CN213539717U - Stair aluminum mould board of marking time - Google Patents

Stair aluminum mould board of marking time Download PDF

Info

Publication number
CN213539717U
CN213539717U CN202022223662.9U CN202022223662U CN213539717U CN 213539717 U CN213539717 U CN 213539717U CN 202022223662 U CN202022223662 U CN 202022223662U CN 213539717 U CN213539717 U CN 213539717U
Authority
CN
China
Prior art keywords
die
mould
marking time
stair
marking
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022223662.9U
Other languages
Chinese (zh)
Inventor
蒋瑞群
冯乾跃
赵海云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Xi'an Changhui Formwork Co ltd
Original Assignee
Xi'an Changhui Formwork Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Xi'an Changhui Formwork Co ltd filed Critical Xi'an Changhui Formwork Co ltd
Priority to CN202022223662.9U priority Critical patent/CN213539717U/en
Application granted granted Critical
Publication of CN213539717U publication Critical patent/CN213539717U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Steps, Ramps, And Handrails (AREA)

Abstract

The utility model relates to a stair aluminum mould board of marking time, building aluminum mould board's field, it includes the die block, first side form, second side form and a plurality of mould of marking time, set up two caulking grooves that can supply first side form and second side form male on the die block, set up a plurality of mould of marking time one side slope male mounting grooves of supplying on the first side form, the mounting groove communicates the setting each other, set up a plurality of mould of marking time other end male fixed slots of supplying on the second side form, the fixed slot communicates the setting each other, each mounting groove corresponds the setting with the fixed slot, the length of mould of marking time is greater than the length between first side form and the second side form, be provided with on the first side form and carry out spacing fixing device to the mould of marking time. This application is through seting up the fixed slot that mounting groove and second side mould were seted up on first side mould, and the installation effectiveness of the mould of marking time of being convenient for uses manpower sparingly, through fixing device, realizes the fixed to the mould of marking time, can realize that the stair watering takes shape.

Description

Stair aluminum mould board of marking time
Technical Field
The application relates to the field of building aluminum templates, in particular to a stair step aluminum template.
Background
At present, the aluminum alloy template is called as a concrete engineering aluminum alloy template and is a new generation template system behind a wood template, a bamboo plywood and a steel template. The aluminum alloy template is a template which is made of aluminum alloy sections as main materials through processes of machining, welding and the like and is suitable for concrete engineering, and is formed by combining a panel, ribs, main section bars, a plane template, a corner template and an early-dismantling device according to the 50mm modulus design. In the building, a stair is needed to connect an upper building with a lower building, and the stair is usually formed by utilizing a step aluminum film plate.
The Chinese patent with the application number of 201620685851.9 discloses an aluminum alloy stair template, which comprises a stair tread, a vertical plate and two stair side plates, wherein the stair tread comprises a flat plate and the vertical plate which is extruded integrally and formed at one end of the flat plate and extends vertically; the stair tread is of a hollow structure, wherein a plurality of reinforcing ribs connected with the flat plate and the vertical plate are arranged in the hollow cavity; the flat plate is provided with a wedge groove, the wedge groove is detachably connected with an observation plate, and the outer edges of the flat plate and the observation plate are connected with the connecting part of the next layer of stair tread through two sections of external corner pieces.
The method for using the aluminum alloy stair template comprises the following steps: the end parts of the stair tread plates are connected with the stair side plates through the external corner pieces and the pins, the outer edges of the flat plates and the observation plates are connected with the connecting parts of the next layer of stair tread plates through the two sections of external corner pieces through the pins, so that the stair tread plates are connected layer by layer, the combination of the stairs can be completed, and the observation plates can be detached after pouring to observe the pouring effect.
With respect to the related art in the above, the inventors consider that the installation of the step plate is complicated, causing inconvenience in installation.
SUMMERY OF THE UTILITY MODEL
In order to facilitate the installation of the mould of marking time, this application provides a stair aluminium template of marking time.
The application provides a stair aluminum template that marks time adopts following technical scheme:
the utility model provides a stair aluminum mould board of marking time, includes die block, first side form, second side form and a plurality of mould of marking time, seted up two on the die block and can supply first side form and two caulking grooves of second side form male, seted up a plurality of can supply on the first side form mark time mould lopsidedness male mounting groove, the mounting groove communicates the setting each other, it can supply to have seted up a plurality ofly on the second side form mark time mould other end male fixed slot, the fixed slot communicates the setting each other, each the mounting groove with the fixed slot corresponds the setting, the length of mould of marking time is greater than length between first side form and the second side form, it can be right to be provided with on the first side form mark time the mould and carry out spacing fixing device.
By adopting the technical scheme, during installation, the bottom die is placed at the designated position for stair installation, then the first side die and the second side die are respectively inserted into the caulking groove of the bottom die, the marking die is obliquely inserted into the mounting groove, then the marking die is tightly ejected against the mounting groove, the marking die is adjusted to the horizontal direction, then the other end of the marking die is aligned to the fixing groove, the other end of the marking die is tightly ejected against the fixing groove, the fixing device is adjusted to fix the marking die, and then the marking die is sequentially installed from the bottom to the top to finish the installation of the marking die; through set up the fixed slot that mounting groove and second side mould were seted up on first side mould, the installation effectiveness of the mould of marking time of being convenient for uses manpower sparingly, through fixing device, realizes fixing the mould of marking time, can realize that the stair watering takes shape.
Optionally, fixing device includes screw rod and fixed block, the screw rod runs through first side form is connected with the fixed block, the fixed block is located in the mounting groove, just the fixed block can be right the mould of marking time carries on spacingly.
By adopting the technical scheme, the screw rod is adjusted and drives the fixing block to move downwards, the screw rod moves to press and prop the stepping die downwards, so that the stepping die is fixed, the arranged screw rod realizes the installation of the stepping die through the fixing block, the stepping die is prevented from sliding in the installation groove, the inconvenience in installation is caused, and meanwhile, the stepping die is prevented from being jacked up when building materials are formed, the deformation of a stair is caused, and the forming of the stair is prevented from being influenced; the fixing device who sets up can realize the fixing to the mould of marking time, and the mould installation of marking time after being convenient for simultaneously, prevents that building material from when taking shape, to the mould full force of marking time, will mark time the mould and jack up, causes the stair to warp, influences the quality of filling of stair.
Optionally, one end of the stepping die, which is close to the fixing groove, is provided with a limiting groove capable of limiting the fixing block.
Through adopting above-mentioned technical scheme, the spacing groove that sets up is convenient for realize the screw rod fixed to the mould of marking time, prevents the slip of mould of marking time, causes building material's shaping inconvenient.
Optionally, the stepping die is provided with a plurality of handles capable of carrying the stepping die.
Through adopting above-mentioned technical scheme, the handle of setting, the installer of being convenient for installs the mould of marking time through the handle, improves the efficiency of installation mould of marking time.
Optionally, a limiting plate located on the stepping die is arranged close to the second side die.
Through adopting above-mentioned technical scheme, the limiting plate of setting realizes the spacing to the mould of marking time, strengthens the intensity of the mould of marking time, improves the support intensity of the mould of marking time.
Optionally, a plurality of threaded holes are formed in the horizontal section of the stepping die, and a threaded rod matched with the threaded holes is arranged on the vertical section penetrating through the stepping die.
Through adopting above-mentioned technical scheme, the connection of adjacent marking time mould can be realized to the screw hole and the threaded rod of setting, strengthens the zonulae occludens between the adjacent marking time mould, realizes the quality of pouring of stair.
Optionally, a plurality of support rods capable of supporting the bottom die are arranged below the bottom die.
Through adopting above-mentioned technical scheme, the bracing piece that sets up realizes strengthening the support intensity of die block to the support of die block, is convenient for improve the filling quality of die block.
Optionally, the mark time mould is provided with an exhaust hole, and the mark time mould is provided with an exhaust cover capable of plugging the exhaust hole.
By adopting the technical scheme, the exhaust holes are formed, so that the problem that bubbles and pitted surfaces are easily generated during stair pouring can be solved, and the leveling and fixing of the tread mold and the stair pouring quality are improved; the exhaust cover is convenient for plugging the exhaust hole.
In summary, the present application includes at least one of the following beneficial technical effects:
1. the installation efficiency of the tread mold is facilitated by arranging the installation groove on the first side mold and the fixing groove arranged on the second side mold, labor is saved, the tread mold is fixed through the fixing device, and the pouring forming of the stairs can be realized;
2. the fixing device who sets up can realize the fixing to the mould of marking time, and the mould installation of marking time after being convenient for simultaneously, prevents that building material from when taking shape, to the mould full force of marking time, will mark time the mould and jack up, causes the stair to warp, influences the quality of filling of stair.
Drawings
Fig. 1 is a schematic overall structure diagram of an aluminum stair tread template according to an embodiment of the present application.
Fig. 2 is a sectional view taken along line a-a of fig. 1.
FIG. 3 is an exploded view of the tread mold according to the embodiment of the present application.
FIG. 4 is a schematic structural diagram of a mounting groove according to an embodiment of the present application.
Fig. 5 is a schematic structural diagram of a fixing groove according to an embodiment of the present application.
Description of reference numerals: 1. bottom die; 11. caulking grooves; 2. a first side mold; 21. mounting grooves; 22. a fixing device; 221. a screw; 222. a fixed block; 3. a second side mold; 31. fixing grooves; 4. a step mold; 41. a limiting groove; 42. a handle; 43. a limiting plate; 44. a threaded hole; 45. a threaded rod; 46. an exhaust hole; 47. an exhaust cover; 5. a support rod.
Detailed Description
The present application is described in further detail below with reference to figures 1-5.
The embodiment of the application discloses stair aluminum mould board of marking time. Referring to fig. 1 and 2, the stair step aluminum formwork comprises a bottom formwork 1, a first side formwork 2, a second side formwork 3 and a plurality of step formworks 4, two caulking grooves 11 which can be used for inserting the first side formwork 2 and the second side formwork 3 are formed in the bottom formwork 1, the first side formwork 2 and the second side formwork 3 are fixed through bolts, and the caulking grooves 11 are respectively located on two sides of the bottom formwork 1.
Referring to fig. 2 and 3, a plurality of mounting grooves 21 into which one side of the stepping mold 4 can be obliquely inserted are formed in the first side mold 2, eight mounting grooves 21 are formed in the embodiment, the mounting grooves 21 are arranged in an L shape, a horizontal section of each mounting groove 21 is communicated with a vertical section of each adjacent mounting groove 21, referring to fig. 5, a plurality of fixing grooves 31 into which the other end of the stepping mold 4 can be inserted are formed in the second side mold 3, eight fixing grooves 31 are formed in the embodiment, each fixing groove 31 is arranged in an L shape, a horizontal section of each fixing groove 31 is communicated with a vertical section of each adjacent fixing groove 31, each mounting groove 21 corresponds to each fixing groove 31, the length of each stepping mold 4 is greater than the length between the first side mold 2 and the second side mold 3, each stepping mold 4 is arranged in an L shape, and two handles 42 capable of moving the stepping molds; a limit plate 43 positioned on the marking die 4 is integrally connected close to the second side die 3; the horizontal section of the marking die 4 is provided with 6 threaded holes 44, and the vertical section penetrating through the marking die 4 is provided with a threaded rod 45 matched with the threaded holes 44; eight support rods 5 capable of supporting the bottom die 1 are connected below the bottom die 1 through bolts; exhaust hole 46 has been seted up to the marking time mould 4, is provided with the exhaust lid 47 that can carry out the shutoff to exhaust hole 46 on the marking time mould 4, and exhaust lid 47 is located the horizontal segment of marking time mould 4, and exhaust lid 47 passes through threaded connection with the horizontal segment.
Referring to fig. 3 and 4, the first side mold 2 is provided with a plurality of fixing devices 22 capable of limiting the mark time mold 4, the embodiment includes eight fixing devices 22, each fixing device 22 includes a screw 221 and a fixing block 222, the screw 221 penetrates through the first side mold 2 and is rotatably connected with the fixing block 222, the fixing block 222 is located in the installation groove 21, and the fixing block 222 can limit the mark time mold 4; one end of the mark time mold 4 close to the fixing groove 31 is provided with a limiting groove 41 capable of limiting the fixing block 222.
The implementation principle of the stair step aluminum formwork in the embodiment of the application is as follows: during the installation, place die block 1 in the assigned position department of stair installation, then insert first side mould 2 and second side mould 3 respectively in the caulking groove 11 of die block 1, insert mounting groove 21 with the slope of marking time mould 4, then with the tight mounting groove 21 in 4 tops of marking time mould, adjustment marking time mould 4 to horizontal direction, then aim at fixed slot 31 with the other end of marking time mould 4, the tight fixed slot 31 in the other end top of marking time mould 4, adjusting screw 221, screw 221 drives fixed block 222 downstream, the motion is realized pushing down tightly the top of marking time mould 4, realize the fixed to marking time mould 4, then install marking time mould 4 by the top down in proper order, accomplish the installation of marking time mould 4.
The above embodiments are preferred embodiments of the present application, and the protection scope of the present application is not limited by the above embodiments, so: all equivalent changes made according to the structure, shape and principle of the present application shall be covered by the protection scope of the present application.

Claims (8)

1. The utility model provides a stair aluminium template of marking time which characterized in that: comprises a bottom die (1), a first side die (2), a second side die (3) and a plurality of marking dies (4), the bottom die (1) is provided with two caulking grooves (11) for the first side die (2) and the second side die (3) to be inserted into, the first side die (2) is provided with a plurality of mounting grooves (21) into which one side of the marking die (4) can be obliquely inserted, the mounting grooves (21) are communicated with each other, the second side mold (3) is provided with a plurality of fixing grooves (31) into which the other end of the marking time mold (4) can be inserted, the fixing grooves (31) are communicated with each other, each mounting groove (21) is arranged corresponding to the fixing groove (31), the length of the marking time die (4) is larger than the length between the first side die (2) and the second side die (3), the first side die (2) is provided with a fixing device (22) capable of limiting the stepping die (4).
2. The stair tread aluminum formwork of claim 1, wherein: fixing device (22) include screw rod (221) and fixed block (222), screw rod (221) run through first side form (2) are connected with fixed block (222), fixed block (222) are located in mounting groove (21), just fixed block (222) can be right mark time mould (4) are spacing.
3. The stair tread aluminum formwork of claim 2, wherein: one end of the stepping die (4) close to the fixing groove (31) is provided with a limiting groove (41) capable of limiting the fixing block (222).
4. The stair tread aluminum formwork of claim 1, wherein: the mark time mould (4) is provided with a plurality of handles (42) which can carry the mark time mould (4).
5. The stair tread aluminum formwork of claim 1, wherein: and a limiting plate (43) positioned on the stepping die (4) is arranged close to the second side die (3).
6. The stair tread aluminum formwork of claim 1, wherein: a plurality of threaded holes (44) are formed in the horizontal section of the stepping die (4), and a threaded rod (45) matched with the threaded holes (44) is arranged in the vertical section penetrating through the stepping die (4).
7. The stair tread aluminum formwork of claim 1, wherein: the lower part of the bottom die (1) is provided with a plurality of supporting rods (5) capable of supporting the bottom die (1).
8. The stair tread aluminum formwork of claim 1, wherein: the air exhaust hole (46) is formed in the stepping die (4), and an air exhaust cover (47) capable of plugging the air exhaust hole (46) is arranged on the stepping die (4).
CN202022223662.9U 2020-09-30 2020-09-30 Stair aluminum mould board of marking time Active CN213539717U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022223662.9U CN213539717U (en) 2020-09-30 2020-09-30 Stair aluminum mould board of marking time

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022223662.9U CN213539717U (en) 2020-09-30 2020-09-30 Stair aluminum mould board of marking time

Publications (1)

Publication Number Publication Date
CN213539717U true CN213539717U (en) 2021-06-25

Family

ID=76495929

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022223662.9U Active CN213539717U (en) 2020-09-30 2020-09-30 Stair aluminum mould board of marking time

Country Status (1)

Country Link
CN (1) CN213539717U (en)

Similar Documents

Publication Publication Date Title
CN210791422U (en) Building block combined mould
CN213499892U (en) Prefab mould with adjustable
CN213539717U (en) Stair aluminum mould board of marking time
CN104929660B (en) Formation and construction set for continuous open-cut tunnel
CN108868130B (en) Double-layer connecting beam opening formwork system and construction method thereof applied to double-layer connecting beam
CN215594893U (en) Descending plate formwork device
CN211850845U (en) Stair template supporting structure
CN111391112B (en) Production method of prefabricated reinforced concrete hollow template with internal crossed holes
CN210389587U (en) Prefabricated plate type stair mold
CN211948026U (en) Cast-in-place splayed wall template system of apron culvert
CN218176652U (en) Open cut tunnel positioning and forming combined tool reserved for structural beam
CN218467114U (en) Hole forming template structure
CN110965774A (en) Concrete stair formwork and erecting method thereof
CN214362913U (en) Bridge deck mould
CN217531224U (en) Assembled stair mould
CN215443152U (en) Cement perfusion device for building engineering
CN218758758U (en) Building eaves mouth position integration formwork structure
CN210082015U (en) Multilayer turnover continuous grouting forming equipment
CN220285321U (en) Detachable building body mould of marking time
CN220150871U (en) Building main body pouring formwork reinforcing structure
CN217861902U (en) Adjustable aluminum-plastic template prefabricated stair mold
CN215926693U (en) Building engineering construction pouring template
CN218365451U (en) Cement board production mould
CN221346311U (en) Adjustable shaping adjustment windowsill coping structure
CN214819443U (en) Prefabricated mould for water retaining platform of pipe well

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant