CN214124504U - Electric energy metering box convenient to overhaul - Google Patents
Electric energy metering box convenient to overhaul Download PDFInfo
- Publication number
- CN214124504U CN214124504U CN202023174851.8U CN202023174851U CN214124504U CN 214124504 U CN214124504 U CN 214124504U CN 202023174851 U CN202023174851 U CN 202023174851U CN 214124504 U CN214124504 U CN 214124504U
- Authority
- CN
- China
- Prior art keywords
- electric energy
- metering box
- connecting column
- overhaul
- spliced pole
- Prior art date
- Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
- Expired - Fee Related
Links
- 238000009434 installation Methods 0.000 claims abstract description 12
- 230000008901 benefit Effects 0.000 abstract description 6
- 238000000034 method Methods 0.000 description 6
- 230000008569 process Effects 0.000 description 3
- 230000001105 regulatory effect Effects 0.000 description 3
- 230000009471 action Effects 0.000 description 2
- 230000000694 effects Effects 0.000 description 2
- 241000255789 Bombyx mori Species 0.000 description 1
- 230000004075 alteration Effects 0.000 description 1
- 230000009286 beneficial effect Effects 0.000 description 1
- 230000004048 modification Effects 0.000 description 1
- 238000012986 modification Methods 0.000 description 1
- 238000006467 substitution reaction Methods 0.000 description 1
- 239000000725 suspension Substances 0.000 description 1
Images
Landscapes
- Nitrogen Condensed Heterocyclic Rings (AREA)
Abstract
The utility model relates to a batch meter technical field just discloses an electric-energy metering box convenient to overhaul, including the batch meter shell, the inboard swing joint of batch meter shell has first spliced pole, the top fixed mounting of first spliced pole has the connecting plate, the top fixed mounting of connecting plate has the electric energy meter body, the front surface fixed mounting of batch meter shell has the mounting bracket, the inboard of mounting bracket is rotated and is connected with the rotation curb plate, the inboard of first spliced pole is rotated and is connected with the connecting block, the outside fixed mounting of connecting block has the second spliced pole, the bottom fixed mounting of batch meter shell has the installation dustcoat. This electric-energy metering box convenient to overhaul through setting up first spliced pole and second spliced pole, when the user need overhaul the electric energy meter body, the user can adjust the pole to the outside pulling top to make the device possess the advantage that the convenience overhauld the electric energy meter, made things convenient for the user to use.
Description
Technical Field
The utility model relates to a batch meter technical field specifically is an electric-energy batch meter convenient to overhaul.
Background
The metering box is the total of metering devices and auxiliary equipment necessary for metering electric energy, and comprises an electric energy meter, a voltage for metering, a current transformer and a secondary circuit thereof, an electric energy metering screen, a cabinet, a box and the like.
For guaranteeing installation quality, the fixed built-in expansion bolts of must silkworm chrysalis of suspension type box, the bolt size satisfies safe firm requirement and outdoor installation condition, but the current floor type electric energy metering box is inconvenient overhauls the electric energy meter, has caused the problem that the user need consume too much time when overhauing the electric energy meter, so provide the electric energy metering box convenient to overhaul and solve above-mentioned problem.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides an electric-energy metering box convenient to overhaul possesses the convenience and overhauls advantages such as electric energy meter, has solved present console mode electric-energy metering box inconvenient overhauls the electric energy meter, has caused the user to need consume the problem of too much time when overhauing the electric energy meter.
(II) technical scheme
For the purpose that realizes above-mentioned convenience and overhaul the electric energy meter, the utility model provides a following technical scheme: an electric energy metering box convenient to overhaul comprises a metering box shell, wherein a first connecting column is movably connected to the inner side of the metering box shell, a connecting plate is fixedly mounted at the top end of the first connecting column, an electric energy meter body is fixedly mounted at the top of the connecting plate, a mounting frame is fixedly mounted on the front surface of the metering box shell, a rotating side plate is rotatably connected to the inner side of the mounting frame, a connecting block is rotatably connected to the inner side of the first connecting column, a second connecting column is fixedly mounted on the outer side of the connecting block, an installation cover is fixedly mounted at the bottom of the metering box shell, a first positioning clamping groove is formed in the right side of the first connecting column, a second positioning clamping groove is formed in the right side of the second connecting column, two sliding groove rings are fixedly mounted on the right side wall of an inner cavity of the installation cover, and a first positioning clamping block is slidably connected to the inner side of the sliding groove rings at the top, the bottom the inboard sliding connection of chute circle has the second location fixture block, the equal fixed mounting in right side of first location fixture block and second location fixture block has the regulation pole, the outside of adjusting the pole has cup jointed the regulating spring of fixed connection chute circle and first location fixture block or second location fixture block.
Preferably, the top of the electric energy meter body is fixedly provided with a control button, and the electric energy meter body is fixedly connected with the connecting plate through a bolt.
Preferably, the bottom of the metering box shell is provided with a limiting through hole, and the first connecting column is tightly connected with the limiting through hole.
Preferably, the first connecting column and the second connecting column are square columns, and the outer end of the adjusting rod is fixedly provided with an adjusting pull ring.
Preferably, the first positioning clamping groove and the first positioning clamping block have the same shape, and the second positioning clamping groove and the second positioning clamping block have the same shape.
Preferably, the connecting groove has been seted up to the bottom of first spliced pole, and the connecting groove extends to the front surface and the rear surface of first spliced pole, and the connecting block is located the inboard of connecting groove and is connected with first spliced pole rotation.
(III) advantageous effects
Compared with the prior art, the utility model provides an electric-energy metering box convenient to overhaul possesses following beneficial effect:
the electric energy metering box convenient to overhaul is characterized in that the first connecting column and the second connecting column are arranged, when a user needs to overhaul an electric energy meter body, the user can pull the top adjusting rod outwards, the top adjusting rod drives the first positioning fixture block to move outwards, when the first positioning fixture block is separated from the first positioning clamping groove, the user can rotate the connecting block, the connecting block drives the second connecting column to rotate, when the second connecting column and the first connecting column are in the same vertical position, the user can push the second connecting column towards the top, the second connecting column drives the first connecting column to move towards the top, when the second connecting column moves to the second positioning fixture block, the second positioning fixture block is inserted into the second positioning clamping groove under the action of the adjusting spring, so that clamping and fixing of the second connecting column are completed, at the moment, the electric energy meter body cannot move towards the bottom normally, and the electric energy meter body is positioned outside a shell of the metering box, therefore, the device has the advantage of conveniently overhauling the electric energy meter, and is convenient for a user to use.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is an enlarged schematic view of the point A shown in FIG. 1 according to the present invention;
fig. 3 is a front view of the present invention.
In the figure: 1 batch meter shell, 2 first spliced poles, 3 connecting plates, 4 electric energy meter bodies, 5 mounting brackets, 6 rotation curb plates, 7 connecting blocks, 8 second spliced poles, 9 installation dustcoats, 10 first positioning clamping grooves, 11 second positioning clamping grooves, 12 chute rings, 13 first positioning clamping blocks, 14 second positioning clamping blocks, 15 regulation poles, 16 regulating springs.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, an electric energy metering box convenient to overhaul comprises a metering box shell 1, wherein a first connecting column 2 is movably connected to the inner side of the metering box shell 1, a limiting through hole is formed in the bottom of the metering box shell 1, the first connecting column 2 is tightly connected with the limiting through hole, a connecting plate 3 is fixedly installed at the top end of the first connecting column 2, an electric energy meter body 4 is fixedly installed at the top of the connecting plate 3, a control button is fixedly installed at the top of the electric energy meter body 4, the electric energy meter body 4 is fixedly connected with the connecting plate 3 through a bolt, an installation frame 5 is fixedly installed on the front surface of the metering box shell 1, a rotating side plate 6 is rotatably connected to the inner side of the installation frame 5, a connecting block 7 is rotatably connected to the inner side of the first connecting column 2, a connecting groove is formed in the bottom of the first connecting column 2, and extends to the front surface and the rear surface of the first connecting column 2, the connecting block 7 is positioned on the inner side of the connecting groove and is rotationally connected with the first connecting post 2, a second connecting post 8 is fixedly arranged on the outer side of the connecting block 7, an installation outer cover 9 is fixedly arranged at the bottom of the metering box shell 1, a first positioning clamping groove 10 is formed in the right side of the first connecting post 2, a second positioning clamping groove 11 is formed in the right side of the second connecting post 8, two sliding groove rings 12 are fixedly arranged on the right side wall of the inner cavity of the installation outer cover 9, a first positioning clamping block 13 is slidably connected to the inner side of the sliding groove ring 12 at the top, a second positioning clamping block 14 is slidably connected to the inner side of the sliding groove ring 12 at the bottom, the first positioning clamping groove 10 is the same as the first positioning clamping block 13 in shape, the second positioning clamping groove 11 is the same as the second positioning clamping block 14 in shape, an adjusting rod 15 is fixedly arranged on the right sides of the first positioning clamping block, the first connecting column 2 and the second connecting column 8 are both square columns, an adjusting pull ring is fixedly installed at the outer end of the adjusting rod 15, the adjusting rod 15 is sleeved with an adjusting spring 16 fixedly connected with a chute ring 12 and a first positioning fixture block 13 or a second positioning fixture block 14, by arranging the first connecting column 2 and the second connecting column 8, when a user needs to overhaul the electric energy meter body 4, the user can pull the top adjusting rod 15 outwards, the top adjusting rod 15 drives the first positioning fixture block 13 to move outwards, when the first positioning fixture block 13 is separated from the first positioning fixture groove 10, the user can rotate the connecting block 7, the connecting block 7 drives the second connecting column 8 to rotate, when the second connecting column 8 and the first connecting column 2 are at the same vertical position, the user can push the second connecting column 8 to the top, and at the time, the second connecting column 8 drives the first connecting column 2 to move to the top, when second spliced pole 8 removed to second positioning fixture block 14 department, second positioning fixture block 14 inserted the inside to second positioning slot 11 under regulating spring 16's effect to it is fixed to accomplish the joint of second spliced pole 8, and electric energy meter body 4 can't be located the outside of batch meter shell 1 to the bottom removal while electric energy meter body 4 this moment, thereby makes the device possess the advantage that conveniently overhauls the electric energy meter, has made things convenient for the user to use.
When using, the user can adjust pole 15 to the outside pulling top, when first positioning fixture block 13 breaks away from first positioning draw-in groove 10, the user can rotate connecting block 7, when second spliced pole 8 is in same vertical position with first spliced pole 2, the user can promote second spliced pole 8 to the top, when second spliced pole 8 removes to second positioning fixture block 14 department, second positioning fixture block 14 is accomplished fixedly to the joint of second spliced pole 8, this moment ammeter body 4 can't be moved the outside that simultaneously ammeter body 4 is located batch meter shell 1 to the bottom, thereby make the device possess the advantage that conveniently overhauls the ammeter, made things convenient for the user to use.
In summary, according to the electric energy metering box convenient to overhaul, by arranging the first connecting post 2 and the second connecting post 8, when a user needs to overhaul the electric energy meter body 4, the user can pull the top adjusting rod 15 outwards, at this time, the top adjusting rod 15 drives the first positioning fixture block 13 to move outwards, when the first positioning fixture block 13 is separated from the first positioning fixture groove 10, the user can rotate the connecting block 7, at this time, the connecting block 7 drives the second connecting post 8 to rotate, when the second connecting post 8 and the first connecting post 2 are at the same vertical position, the user can push the second connecting post 8 to the top, at this time, the second connecting post 8 drives the first connecting post 2 to move to the top, when the second connecting post 8 moves to the second positioning fixture block 14, the second positioning fixture block 14 is inserted into the second positioning fixture groove 11 under the action of the adjusting spring 16, thereby completing the clamping fixation of the second connecting post 8, electric energy meter body 4 can't be moved to the bottom this moment and electric energy meter body 4 is located the outside of batch meter shell 1 simultaneously to make the device possess the advantage that the convenience was overhauld the electric energy meter, made things convenient for the user to use, solved present floor type electric energy metering box inconvenient overhauls the electric energy meter, caused the user to need consume the problem of too much time when overhauing the electric energy meter.
It is to be noted that the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other identical elements in a process, method, article, or apparatus that comprises the element.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.
Claims (6)
1. The utility model provides an electric-energy metering box convenient to overhaul, includes batch meter shell (1), its characterized in that: the electric energy meter is characterized in that the inner side of the metering box shell (1) is movably connected with a first connecting column (2), the top end of the first connecting column (2) is fixedly provided with a connecting plate (3), the top of the connecting plate (3) is fixedly provided with an electric energy meter body (4), the front surface of the metering box shell (1) is fixedly provided with a mounting frame (5), the inner side of the mounting frame (5) is rotatably connected with a rotating side plate (6), the inner side of the first connecting column (2) is rotatably connected with a connecting block (7), the outer side of the connecting block (7) is fixedly provided with a second connecting column (8), the bottom of the metering box shell (1) is fixedly provided with an installation outer cover (9), the right side of the first connecting column (2) is provided with a first positioning clamping groove (10), the right side of the second connecting column (8) is provided with a second positioning clamping groove (11), and the right side wall of the inner cavity of the installation outer cover (9) is fixedly provided with two sliding groove rings (12), the top the inboard sliding connection of spout circle (12) has first location fixture block (13), the bottom the inboard sliding connection of spout circle (12) has second location fixture block (14), the equal fixed mounting in right side of first location fixture block (13) and second location fixture block (14) has regulation pole (15), adjusting rod (15) outside cup jointed fixed connection spout circle (12) and first location fixture block (13) or adjusting spring (16) of second location fixture block (14).
2. An electric energy metering box convenient to overhaul according to claim 1, characterized in that: the top fixed mounting of electric energy meter body (4) has control button, and electric energy meter body (4) passes through bolt and connecting plate (3) fixed connection.
3. An electric energy metering box convenient to overhaul according to claim 1, characterized in that: the bottom of the metering box shell (1) is provided with a limiting through hole, and the first connecting column (2) is tightly connected with the limiting through hole.
4. An electric energy metering box convenient to overhaul according to claim 1, characterized in that: the first connecting column (2) and the second connecting column (8) are both square columns, and the outer end of the adjusting rod (15) is fixedly provided with an adjusting pull ring.
5. An electric energy metering box convenient to overhaul according to claim 1, characterized in that: the first positioning clamping groove (10) and the first positioning clamping block (13) are the same in shape, and the second positioning clamping groove (11) and the second positioning clamping block (14) are the same in shape.
6. An electric energy metering box convenient to overhaul according to claim 1, characterized in that: the spread groove has been seted up to the bottom of first spliced pole (2), and the spread groove extends to the front surface and the rear surface of first spliced pole (2), and connecting block (7) are located the inboard of spread groove and are rotated with first spliced pole (2) and be connected.
Priority Applications (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202023174851.8U CN214124504U (en) | 2020-12-25 | 2020-12-25 | Electric energy metering box convenient to overhaul |
Applications Claiming Priority (1)
Application Number | Priority Date | Filing Date | Title |
---|---|---|---|
CN202023174851.8U CN214124504U (en) | 2020-12-25 | 2020-12-25 | Electric energy metering box convenient to overhaul |
Publications (1)
Publication Number | Publication Date |
---|---|
CN214124504U true CN214124504U (en) | 2021-09-03 |
Family
ID=77514549
Family Applications (1)
Application Number | Title | Priority Date | Filing Date |
---|---|---|---|
CN202023174851.8U Expired - Fee Related CN214124504U (en) | 2020-12-25 | 2020-12-25 | Electric energy metering box convenient to overhaul |
Country Status (1)
Country | Link |
---|---|
CN (1) | CN214124504U (en) |
-
2020
- 2020-12-25 CN CN202023174851.8U patent/CN214124504U/en not_active Expired - Fee Related
Similar Documents
Publication | Publication Date | Title |
---|---|---|
CN209980872U (en) | 400kV composite suspension insulator | |
CN214124504U (en) | Electric energy metering box convenient to overhaul | |
CN212161041U (en) | Think political affairs education propaganda device | |
CN210650466U (en) | Roll-over stand matched with ultracrystalline iron core manual tool | |
CN210866837U (en) | Liftable high-voltage board rack of installing fast | |
CN111141980B (en) | A portable functional test box for new energy automobile fills electric pile | |
CN110285305A (en) | A kind of operation field alarming device | |
CN216785604U (en) | High-low voltage power distribution cabinet installation auxiliary device | |
CN214271767U (en) | Warning device is used in road construction that suitability is strong | |
CN211858986U (en) | Mobile power supply plugging device | |
CN209571066U (en) | A kind of portable multifunctional traffic street lamp | |
CN216281105U (en) | Novel solar windmill lamp with fixed bolster | |
CN210515954U (en) | Warning sign is used in electric power construction | |
CN215577383U (en) | Novel tourist attraction is with tourism sign | |
CN215881264U (en) | A burring tool for production of notebook shell | |
CN210510942U (en) | Outdoor camera placer | |
CN212570332U (en) | Safe and efficient fixed suspension banner device | |
CN221171521U (en) | Outdoor photographic live broadcast support | |
CN212435195U (en) | Operation joint capable of being installed on insulating rod | |
CN108758221A (en) | A kind of communication equipment holder that can highly adjust | |
CN111294674B (en) | Sound box convenient to hang and disassemble | |
CN218783747U (en) | A support frame for installation of photovoltaic board | |
CN214750491U (en) | Adjustable ammeter meter mounting device | |
CN217563376U (en) | Novel mobile power supply | |
CN221201398U (en) | Energy storage battery rack |
Legal Events
Date | Code | Title | Description |
---|---|---|---|
GR01 | Patent grant | ||
GR01 | Patent grant | ||
CF01 | Termination of patent right due to non-payment of annual fee |
Granted publication date: 20210903 |