CN214031363U - High-rise building engineering tube well riser hoist device - Google Patents

High-rise building engineering tube well riser hoist device Download PDF

Info

Publication number
CN214031363U
CN214031363U CN202021953431.7U CN202021953431U CN214031363U CN 214031363 U CN214031363 U CN 214031363U CN 202021953431 U CN202021953431 U CN 202021953431U CN 214031363 U CN214031363 U CN 214031363U
Authority
CN
China
Prior art keywords
well
pipe
hoisted
rise building
building engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021953431.7U
Other languages
Chinese (zh)
Inventor
葛兴元
冯艳利
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Second Metallurgy Group Co Ltd
Original Assignee
China Second Metallurgy Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Second Metallurgy Group Co Ltd filed Critical China Second Metallurgy Group Co Ltd
Priority to CN202021953431.7U priority Critical patent/CN214031363U/en
Application granted granted Critical
Publication of CN214031363U publication Critical patent/CN214031363U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model provides a high-rise building engineering tube well riser hoist device, this hoist device includes: the supporting plate, the inserted link, the top pressure supporting frame and the top pressure piece; the inserting rods are arranged above the supporting plate and detachably connected to the supporting plate, and are used for penetrating into the vertical pipe of the well to be hoisted so as to position and hoist the vertical pipe of the well to be hoisted, which is supported by the supporting plate; the first end of the jacking support frame is connected with the upper part of the inserted link; the jacking part is adjustably connected to the second end of the jacking support frame along the radial position of the inserted rod and used for jacking the vertical pipe of the well to be hoisted so that the vertical pipe of the well to be hoisted is fixed between the inserted rod and the jacking part. The utility model discloses can erect the handling with treating the hoist well riser that high-rise building engineering tube well riser promptly, can the auxiliary installation on the high-rise building engineering tube well riser of bottom, construction operation is got up very conveniently.

Description

High-rise building engineering tube well riser hoist device
Technical Field
The utility model relates to a building engineering technical field particularly, relates to a high-rise building engineering tube well riser hoist device.
Background
The hoisting of the air pipe well vertical pipe of the super high-rise building usually adopts a normal installation method to carry out the construction of the air pipe well vertical pipe, the construction sequence is that the air pipe sections are connected and installed from bottom to top one by one, and each layer needs to horizontally transport the air pipe sections to the position of the air pipe well. The normal installation method needs to transport the air pipes vertically and horizontally for many times, and in the butt joint construction between the vertical pipes, the upper air pipe and the lower air pipe are aligned and kept vertical and then connected and installed.
The hoisting of the high-rise building engineering pipe well vertical pipes needs to be fixed by means of hoisting equipment, and then the hoisting equipment and the high-rise building engineering pipe well vertical pipes are hoisted by a crane. The existing high-rise building engineering pipe well vertical pipe hoisting equipment is designed to be simpler and more traditional, can only fixedly clamp the high-rise building engineering pipe well vertical pipe, cannot vertically install the high-rise building engineering pipe well vertical pipe on the high-rise building engineering pipe well vertical pipe at the bottom, and is inconvenient to construct and operate.
Disclosure of Invention
In view of this, the utility model provides a high-rise building engineering tube well riser hoist device aims at solving the inconvenient problem of current high-rise building engineering tube well riser installation.
The utility model provides a high-rise building engineering tube well riser hoist device, this hoist device includes: the supporting plate, the inserted link, the top pressure supporting frame and the top pressure piece; the inserting rods are arranged above the supporting plate and detachably connected to the supporting plate, and are used for penetrating into the vertical pipe of the well to be hoisted so as to position and hoist the vertical pipe of the well to be hoisted, which is supported by the supporting plate; the first end of the jacking support frame is connected with the upper part of the inserted link; the jacking part is adjustably connected to the second end of the jacking support frame along the radial position of the inserted rod and used for jacking the vertical pipe of the well to be hoisted so that the vertical pipe of the well to be hoisted is fixed between the inserted rod and the jacking part.
Further, above-mentioned high-rise building engineering tube well riser hoist device, the roof pressure piece includes: the fixing piece, the adjusting rod and the pressing plate; the adjusting rod penetrates through the fixing piece and is in threaded connection with the adjusting rod; and a pressing plate is arranged at the first end of the adjusting rod and used for jacking the vertical pipe of the well to be hoisted, so that the side wall of the vertical pipe of the well to be hoisted is clamped between the pressing plate and the inserting rod.
Further, above-mentioned high-rise building engineering tube well riser hoist device, the mounting is the screwed pipe, the adjusting part is the threaded rod, the threaded rod wear to locate the screwed pipe and with screwed pipe looks spiro union.
Furthermore, according to the hoisting device for the pipe well vertical pipe in the high-rise building engineering, the second end of the adjusting rod is provided with the handle for applying acting force to the adjusting rod so as to enable the adjusting rod to rotate and drive the pressing plate to move towards the direction close to or far away from the inserted rod.
Furthermore, according to the hoisting device for the pipe well vertical pipe in the high-rise building engineering, the inserted bar is in threaded connection with the supporting plate.
Further, above-mentioned high-rise building engineering tube well riser hoist device, be equipped with the connecting pipe on the roof of layer board, its inside is equipped with the internal thread, the bottom of inserted bar is equipped with the external screw thread, its with the internal thread looks spiro union of connecting pipe.
Further, according to the hoisting device for the pipe well vertical pipe in the high-rise building engineering, the jacking support frame is a bending rod.
Further, according to the hoisting device for the pipe well vertical pipe in the high-rise building engineering, the jacking support frame comprises a horizontal section and an arc section arranged at the end part of the horizontal section.
Further, according to the hoisting device for the pipe well vertical pipe in the high-rise building engineering, the horizontal section and the circular arc section are of an integral structure.
Further, above-mentioned high-rise building engineering tube well riser hoist device, its characterized in that, the top of inserted bar is equipped with rings.
The utility model provides a high-rise building engineering tube well riser hoisting device, which is inserted in the interior of a to-be-hoisted well riser through an insertion rod, so as to realize the positioning of the to-be-hoisted well riser on a supporting plate; the vertical pipe of the well to be hoisted is hoisted through the supporting plate, the vertical pipe of the well to be hoisted is jacked through the jacking piece, so that the side wall of the vertical pipe of the well to be hoisted is clamped between the inserted link and the jacking piece, the vertical pipe of the well to be hoisted is fixed, the supporting plate is dismantled, and the vertical pipe of the well to be hoisted and the vertical pipe which is in place are installed and welded. The hoisting device can vertically hoist the vertical pipe of the well to be hoisted, namely the vertical pipe of the high-rise building engineering pipe well, and can be installed on the vertical pipe of the high-rise building engineering pipe well at the bottom in an auxiliary manner, so that the construction operation is very convenient, the construction period is shortened, and the construction efficiency is improved.
Drawings
Various other advantages and benefits will become apparent to those of ordinary skill in the art upon reading the following detailed description of the preferred embodiments. The drawings are only for purposes of illustrating the preferred embodiments and are not to be construed as limiting the invention. Also, like reference numerals are used to refer to like parts throughout the drawings. In the drawings:
fig. 1 is a front view of a pipe well riser hoisting device for high-rise building engineering provided by an embodiment of the utility model;
fig. 2 is a side view of a pipe well riser hoisting device for high-rise building engineering provided by the embodiment of the invention;
fig. 3 is a bottom view of the pipe well riser hoisting device for high-rise building engineering provided by the embodiment of the utility model.
Detailed Description
Exemplary embodiments of the present disclosure will be described in more detail below with reference to the accompanying drawings. While exemplary embodiments of the present disclosure are shown in the drawings, it should be understood that the present disclosure may be embodied in various forms and should not be limited to the embodiments set forth herein. Rather, these embodiments are provided so that this disclosure will be thorough and complete, and will fully convey the scope of the disclosure to those skilled in the art. It should be noted that, in the present invention, the embodiments and features of the embodiments may be combined with each other without conflict. The present invention will be described in detail below with reference to the accompanying drawings in conjunction with embodiments.
Referring to fig. 1 to 3, a preferred structure of a high-rise building engineering pipe well riser hoisting device provided by the embodiment of the invention is shown. As shown in the figure, this hoist device includes: the device comprises a supporting plate 1, an inserted link 2, a jacking support frame 3 and a jacking piece 4; wherein,
the inserted bar 2 is arranged above the supporting plate 1, the inserted bar 2 can be detachably connected to the supporting plate 1, and the inserted bar 2 is used for penetrating through the inside of a vertical pipe (not shown in the figure) of a well to be hoisted so as to position and hoist the vertical pipe of the well to be hoisted, which is supported by the supporting plate 1. Specifically, the supporting plate 1 can be a flat plate-shaped structure, the inserting rod 2 can be vertically arranged between the supporting plate 1 so as to be inserted into the vertical pipe of the well to be hoisted through the inserting rod 2, and the bottom end of the vertical pipe of the well to be hoisted is in abutting contact with the top wall (relative to the position shown in fig. 1) of the supporting plate 1, so that the vertical pipe of the well to be hoisted is hoisted through the supporting plate 1, and the vertical pipe of the well to be hoisted supported on the supporting plate 1 and the supporting plate 1 is hoisted through the hoisting of the inserting rod 2, meanwhile, the inserting rod 2 not only can realize the positioning of the vertical pipe of the well to be hoisted, but also can realize the hoisting of the vertical pipe of the well to be hoisted; in order to realize the hoisting of the well riser to be hoisted, preferably, the top end of the inserted link 2 is provided with a hoisting ring 21 for hoisting the inserted link 2; the hanging ring 21 and the inserted rod 2 can be made of aluminum alloy pieces, and are light in weight, firm, durable and good in corrosion resistance, and the hanging ring 21 and the inserted rod can be fixedly connected through welding and can also be of an integral structure.
The jacking support frame 3 is positioned at the upper part of the inserted link 2, and the first end of the jacking support frame 3 is connected with the inserted link 2; the jacking part 4 is adjustably connected to the second end of the jacking support frame 3 along the radial position of the inserted link 2 and is used for jacking the vertical pipe of the well to be hoisted, so that the vertical pipe of the well to be hoisted is fixed between the inserted link 2 and the jacking part 4, namely the vertical pipe of the well to be hoisted is fixed on the inserted link 2, and then the support plate 1 is disassembled, so that the vertical pipe of the well to be hoisted can be erected on the vertical pipe which is positioned at the bottom, and the vertical pipe of the well to be hoisted and the welding between the vertical pipes which are positioned are realized. Specifically, the jacking support frame 3 may be a bending rod, and includes a horizontal section 31 and an arc section 32 disposed at an end of the horizontal section 31, so that an end (a right lower end as shown in fig. 1) of the arc section 32 far from the horizontal section 31 is disposed downward (with respect to a position shown in fig. 1), and further, the jacking member 4 may be adjustably connected to an end of the arc section 32 far from the horizontal section 31 along a radial direction (a horizontal direction as shown in fig. 1) of the insertion rod 2, so as to jack the well riser to be hoisted by the jacking member 4, thereby fixing the well riser to be hoisted; the horizontal section 31 and the circular arc section 32 can be integrated to improve the overall stability of the top pressure support frame 3, and further improve the stability of the top pressure piece 4.
With continued reference to fig. 1, in the present embodiment, in order to facilitate the detachable connection between the insertion rod 2 and the supporting plate 1, preferably, the insertion rod 2 and the supporting plate 1 are connected by threads, so that the insertion and removal can be achieved by only screwing one of the insertion rod and the supporting plate; further preferably, the top wall of the supporting plate 1 is provided with a connecting pipe 11, the inside of which is provided with an internal thread, and the bottom end of the insert rod 2 is provided with an external thread 22 which is in threaded connection with the internal thread of the connecting pipe 11. Wherein, layer board 1 and connecting pipe 11 all can be aluminum alloy spare, and light in weight, sturdy and durable, and corrosion resistance is good, and the accessible welding fixed connection between the two also can be other connected modes, does not do any restriction to it in this embodiment.
With continued reference to fig. 1, the pressing member 4 includes: a fixing member 41, an adjusting lever 42, a pressing plate 43, and a handle 44; the adjusting rod 42 is inserted into the fixing member 41 and adjustably connected to the adjusting rod 41; a first end (the left end shown in fig. 1) of the adjusting rod 42 is provided with a pressing plate 43 for pressing against the vertical pipe of the well to be hoisted; a handle 44 may be disposed at a second end (a right end as viewed in fig. 1) of the adjusting rod 42 for applying a force to the adjusting rod 42 to move the adjusting rod 42 and further move the pressing plate 43 toward the inserting rod 2 or away from the inserting rod 2. Specifically, the fixing element 41 may be fixedly connected to the end of the circular arc segment 32 away from the horizontal segment 31 by welding, or may be fixedly connected by other methods, which is not limited in this embodiment. The pressing plate 43 can be a flat structure and is vertically arranged with the adjusting rod 42 so as to apply acting force to the vertical pipe of the well to be hoisted, and the vertical pipe of the well to be hoisted is pressed to enable the side wall of the vertical pipe of the well to be hoisted to be clamped between the inserted link 2 and the pressing plate 43, so that the vertical pipe of the well to be hoisted is fixed. The handle 44 may be a plastic part, so as to reduce the cost, and the handle 44 may be fixedly connected to the adjusting rod 42 through a screw, or may be fixedly connected to the adjusting rod 42 through other connecting methods, which is not limited in this embodiment; the fixing member 41 and the top pressure support frame 3 can be made of aluminum alloy, so that the aluminum alloy is light in weight, firm, durable and good in corrosion resistance, and the fixing member and the top pressure support frame can be fixedly connected through welding or in other connection modes; the pressing plate 43 and the adjusting rod 42 can be made of aluminum alloy, so that the device is light in weight, firm, durable and good in corrosion resistance, the pressing plate 43 and the adjusting rod 42 can be fixedly connected through welding, and can also be connected in other modes.
With continued reference to fig. 1, the fixing member 41 may be a threaded tube, and the adjusting rod 42 may be a threaded rod, which is inserted through the threaded tube and is screwed with the threaded tube, so as to adjust the position of the threaded rod by screwing the threaded rod, thereby moving the pressing plate 43 toward a direction (left or right as shown in fig. 1) close to the inserting rod 2 or away from the inserting rod 2. Wherein the handle 44 can apply a screwing force to the threaded rod to rotate the threaded rod, thereby moving the pressing plate 43.
The working principle of the high-rise building engineering tube well vertical tube hoisting device is as follows: when in use, the well stand pipe to be hoisted can be vertically placed on the supporting plate 1 to be sleeved on the connecting pipe 11, and then the inserting rod 2 is inserted into the well stand pipe to be hoisted from the upper part and is screwed in the connecting pipe 11; a hoisting rope penetrates through the hoisting ring 21, the hoisting rope and the hoisting ring 21 are hoisted by a crane, and the well vertical pipe to be hoisted and the supporting plate 1 are vertically hoisted to a proper position of a high-rise building; the inserted rod 2 penetrates through the whole vertical pipe of the well to be hoisted, and the whole vertical hoisting of the vertical pipe of the well to be hoisted is very stable under the supporting action of the supporting plate 1; then, the handle 44 is held by hand to rotate the adjusting rod 42 in the fixing part 41, the pressing plate 43 is utilized to only press the well riser to be hoisted to be fixed on the inserted link 2, then the supporting plate 1 is rotated to unscrew the connecting pipe 11 from the bottom of the inserted link 2 to move away, and the well riser to be hoisted is erected on the riser at the bottom in place to be welded and connected; finally, the adjusting rod 42 can be unscrewed to remove the pressing plate 43, and the hanging ring 21 and the inserting rod 2 are lifted to remove, so that the installation of the well vertical pipe to be hoisted can be completed.
In summary, the pipe well vertical pipe hoisting device for high-rise building engineering provided by the embodiment is inserted into the vertical pipe of the well to be hoisted through the insertion rod 2, so that the vertical pipe of the well to be hoisted is positioned on the supporting plate 1; the vertical pipe of the well to be hoisted is hoisted through the supporting plate 1, the vertical pipe of the well to be hoisted is jacked through the jacking piece 4, so that the side wall of the vertical pipe of the well to be hoisted is clamped between the inserted link 2 and the jacking piece 4, the vertical pipe of the well to be hoisted is fixed, the supporting plate 1 is dismantled, and the vertical pipe of the well to be hoisted and the vertical pipe in place are installed and welded. The hoisting device can vertically hoist the vertical pipe of the well to be hoisted, namely the vertical pipe of the high-rise building engineering pipe well, and can be installed on the vertical pipe of the high-rise building engineering pipe well at the bottom in an auxiliary manner, so that the construction operation is very convenient, the construction period is shortened, and the construction efficiency is improved.
It should be noted that in the description of the present invention, the terms of direction or positional relationship indicated by the terms "upper", "lower", "left", "right", "inner", "outer", etc. are based on the directions or positional relationships shown in the drawings, which are only for convenience of description, and do not indicate or imply that the device or element must have a specific orientation, be constructed in a specific orientation, and be operated, and thus, should not be construed as limiting the present invention.
Furthermore, it should be noted that, in the description of the present invention, unless otherwise explicitly specified or limited, the terms "mounted," "connected," and "connected" are to be construed broadly, and may be, for example, fixedly connected, detachably connected, or integrally connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meanings of the above terms in the present invention can be understood by those skilled in the art according to specific situations.
It will be apparent to those skilled in the art that various changes and modifications may be made without departing from the spirit and scope of the invention. Thus, if such modifications and variations of the present invention fall within the scope of the claims and their equivalents, the present invention is also intended to include such modifications and variations.

Claims (10)

1. The utility model provides a high-rise building engineering tube well riser hoist device which characterized in that includes: the supporting plate, the inserted link, the top pressure supporting frame and the top pressure piece; wherein,
the inserting rods are arranged above the supporting plate and detachably connected to the supporting plate, and are used for penetrating into the vertical pipe of the well to be hoisted so as to position and hoist the vertical pipe of the well to be hoisted, which is supported by the supporting plate;
the first end of the jacking support frame is connected with the upper part of the inserted link; the jacking part is adjustably connected to the second end of the jacking support frame along the radial position of the inserted rod and used for jacking the vertical pipe of the well to be hoisted so that the vertical pipe of the well to be hoisted is fixed between the inserted rod and the jacking part.
2. The high-rise building engineering tube well riser hoisting device of claim 1, wherein the jacking member comprises: the fixing piece, the adjusting rod and the pressing plate; wherein,
the adjusting rod penetrates through the fixing piece and is in threaded connection with the adjusting rod;
and a pressing plate is arranged at the first end of the adjusting rod and used for jacking the vertical pipe of the well to be hoisted, so that the side wall of the vertical pipe of the well to be hoisted is clamped between the pressing plate and the inserting rod.
3. The high-rise building engineering pipe well riser hoisting device of claim 2,
the mounting is the screwed pipe, it is the threaded rod to adjust the pole, the threaded rod wears to locate the screwed pipe and with screwed pipe looks spiro union.
4. The high-rise building engineering pipe well riser hoisting device of claim 2,
and a handle is arranged at the second end of the adjusting rod and used for applying acting force to the adjusting rod so as to enable the adjusting rod to rotate and drive the pressing plate to move towards the direction close to or far away from the inserted rod.
5. The high-rise building engineering tube well riser hoisting device according to any one of claims 1 to 4, wherein the inserted rod is in threaded connection with the supporting plate.
6. The high-rise building engineering pipe well riser hoisting device of claim 5,
the top wall of the supporting plate is provided with a connecting pipe, an internal thread is arranged in the connecting pipe, and an external thread is arranged at the bottom end of the inserting rod and is in threaded connection with the internal thread of the connecting pipe.
7. The device for hoisting the high-rise building engineering pipe well riser according to any one of claims 1 to 4, wherein the jacking support frame is a bent rod.
8. The device for hoisting the pipe well riser in the high-rise building engineering according to claim 7, wherein the jacking support frame comprises a horizontal section and an arc section arranged at the end part of the horizontal section.
9. The device for hoisting the pipe well riser in the high-rise building engineering according to claim 8, wherein the horizontal section and the circular arc section are of an integral structure.
10. The high-rise building engineering tube well riser hoisting device according to any one of claims 1 to 4, wherein a lifting ring is arranged at the top end of the inserted rod.
CN202021953431.7U 2020-09-09 2020-09-09 High-rise building engineering tube well riser hoist device Active CN214031363U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021953431.7U CN214031363U (en) 2020-09-09 2020-09-09 High-rise building engineering tube well riser hoist device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021953431.7U CN214031363U (en) 2020-09-09 2020-09-09 High-rise building engineering tube well riser hoist device

Publications (1)

Publication Number Publication Date
CN214031363U true CN214031363U (en) 2021-08-24

Family

ID=77349583

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021953431.7U Active CN214031363U (en) 2020-09-09 2020-09-09 High-rise building engineering tube well riser hoist device

Country Status (1)

Country Link
CN (1) CN214031363U (en)

Similar Documents

Publication Publication Date Title
CN211813021U (en) High-precision crane hoisting mechanism
CN201260050Y (en) 220KV bracket for replacing bus bar column insulator
CN214031363U (en) High-rise building engineering tube well riser hoist device
CN215240464U (en) Quick and accurate mounting device for flange branch pipe
CN209854937U (en) Modular assembly type building structure capable of being spliced
CN220926108U (en) Hoisting device for cylindrical steel structure
CN211667294U (en) Horseshoe-shaped pipeline supporting piece
CN215160551U (en) Miniature electric hoist supporting frame
CN210263968U (en) Hydraulic supporting device for concrete replacement of shear wall of factory building
CN217352157U (en) Support equipment for municipal bridge construction
CN216190580U (en) Tower machine pull rod auxiliary installation device easy to assemble
CN205034887U (en) Portable electric power multiplexer utensil linkage
CN216447537U (en) Inclined-pulling type support hanger
CN215755962U (en) Turning fixture for large-diameter pipe fitting
CN219712553U (en) Multi-pipeline combined hanging bracket in double-T-plate factory building
CN217557617U (en) Spider man suspension arm device
CN213806905U (en) High-strength concrete pole
CN218668793U (en) Subsidence area steel pylons slope deviation correcting device
CN214298977U (en) Special tool for overhauling and disassembling large boiler feed pump
CN219031449U (en) Suction crane for 180-degree electric turnover steel plate inspection
CN212450266U (en) Assembling unit for hoisting pipeline
CN217676540U (en) Pipeline lifting device
CN216516989U (en) Efficient building structure's location connecting device
CN218024953U (en) Water hose elbow lifting fixer
CN212336871U (en) Video monitoring rod