CN214141265U CN202023295590.5U CN202023295590U CN214141265U CN 214141265 U CN214141265 U CN 214141265U CN 202023295590 U CN202023295590 U CN 202023295590U CN 214141265 U CN214141265 U CN 214141265U
Authority
CN
China
Prior art keywords
reinforcement cage
plate
wire rope
pile foundation
steel reinforcement
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202023295590.5U
Other languages
Chinese (zh)
Inventor
赵冰
马先秋
张纪升
袁德明
王凡
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
SEPCO1 Electric Power Construction Co Ltd
Original Assignee
SEPCO1 Electric Power Construction Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by SEPCO1 Electric Power Construction Co Ltd filed Critical SEPCO1 Electric Power Construction Co Ltd
Priority to CN202023295590.5U priority Critical patent/CN214141265U/en
Application granted granted Critical
Publication of CN214141265U publication Critical patent/CN214141265U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a bridge foundation technology specifically is a get and puts device for bridge pile foundation steel reinforcement cage, including beam slab, the scalable regulation stand of setting in beam slab both sides, hoisting machine construct and be used for a pair of electric telescopic handle of centre gripping steel reinforcement cage, but the lower extreme of adjusting the stand is all installed the horizontal walking chassis, hoisting machine constructs including two sets of drive assembly, two sets of wire rope and horizontally hanger plate, wire rope is used for lifting by crane or whereabouts hanger plate by the drive assembly one-to-one drive, electric telescopic handle installs on the lower face of hanger plate. This device convenient to use, and stable effectual, improved bridge pile foundation steel reinforcement cage and got and put stability. Through setting up the brake box, can stable control device open stop, guarantee accurate, stable get and put the action. Through setting up the stabilising plate, alleviateed wire rope's rocking, further improved stability.

Description

Be used for bridge pile foundation steel reinforcement cage to get and put device
Technical Field
The utility model relates to a bridge foundation technology specifically is a be used for bridge pile foundation steel reinforcement cage to get and put device.
Background
Bridge foundation is the direct lower part with the ground contact of bridge structures thing, is the important component of bridge substructure, and prior art is multi-purpose to add the mode of establishing circular concrete cushion, the spacing reinforcing bar of welding, and pile foundation steel reinforcement cage ann side is carried out by adopting the hoist and mount mode entirely, and poor stability easily produces destruction to the steel reinforcement cage, leads to concrete placement in-process to produce disconnected stake, and the construction is dangerous big, is unfavorable for guaranteeing construction progress and quality, also will increase the construction degree of difficulty and cost.
Disclosure of Invention
In order to solve the problem, the utility model provides a be used for bridge pile foundation steel reinforcement cage to get and put device, convenient to use, stability is good, reduces the danger when hoist and mount construction, improves the efficiency of construction. The utility model adopts the technical scheme as follows:
the utility model provides a get and put device for bridge pile foundation steel reinforcement cage, includes the beam slab, sets up scalable regulation stand, hoisting machine in the beam slab both sides construct and be used for a pair of electric telescopic handle of centre gripping steel reinforcement cage, but adjust the lower extreme of stand and all install the horizontal walking chassis, hoisting machine constructs including two sets of drive assembly, two sets of wire rope and horizontally hanger plate, wire rope is used for lifting by crane or whereabouts hanger plate by the drive assembly one-to-one drive, electric telescopic handle installs on the lower face of hanger plate.
The device is put to above-mentioned being used for bridge pile foundation steel reinforcement cage, chassis front side or rear side are equipped with the brake box, be equipped with the electronic push-and-pull rod of vertical installation, the push pedal of level setting and the ground pole of inserting of several vertical settings in the brake box, the push pedal is connected at top, the lower extreme in the brake box to the upper end of electronic push-and-pull rod, insert the ground pole upper end and connect push pedal, lower extreme and be the tip form in order to insert the ground.
The device is got to above-mentioned being used for bridge pile foundation steel reinforcement cage, be equipped with the spout on all both sides walls in the brake box respectively, the left and right sides of push pedal is equipped with respectively with spout sliding fit's slider.
The device is put to above-mentioned being used for bridge pile foundation steel reinforcement cage, drive assembly includes motor, pivot and drives rotatory line roller by the pivot, wire rope's upper end winding is on the line roller, it has logical groove to hang with wire rope to hang the hoist on the roof beam slab under the line roller to open.
The device is put to the aforesaid is used for bridge pile foundation steel reinforcement cage, the below level of beam slab is equipped with a pair of steadying plate, steadying plate cantilever installation respectively is on adjusting the stand, the suspension end of steadying plate is equipped with the through-hole that is used for wire rope to hang and passes through.
The utility model has the advantages that: this device convenient to use, and stable effectual, improved bridge pile foundation steel reinforcement cage and got and put stability. Through setting up the brake box, can stable control device open stop, guarantee accurate, stable get and put the action. Through setting up the stabilising plate, alleviateed wire rope's rocking, further improved stability.
Drawings
FIG. 1 is a front view of the structure of the present invention;
FIG. 2 is a right side sectional view of the brake box structure of the present invention;
fig. 3 is a cross-sectional view of the driving assembly according to the present invention.
In the figure: 1. a beam plate; 2. a motor; 3. a rotating shaft; 4. a wire roller; 5. a wire rope; 6. adjusting the upright post; 7. a chassis; 8. a brake box; 9. an electric push-pull rod; 10. pushing the plate; 11. a ground inserting rod; 12. a stabilizing plate; 13. a through groove; 14. a hanger plate; 16. a bearing seat; 17. a bearing; 18. a slider; 19. a chute; 20. A moving wheel; 22. an electric telescopic rod.
Detailed Description
The present invention will be further explained with reference to the accompanying drawings.
Referring to fig. 1 to 3, this embodiment is with a device is put to a pair of electric telescopic handle 22 that is used for bridge pile foundation steel reinforcement cage to get, including beam slab 1, the scalable regulation stand 6, the hoisting machine of setting in beam slab 1 both sides construct and be used for centre gripping steel reinforcement cage, but adjust the lower extreme of stand 6 and all install horizontal walking chassis 7, the several is installed to chassis 7's bottom surface and is removed the wheel. The hoisting mechanism comprises two groups of driving components, two groups of steel wire ropes 5 and a horizontal hoisting plate 14, the steel wire ropes 5 are connected and driven by the driving components one by one to hoist or fall the hoisting plate 14, and the electric telescopic rod 22 is installed on the lower plate surface of the hoisting plate 14.
The device is put to aforesaid be used for bridge pile foundation steel reinforcement cage to get, 7 front sides of chassis or rear sides are equipped with brake box 8, be equipped with the electronic push-and-pull rod 9 of vertical installation, the push pedal 10 that the level set up and the ground pole 11 of inserting of several vertical settings in the brake box 8, the push pedal 10 is connected at top, the lower extreme in brake box 8 to the upper end of electronic push-and-pull rod 9, insert in 11 upper ends of ground pole connection push pedal 10, lower extreme are the tip form in order to insert the ground, play the braking action, reduce the device and rock when the centre gripping.
The device is put to above-mentioned being used for bridge pile foundation steel reinforcement cage, be equipped with spout 19 on all both sides walls in the brake box 8 respectively, the left and right sides of push pedal 10 is equipped with respectively with spout 19 sliding fit's slider 8. Due to the sliding fit of the push plate 10, the movement of the push plate in the brake box 8 is smoother, and the phenomenon that the push plate 10 inclines in the moving process is avoided. The device is put to above-mentioned being used for bridge pile foundation steel reinforcement cage, drive assembly includes motor 2, pivot 3 and drives rotatory line roller 4 by pivot 3, and motor 2, the other end are passed through bearing 17 rotation and are injectd in bearing frame 16 to the one end of pivot 3 connection. The upper end of the steel wire rope 5 is wound on the wire roller 4, and the beam plate 1 right below the wire roller 4 is provided with a through groove 13 for hanging and hoisting the steel wire rope 5.
The device is put to above-mentioned being used for bridge pile foundation steel reinforcement cage, the below level of beam slab 1 is equipped with a pair of steadying plate 12, steadying plate 12 cantilever installation respectively is on adjusting stand 4, the suspension end of steadying plate 12 is equipped with the through-hole that is used for the wire rope to hang and passes through.
The operation process of the device is as follows: promote chassis 7 and drive the device and remove required pile foundation hole department, start brake box 8 through external controller, electronic push-and-pull rod 9 drives push pedal 10 downstream for insert ground pole 11 downstream, insert ground pole 11 and insert and realize fixedly in the soil of pile foundation hole both sides. Then after the electric push-pull rod 9 is closed through the external controller, the motor 2 is opened immediately, the motor 2 drives the steel wire rope 5 to move, so that the hanging plate 14 and the electric telescopic rod move to the specified position, the electric telescopic rod 22 is started through the external controller, after the steel reinforcement cage is clamped by the electric telescopic rod 22, the motor 2 rotates reversely to enable the steel wire rope 5 to be hoisted reversely, and the steel reinforcement cage is placed into or taken out of a foundation pit of a bridge pile.
When the steel reinforcement cage was in the device below to 1/3 departments, can remove the hoist and mount facility, rely on this device self spacing fixed to reach the steady ann side of steel reinforcement cage, and the off normal does not appear, does not produce the destruction to the steel reinforcement cage wholeness, and it is effectual to stabilize.

Claims (5)

1. The utility model provides a be used for bridge pile foundation steel reinforcement cage to get puts device which characterized in that: including beam slab (1), set up scalable regulation stand (6), hoisting machine in beam slab (1) both sides construct and a pair of electric telescopic handle (22) that are used for centre gripping steel reinforcement cage, but adjust the lower extreme of stand (6) and all install horizontal walking chassis (7), hoisting machine constructs including two sets of drive assembly, two sets of wire rope (5) and horizontally hanger plate (14), wire rope (5) are used for lifting by crane or whereabouts hanger plate (14) by the drive assembly one-to-one drive, electric telescopic handle (22) are installed on the lower face of hanger plate (14).
2. The device for picking and placing the reinforcement cage of the bridge pile foundation according to claim 1, wherein: the ground-inserting device is characterized in that a brake box (8) is arranged on the front side or/and the rear side of the underframe (7), an electric push-pull rod (9) which is vertically arranged, a horizontally arranged push plate (10) and a plurality of ground-inserting rods (11) which are vertically arranged are arranged in the brake box (8), the upper end of the electric push-pull rod (9) is arranged at the top and the lower end in the brake box (8) and is connected with the push plate (10), the upper end of the ground-inserting rod (11) is connected with the push plate (10), and the lower end of the ground-inserting rod is in a pointed shape to be inserted into the ground.
3. The device for picking and placing the reinforcement cage of the bridge pile foundation according to claim 2, wherein: all the two side walls in the brake box (8) are respectively provided with a sliding groove (19), and the left side and the right side of the push plate (10) are respectively provided with a sliding block (18) which is in sliding fit with the sliding groove (19).
4. The device for picking and placing the reinforcement cage of the bridge pile foundation according to claim 1, wherein: the driving assembly comprises a motor (2), a rotating shaft (3) and a wire roller (4) driven by the rotating shaft (3) to rotate, the upper end of a steel wire rope (5) is wound on the wire roller (4), and a beam plate (1) right below the wire roller (4) is provided with a through groove (13) which is hung and hoisted by the steel wire rope (5).
5. The device of claim 4, wherein the device comprises: the lower level of beam slab (1) is equipped with a pair of stabilizer plate (12), stabilizer plate (12) cantilever installation respectively is on adjusting stand (6), the suspension end of stabilizer plate (12) is equipped with the through-hole that is used for the wire rope to hang and passes through.
CN202023295590.5U 2020-12-31 2020-12-31 Be used for bridge pile foundation steel reinforcement cage to get and put device Active CN214141265U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202023295590.5U CN214141265U (en) 2020-12-31 2020-12-31 Be used for bridge pile foundation steel reinforcement cage to get and put device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202023295590.5U CN214141265U (en) 2020-12-31 2020-12-31 Be used for bridge pile foundation steel reinforcement cage to get and put device

Publications (1)

Publication Number Publication Date
CN214141265U true CN214141265U (en) 2021-09-07

Family

ID=77544797

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202023295590.5U Active CN214141265U (en) 2020-12-31 2020-12-31 Be used for bridge pile foundation steel reinforcement cage to get and put device

Country Status (1)

Country Link
CN (1) CN214141265U (en)

Similar Documents

Publication Publication Date Title
CN109680967B (en) Jacking equipment of steel structure beam for mounting small-sized factory building
CN215756065U (en) Quick hoist device of construction is contained to prefabricated box of bridge
CN107500145A (en) A kind of Mobile hoisting takes off bar apparatus
CN212174394U (en) Tower crane climbing protector
CN214141265U (en) Be used for bridge pile foundation steel reinforcement cage to get and put device
CN207108307U (en) The portable boom hoisting of urban viaduct construction in later period
CN210286528U (en) Gantry crane and balance support thereof
CN107601301B (en) A kind of steel reinforcement cage lifting device and hoisting method
CN214935462U (en) Bridge crane capable of lifting in sectional mode
CN214885596U (en) Concrete vibrating rod lifting device
CN211498813U (en) Dynamic compactor detacher
CN209797330U (en) Mechanical equipment hoisting frame with stabilizing function
CN211898307U (en) Rod pit tamping device for electric power engineering construction
CN203188197U (en) Automatic hooking device and dynamic compactor
CN210458947U (en) Bridge concrete guardrail pouring trolley
CN102030272A (en) Building equipment hoisting device
CN220149048U (en) Hoisting mechanism capable of slowing down shaking
CN220432101U (en) Auxiliary hanging bracket for road bridge construction
CN111173522A (en) Construction method for hoisting and descending air shaft shield machine
CN209797300U (en) Injection molding machine spare part of high stability changes auxiliary device
CN221397109U (en) Chain type elevator structure
CN213804934U (en) Lifting and moving tool for traveling rail of bridge girder erection machine
CN215886105U (en) Movable submersible sewage pump hoisting device
CN219259344U (en) Drilling bored concrete pile steel reinforcement cage hangs puts device
CN221253635U (en) Safety elevator capable of adjusting heavy core position

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant