CN213773352U - Civil engineering construction pile driver - Google Patents

Civil engineering construction pile driver Download PDF

Info

Publication number
CN213773352U
CN213773352U CN202021829753.0U CN202021829753U CN213773352U CN 213773352 U CN213773352 U CN 213773352U CN 202021829753 U CN202021829753 U CN 202021829753U CN 213773352 U CN213773352 U CN 213773352U
Authority
CN
China
Prior art keywords
civil engineering
rotary
rod
engineering construction
pile driver
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021829753.0U
Other languages
Chinese (zh)
Inventor
李乐乐
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Baiping Mechanical And Electrical Equipment Co ltd
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021829753.0U priority Critical patent/CN213773352U/en
Application granted granted Critical
Publication of CN213773352U publication Critical patent/CN213773352U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model relates to a civil engineering correlation technique field just discloses a civil engineering construction pile driver, including dead lever and bracing piece, the inboard of dead lever is provided with supporting platform, and supporting platform's both sides all are provided with the slide rail, the inside of slide rail all is provided with the slider, and is provided with the pneumatic cylinder below the outside of slider, the below of pneumatic cylinder is provided with the hydraulic stem, and the below of hydraulic stem is provided with rotary platform, rotary platform's below is provided with rotatory piece, and the both sides of rotatory piece all are provided with the draw-in groove, the outside of draw-in groove is provided with the fixture block, and the below of fixture block is provided with the drill bit. This civil engineering construction pile driver carries out vertical both sides slip control at slide rail and slider through the pneumatic cylinder, makes it carry out vertical both sides slip control to the pneumatic cylinder according to the pile demand and handles to the effectual use efficiency that promotes the device has promoted the device operability when the pile, makes its use that has made things convenient for people.

Description

Civil engineering construction pile driver
Technical Field
The utility model relates to a civil engineering correlation technique field specifically is a civil engineering construction pile driver.
Background
Civil engineering refers to the applied materials, equipment, the technical activities of surveying, designing, constructing, maintaining, repairing and the like, and also refers to the objects of engineering construction, namely, various engineering facilities which are constructed on the ground or underground or on the land and directly or indirectly serve human life, production, military and scientific research, piling refers to driving piles into the ground to enable the building foundation to be firm, and piling training is an ideal choice for carrying out rural residual labor transfer training, technical training of construction enterprises and reckoning of workers who are off duty.
However, the civil engineering construction pile driver used at present does not have the function of supporting and reinforcing, and in the using process, the pile driver cannot be effectively supported and fixed according to the using requirements, so that the pile driver is easy to shake, and the using stability of the pile driver is reduced.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
The utility model provides a not enough to prior art, the utility model provides a civil engineering construction pile driver possesses the dustproof function of protection, in the use, can carry out advantages such as effectual protection processing to the dust that the pile caused, has solved the civil engineering construction pile driver of present use, does not possess the support reinforcement function, in the use, can't carry out effectual support fixed processing to the device according to the user demand, produces easily and rocks to the problem of the stability in use of the device has been reduced.
(II) technical scheme
For realizing that above-mentioned main part possesses fixed clamping function, can effectually fix the centre gripping to the drill bit and handle, avoid taking place to rock the purpose of off tracking, the utility model provides a following technical scheme: a civil engineering construction pile driver comprises a fixed rod and a supporting rod, wherein the inner side of the fixed rod is provided with a supporting platform, sliding rails are arranged on both sides of the supporting platform, sliding blocks are arranged inside the sliding rails, hydraulic cylinders are arranged below the outer sides of the sliding blocks, hydraulic rods are arranged below the hydraulic cylinders, and a rotary platform is arranged below the hydraulic rod, a rotary block is arranged below the rotary platform, and the two sides of the rotating block are both provided with clamping grooves, the outer sides of the clamping grooves are provided with clamping blocks, the lower parts of the clamping blocks are provided with drill bits, the two sides of the drill bits are both provided with lifting sleeves, an electric lifting rod is arranged on the outer side of the lifting sleeve, a baffle plate is arranged below the electric lifting rod, and the baffle is arranged below the baffle, the support rods are arranged on two sides of the fixing rod, and the fixing bolts are arranged above the support rods.
Preferably, the hydraulic cylinder, the slide rail and the slide block form a sliding structure, and the slide block is arranged inside the slide rail in an equidistant distribution manner.
Preferably, the hydraulic cylinder, the hydraulic rod and the rotating platform form a lifting structure, and the size of the hydraulic cylinder is larger than that of the hydraulic rod.
Preferably, the rotary platform, the rotary block and the drill constitute a rotary structure, and the rotary platform is larger in size and the rotary block is larger in size.
Preferably, the clamping groove is connected with the drill bit in a clamping mode through a clamping block, and the size of the clamping groove is matched with that of the clamping block.
Preferably, the baffle, the rotary bolt and the fixed rod form a rotary structure, and the rotary bolt is symmetrically arranged on the central axis of the baffle.
Preferably, the support rod is in threaded connection with the fixing rod through a fixing bolt, and the support rod is of an 'L' -shaped structure.
(III) advantageous effects
Compared with the prior art, the utility model provides a civil engineering construction pile driver possesses following beneficial effect:
1. this civil engineering construction pile driver carries out vertical both sides sliding adjustment at slide rail and slider through the pneumatic cylinder, makes it carry out vertical both sides sliding adjustment to the pneumatic cylinder according to the pile demand and handles to the effectual use efficiency that has promoted the device has promoted the operability of the device when the pile, makes its use that has made things convenient for people.
2. This civil engineering construction pile driver carries out block fixed mounting to fixture block and drill bit through the draw-in groove, in the use, can conveniently dismantle the change installation processing to the drill bit, avoids complicated dismantlement and installation procedure to the effectual use efficiency who promotes the device.
3. This civil engineering construction pile driver can play effectual fixed stay function to the device through bracing piece and fixing bolt, in the use, can carry out effectual support to the produced impact force of the device during operation according to the user demand and alleviate to the effectual use efficiency who promotes the device.
Drawings
FIG. 1 is a schematic view of the front cut-open structure of the present invention;
FIG. 2 is a schematic top view of the present invention;
FIG. 3 is a connection diagram of the telescopic sleeve and the electric telescopic rod of the present invention;
FIG. 4 is an enlarged schematic view of the structure at A in FIG. 1.
In the figure: 1. fixing the rod; 2. a support platform; 3. a slide rail; 4. a slider; 5. a hydraulic cylinder; 6. a hydraulic lever; 7. rotating the platform; 8. rotating the block; 9. a card slot; 10. a clamping block; 11. a drill bit; 12. a lifting sleeve; 13. an electric lifting rod; 14. a baffle plate; 15. rotating the bolt; 16. a support bar; 17. and (5) fixing the bolt.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, a civil engineering construction pile driver comprises a fixed rod 1 and a support rod 16, a support platform 2 is arranged on the inner side of the fixed rod 1, slide rails 3 are arranged on both sides of the support platform 2, a slide block 4 is arranged inside the slide rails 3, a hydraulic cylinder 5 is arranged below the outer side of the slide block 4, a hydraulic rod 6 is arranged below the hydraulic cylinder 5, a rotary platform 7 is arranged below the hydraulic rod 6, a rotary block 8 is arranged below the rotary platform 7, clamping grooves 9 are arranged on both sides of the rotary block 8, a clamping block 10 is arranged outside the clamping groove 9, a drill bit 11 is arranged below the clamping block 10, a lifting sleeve 12 is arranged on both sides of the drill bit 11, an electric lifting rod 13 is arranged outside the lifting sleeve 12, a baffle plate 14 is arranged below the electric lifting rod 13, a baffle plate 14 is arranged below the baffle plate 14, and the support rod 16 is arranged on both sides of the fixed rod 1, and a fixing bolt 17 is provided above the support bar 16.
Furthermore, the hydraulic cylinder 5, the slide rail 3 and the slide block 4 form a sliding structure, the slide blocks 4 are arranged in the slide rail 3 at equal intervals, and the slide rail 3 and the slide block 4 are subjected to longitudinal two-side sliding adjustment through the hydraulic cylinder 5, so that the hydraulic cylinder 5 is subjected to longitudinal two-side sliding adjustment according to the piling requirement, the use efficiency of the device is effectively improved, the operability of the device during piling is improved, and the device is convenient for people to use.
Further, pneumatic cylinder 5, hydraulic stem 6 and rotary platform 7 constitute elevation structure, and 5 sizes of pneumatic cylinder are greater than 6 sizes of hydraulic stem, can play effectual lift adjustment function to the device through pneumatic cylinder 5, in the use, can carry out effectual upper and lower both sides lift pile treatment to the device according to the user demand to the effectual use efficiency who promotes the device.
Further, rotary platform 7, rotatory piece 8 and drill bit 11 constitute revolution mechanic, and rotary platform 7 size big with rotatory piece 8 size, can play effectual rotation regulation function to drill bit 11 through setting up rotatory piece 8, in the use, can carry out the angular rotation to drill bit 11 according to the user demand and handle to the effectual use efficiency who promotes the device.
Further, the clamping groove 9 is connected with the drill bit 11 through the clamping block 10 in a clamping mode, the size of the clamping groove 9 is identical to that of the clamping block 10, the clamping block 10 and the drill bit 11 are fixedly installed in a clamping mode through the clamping groove 9, the drill bit 11 can be conveniently detached, replaced and installed in the using process, complex detaching and installing procedures are avoided, and therefore the using effect of the device is effectively improved.
Further, baffle 14, swivel bolt 15 and dead lever 1 constitute revolution mechanic, and swivel bolt 15 sets up with the axis symmetry of baffle 14, can play effectual protection dustproof function to the device through setting up baffle 14, in the use, can carry out some protection dustproof processing to the device according to the user demand to the effectual use efficiency who promotes the device.
Furthermore, the supporting rod 16 is in threaded connection with the fixing rod 1 through the fixing bolt 17, the supporting rod 16 is of an L-shaped structure, an effective fixing and supporting function can be achieved for the device through the supporting rod 16 and the fixing bolt 17, in the using process, impact force generated when the device works can be effectively supported and relieved according to using requirements, and therefore using efficacy of the device is effectively improved.
The electrical components presented in the document are all electrically connected with an external master controller and 220V mains, and the master controller can be a conventional known device controlled by a computer or the like.
When in use, firstly an external power supply is connected, the fixed rod 1 is placed to a proper position, the hydraulic cylinder 5 and the slide rail 3 are slid to proper positions through the two longitudinal sides to enable the drill bit 11 connected below the hydraulic cylinder 5 to be conveniently subjected to angle sliding adjustment treatment, then the rotating platform 7 is rotated clockwise to drive the rotating block 8 and the drill bit 11 to rotate to proper positions to further enable the drill bit 11 to be further subjected to angle adjustment so as to achieve accurate positioning of pile driving, then the power control switch of the hydraulic cylinder 5 is opened, the hydraulic rod 6 and the drill bit 11 are driven by the hydraulic cylinder 5 to be subjected to lifting and pressing on the upper side and the lower side so as to enable the drill bit 11 to be hammered on a required target, meanwhile, the clamping grooves 9 and the clamping blocks 10 on the two sides above the drill bit 11 are disassembled so as to facilitate the installation, disassembly and replacement treatment of the drill bit 11, complex disassembly and installation procedures are avoided, and finally the fixing bolts 17 and the supporting rods 16 on the two sides of the fixed rod 1 are tightened, it is possible to facilitate the fixed supporting process of the vibration generated during the pile driving of the fixed rod 1 in which the hydraulic cylinder 5 is of the type YS-NZ100-12A, thus completing the operation of the pile driver for civil engineering construction.
To sum up, this civil engineering construction pile driver, the fixed stay is effectual, has reduced the impact force to dead lever 1, has promoted the stability and the operability of dead lever 1 to make things convenient for people's use.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (7)

1. The utility model provides a civil engineering construction pile driver, includes dead lever (1) and bracing piece (16), its characterized in that: the inner side of the fixed rod (1) is provided with a supporting platform (2), two sides of the supporting platform (2) are respectively provided with a sliding rail (3), the inside of each sliding rail (3) is provided with a sliding block (4), a hydraulic cylinder (5) is arranged below the outer side of each sliding block (4), a hydraulic rod (6) is arranged below each hydraulic cylinder (5), a rotary platform (7) is arranged below each hydraulic rod (6), a rotary block (8) is arranged below each rotary platform (7), two sides of each rotary block (8) are respectively provided with a clamping groove (9), the outer side of each clamping groove (9) is provided with a clamping block (10), a drill bit (11) is arranged below each clamping block (10), two sides of each drill bit (11) are respectively provided with a lifting sleeve (12), the outer side of each lifting sleeve (12) is provided with an electric lifting rod (13), a baffle plate (14) is arranged below each electric lifting rod (13), and the baffle (14) is arranged below the baffle (14), the support rods (16) are arranged on two sides of the fixing rod (1), and the fixing bolts (17) are arranged above the support rods (16).
2. A civil engineering construction pile driver as claimed in claim 1, wherein: the hydraulic cylinder (5), the sliding rail (3) and the sliding block (4) form a sliding structure, and the sliding block (4) is distributed in the sliding rail (3) at equal intervals.
3. A civil engineering construction pile driver as claimed in claim 1, wherein: the hydraulic cylinder (5), the hydraulic rod (6) and the rotary platform (7) form a lifting structure, and the size of the hydraulic cylinder (5) is larger than that of the hydraulic rod (6).
4. A civil engineering construction pile driver as claimed in claim 1, wherein: the rotary platform (7), the rotary block (8) and the drill bit (11) form a rotary structure, and the rotary platform (7) is large in size and the rotary block (8) is large in size.
5. A civil engineering construction pile driver as claimed in claim 1, wherein: the clamping groove (9) is connected with the drill bit (11) in a clamping mode through a clamping block (10), and the size of the clamping groove (9) is matched with that of the clamping block (10).
6. A civil engineering construction pile driver as claimed in claim 1, wherein: the baffle (14), the rotary bolt (15) and the fixing rod (1) form a rotary structure, and the rotary bolt (15) is symmetrically arranged on the central axis of the baffle (14).
7. A civil engineering construction pile driver as claimed in claim 1, wherein: the supporting rod (16) is in threaded connection with the fixing rod (1) through a fixing bolt (17), and the supporting rod (16) is of an L-shaped structure.
CN202021829753.0U 2020-08-27 2020-08-27 Civil engineering construction pile driver Active CN213773352U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021829753.0U CN213773352U (en) 2020-08-27 2020-08-27 Civil engineering construction pile driver

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021829753.0U CN213773352U (en) 2020-08-27 2020-08-27 Civil engineering construction pile driver

Publications (1)

Publication Number Publication Date
CN213773352U true CN213773352U (en) 2021-07-23

Family

ID=76903750

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021829753.0U Active CN213773352U (en) 2020-08-27 2020-08-27 Civil engineering construction pile driver

Country Status (1)

Country Link
CN (1) CN213773352U (en)

Similar Documents

Publication Publication Date Title
CN213773352U (en) Civil engineering construction pile driver
CN201896577U (en) Wire pole pit boring machine
CN219908919U (en) Roadbed construction pile driving structure
CN210959400U (en) Planting and digging device for water and soil conservation
CN106246112B (en) Angular adjustment frame and its application method for side slope drilling device
CN213417851U (en) Interim protector of foundation ditch for construction site operation
CN209820971U (en) Steel construction welding department quality detection device
CN211229535U (en) Template fixing device for building engineering construction
CN216999196U (en) Pavement brick construction auxiliary device
CN217206322U (en) Pile machine with leveling mechanism for pile foundation construction
CN216921499U (en) Top bracing device for controlling crack of super-long reinforced concrete structure
CN211172147U (en) Electric power construction wire pole foundation ditch trimming device
CN213494207U (en) Laborsaving breaker of town road construction
CN216238938U (en) Civil engineering frame reinforcing apparatus
CN220979402U (en) Device for assisting positioning of drilling machine
CN211008648U (en) Tunnel is first to prop flatness control device
CN213205041U (en) Reinforcing apparatus of external convenient to detach of ancient building
CN220580946U (en) Reinforcing and supporting device of guide pillar type jumbolter
CN219931612U (en) Novel external corner stay cable
CN218402130U (en) Building rubbish handling device based on civil engineering
CN220703171U (en) Municipal administration public piping shaft construction auxiliary device
CN213114624U (en) Municipal works pile device
CN211598501U (en) Drilling equipment is used in road bridge municipal construction
CN215326433U (en) Temporary protection device for pipeline construction
CN216999197U (en) Municipal works road laying structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210916

Address after: 200000 Room 102, No. 214, Lane 1498, Wenchuan Road, Baoshan District, Shanghai

Patentee after: Peng Hongyi

Address before: 325800 171 Haibin Road, Haibin village, Chixi Town, Cangnan County, Wenzhou City, Zhejiang Province

Patentee before: Li Lele

TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20211215

Address after: 641400 Jiajia Small and Medium-sized Enterprise Park, Jianyang Industrial Park, Chengdu City, Sichuan Province

Patentee after: SICHUAN BAIPING MECHANICAL AND ELECTRICAL EQUIPMENT CO.,LTD.

Address before: 200000 Room 102, No. 214, Lane 1498, Wenchuan Road, Baoshan District, Shanghai

Patentee before: Peng Hongyi