CN214092576U - Dust collecting equipment track quick connect structure - Google Patents

Dust collecting equipment track quick connect structure Download PDF

Info

Publication number
CN214092576U
CN214092576U CN202022644062.XU CN202022644062U CN214092576U CN 214092576 U CN214092576 U CN 214092576U CN 202022644062 U CN202022644062 U CN 202022644062U CN 214092576 U CN214092576 U CN 214092576U
Authority
CN
China
Prior art keywords
fixedly connected
device base
sets
slider
block
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022644062.XU
Other languages
Chinese (zh)
Inventor
黄帆
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Zhejiang Dingli Environmental Protection Technology Co ltd
Original Assignee
Zhejiang Dingli Environmental Protection Technology Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Zhejiang Dingli Environmental Protection Technology Co ltd filed Critical Zhejiang Dingli Environmental Protection Technology Co ltd
Priority to CN202022644062.XU priority Critical patent/CN214092576U/en
Application granted granted Critical
Publication of CN214092576U publication Critical patent/CN214092576U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model relates to a rail set field specifically is a dust collecting equipment track quick connect structure, including the mounting panel, mounting panel top movable mounting has the device base, and device base top fixedly connected with track main part, the device base is inserted and is established the inslot that sets up on the mounting panel, the spout has all been seted up, and is two sets of the mounting panel left and right sides both ends have all been seted up first slide rail about the spout, and both ends all sliding connection have first slider, and are two sets of the inside all fixedly connected with of first slider connects the inserted bar, and connects the inserted bar and insert and establish the inslot that sets up in the device base left and right sides. The utility model discloses solved traditional track relatively and be fixed connection usually in the use, the inconvenient problem that can not the high-speed joint when dismantling like this has improved the device rate of utilization in for the device operation is more convenient, has ensured the convenience of device.

Description

Dust collecting equipment track quick connect structure
Technical Field
The utility model relates to a rail set field specifically is a dust collecting equipment track quick connect structure.
Background
The dust removal equipment is a device for separating dust from flue gas, namely a dust remover or dust removal equipment, the dust remover is a common facility in industrial production, and because the distance between the dust remover and the flue gas is different, a track is usually arranged to be matched with the dust removal equipment for use, so that the operation is more convenient and faster, the efficiency is improved, the current society basically meets the requirements of people on the track of the dust removal equipment, but some problems still exist.
Traditional track is fixed connection usually in the use, can not the high-speed joint when inconvenient dismantlement like this for the device rate of utilization reduces, again because the removal that need not stop in equipment course of the work, can not guarantee the firm effect of device, consequently needs a dust collecting equipment track high-speed joint structure to solve above-mentioned problem urgently.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a dust collecting equipment track quick connect structure to can not the high-speed joint when solving the inconvenient dismantlement that proposes in the above-mentioned background art, can not guarantee the firm effect of device in equipment during operation in addition, thereby influence the problem of the result of use of device in the use.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides a dust collecting equipment track quick connect structure, includes the mounting panel, mounting panel top movable mounting has the device base, and installs base top fixedly connected with track main part, the device base is inserted and is established the inslot that sets up on the mounting panel, the spout has all been seted up to the mounting panel left and right sides, and is two sets of first slide rail has all been seted up at both ends about the spout, and the first slide rail about both ends all sliding connection have a first slider, two sets of the inside all fixedly connected with of first slider connects the inserted bar, and connects the inserted bar and insert the inslot that sets up in the device base left and right sides, it has all welding reset spring to connect inserted bar outside middle part, and reset spring deviates from the one end of connecting the inserted bar and all welds at the spout inner wall, connect the all fixedly connected with dead levers in the inserted bar upper end.
Preferably, the inner sides of the two groups of fixing rods are fixedly connected with arc-shaped inserting blocks, the arc-shaped inserting blocks are inserted into grooves formed in the device base, and the outer sides of the fixing rods are fixedly connected with pull handles.
Preferably, the equal fixedly connected with lug in the inslot left and right sides that sets up on the mounting panel, and the lug all inserts the inslot that sets up both ends about establishing on the device base, the spout inner wall all is glued with the protection cushion, and the material of protection cushion is the rubber material.
Preferably, the loop bar is all installed to the device base left and right sides, the second slide rail has all been seted up to the loop bar left and right sides, and all sliding connection has the second slider on the second slide rail, and is two sets of the inside all fixedly connected with telescopic links of second slider, and the telescopic link deviates from the one end of second slider and all connects in the device base outside through the bearing, evenly distributed has seted up the spacing groove on the telescopic link, and inserts on the spacing groove and be equipped with spacing inserted block.
Preferably, all fixedly connected with fixed blocks on the spacing inserted block, and both ends set up to the arc about the fixed block, both ends all weld spacing spring about the fixed block inboard, and the one end that spacing spring deviates from the fixed block all welds on the loop bar.
Preferably, both ends all are glued with anti-skidding cushion about the fixed block, the material of anti-skidding cushion is the rubber material, and is provided with anti-skidding line on the anti-skidding cushion.
Compared with the prior art, the beneficial effects of the utility model are that:
1. this dust collecting equipment track quick connect structure is provided with the spout, first slider, connect the inserted bar, arc inserted block and draw the handle, when dismantling the device installation, the pulling is drawn the handle, it removes simultaneously to drive the dead lever, make first slider remove, when first slider removes, connect the inserted bar and remove simultaneously, extrude the spout, the arc inserted block breaks away from the lock-out state, when removing regularly, it breaks away from the locking to connect the inserted bar, the device dismantles, during the installation, the effort of stopping, make the spout take place elastic deformation, the reconversion, the device obtains quick installation, the aforesaid device, traditional track is fixed connection usually in the use has been solved relatively, the problem of unable high-speed joint when inconvenient dismantlement like this, when having improved the device rate of utilization, make the device operation more convenient, the convenience of device has been ensured.
2. The rapid connecting structure for the track of the dust removing equipment is provided with a loop bar, a second slide rail, a telescopic rod, a limiting groove, a limiting insert block, a fixed block and a limiting spring, when the rapid connecting structure is supported, the fixed block is pulled outwards at the moment to drive the fixed block to move, the limiting spring is stretched to separate the limiting insert block from locking, the telescopic rod is moved to enable a second slide block to move on the second slide rail, when the rapid connecting structure is adjusted to a proper length, the fixed block is stopped to be pulled, the limiting spring is elastically deformed to enable the limiting insert block to be inserted into the proper limiting groove, at the moment, the loop bars on two sides are rotated to be contacted with a mounting plate, the device is supported, the problem that the stabilizing effect of the device cannot be ensured due to continuous movement in the working process of the traditional equipment is solved, and the using effect of the device is improved when the device is stabilized, the integrity of the device is ensured.
Drawings
Fig. 1 is a schematic front view of a cross-sectional structure of the present invention;
fig. 2 is a schematic front sectional view of a partial structure of the supporting device of the present invention;
fig. 3 is an enlarged schematic structural view of a point a in fig. 1 according to the present invention;
fig. 4 is an enlarged schematic structural view of the utility model at the position B in fig. 1;
fig. 5 is an enlarged schematic structural diagram of the position C in fig. 2 according to the present invention.
In the figure: 1. mounting a plate; 101. a chute; 102. a first slide rail; 103. a first slider; 104. connecting the inserted link; 105. a return spring; 106. a protective cushion; 107. fixing the rod; 108. an arc-shaped insert block; 109. pulling a handle; 110. a bump; 2. a device base; 201. a loop bar; 202. a second slide rail; 203. a second slider; 204. a telescopic rod; 205. a limiting groove; 206. limiting the inserting block; 207. a fixed block; 208. an anti-slip soft cushion; 209. a limiting spring; 3. a track body.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-5, the present invention provides an embodiment: the utility model provides a dust collecting equipment track quick connect structure, includes mounting panel 1, its characterized in that: the device comprises a mounting plate 1, a device base 2, a track main body 3, a track, a first slide rail 102, a first slide block 103, a second slide block 103, a connecting insert rod 104, a reset spring 105, a second slide block 107 and a track main body, wherein the device base 2 is movably mounted above the mounting plate 1, the top end of the device base 2 is fixedly connected with the track main body 3, the device base 2 is inserted into a groove arranged on the mounting plate 1, the left side and the right side of the mounting plate 1 are both provided with slide grooves 101, the upper end and the lower end of the two slide grooves 101 are both provided with first slide rails 102, the upper end and the lower end of each first slide rail 102 are both slidably connected with the first slide block 103, the inner parts of the two first slide blocks 103 are both fixedly connected with the connecting insert rod 104, the connecting insert rod 104 is inserted into the groove arranged on the left side and the right side of the device base 2, the middle part of the outer side of the connecting insert rod 104 is welded with the reset spring 105, one end of the reset spring 105, which deviates from the connecting insert rod 107 is fixedly connected with the track in the inner wall of the slide groove 101, the problem of inconvenient dismantlement simultaneously can not high-speed joint like this, when having improved the device rate of utilization for the device operation is more convenient, has ensured the convenience of device.
Two sets of the inboard all fixedly connected with arc inserted block 108 of dead lever 107, and arc inserted block 108 inserts the inslot that sets up on device base 2, the dead lever 107 outside all fixedly connected with draws handle 109, and its effect lies in further stabilizing the device use, has ensured the steadiness of device.
The equal fixedly connected with lug 110 of the inslot left and right sides that sets up on mounting panel 1, and lug 110 all inserts the inslot of establishing both ends setting about on device base 2, spout 101 inner wall all is glued has protection cushion 106, and the material of protection cushion 106 is the rubber material, and its effect lies in placing the object that can stabilize relatively, has ensured the rationality of device in the use, carries out the guard action to banker in going on in the use simultaneously, has ensured the integrality of device in the use.
The utility model discloses a device, including device base 2, loop bar 201, second slide rail 202, second slider 203, two sets of all sliding connection has been seted up to the loop bar 201 left and right sides all, and all sliding connection has second slider 203 on the second slide rail 202, and is two sets of inside all fixedly connected with telescopic link 204 of second slider 203, and telescopic link 204 deviates from the one end of second slider 203 and all connects in the device base 2 outside through the bearing, evenly distributed has seted up spacing groove 205 on the telescopic link 204, and inserts on the spacing groove 205 and be equipped with spacing inserted block 206, and its effect lies in solving traditional equipment course of working because the removal that need not stop, can not guarantee the problem of the firm effect of device, in securing device, has improved the device result of use, has ensured the integrality of device.
All fixedly connected with fixed block 207 on the spacing inserted block 206, and both ends set up to the arc about the fixed block 207, both ends all weld spacing spring 209 about the fixed block 207 is inboard, and spacing spring 209 deviates from the one end of fixed block 207 and all welds on loop bar 201 for the device is more reasonable in the use, can make the quick reduction original state of device, has ensured the integrality of device in the use.
Both ends all are glued with anti-skidding cushion 208 about the fixed block 207, anti-skidding cushion 208's material is the rubber material, and is provided with anti-skidding line on the anti-skidding cushion 208, and its effect lies in can be relatively convenient uses the device, has increased the result of use of device for it is more comfortable in the operation process, has ensured the wholeness of device.
The working principle is as follows: when needing to dismantle the device installation, the outside pulling is drawn handle 109 this moment, under the effort, it removes simultaneously to drive dead lever 107, make first slider 103 remove, because first slider 103 and connection inserted bar 104 formula structural design as an organic whole, when first slider 103 removes, it removes to drive to connect inserted bar 104 to the outside, extrude spout 101, arc inserted block 108 breaks away from the locking state this moment, when removing a timing, connect inserted bar 104 and break away from the locking state this moment, the device is dismantled this moment, when needing the installation, the effort stops, make spout 101 take place elastic deformation, the reconversion, the device obtains quick installation.
When needing to support the device, outside pulling fixed block 207 this moment, under the effect of power, drive fixed block 207 and remove, stretch spacing spring 209, spacing inserted block 206 breaks away from the locking state this moment, remove telescopic link 204, make second slider 203 remove on second slide rail 202, when adjusting to a certain suitable length, stop pulling fixed block 207, it takes place elastic deformation to obtain spacing spring 209, make spacing inserted block 206 insert and establish in suitable spacing groove 205, rotate both sides loop bar 201 to mounting panel 1 and contact this moment, the device obtains the support, the operation is ended this time.
It is obvious to a person skilled in the art that the invention is not restricted to details of the above-described exemplary embodiments, but that it can be implemented in other specific forms without departing from the spirit or essential characteristics of the invention. The present embodiments are therefore to be considered in all respects as illustrative and not restrictive, the scope of the invention being indicated by the appended claims rather than by the foregoing description, and all changes which come within the meaning and range of equivalency of the claims are therefore intended to be embraced therein. Any reference sign in a claim should not be construed as limiting the claim concerned.

Claims (6)

1. The utility model provides a dust collecting equipment track quick connect structure, includes mounting panel (1), its characterized in that: a device base (2) is movably arranged above the mounting plate (1), the top end of the device base (2) is fixedly connected with a track main body (3), the device base (2) is inserted in a groove arranged on the mounting plate (1), sliding grooves (101) are arranged on the left side and the right side of the mounting plate (1), first sliding rails (102) are arranged at the upper ends and the lower ends of the two groups of sliding grooves (101), the upper end and the lower end of the first slide rail (102) are both connected with a first slide block (103) in a sliding way, the inner parts of the two groups of first slide blocks (103) are both fixedly connected with connecting inserted rods (104), and the connecting inserted bar (104) is inserted in the grooves arranged at the left and the right sides of the device base (2), the middle part of the outer side of the connecting inserted bar (104) is welded with a return spring (105), and one end of the return spring (105) departing from the connecting inserted bar (104) is welded on the inner wall of the sliding chute (101), the upper ends of the connecting inserted rods (104) are fixedly connected with fixing rods (107).
2. The rapid connection structure of a dedusting equipment rail as set forth in claim 1, wherein: two sets of dead lever (107) inboard all fixedly connected with arc inserted block (108), and arc inserted block (108) insert establish the inslot that sets up on device base (2), dead lever (107) outside all fixedly connected with pull handle (109).
3. The rapid connection structure of a dedusting equipment rail as set forth in claim 1, wherein: the mounting device is characterized in that the left side and the right side of the groove formed in the mounting plate (1) are fixedly connected with bumps (110), the bumps (110) are inserted into the groove formed in the left end and the right end of the device base (2), the inner wall of the sliding groove (101) is glued with a protective soft cushion (106), and the protective soft cushion (106) is made of rubber.
4. The rapid connection structure of a dedusting equipment rail as set forth in claim 1, wherein: the device base (2) left and right sides all installs loop bar (201), second slide rail (202) have all been seted up to loop bar (201) left and right sides, and all sliding connection has second slider (203), two sets of all sliding connection has second slider (203) on second slide rail (202) inside all fixedly connected with telescopic link (204), and telescopic link (204) deviate from the one end of second slider (203) and all connect in the device base (2) outside through the bearing, spacing groove (205) have been seted up to evenly distributed on telescopic link (204), and insert on spacing groove (205) and be equipped with spacing inserted block (206).
5. The rapid connection structure of a dedusting equipment rail as set forth in claim 4, wherein: all fixedly connected with fixed block (207) on spacing inserted block (206), and both ends set up to the arc about fixed block (207), both ends all weld spacing spring (209) about fixed block (207) inboard, and spacing spring (209) deviate from the one end of fixed block (207) and all weld on loop bar (201).
6. The rapid connection structure of a dedusting equipment rail as set forth in claim 5, wherein: both ends all are glued with anti-skidding cushion (208) about fixed block (207), the material of anti-skidding cushion (208) is the rubber material, and is provided with anti-skidding line on anti-skidding cushion (208).
CN202022644062.XU 2020-11-16 2020-11-16 Dust collecting equipment track quick connect structure Active CN214092576U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022644062.XU CN214092576U (en) 2020-11-16 2020-11-16 Dust collecting equipment track quick connect structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022644062.XU CN214092576U (en) 2020-11-16 2020-11-16 Dust collecting equipment track quick connect structure

Publications (1)

Publication Number Publication Date
CN214092576U true CN214092576U (en) 2021-08-31

Family

ID=77450241

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022644062.XU Active CN214092576U (en) 2020-11-16 2020-11-16 Dust collecting equipment track quick connect structure

Country Status (1)

Country Link
CN (1) CN214092576U (en)

Similar Documents

Publication Publication Date Title
CN109453840A (en) Crushing plant is used in a kind of detection of rare earth ore
CN113478136B (en) Engineering machine tool processing presss from both sides tight frock with fire prevention star
CN214092576U (en) Dust collecting equipment track quick connect structure
CN211646138U (en) Novel rotation type anticollision barrier
CN215172354U (en) Special gate valve for dry dedusting
CN213159203U (en) Ligament tractive device for track and field training
CN215419326U (en) Overhaul flying vehicle for power transmission line
CN220203335U (en) Scaffold lifting device
CN217855133U (en) Plastic burning plate dust remover with emission concentration below 10mg/Nm3
CN214236143U (en) Natural gas heating furnace for forging
CN212794060U (en) Positioning tool for automobile ceiling production
CN111545968A (en) Angle modulation auxiliary assembly is used in iron plate welding
CN214815920U (en) Novel rack automatic weld equipment
CN216243068U (en) Alarm device based on power grid system
CN112871783B (en) Soldering removing equipment for cleaning and recycling PCB (printed circuit board)
CN213499109U (en) Portable automobile repair instrument containing box
CN214289521U (en) Industrial computer with automatic deashing structure
CN216926387U (en) Pipe surface compressive resistance detection device is used in production of high-speed railway contact net cantilever
CN205437581U (en) Transfer line welding jig convenient to remove
CN215587446U (en) Dust collector is used in production of medical dry-type film
CN212362536U (en) Air cooling device for soundproof cotton production
CN220893115U (en) Self-cleaning tubular air preheater
CN213661785U (en) Monitoring system of electric power system
CN212836860U (en) Triangular steel structure support frame with fastening structure
CN210649218U (en) Welding device for steel wire

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
PE01 Entry into force of the registration of the contract for pledge of patent right
PE01 Entry into force of the registration of the contract for pledge of patent right

Denomination of utility model: A fast connection structure for dust removal equipment tracks

Granted publication date: 20210831

Pledgee: Bank of Jinhua Limited by Share Ltd. science and Technology Branch

Pledgor: Zhejiang Dingli Environmental Protection Technology Co.,Ltd.

Registration number: Y2024980008256