CN213477339U - Steel construction factory building roof convenient to dismouting - Google Patents

Steel construction factory building roof convenient to dismouting Download PDF

Info

Publication number
CN213477339U
CN213477339U CN202020821953.5U CN202020821953U CN213477339U CN 213477339 U CN213477339 U CN 213477339U CN 202020821953 U CN202020821953 U CN 202020821953U CN 213477339 U CN213477339 U CN 213477339U
Authority
CN
China
Prior art keywords
panel
connecting plate
factory building
building roof
convenient
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020821953.5U
Other languages
Chinese (zh)
Inventor
杨恩祥
林理成
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Jinqidian Industrial Co ltd
Original Assignee
Fujian Jinqidian Industrial Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Jinqidian Industrial Co ltd filed Critical Fujian Jinqidian Industrial Co ltd
Priority to CN202020821953.5U priority Critical patent/CN213477339U/en
Application granted granted Critical
Publication of CN213477339U publication Critical patent/CN213477339U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model discloses a steel construction factory building roof convenient to dismouting, including two structures the same, and be the first panel and the second panel of rectangle structure, all be fixed with the rubber slab of rectangle structure and the first connecting plate of rectangle structure on the same end of first panel and second panel, and all be fixed with the second connecting plate of two long banding structures on the other end of first panel and second panel, the upper surface of first panel and second panel all seted up with rubber slab assorted spread groove. Has the advantages that: through being provided with first connecting plate and second connecting plate between the panel to set up corresponding jack on the panel, it is fixed to utilize the bolt to alternate, utilize the connecting plate to connect and support, the quick concatenation of being convenient for, through be provided with rubber slab and spread groove on the panel, be used for seamless butt joint, improve the leakproofness, the equipment mode that adopts the grafting replaces the welding concatenation, can not damage the material when dismantling, the reutilization of being convenient for, easy dismounting is swift simultaneously.

Description

Steel construction factory building roof convenient to dismouting
Technical Field
The utility model relates to a factory building roof technical field specifically is a steel construction factory building roof convenient to dismouting.
Background
The factory building is a house without partition walls, the internal space of the house is large, the house is composed of a pier seat and a roof, the roof is erected on the pier seat, and can be built into factories, workshops, warehouses, dining halls and the like, and the roof structures arranged in different factory buildings are different and are extremely diverse.
The steel construction factory building roof that uses at present all forms by a plurality of monomer plate welding, forms a holistic roof panel on steel construction pier seat, nevertheless welded fastening's mode is although firm, but the technical requirement to welding and concatenation is higher, and needs seamless butt joint, if welding quality is not too close, cause the roof to leak easily, form holistic roof dismantlement of being not convenient for after the welding, when the dismouting, waste time and energy, and cause the material damage easily, be unfavorable for the secondary use.
SUMMERY OF THE UTILITY MODEL
The utility model aims to provide a: to the above-mentioned problem that exists at present, a steel construction factory building roof convenient to dismouting is provided, through be provided with first connecting plate and second connecting plate between the panel, and set up the jack that corresponds on the panel, it is fixed to utilize the bolt to alternate, utilize the connecting plate to connect and support, be convenient for splice fast, through be provided with rubber slab and spread groove on the panel, be used for seamless butt joint, improve the leakproofness, the equipment mode that adopts the grafting replaces the welding concatenation, can not damage the material when dismantling, the reutilization of being convenient for, easy dismounting simultaneously, and is swift, thereby solve not enough and the defect that prior art exists.
In order to realize the purpose, the utility model discloses a technical scheme is:
the utility model provides a steel construction factory building roof convenient to dismouting, is the same including two structures, and is the first panel and the second panel of rectangle structure, first panel with all be fixed with the rubber slab of rectangle structure and the first connecting plate of rectangle structure on the same end of second panel for seamless connection and fixed, just first panel with all be fixed with the second connecting plate of two rectangular form structures on the other end of second panel for prop the joint seam, avoid sinking, first panel with the upper surface of second panel all seted up with rubber slab assorted spread groove for seamless connection avoids the rainwater infiltration.
Preferably, the first connecting plate is provided with two inner inserting pin holes, and the first panel and the second panel are provided with two second inserting holes matched with the first connecting plate.
Preferably, the front and back sides of the first and second panels are respectively provided with an external pin hole corresponding to the internal pin hole, and the external pin hole penetrates into the second insertion hole.
Preferably, the first panel and the second panel are both provided with first jacks corresponding to the second connecting plate.
Preferably, the first panel and the second panel are inserted into the second jack through the first connecting plate and are fixed by being inserted into the first jack through the second connecting plate.
Preferably, a bolt is fixedly inserted into the inner inserting pin hole and the outer inserting pin hole on the same side.
Since the technical scheme is used, the beneficial effects of the utility model are that:
1. through being provided with first connecting plate and second connecting plate between the panel to set up corresponding jack on the panel, it is fixed to utilize the bolt to alternate, utilizes the connecting plate to connect and support, is convenient for splice fast.
2. Through being provided with rubber slab and spread groove on the panel for seamless butt joint improves the leakproofness, adopts the equipment mode of pegging graft to replace the welding concatenation, can not damage the material when dismantling, and the reutilization of being convenient for, easy dismounting is swift simultaneously.
Drawings
FIG. 1 is a schematic view of the overall structure of the utility model after splicing;
FIG. 2 is a schematic structural view after the detachment of the present invention;
fig. 3 is a schematic structural diagram of a single panel in the present invention.
In the figure: 1. a first panel; 2. a second panel; 3. a rubber plate; 4. connecting grooves; 5. a first connecting plate; 6. a second connecting plate; 7. a first jack; 8. an inner pin hole; 9. externally inserting pin holes; 10. a second jack; 11. and (4) a bolt.
Detailed Description
In order to make the purpose, technical solution and advantages of the embodiments of the present invention clearer, the accompanying drawings in the embodiments of the present invention are combined below to clearly and completely describe the technical solution in the embodiments of the present invention, and it is obvious that the described embodiments are some embodiments of the present invention, rather than all embodiments, based on the embodiments in the present invention, all other embodiments obtained by a person of ordinary skill in the art without creative work belong to the scope of the present invention.
Please refer to fig. 1-3, the utility model provides a technical scheme, a steel construction factory building roof convenient to dismouting, it is the same including two structures, and be the first panel 1 and the second panel 2 of rectangle structure, all be fixed with the rubber slab 3 of rectangle structure and the first connecting plate 5 of rectangle structure on the same end of first panel 1 and second panel 2, be used for firm, seamless connection, and all be fixed with the second connecting plate 6 of two long strip structure on the other end of first panel 1 and second panel 2, be used for propping up the junction, avoid sinking, the upper surface of first panel 1 and second panel 2 all seted up with rubber slab 3 assorted spread groove 4, be used for sealing connection.
Preferably, two inner inserting pin holes 8 are formed in the first connecting plate 5, and two second inserting holes 10 matched with the first connecting plate 5 are formed in the first panel 1 and the second panel 2 and used for inserting connection and dismounting conveniently.
Preferably, the front and back sides of the first panel 1 and the second panel 2 are respectively provided with an external inserting pin hole 9 corresponding to the internal inserting pin hole 8, and the external inserting pin hole 9 penetrates into the second inserting hole 10, so that the connection and fixation by the bolt 11 are facilitated.
Preferably, the first panel 1 and the second panel 2 are both provided with a first insertion hole 7 corresponding to the second connecting plate 6 for inserting the plug pin 11.
Preferably, the first panel 1 and the second panel 2 are inserted into the second insertion hole 10 through the first connecting plate 5 and are fixed by being inserted into the first insertion hole 7 through the second connecting plate 6 for connection and support.
Preferably, a bolt 11 is fixedly inserted into the inner inserting pin hole 8 and the outer inserting pin hole 9 on the same side, so that firm fixation and disassembly and assembly are facilitated.
In this embodiment, the installation steps of steel construction factory building roof are as follows:
the method comprises the following steps: fix second panel 2 on the fossil fragments support of factory building earlier, then align first panel 1 and second panel 2, the extrusion concatenation is in one, during the alignment, let first connecting plate 5 and second connecting plate 6 aim at second jack 10 and first jack 7 respectively, then extrude the concatenation with two panels in one, it is whole to form the panel of two unifications after the concatenation, 3 cards of rubber slab form the seamless connection state in the recess on 4 tops of spread groove, avoid the rainwater infiltration.
Step two: the bolt 11 is inserted from the outer inserting pin hole 9, penetrates the panel and the inner inserting pin hole 8, and is finally fixed, the two panels are connected and fixed together by the first connecting plate 5, and the inner side of the panel is supported by the second connecting plate 6, so that the sinking of the connecting position is avoided.
Step three: the panel and the rubber plate 3 are coated with protective paint for protection.
The above description is only for the specific embodiments of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art can easily think of the changes or substitutions within the technical scope of the present invention, and all should be covered within the protection scope of the present invention. Therefore, the protection scope of the present invention shall be subject to the protection scope of the claims.

Claims (6)

1. The utility model provides a steel construction factory building roof convenient to dismouting, is the same including two structures, and is first panel (1) and second panel (2) of rectangle structure, its characterized in that: first panel (1) with all be fixed with rubber slab (3) of rectangle structure and first connecting plate (5) of rectangle structure on the same end of second panel (2), just first panel (1) with all be fixed with second connecting plate (6) of two long structure on the other end of second panel (2), first panel (1) with the upper surface of second panel (2) all seted up with rubber slab (3) assorted spread groove (4).
2. The steel structure factory building roof convenient to disassemble and assemble of claim 1, wherein: two inner inserting pin holes (8) are formed in the first connecting plate (5), and two second inserting holes (10) matched with the first connecting plate (5) are formed in the first panel (1) and the second panel (2).
3. The steel structure factory building roof convenient to disassemble and assemble of claim 2, wherein: and the sides of the front and back surfaces of the first panel (1) and the second panel (2) are respectively provided with an outer inserting pin hole (9) corresponding to the inner inserting pin hole (8), and the outer inserting pin holes (9) penetrate into the second inserting holes (10).
4. The steel structure factory building roof convenient to disassemble and assemble of claim 3, wherein: and the first panel (1) and the second panel (2) are provided with first jacks (7) corresponding to the second connecting plate (6).
5. The steel structure factory building roof convenient to disassemble and assemble of claim 4, wherein: the first panel (1) and the second panel (2) are inserted into the second jack (10) through the first connecting plate (5) and are fixed by being inserted into the first jack (7) through the second connecting plate (6).
6. The steel structure factory building roof convenient to disassemble and assemble of claim 5, wherein: and a plug pin (11) is fixedly inserted into the inner plug pin hole (8) and the outer plug pin hole (9) on the same side.
CN202020821953.5U 2020-05-18 2020-05-18 Steel construction factory building roof convenient to dismouting Active CN213477339U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020821953.5U CN213477339U (en) 2020-05-18 2020-05-18 Steel construction factory building roof convenient to dismouting

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020821953.5U CN213477339U (en) 2020-05-18 2020-05-18 Steel construction factory building roof convenient to dismouting

Publications (1)

Publication Number Publication Date
CN213477339U true CN213477339U (en) 2021-06-18

Family

ID=76391034

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020821953.5U Active CN213477339U (en) 2020-05-18 2020-05-18 Steel construction factory building roof convenient to dismouting

Country Status (1)

Country Link
CN (1) CN213477339U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115030385A (en) * 2022-07-11 2022-09-09 永盟绿建科技(南通)有限公司 Novel building roof steel structure
CN116397827A (en) * 2023-05-09 2023-07-07 江苏沪武建设集团有限公司 Large-span magnesium aluminum manganese plate roof structure and construction method

Cited By (4)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115030385A (en) * 2022-07-11 2022-09-09 永盟绿建科技(南通)有限公司 Novel building roof steel structure
CN115030385B (en) * 2022-07-11 2024-02-20 永盟绿建科技(南通)有限公司 Building roof steel structure
CN116397827A (en) * 2023-05-09 2023-07-07 江苏沪武建设集团有限公司 Large-span magnesium aluminum manganese plate roof structure and construction method
CN116397827B (en) * 2023-05-09 2023-10-27 江苏沪武建设集团有限公司 Large-span magnesium aluminum manganese plate roof structure and construction method

Similar Documents

Publication Publication Date Title
CN213477339U (en) Steel construction factory building roof convenient to dismouting
CN102888895B (en) Light ultrathin wall steel structure house
CN114411978A (en) Dovetail-tenon concrete assembled enclosure wall building
CN202866323U (en) Steel structure house with light ultrathin wall
CN212336427U (en) Hidden grafting shingle nail
CN217175213U (en) House built by building structure module for building house
CN210238840U (en) Double-layer reinforced combined wall
CN213897562U (en) Integrated building house
CN210857493U (en) Replaceable energy-saving building structure
CN215167262U (en) Leak-proof connecting structure for color steel plate roof
CN112538985A (en) Quickly-built house and dismounting and mounting method thereof
CN113668703A (en) Direct-insertion type bolt-free connecting joint of closed cavity column and steel beam with three-layer ring plate structure
TWM592499U (en) Solar waterproof scaffolding
CN206220292U (en) A kind of column section component for house corner portion fast-assembling
CN216973704U (en) Scenic spot log cabin
CN216948746U (en) Steel construction roof beam concatenation fixed knot constructs
CN210195005U (en) Combined assembled storeroom
CN218758316U (en) Novel waterproof color steel tile
CN216475508U (en) Assembled aluminum alloy light steel house
CN204959972U (en) Prefabricated house
CN218176616U (en) Movable reusable steel-concrete composite structure
CN209924266U (en) Splicing structure of splicing beams
CN221194218U (en) High large-span frame construction outer scaffold frame steel column even wall spare sets up post
CN214091170U (en) Assembled villa structure
CN220790728U (en) Quick assembly disassembly formula camping unit and composite set thereof

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant