viaduct body group are higher in the construction process, and according to the resource configuration condition, the viaduct sections are usually constructed in a flowing mode, and the viaduct body construction is usually directly related to the key construction period. Therefore, the reasonable, economical and efficient construction scheme of the viaduct body is the key of success and failure of the project, and the viaduct high hollow pier group turnover formwork is provided for the project.
SUMMERY OF THE UTILITY MODEL
The utility model aims at providing a viaduct high hollow mound crowd turns over mould to solve the problem that provides among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a formwork overturning device for a viaduct high hollow pier group comprises a tripod, a formwork is arranged on one side of the tripod, a clamping column and a cross column are connected between the tripod and the formwork, a framework plate of the tripod partially protrudes into the clamping column, a through hole is formed in the clamping column, an L-shaped rod-shaped hook penetrates through the through hole of the clamping column, the hook penetrates through the through hole formed in the tripod, the cross column is arranged on one side of the clamping column in a matching mode, a clamping block is arranged on the side surface of the cross column, one end of the clamping block is fixedly connected with a first spring, the clamping block and the first spring are arranged in a square groove formed in the outer wall of the cross column, an air column penetrates through the middle of the first spring, one end of the air column is fixedly connected with the clamping block, one end of the cross column extends into a square plate groove formed in the formwork, the clamping block partially protrudes into a clamping groove formed in the inner wall of the square plate groove of the formwork, an L-shaped pipe cavity and a straight pipe cavity are formed in the cross column, the end of the straight pipe cavity is connected with the bottom surface of the square groove formed in the cross column, one side intercommunication of straight lumen has L type lumen, and the one end of L type lumen extends to the tripod outside, be provided with the pneumatic valve in the L type lumen, the other end of gas column extends to in the straight lumen, and gas column tip fixedly connected with bellows, the one end fixedly connected with location section of thick bamboo of bellows.
Preferably, the air valve comprises a partition plate, a second spring, a sealing ball and a sealing barrel, the partition plate and the sealing barrel are fixed on the inner wall of the L-shaped pipe cavity, the second spring and the sealing ball are arranged between the partition plate and the sealing barrel, one end of the second spring is in contact with the sealing ball, and the other end of the second spring is in contact with the partition plate.
Preferably, the baffle shape is the plectane and the plate body is fitted with a contraceptive ring and is equipped with a plurality of evenly distributed's through-hole, and the spherical groove has been seted up on the spherical groove of the sealed tube shape for drum and barrel on one side bottom surface, agrees with in the spherical groove of sealed tube and is provided with the sealed ball, and sealed tube is fitted with a contraceptive ring and is equipped with a plurality of evenly distributed's pore.
Preferably, the gas column is cylindrical, a plurality of uniformly distributed protruding sliding blocks are arranged on the upper fixing ring of the side wall of the column body, the gas column and the corrugated pipe are movably sleeved in the inner cavity of the straight pipe cavity, and the protruding sliding blocks partially extend into prismatic sliding grooves formed in the inner wall of the straight pipe cavity.
Preferably, the positioning cylinder is fixed on the inner wall of the straight tube cavity, one end of the first spring is in contact with the bottom surface of the square groove on the transverse column, and the other end of the first spring abuts against the clamping block.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model adopts the combined steel mould and the standard flat mould and the 1/2 top corner mould, thereby increasing the utilization rate of the template and ensuring the appearance quality of the concrete; the internal mold adopts a standard flat mold, an angle mold and a telescopic strap to supplement a wood mold, and the internal mold template reaches the optimized configuration, the utility model adopts a reusable steel bar installation internal support to assist the installation of a vertical main steel bar, and simultaneously considers a steel bar positioning framework and a construction platform, thereby greatly saving the cost compared with the traditional steel bar stiff framework; the pier body reinforcing steel bar manufacturing is good, the raw material reinforcing steel bar (9m or 12m) can be directly stripped to be installed, a large amount of working reinforcing steel bar processing workload is reduced, the construction platform can be used as a construction platform for installing the hollow pier inner curtain, the construction progress is accelerated, and the cost is saved;
2. the utility model discloses a climb the awl and regard as the pre-buried of pump line support, both reduced the pre-buried degree of difficulty, climb the awl simultaneously and can fall to usefulness many times, be favorable to engineering cost control. The utility model discloses a standardized safety protection platform is with the template piecemeal, ann tears open simultaneously, has both guaranteed the security of construction, has reduced the work load of repeated installation safety protection railing again. The utility model discloses hollow mound top entity section support adopts prefabricated reinforced concrete apron to replace, and furthest utilizes the major structure concrete, and the convenience is torn open to prefabricated component ann simultaneously, more utilizes field operation, practices thrift construction period.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a schematic view of a cross-post structure;
fig. 3 is a schematic view of a clamp post structure.
In the figure: the device comprises a tripod 1, a template 2, a clamping column 3, a cross column 4, a hook 5, a clamping block 6, a first spring 7, an air column 8, a tube cavity 9L, a straight tube cavity 10, an air valve 11, a corrugated tube 12, a positioning tube 13, a partition plate 14, a second spring 15, a sealing ball 16, a sealing tube 17, a pier wall 18, an inner support 19 and a pull rod 20.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the technical scheme in the utility model, all other embodiments that ordinary skilled person in the art obtained under the prerequisite of not making the creative work all belong to the scope of the utility model protection.
Referring to fig. 1 to 3, the present invention provides a technical solution: a formwork overturning device for a viaduct high hollow pier group comprises a tripod 1, a formwork 2 is arranged on one side of the tripod 1, a clamping column 3 and a cross column 4 are connected between the tripod 1 and the formwork 2, a frame plate part of the tripod 1 protrudes into the clamping column 3, a through hole is formed in the clamping column 3, an L-shaped rod-shaped hook 5 penetrates through the through hole of the clamping column 3, the hook 5 penetrates through the through hole formed in the tripod 1, the cross column 4 is arranged on one side of the clamping column 3 in a matching manner, a clamping block 6 is arranged on the side surface of the cross column 4, one end of the clamping block 6 is fixedly connected with a spring I7, the clamping block 6 and the spring I7 are arranged in a square groove formed in the outer wall of the cross column 4, an air column 8 penetrates through the middle of the spring I7, one end of the air column 8 is fixedly connected with the clamping block 6, one end of the cross column 4 extends into the square groove formed in the formwork 2, and the part of the clamping block 6 protrudes into a clamping groove formed in the inner wall of the square plate groove of the formwork 2, open L type pipe chamber 9 and straight tube chamber 10 in the spreader 4, the square groove bottom surface on the tip of straight tube chamber 10 and the spreader 4 is connected, one side intercommunication of straight tube chamber 10 has L type pipe chamber 9, and L type pipe chamber 9's one end extends to tripod 1 outside, is provided with pneumatic valve 11 in the L type pipe chamber 9, and the other end of gas column 8 extends to in the straight tube chamber 10, and 8 tip fixedly connected with bellows 12 of gas column, the one end fixedly connected with location section of thick bamboo 13 of bellows 12.
The air valve 11 comprises a partition plate 14, a second spring 15, a sealing ball 16 and a sealing cylinder 17, the partition plate 14 and the sealing cylinder 17 are fixed on the inner wall of the L-shaped pipe cavity 9, the second spring 15 and the sealing ball 16 are arranged between the partition plate 14 and the sealing cylinder 17, one end of the second spring 15 is in contact with the sealing ball 16, and the other end of the second spring 15 is in contact with the partition plate 14.
The partition plate 14 is in a circular plate shape, a plurality of uniformly distributed through holes are annularly arranged on the plate body, the sealing cylinder 17 is in a cylinder shape, a spherical groove is formed in the bottom surface of one side of the cylinder body, a sealing ball 16 is arranged in the spherical groove of the sealing cylinder 17 in a matching mode, and a plurality of uniformly distributed fine holes are annularly arranged on the sealing cylinder 17.
The gas column 8 is cylindrical, a plurality of uniformly distributed convex sliding blocks are arranged on the upper fixing ring of the side wall of the column body, the gas column 8 and the corrugated pipe 12 are movably sleeved in the inner cavity of the straight pipe cavity 10, and the convex sliding blocks partially extend into prismatic sliding grooves formed in the inner wall of the straight pipe cavity 10.
The positioning cylinder 13 is fixed on the inner wall of the straight tube cavity 10, one end of the first spring 7 is contacted with the bottom surface of the square groove on the cross column 4, and the other end of the first spring 7 is propped against the fixture block 6.
The turnover installation process flow comprises the following steps: construction preparation → positioning and paying-off → ground pre-splicing → checking the quality of the templates and pre-splicing installation → erecting the outer corner mold of the first layer → erecting the outer flat mold of the first layer → erecting the outer safe operation platform of the outer mold → erecting the inner flat mold of the first layer → installing the split screw rod → erecting the inner corner mold of the first layer → erecting the inner safe operation platform of the inner mold → erecting the outer corner mold of the second layer → installing the inner and outer templates according to the method → completing the installation of the top template of the section → installing the split screw rod → erecting the inner and outer safe operation platforms of the top layer of the section.
The turnover mould dismantling and turning up process flow comprises the following steps: removing a lowermost layer of outer corner formwork pull rod and an adjacent formwork bolt → hoisting a lowermost layer of corner formwork to the position of the outer corner formwork of the top layer of the concrete pouring section by using hoisting equipment such as a tower crane and the like → removing the lowermost layer of outer flat formwork pull rod and the adjacent formwork bolt → hoisting to the top layer and assembling with the outer corner formwork → removing the lowermost layer of inner flat formwork pull rod and the adjacent formwork bolt → hoisting to the position of the inner flat formwork of the top layer by using hoisting equipment such as a tower crane and the like → removing the lowermost layer of inner corner formwork pull rod and the adjacent formwork bolt → hoisting to the top layer and assembling with the inner flat formwork → installing a newly assembled formwork split screw → erecting an inner and outer safety operation protection platform, and repeating the steps to sequentially turn up and assemble the lower layer formwork until the upper layer of upper section and the top layer formwork are all turned up and installed.
The working principle is as follows: the cross column 4 is inserted into the template 2, the spring I7 rebounds to push the clamping block 6 to protrude from the cross column 4, the clamping and fixing between the cross column 4 and the template 2 are realized, a worker uses a gas injection device in the prior art to perform gas extraction operation on the L-shaped pipe cavity 9, namely, the air in the corrugated pipe 12 can be pumped out through the L-shaped pipe cavity 9 and the straight pipe cavity 10, the air flow in the process jacks up the sealing ball 16, then quickly passes through the gap between the sealing ball 16 and the sealing cylinder 17, the air pressure suction acts on the air column 8, the air column 8 moves to drive the clamping block 6, namely, the fixture block 6 can be controlled to retract into the cross column 4, and the fixture block 6 extends out of the cross column 4 again, the process is slow, because the air flow in the L-shaped pipe cavity 9 can only permeate through the fine holes on the sealing cylinder 17 in the process of flowing to the straight pipe cavity 10, certain time is needed, and the butt joint work of the tripod 1 and the template 2 is completed in the time.
The height division of the bridge construction sections can be conveniently positioned by 4.5m or 6m according to the length of the main reinforcement raw material, the main difficulty of high-altitude center pier reinforcement binding lies in positioning and installation of vertical reinforcements, the construction method is inspired by the traditional process, the stiff skeleton is optimized into a reusable inner support, namely after the vertical reinforcements are positioned and installed, a part of horizontal stirrups are installed, and the inner support is hung and removed by utilizing hoisting equipment and used for the next section. The vertical main reinforcement can be bound according to 9m and 12m blanking by adopting the inner support, so that the construction process is greatly optimized, and the construction progress is accelerated.
The external mold is configured by adopting a combined steel mold, in order to ensure the appearance quality, the number of the blocks of the template is reduced as much as possible, and meanwhile, the field installation is convenient, and the requirements of four-side slope shrinkage are met by adopting a large flat mold and a gradual change angle mold. Considering that the pier body is high in height, in order to reduce the types of angle molds and facilitate field construction, the angle molds are only configured to half of the pier body and are adjusted by utilizing the flat molds. The template utilization rate can be increased.
The requirement on the appearance quality of the inner mold is not high, and the construction method adopts a standard flat mold, a standard angle mold, a telescopic back rib and a wood mold to fill to ensure that the inner cavity has the linear requirement of a structural form of four-side slope shrinkage.
The concrete pouring mainly needs to optimize the fixing mode of the pump pipe, the method mainly adopts the form of a vehicle-mounted pump and the pump pipe to pump concrete, the positioning of the pump pipe adopts the climbing cone as pre-embedding, the supporting cushion block is made of a steel structure, the stability of the pump pipe is guaranteed, meanwhile, main components can be used reversely, and compared with the traditional fixing mode, the cost is saved.
The temporary measures of the high hollow pier mainly comprise construction temporary measures of a diaphragm plate and a pier top capping section, the construction method utilizes the reinforced concrete with a main structure as much as possible, and a reinforced concrete cover plate with the strength equal to that of the concrete after 15cm is manufactured by a prefabricating method and used as a supporting measure for pouring the concrete on the reinforced concrete cover plate, so that the construction method has the advantages of convenience in construction, construction period saving, no need of dismantling and the like.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. Viaduct high hollow mound crowd turns over mould, including tripod (1), one side of tripod (1) is provided with template (2), its characterized in that: a clamping column (3) and a cross column (4) are connected between the tripod (1) and the template (2), the frame plate part of the tripod (1) protrudes into the clamping column (3), a through hole is formed in the clamping column (3), an L-shaped rod-shaped hook (5) penetrates through the through hole of the clamping column (3), the hook (5) penetrates through the through hole formed in the tripod (1), the cross column (4) is arranged on one side of the clamping column (3) in a matching manner, a clamping block (6) is arranged on the side surface of the cross column (4), one end of the clamping block (6) is fixedly connected with a first spring (7), the clamping block (6) and the first spring (7) are arranged in a square groove formed in the outer wall of the cross column (4), an air column (8) penetrates through the middle part of the first spring (7), one end of the air column (8) is fixedly connected with the clamping block (6), one end of the cross column (4) extends into a square plate groove formed in the template (2), in the draw-in groove of seting up on the square plate inslot wall of fixture block (6) part protrusion template (2), seted up L type lumen (9) and straight tube chamber (10) in spreader (4), the tip of straight tube chamber (10) is connected with the square tank bottom surface on spreader (4), and one side intercommunication of straight tube chamber (10) has L type lumen (9), and the one end of L type lumen (9) extends to tripod (1) outside, be provided with pneumatic valve (11) in L type lumen (9), the other end of gas column (8) extends to in straight tube chamber (10), and gas column (8) tip fixedly connected with bellows (12), the one end fixedly connected with location section of thick bamboo (13) of bellows (12).
2. The overhead viaduct pier group rollover as claimed in claim 1, wherein: the air valve (11) comprises a partition plate (14), a second spring (15), a sealing ball (16) and a sealing barrel (17), the partition plate (14) and the sealing barrel (17) are fixed on the inner wall of the L-shaped pipe cavity (9), the second spring (15) and the sealing ball (16) are arranged between the partition plate (14) and the sealing barrel (17), the sealing ball (16) is contacted with one end of the second spring (15), and the partition plate (14) is contacted with the other end of the second spring (15).
3. The overhead viaduct pier group rollover as claimed in claim 2, wherein: the partition plate (14) is in a circular plate shape, the plate body is provided with a plurality of uniformly distributed through holes in an annular mode, the sealing barrel (17) is in a cylindrical shape, the bottom surface of one side of the barrel body is provided with a spherical groove, sealing balls (16) are arranged in the spherical groove of the sealing barrel (17) in a matched mode, and the sealing barrel (17) is provided with a plurality of uniformly distributed fine holes in an annular mode.
4. The overhead viaduct pier group rollover as claimed in claim 1, wherein: gas post (8) are cylindric and cylinder lateral wall upper fixed ring is equipped with a plurality of evenly distributed's protrusion slider, and gas post (8) and bellows (12) activity cup joint in the inner chamber of straight lumen (10), and protrusion slider part extends to in the prismatic spout of seting up on the inner wall of straight lumen (10).
5. The overhead viaduct pier group rollover as claimed in claim 1, wherein: the positioning cylinder (13) is fixed on the inner wall of the straight tube cavity (10), one end of the first spring (7) is in contact with the bottom surface of the square groove on the transverse column (4), and the other end of the first spring (7) is pressed against the clamping block (6).
CN202022453699.0U 2020-10-30 2020-10-30 Overhead bridge high hollow pier group overturning mold Active CN214143313U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022453699.0U CN214143313U (en) 2020-10-30 2020-10-30 Overhead bridge high hollow pier group overturning mold

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022453699.0U CN214143313U (en) 2020-10-30 2020-10-30 Overhead bridge high hollow pier group overturning mold

Publications (1)

Publication Number Publication Date
CN214143313U true CN214143313U (en) 2021-09-07

Family

ID=77560602

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022453699.0U Active CN214143313U (en) 2020-10-30 2020-10-30 Overhead bridge high hollow pier group overturning mold

Country Status (1)

Country Link
CN (1) CN214143313U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112176885A (en) * 2020-10-30 2021-01-05 中建八局第二建设有限公司 High hollow pier group formwork turnover rapid construction method for viaduct bridge

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112176885A (en) * 2020-10-30 2021-01-05 中建八局第二建设有限公司 High hollow pier group formwork turnover rapid construction method for viaduct bridge

Similar Documents

Publication Publication Date Title
CN110774421B (en) Modular mold for pouring prefabricated stand column
CN106088330A (en) The assembling frame beam printed based on 3D and the attachment structure of frame column and construction method thereof
CN204899948U (en) Cable groove formworking jumbo
CN214143313U (en) Overhead bridge high hollow pier group overturning mold
CN110847050B (en) Large-span prefabricated corrugated steel web composite beam top and bottom plate synchronous pouring template and application method thereof
CN201447866U (en) Inclined steel reinforced concrete double-layer die plate structure
CN112176885A (en) High hollow pier group formwork turnover rapid construction method for viaduct bridge
CN114197877A (en) Wall and column concrete junction position separation device and construction method
CN212802515U (en) Integral hoisting type hoisting platform
CN210458963U (en) Light formwork without tie rod for bridge capping beam
CN206048468U (en) A kind of horizontal piping lane mould
CN202658765U (en) Keel framework concrete anti-crack filling wall
CN207004010U (en) A kind of building bearing post pours mould
CN201554155U (en) Steel pipe concrete column structure
CN203905483U (en) Fixed keelson supporting template during structural arc construction
CN209082555U (en) A kind of prefabricated piping lane machinery and Combined hydraulic type, which are integrally pacified, tears steel form open
CN113944328A (en) Cast-in-place construction process of column
CN111535175A (en) Rapid connecting structure and method for cast-in-place joint sections in cable tower beam prefabrication and assembly construction
CN205908019U (en) Prefabricated staircase mould of removable template
CN206128445U (en) Reserve solid post of prefabrication of plug hole
CN214459703U (en) Bridge pier inner mold
CN109930712A (en) The cast-in-place double mesh sheet of one kind exempt from the plaster dedicated framework of partition wall construction and its construction method
CN220599184U (en) Cylindrical concrete column reinforcing device
CN204728698U (en) The closed formwork structure of a kind of concrete suspension bridging piece
CN110284433B (en) Method for mounting arched Pi-shaped rigid frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant