CN213516410U - Traffic engineering construction supervision equipment - Google Patents

Traffic engineering construction supervision equipment Download PDF

Info

Publication number
CN213516410U
CN213516410U CN202022418315.1U CN202022418315U CN213516410U CN 213516410 U CN213516410 U CN 213516410U CN 202022418315 U CN202022418315 U CN 202022418315U CN 213516410 U CN213516410 U CN 213516410U
Authority
CN
China
Prior art keywords
bottom plate
core
side wall
fixed
engineering construction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022418315.1U
Other languages
Chinese (zh)
Inventor
申泽峰
万泉全
奚嵩
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Zhongyu Engineering Consulting Supervision Co ltd
Original Assignee
Chongqing Zhongyu Engineering Consulting Supervision Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Zhongyu Engineering Consulting Supervision Co ltd filed Critical Chongqing Zhongyu Engineering Consulting Supervision Co ltd
Priority to CN202022418315.1U priority Critical patent/CN213516410U/en
Application granted granted Critical
Publication of CN213516410U publication Critical patent/CN213516410U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Repair (AREA)
  • Road Signs Or Road Markings (AREA)

Abstract

The utility model provides a traffic engineering construction supervision equipment, include: the device comprises a pull rod, a cross rod, a coring device, a core taking machine, a bottom plate, supporting legs and rollers; the bottom plate is a rectangular metal plate; the pull rod is vertically fixed on the left side of the upper surface of the bottom plate; the roller is vertically fixed on the left side of the lower surface of the bottom plate through a bracket; the supporting legs are vertically fixed on the right side of the lower surface of the bottom plate; a cross bar is fixed in the middle of the pull rod; the bottom of the core drilling machine is fixed on the upper surface of the bottom plate, and the left part of the core drilling machine is fixedly connected with the cross rod; a circular through hole for placing a core taking device is formed in a bottom plate on the right side of the core taking machine; the lower half part of the coring device is arranged in the circular through hole on the bottom plate. Above-mentioned traffic engineering construction supervision equipment will get the core machine and set up on a portable platform, has reduced the removal degree of difficulty of getting the core machine, still is provided with the corer that is used for taking out the sample simultaneously on portable platform, can be convenient take out the sample, has improved supervision personnel's road and has got core efficiency.

Description

Traffic engineering construction supervision equipment
Technical Field
The utility model relates to engineering monitoring field, in particular to traffic engineering construction supervision equipment.
Background
After the road construction is completed, the supervision personnel usually need to detect various parameters of the road, such as the thickness of asphalt, the thickness of a concrete layer, and the like. It is comparatively common to the thickness detection of pitch to lead to producing, and the supervisor need carry out coring operation on the road through equipment such as core taking machine, and current core taking machine is cutting out the sample after, and the sample is less with the interval of lancing, wants to take out the sample more difficult, consequently, needs one kind can enough carry out coring operation, the equipment of taking out the sample that can be convenient again.
SUMMERY OF THE UTILITY MODEL
In order to solve the defects of the prior art, the traffic engineering construction supervision equipment is provided.
The utility model provides a technical scheme is: a traffic engineering construction supervision apparatus comprising: the device comprises a pull rod, a cross rod, a coring device, a core taking machine, a bottom plate, supporting legs and rollers; the bottom plate is a rectangular metal plate; the pull rod is vertically fixed on the left side of the upper surface of the bottom plate; the roller is vertically fixed on the left side of the lower surface of the bottom plate through a bracket; the supporting legs are vertically fixed on the right side of the lower surface of the bottom plate; a cross bar is fixed in the middle of the pull rod; the bottom of the core drilling machine is fixed on the upper surface of the bottom plate, and the left part of the core drilling machine is fixedly connected with the cross rod; a circular through hole for placing a core taking device is formed in a bottom plate on the right side of the core taking machine; the lower half part of the coring device is arranged in the circular through hole on the bottom plate.
The utility model discloses a traffic engineering construction supervision equipment will get the core machine and set up on a portable platform, has reduced the removal degree of difficulty of getting the core machine, still is provided with the corer that is used for taking out the sample simultaneously on portable platform, can be convenient take out the sample, has improved supervision personnel's road and has got core efficiency. Specifically, the utility model discloses a traffic engineering construction supervision equipment, include: pull rod, horizontal pole, corer, core taking machine, bottom plate, supporting leg and gyro wheel. Wherein, as shown in the figure, the pull rod comprises two fore-and-aft metal stock and a horizontal metal quarter butt, and the both ends of quarter butt are connected respectively in the top of two stock, and the middle part of two stock of pull rod is fixed with the horizontal pole, and both ends are fixed with two stock respectively about the horizontal pole. As shown in the figure, the pull rod is vertically fixed on the left side of the upper surface of the bottom plate, and the pull rod and the bottom plate can be fixed in a welding mode. The bottom plate is a rectangular metal plate, for example, a round through hole for the rotating rod of the core taking machine to pass through is formed in the left part in the middle of the bottom plate, and a round through hole for the lower half part of the core taking machine to pass through is formed in the right part in the middle of the bottom plate, namely the bottom plate on the right side of the core taking machine. The core drilling machine is fixed on the left side of the middle of the upper surface of the bottom plate through screws, and the left part of the rectangular case above the core drilling machine is fixedly connected with the cross rod. Pulleys are fixed at two right angles on the left side of the lower surface of the bottom plate, and after the traffic engineering construction supervision equipment is inclined to the left, the traffic engineering construction supervision equipment can be moved through the rollers. Two right angles on the right side of the lower surface of the bottom plate are fixed with supporting legs which are rectangular metal rods. The lower half part of the coring device is placed in a circular through hole at the right part of the middle of the bottom plate.
The utility model has the beneficial technical effects that:
the utility model provides a traffic engineering construction supervision equipment will get the core machine and set up on a portable platform, has reduced the removal degree of difficulty of getting the core machine, still is provided with the corer that is used for taking out the sample simultaneously on portable platform, can be convenient take out the sample, has improved supervision personnel's road and has got core efficiency.
Drawings
Fig. 1 is a schematic front structural view of traffic engineering construction supervision equipment of the utility model;
FIG. 2 is a schematic side view of the traffic engineering construction supervision device of the present invention;
fig. 3 is a schematic front structural view of the coring device of the present invention;
fig. 4 is a schematic side view of the coring device of the present invention.
In the drawings: 1. the device comprises a pull rod, 2, a cross rod, 3, a coring device, 4, a coring machine, 5, a bottom plate, 6, supporting legs, 7, rollers, 8, a handle, 9, a left side wall, 10, a top wall, 11, a right side wall, 12, a right movable wall, 13, a rotating rod, 14 and a fixed rod.
Detailed Description
The invention will be further described with reference to the accompanying drawings and specific embodiments.
In the description of the present invention, the relative terms "upper", "lower", "left", "right", "inner", "outer" and other position indication positions are only based on the position shown in the drawings to simplify the description of the present invention, but not the position and structure that the components must have, and thus, the limitation of the present invention cannot be understood.
Example 1
As shown in fig. 1 and 2, a traffic engineering construction supervision apparatus includes: the core drilling machine comprises a pull rod 1, a cross rod 2, a coring device 3, a core drilling machine 4, a bottom plate 5, supporting legs 6 and rollers 7; the bottom plate 5 is a rectangular metal plate; the pull rod 1 is vertically fixed on the left side of the upper surface of the bottom plate 5; the roller 7 is vertically fixed on the left side of the lower surface of the bottom plate 5 through a bracket; the supporting legs 6 are vertically fixed on the right side of the lower surface of the bottom plate 5; a cross bar 2 is fixed in the middle of the pull rod 1; the bottom of the core drilling machine 4 is fixed on the upper surface of the bottom plate 5, and the left part of the core drilling machine 4 is fixedly connected with the cross rod 2; a circular through hole for placing the core taking device 3 is formed in the bottom plate 5 on the right side of the core taking machine 3; the lower half of the coring device 3 is placed in a circular through hole in the bottom plate 5.
The utility model discloses a traffic engineering construction supervision equipment will get the core machine and set up on a portable platform, has reduced the removal degree of difficulty of getting the core machine, still is provided with the corer that is used for taking out the sample simultaneously on portable platform, can be convenient take out the sample, has improved supervision personnel's road and has got core efficiency. Specifically, as shown in fig. 2, the utility model discloses a traffic engineering construction supervision equipment, include: pull rod 1, horizontal pole 2, corer 3, core machine 4, bottom plate 5, supporting leg 6 and gyro wheel 7. As shown in fig. 1, the pull rod 1 is composed of two longitudinal long metal rods and a transverse short metal rod, the two ends of the short metal rod are connected to the top ends of the two long metal rods respectively, a cross rod 2 is fixed to the middle of each of the two long metal rods of the pull rod 1, and the left end and the right end of the cross rod 2 are fixed to the two long metal rods respectively. As shown in fig. 2, the pull rod 1 is vertically fixed on the left side of the upper surface of the bottom plate 5, and the pull rod 1 and the bottom plate 5 can be fixed by welding. The bottom plate 5 is a rectangular metal plate, for example, as shown in fig. 2, a circular through hole for the rotating rod of the core taking machine 4 to pass through is formed in the middle of the bottom plate 5 on the left side, and a circular through hole for the lower half part of the core taking device 3 to pass through is formed in the middle of the bottom plate 5 on the right side, namely, the bottom plate 5 on the right side of the core taking machine 3. The core drilling machine 4 is fixed on the left side of the middle of the upper surface of the bottom plate 5 through screws, and the left part of the cuboid case above the core drilling machine 4 is fixedly connected with the cross rod. The pulleys 7 are fixed at the two right angles on the left side of the lower surface of the bottom plate 5, and after the traffic engineering construction supervision equipment is inclined to the left, the traffic engineering construction supervision equipment can be moved through the pulleys 7. Two right angles on the right side of the lower surface of the bottom plate 5 are fixed with supporting legs 6, and the supporting legs 6 are rectangular metal rods. The lower half part of the coring device 3 is placed in a circular through hole at the right part of the middle of the bottom plate 5.
Further, as shown in fig. 3 and 4, the corer 3 includes a left side wall 9, a right side wall 11, a top wall 10, and a right movable wall 12; the top wall 10 is a circular metal disc, the diameter of the top wall is slightly larger than the inner diameter of a rotating rod of the core drilling machine 4, the left side wall 9 and the right side wall 11 are both long-strip-shaped bent metal sheets with the curved surface radius being the same as that of the top wall 10, and the top ends of the left side wall 9 and the right side wall 11 are fixedly connected with the edge of the top wall 10 and are usually welded; the right movable wall 12 is hinged to the lower end of the right side wall 11.
Furthermore, the middle parts of the right movable wall 12 and the left side wall 9 are provided with circular through holes for installing the rotating rod 13, the two through holes are opposite, the rotating rod 13 penetrates through the through holes on the right movable wall 12 and the left side wall 9, and the left end of the rotating rod 13 is fixed with the left side wall 9 through a nut. As shown in fig. 2, the turning bar 13 includes a transverse metal bar provided between the left side wall 9 and the right movable wall 12, and an L-shaped turning bar located to the right of the right movable wall 12.
Furthermore, the right movable wall 12 and the left side wall 9 below the rotating rod 13 are both provided with circular through holes for installing the fixing rods 14, the two through holes are opposite, and the fixing rods 14 are fixed in the through holes. When the coring device 3 is placed in the circular through hole on the right side of the center of the bottom plate 5, the fixing rod 14 abuts against the upper surface of the bottom plate 5, so that the coring device 3 does not fall out of the through hole of the bottom plate 5.
Further, a handle 8 is fixed to the upper surface of the top wall 10.
The prisoner uses core taking machine 4 to bore from the road and gets after the sample, will the utility model provides a traffic engineering construction prison reason equipment moves one section distance forward, take out core taking device 3 from bottom plate 5 again, insert left side wall 9 and the right side activity wall 12 of core taking device 3 between the gap of sample and road, rotatory bull stick 13 again, bull stick 13 tightens up left side wall 9 and the right side activity wall 12 of core taking device 3, the sample is lived to the clamp, then rethread handle 8 takes out core taking device 3 and sample together, at last back rotation bull stick 13 again loosens the sample, has accomplished the acquireing of sample promptly.
Obviously, the utility model provides a traffic engineering construction supervision equipment will get the core machine and set up on a portable platform, has reduced the removal degree of difficulty of getting the core machine, still is provided with the corer that is used for taking out the sample simultaneously on portable platform, can be convenient take out the sample, has improved supervision personnel's road and has got core efficiency.
The foregoing is a preferred embodiment of the present invention, and it should be understood that those skilled in the art can derive the related technical solutions through logic analysis, reasoning or experiment based on the present invention without creative efforts, and therefore, these related technical solutions should be within the protection scope of the present claims.

Claims (5)

1. The traffic engineering construction supervision equipment is characterized by comprising: the core taking machine comprises a pull rod (1), a cross rod (2), a core taking device (3), a core taking machine (4), a bottom plate (5), supporting legs (6) and rollers (7); the bottom plate (5) is a rectangular metal plate; the pull rod (1) is vertically fixed on the left side of the upper surface of the bottom plate (5); the roller (7) is vertically fixed on the left side of the lower surface of the bottom plate (5) through a bracket; the supporting legs (6) are vertically fixed on the right side of the lower surface of the bottom plate (5); a cross bar (2) is fixed in the middle of the pull rod (1); the bottom of the core drilling machine (4) is fixed on the upper surface of the bottom plate (5), and the left part of the core drilling machine (4) is fixedly connected with the cross rod (2); a circular through hole for placing the coring device (3) is formed in a bottom plate (5) on the right side of the core taking machine (4); the lower half part of the coring device (3) is arranged in a circular through hole on the bottom plate (5).
2. Traffic engineering construction supervision equipment according to claim 1, characterized in that the corer (3) comprises a left side wall (9), a right side wall (11), a top wall (10) and a right movable wall (12); the top wall (10) is a circular metal disc, the left side wall (9) and the right side wall (11) are both long-strip-shaped bent metal sheets with the curved surface radius being the same as that of the top wall (10), and the top ends of the left side wall (9) and the right side wall (11) are fixedly connected with the edge of the top wall (10); the right movable wall (12) is hinged at the lower end of the right side wall (11).
3. The traffic engineering construction supervision equipment according to claim 2, characterized in that the middle of the right movable wall (12) and the left side wall (9) is provided with a circular through hole for installing the rotating rod (13), the rotating rod (13) passes through the through holes on the right movable wall (12) and the left side wall (9), and the left end of the rotating rod (13) is fixed with the left side wall (9) through a nut.
4. Traffic engineering construction supervision equipment according to claim 3, characterized in that the right movable wall (12) and the left side wall (9) below the turning bar (13) are provided with circular through holes for mounting the fixing bars (14), in which the fixing bars (14) are fixed.
5. Traffic engineering construction supervision equipment according to claim 4, characterized in that the upper surface of the top wall (10) is fixed with a handle (8).
CN202022418315.1U 2020-10-27 2020-10-27 Traffic engineering construction supervision equipment Expired - Fee Related CN213516410U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022418315.1U CN213516410U (en) 2020-10-27 2020-10-27 Traffic engineering construction supervision equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022418315.1U CN213516410U (en) 2020-10-27 2020-10-27 Traffic engineering construction supervision equipment

Publications (1)

Publication Number Publication Date
CN213516410U true CN213516410U (en) 2021-06-22

Family

ID=76410948

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022418315.1U Expired - Fee Related CN213516410U (en) 2020-10-27 2020-10-27 Traffic engineering construction supervision equipment

Country Status (1)

Country Link
CN (1) CN213516410U (en)

Similar Documents

Publication Publication Date Title
CN210293757U (en) Pile foundation detects with boring core sampling device
CN212134136U (en) Spiral soil sampler for engineering detection
CN213516410U (en) Traffic engineering construction supervision equipment
CN213986054U (en) Municipal works building material detection device
CN219015689U (en) Soil heavy metal pollution detects sampling device
CN209992215U (en) Adjustable grabbing and installing equipment for concrete core sample for building detection
CN217542461U (en) Sampling device of soil corrosivity
CN211954762U (en) Device is mentioned to core sample is bored on road surface
CN217403850U (en) Building major structure detection device
CN215356442U (en) Cutting equipment is tailor in sounding pipe production and processing
CN204621954U (en) A kind of Coal quality sampler bit change-over removes specific purpose tool
CN215803443U (en) Square reinforced structure of angle steel tower main material
CN218532636U (en) Reinforcing bar detects reinforcing bar intercepting device
CN214407842U (en) Engineering quality stress detection device
CN217542460U (en) Sampling device for rolling, head and tail cutting of long material
CN212501722U (en) Steel pipe rack
CN212670216U (en) Core sample anchor clamps for basic unit coring
CN215698217U (en) Rapid fixing device for steel pipe perforation
CN217651870U (en) Pile foundation ultrasonic detection tube
CN214725396U (en) Dustless cutting environment-friendly device of ceramic tile
CN221080893U (en) Buried cable and processing equipment thereof
CN218051376U (en) Detachable mounting bracket suitable for high-speed steel drill bit
CN218770962U (en) Cable inspection wire stripping device
CN221326520U (en) Metal drain pipe surface quality detecting instrument
CN218067167U (en) River silt sampling device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210622

Termination date: 20211027

CF01 Termination of patent right due to non-payment of annual fee