CN214062235U - Pre-assembly for rapid indoor floor construction - Google Patents

Pre-assembly for rapid indoor floor construction Download PDF

Info

Publication number
CN214062235U
CN214062235U CN202022926877.7U CN202022926877U CN214062235U CN 214062235 U CN214062235 U CN 214062235U CN 202022926877 U CN202022926877 U CN 202022926877U CN 214062235 U CN214062235 U CN 214062235U
Authority
CN
China
Prior art keywords
floor
bottom plate
ground
construction
hole
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022926877.7U
Other languages
Chinese (zh)
Inventor
贺胜荣
贺晶
陈强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Wuhan Shangrui Decoration Design Engineering Co ltd
Original Assignee
Wuhan Shangrui Decoration Design Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Wuhan Shangrui Decoration Design Engineering Co ltd filed Critical Wuhan Shangrui Decoration Design Engineering Co ltd
Priority to CN202022926877.7U priority Critical patent/CN214062235U/en
Application granted granted Critical
Publication of CN214062235U publication Critical patent/CN214062235U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses a what indoor ground was under construction fast assembles in advance, comprising a base plate, the top of bottom plate is seted up flutedly, the inner chamber activity card of recess is equipped with the floor, all set up threaded hole all around at floor top. The utility model discloses a setting of horizontal arc channel and vertical arc channel, can arrange the pipeline and lay with the circuit, the step of grooving construction to ground has been saved, construction speed has been improved greatly, and the setting through the recess, can directly lay the inner chamber at the recess with the floor, it is most for directly laying on ground to have solved current floor simultaneously, do not possess and arrange to lay to subaerial circuit and pipeline, can only slot to ground and carry out pre-buried to pipeline circuit etc. lead to the time limit for a project, and too complicated, but need carry out the water and electricity when rectifying and changing in later stage, can not bury it underground under the floor, can not carry out the problem of quick construction.

Description

Pre-assembly for rapid indoor floor construction
Technical Field
The utility model relates to a construction technical field is laid on the floor, specifically is a pre-assembly of indoor ground quick construction.
Background
Building materials are a general term for various materials used in the fields of construction and civil engineering, and are simply called "building materials", building materials in a narrow sense are materials used in civil engineering, such as steel, wood, glass, cement, paint, etc., cement, steel and wood are generally called three main materials of general building engineering, building materials in a broad sense also include materials used in construction equipment, such as electric wires, water pipes, etc., building materials in the building discipline are disciplines for studying physical and chemical properties of different building materials, floors, i.e., surface layers of floors or floors, which are one of building materials, are made of wood or other materials, and the floors are classified into a plurality of categories according to structures: solid wood floors, laminate wood floors, solid wood laminate floors, bamboo and wood floors, cork floors, and the most popular multi-layer solid wood laminate floors; classified by use are: the floor is used for household and business purposes, the floor is a building material used for the floor of a house or the surface layer of a floor, the floor is made of wood or other materials, the floor is used as the building material, the building material can be divided into structural materials, decorative materials and certain special materials, multiple styles such as Chinese style and European style can be used, the application is more and more extensive, most of the existing floors are directly laid on the ground at present, lines and pipelines below the ground are not arranged and laid, only grooves can be formed in the ground to pre-embed pipeline lines and the like, the construction period is long, the floor is too complicated, and when the floor needs to be rectified and reformed at the later stage, water and electricity cannot be buried under the floor, and rapid construction cannot be carried out.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide an indoor ground is under construction fast assembles in advance, possess and assemble in advance and can arrange the water and electricity and lay, construction speed's advantage has been improved greatly, it is direct laying on ground to have solved current floor mostly, do not possess and arrange to lay to subaerial circuit and pipeline, can only slot to pipeline circuit etc. to ground and carry out pre-buried, lead to the time limit for a project long, and too complicated, but when needing to carry out the water and electricity whole change in the later stage, can not bury it underground under the floor, can not carry out the problem of quick construction.
In order to achieve the above object, the utility model provides a following technical scheme: the utility model provides an indoor ground is under construction fast pre-assembled, comprises a base plate, the top of bottom plate is seted up flutedly, the inner chamber activity card of recess is equipped with the floor, all set up threaded hole all around at floor top, first through-hole has all been seted up to the bottom that just is located the floor all around at bottom plate top, the bottom fixed mounting of first through-hole inner chamber has fastening nut, fastening nut's top fixedly connected with thread bush, the inner chamber threaded connection of thread bush has fastening bolt, fastening bolt runs through the inner chamber and the fastening nut threaded connection of screw hole until first through-hole, fastening bolt's top activity card is equipped with the lid and detains, the bottom fixedly connected with antifriction plate of bottom plate.
Preferably, vertical arc-shaped channels are fixedly mounted on the two sides of the front side of the top of the bottom plate, and transverse arc-shaped channels are fixedly mounted on the top of the vertical arc-shaped channels and the top and the bottom of the vertical arc-shaped channels, which are located on the front side of the floor.
Preferably, the clamping groove is formed in the left side of the bottom plate and located in the middle, the clamping plate is fixedly mounted on the right side of the bottom plate and located in the middle, and the clamping plate is connected with the clamping groove in a clamping mode.
Preferably, the bottom on floor just is located middle part fixed mounting and has the box body, the rectangular channel has been seted up at the top of bottom plate just is located the middle part, the inner chamber at the rectangular channel is established to the box body activity card.
Preferably, the front and the back of the top of the right side of the floor are both provided with a second through hole, and one side of the second through hole is fixedly connected with one end of the transverse arc-shaped channel.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a setting of horizontal arc channel and vertical arc channel, can arrange the laying to pipeline and circuit, the step of grooving construction to ground has been saved, construction speed has been improved greatly, and the setting through the recess, can directly lay the inner chamber at the recess with the floor, be connected through fastening bolt and fastening nut, carry out fixed connection to floor and bottom plate, solved current floor most simultaneously and directly laid on ground, do not possess to arrange the laying to subaerial circuit and pipeline, can only slot to ground and carry out pre-buried to pipeline circuit etc. lead to the time limit for a project, and too complicated, but need carry out the water and electricity when rectifying and changing at the later stage, can not bury underground it under the floor, can not carry out the problem of quick construction.
2. The utility model discloses a setting of lid knot, after fastening bolt installed, the lid detained the card and established at fastening bolt's top, played the effect of beautifying, and can prevent that fastening bolt from exposing for a long time and leading to the corrosion in the air, and establish the inner chamber at the draw-in groove through the cardboard card, improved holistic stability and use strength.
Drawings
FIG. 1 is a schematic structural view of the present invention;
FIG. 2 is a top view of the floor structure of the present invention;
FIG. 3 is an enlarged view of a portion of FIG. 1;
FIG. 4 is a top view of the floor structure of the present invention;
fig. 5 is a side view of the bottom plate structure of the present invention.
In the figure: 1. a base plate; 2. a floor; 3. a box body; 4. a rectangular groove; 5. clamping a plate; 6. a card slot; 7. a wear plate; 8. a threaded hole; 9. a groove; 10. fastening a nut; 11. a threaded sleeve; 12. fastening a bolt; 13. a transverse arcuate channel; 14. a first through hole; 15. a second through hole; 16. a vertical arc channel.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description herein, it is to be understood that the terms "center," "upper," "lower," "front," "rear," "left," "right," "vertical," "horizontal," "top," "bottom," "inner," "outer," and the like are used in the orientations and positional relationships indicated in the drawings to facilitate the description of the patent and to simplify the description, but do not indicate or imply that the referenced device or element must have a particular orientation, be constructed and operated in a particular orientation, and thus are not to be considered limiting of the patent. In the description of the present application, it should be noted that unless otherwise explicitly stated or limited, the terms "mounted," "connected," and "disposed" are to be construed broadly and can, for example, be fixedly connected, disposed, detachably connected, disposed, or integrally connected and disposed. The specific meaning of the above terms in this patent may be understood by those of ordinary skill in the art as appropriate.
Referring to fig. 1-5, a pre-assembled unit for rapid indoor floor construction comprises a bottom plate 1, a groove 9 is formed at the top of the bottom plate 1, a floor 2 is movably clamped in an inner cavity of the groove 9, a box body 3 is fixedly installed at the bottom of the floor 2 and in the middle of the floor, a rectangular groove 4 is formed at the top of the bottom plate 1 and in the middle of the floor, the box body 3 is movably clamped in an inner cavity of the rectangular groove 4, threaded holes 8 are formed around the top of the floor 2, first through holes 14 are formed around the top of the bottom plate 1 and in the bottom of the floor 2, fastening nuts 10 are fixedly installed at the bottoms of the inner cavities of the first through holes 14, threaded sleeves 11 are fixedly connected to the tops of the fastening nuts 10, fastening bolts 12 are in threaded connection with the inner cavities of the threaded sleeves 11, the fastening bolts 12 penetrate through the threaded holes 8 until the inner cavities of the first through holes 14 are in threaded connection with the fastening nuts 10, a cover buckle is movably clamped at the tops of the fastening bolts 12, through the arrangement of the cover buckle, after the fastening bolt 12 is installed, the cover buckle is clamped at the top of the fastening bolt 12 to play a role in beautifying, the fastening bolt 12 can be prevented from being rusted due to long-time exposure in the air, the clamping plate 5 is clamped in the inner cavity of the clamping groove 6 to improve the overall stability and the use strength, the bottom of the bottom plate 1 is fixedly connected with the wear-resisting plate 7, the clamping groove 6 is formed in the left side of the bottom plate 1 and is positioned in the middle of the bottom plate 1, the clamping plate 5 is fixedly arranged on the right side of the bottom plate 1 and is positioned in the middle of the bottom plate 1, the clamping plate 5 is clamped and connected with the clamping groove 6, the vertical arc-shaped channels 16 are fixedly arranged on the two sides of the front of the top of the bottom plate 1, the transverse arc-shaped channels 13 are fixedly arranged on the top of the front of the floor 2 and on the bottom of the front of the right top of the floor 2, the second through holes 15 are respectively formed in the front and back of the top of the right side of the floor 2, one side of the second through holes 15 is fixedly connected with one end of the transverse arc-shaped channels 13, through the setting of horizontal arc channel 13 and vertical arc channel 16, can arrange the pipeline and lay with the circuit, the step of grooving construction to ground has been saved, construction speed has been improved greatly, and the setting through recess 9, can directly lay floor 2 at the inner chamber of recess 9, be connected through fastening bolt 12 and fastening nut 10, carry out fixed connection to floor 2 and bottom plate 1, solved current floor most simultaneously and directly laid on ground, do not possess and arrange to lay to subaerial circuit and pipeline, can only slot to pipeline circuit etc. to ground and pre-bury, lead to the time limit for a project, and too complicated, but when later stage need carry out water and electricity rectification, can not bury it underground under the floor, can not carry out the problem of quick construction.
The utility model provides an all parts are the parts that general standard spare or technical staff in the field know, its structure and principle all are this technical staff all can learn through the technical manual or learn through conventional experimental method, the standard part that uses in this application file all can purchase from the market simultaneously, each part can all be customized according to the record of description and attached drawing in this application file, the concrete joining mode of each part all adopts conventional means such as ripe bolt in the prior art, rivets, welding, machinery, part and equipment all adopt conventional model in the prior art, no longer make specific statement here.
During the use, through the setting of horizontal arc channel 13 and vertical arc channel 16, can arrange the pipeline and lay with the circuit, construction speed has been improved, and the setting through recess 9, can directly lay floor 2 at the inner chamber of recess 9, be connected through fastening bolt 12 and fastening nut 10, carry out fixed connection to floor 2 and bottom plate 1, setting through the lid is detained, after fastening bolt 12 installs, the lid is detained the card and is established at fastening bolt 12's top, beautified effect has been played, and can prevent that fastening bolt 12 from exposing for a long time and leading to the corrosion in the air, and establish the inner chamber at draw-in groove 6 through cardboard 5 cards, whole stability and service strength have been improved.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. The utility model provides a what indoor ground was under construction fast assembles in advance, includes bottom plate (1), its characterized in that: the top of the bottom plate (1) is provided with a groove (9), the inner cavity of the groove (9) is movably clamped with a floor (2), threaded holes (8) are formed in the periphery of the top of the floor (2), first through holes (14) are formed in the periphery of the top of the bottom plate (1) and the bottom of the floor (2), the bottom of the inner cavity of the first through hole (14) is fixedly provided with a fastening nut (10), the top of the fastening nut (10) is fixedly connected with a threaded sleeve (11), the inner cavity of the threaded sleeve (11) is in threaded connection with a fastening bolt (12), the fastening bolt (12) penetrates through the threaded hole (8) until the inner cavity of the first through hole (14) is in threaded connection with the fastening nut (10), the top of the fastening bolt (12) is movably clamped with a cover buckle, and the bottom of the bottom plate (1) is fixedly connected with an abrasion-resistant plate (7).
2. The pre-assembled unit for rapid indoor floor construction according to claim 1, wherein: the floor is characterized in that vertical arc-shaped channels (16) are fixedly mounted on the two sides of the front side of the top of the bottom plate (1), and transverse arc-shaped channels (13) are fixedly mounted on the top of the vertical arc-shaped channels (16) and the top and the bottom of the floor (2) which are located on the front side.
3. The pre-assembled unit for rapid indoor floor construction according to claim 1, wherein: the clamping groove (6) is formed in the left side of the bottom plate (1) and located in the middle, the clamping plate (5) is fixedly mounted on the right side of the bottom plate (1) and located in the middle, and the clamping plate (5) is connected with the clamping groove (6) in a clamping mode.
4. The pre-assembled unit for rapid indoor floor construction according to claim 1, wherein: the bottom on floor (2) just is located middle part fixed mounting and has box body (3), rectangular channel (4) have been seted up at the top of bottom plate (1) just is located the middle part, the inner chamber at rectangular channel (4) is established to box body (3) activity card.
5. The pre-assembled unit for rapid indoor floor construction according to claim 1, wherein: second through-hole (15) have all been seted up with the back to the front at floor (2) right side top, one side and the one end fixed connection of horizontal arc channel (13) of second through-hole (15).
CN202022926877.7U 2020-12-09 2020-12-09 Pre-assembly for rapid indoor floor construction Active CN214062235U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022926877.7U CN214062235U (en) 2020-12-09 2020-12-09 Pre-assembly for rapid indoor floor construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022926877.7U CN214062235U (en) 2020-12-09 2020-12-09 Pre-assembly for rapid indoor floor construction

Publications (1)

Publication Number Publication Date
CN214062235U true CN214062235U (en) 2021-08-27

Family

ID=77406649

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022926877.7U Active CN214062235U (en) 2020-12-09 2020-12-09 Pre-assembly for rapid indoor floor construction

Country Status (1)

Country Link
CN (1) CN214062235U (en)

Similar Documents

Publication Publication Date Title
CN109779194B (en) Floor structure is built in room
CN103015572A (en) Connecting method for wall body and floor slab and special connecting structure as well as quick-assembled house
CN207739431U (en) Modularization Timberwork wall
CN211037679U (en) Splicing structure for wood floor
CN214062235U (en) Pre-assembly for rapid indoor floor construction
CN108035455A (en) Modularization Timberwork wall and its assemble method
CN204492094U (en) A kind of reinforced floor
CN205063103U (en) Partition wall
CN217782702U (en) LVT floor structure convenient to installation
CN209568656U (en) One kind can assembled water-proof floor
CN207177177U (en) Wood veneer cladding system
CN205894388U (en) Bathroom assemble structure
CN205975987U (en) Connected node structure of compound strip siding wall and steel column
CN206545293U (en) A kind of attachment structure of 3D modules shape for hat keel wall and wall
CN210461967U (en) Building wall component based on BIM cost control
CN221399488U (en) ALC light partition plate structure of pre-buried pipeline integration
CN216766783U (en) One-step forming semicircular aluminum alloy water voltage groove section bar
CN215407148U (en) High-hardness reinforced multilayer composite floor
CN209907834U (en) Anti-deformation solid wood lock catch geothermal floor
CN217581027U (en) Modular assembly type fiber floor
CN210530118U (en) House building waterproof sheet structure
CN218834973U (en) Concatenation formula water curtain
CN211057852U (en) Prefabricated piping lane
CN206863307U (en) A kind of sealing structure of fiber-dividing box
CN214006379U (en) Building floor with side end screw thread assembling effect

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant