CN213232987U CN202021778030.2U CN202021778030U CN213232987U CN 213232987 U CN213232987 U CN 213232987U CN 202021778030 U CN202021778030 U CN 202021778030U CN 213232987 U CN213232987 U CN 213232987U
Authority
CN
China
Prior art keywords
ballast
sleeper
hydraulic cylinder
machine body
hydraulic
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021778030.2U
Other languages
Chinese (zh)
Inventor
潘守宏
杨宝旭
刘明义
何飞
姜少义
刘宝华
孙振斌
潘龙
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021778030.2U priority Critical patent/CN213232987U/en
Application granted granted Critical
Publication of CN213232987U publication Critical patent/CN213232987U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Machines For Laying And Maintaining Railways (AREA)

Abstract

The utility model relates to a hydraulic pressure pushes away tiny fragments of stone, coal, etc. and hangs pillow machine that trades, it hangs (2) by pushing away tiny fragments of stone, coal, etc. machine (1) and sleeper and constitutes, push away tiny fragments of stone, etc. machine (1) including preceding organism (11) and back organism (12), preceding organism (11) and back organism (12) link to each other through left consequent beam (14) and right consequent beam (15), it pushes away shovel mechanism (5) to be equipped with on tiny fragments of stone, it is articulated mutually with crossbeam (52) to push away shovel (51), upset pneumatic cylinder (53) are articulated mutually with crossbeam (52), the jar pole is articulated mutually with pushing away shovel (51), left sliding sleeve (54) and right sliding sleeve (55) slidable mounting are on left consequent beam (14) and right consequent beam (15), each lifting hydraulic cylinder fixes respectively on the sliding sleeve, the jar pole links to each other with the crossbeam respectively, each pushing and pulling hydraulic cylinder articulates mutually with the back organism respectively, the jar pole is articulated mutually with the crossbeam respectively, the sleeper links to each. The speed for replacing the ballast of the sleeper and the speed for refilling the ballast of the sleeper are high, and the sleeper is convenient to be matched with the replacement of an old sleeper and the replacement of a new sleeper.

Description

Hydraulic ballast hanging bolster replacing machine
Technical Field
The utility model relates to a railway machinery, concretely relates to trade pillow machine for changing railway sleeper.
Background
In order to improve the sleeper replacement efficiency and reduce the labor intensity of manual sleeper replacement, various mechanical sleeper replacement devices are produced and widely applied in railway departments. The sleeper-changing machines have different working principles and structures and different characteristics, but the problems that road ballasts are inconvenient to clear and backfill the road ballasts and the efficiency is low generally exist, and the ballast clearing and filling are inconvenient to match with the old sleeper and the new sleeper to be changed, so that the sleeper-changing efficiency is directly influenced. The sleeper replacement is carried out in the time of the running clearance of the train, and for workers in the work section of the railway administration, whether the sleeper to be replaced can be replaced in time in a limited time is very important, and the condition that all replaced sleepers are qualified in acceptance is ensured so as to ensure that the train can run safely and reliably after the train is recovered.
Disclosure of Invention
The utility model aims at providing a clear tiny fragments of stone, coal, etc. is fast with backfill railway ballast, and it is convenient with taking out and trade old pillow and the cooperation of renewing the pillow, trade the quick efficient hydraulic pressure of pillow and push away tiny fragments of stone, coal, etc. and throw off the pillow machine that trades.
The technical solution of the utility model is that: the device comprises a ballast pushing machine and a sleeper crane, wherein the ballast pushing machine comprises a front machine body and a rear machine body which are spaced from each other front and back, rail wheels, rail locking devices and a track descending device are respectively arranged on the front machine body and the rear machine body, the upper parts of the left side and the right side of the front machine body and the rear machine body are respectively connected through a left longitudinal beam and a right longitudinal beam which are parallel to each other, a push shovel mechanism is arranged on the ballast pushing machine and comprises a push shovel, a cross beam, a turning hydraulic cylinder, a left sliding sleeve, a right sliding sleeve, a left lifting hydraulic cylinder, a right lifting hydraulic cylinder, a left push-pull hydraulic cylinder and a right push-pull hydraulic cylinder, the push shovel and the cross beam are respectively and transversely arranged below the left longitudinal beam and the right longitudinal beam in front and back, the left side and the right side of the rear part of the push shovel are respectively hinged with the cross beam through hinge seats, the cylinder body of the turning hydraulic cylinder is hinged with the upper side of the middle part of the cross beam, the end part of a cylinder, the left end and the right end of the cross beam are respectively provided with a left upright post and a right upright post which are in up-down sliding fit with the left sliding sleeve and the right sliding sleeve, the lower ends of the left upright post and the right upright post are transversely connected with the cross beam, the cylinder bodies of the left lifting hydraulic cylinder and the right lifting hydraulic cylinder are respectively fixed on the left sliding sleeve and the right sliding sleeve, the end parts of cylinder rods are downwards connected with the cross beam respectively, the cylinder bodies of the left pushing hydraulic cylinder and the right pushing hydraulic cylinder are respectively hinged with the left side and the right side of the rear machine body, the end parts of the cylinder rods are forwards hinged with the left side and the right side of the cross beam respectively, the ballast pushing machine is provided with a hydraulic pump station and a hydraulic distributor which are respectively connected with the hydraulic cylinders through oil pipes.
The technical effects of the utility model are that: the sleeper ballast cleaning and backfilling speed is high when the sleeper ballast cleaning and backfilling machine is used, the sleeper replacement speed is high, and the efficiency is high, and the old sleeper replacement and the new sleeper replacement are convenient to match. The method has the advantages that the old sleeper replacement and the new sleeper replacement are carried out synchronously, the disturbance to the steel rail and the ballast base is small, and the normal operation of the train after the train is communicated can be recovered. Although the manual cooperation is still needed for working, the manual cooperation is completed only by a small amount of manual work, the labor intensity of workers and the operation danger can be greatly reduced, and the use is safer. The sleeper replacement operation time can be greatly shortened by using the sleeper replacement device, more sleepers can be replaced in each operation, and the sleeper replacement device is more favorable for daily maintenance of railway departments. The railway transportation vehicle is convenient to use, safe and reliable to operate, can bring higher economic benefits, and is more suitable for rapid development of railway transportation.
Drawings
Fig. 1 is a perspective structure diagram of the embodiment of the present invention.
Detailed Description
As shown in figure 1, the ballast pushing machine comprises a ballast pushing machine 1 and a sleeper crane 2, wherein the ballast pushing machine 1 comprises a front machine body 11 and a rear machine body 12 which are spaced from each other front and back, rail wheels 13, rail locking devices 3 and a track descending device 4 are respectively arranged on the front machine body 11 and the rear machine body 12, the upper parts of the left side and the right side of the front machine body 11 and the upper parts of the right side of the rear machine body 12 are respectively connected through a left longitudinal beam 14 and a right longitudinal beam 15 which are parallel to each other, a pushing shovel mechanism 5 is arranged on the ballast pushing machine 1, the pushing shovel mechanism 5 comprises a pushing shovel 51, a cross beam 52, a turning hydraulic cylinder 53, a left sliding sleeve 54, a right sliding sleeve 55, a left lifting hydraulic cylinder 56, a right lifting hydraulic cylinder 57, a left pushing hydraulic cylinder 58 and a right hydraulic cylinder 59, the pushing shovel 51 and the cross beam 52 are respectively and transversely arranged below the left longitudinal beam 14 and the right longitudinal beam 15 front and back, the left side and the right side of the rear part of the pushing shovel 51, The end of the cylinder rod is hinged with the middle part of the upper side of the push shovel 51 forwards, the left sliding sleeve 54 and the right sliding sleeve 55 are respectively installed on the left consequent beam 14 and the right consequent beam 15 in a sliding way along the front-back direction, the left end and the right end of the cross beam 52 are respectively provided with a left upright post 60 and a right upright post 61 which are respectively matched with the left sliding sleeve 54 and the right sliding sleeve 55 in a sliding way up and down, the lower ends of the left upright post and the right upright post are transversely connected with the cross beam 52, the cylinder bodies of the left lifting hydraulic cylinder 56 and the right lifting hydraulic cylinder 57 are respectively fixed on the left sliding sleeve 54 and the right sliding sleeve 55, the end of the cylinder rod is downwards respectively connected with the cross beam 52, the cylinder bodies of the left push-pull hydraulic cylinder 58 and the right push-pull hydraulic cylinder 59 are respectively hinged with the left side and the right side of the rear machine body 12, the end of the cylinder rod is respectively hinged with the left side and the, the sleeper crane 2 is provided with an excavating arm 21, and the front end of the excavating arm 21 is provided with a sleeper gripper 22.
The left side and the right side of the rear portion of the front machine body 11 are respectively provided with a ballast pulling device 6, the ballast pulling device is composed of a ballast pulling device support 62, a square slide rod 63, a downward extending hydraulic cylinder 64, a ballast pulling plate 65 and a ballast pulling hydraulic cylinder 66, the left side and the right side of the rear portion of the front machine body 11 of the ballast pulling device support 62 are respectively installed on the front machine body 11, the square slide rod 63 is installed on the ballast pulling device support 62 in a sliding mode along the vertical direction, the lower end of the square slide rod 63 is provided with a bottom plate 67, the cylinder body of the downward extending hydraulic cylinder 64 is installed on the ballast pulling device support 62, the end portion of the cylinder rod is downwards connected with the bottom plate 67, the front side of the ballast pulling plate 65 is hinged with the bottom plate 67 to be horizontally and rotatably matched, the tail end of the ballast pulling hydraulic cylinder 66 is hinged.
The lower side of blade 51 is provided with notches 68 on the left and right sides thereof for engaging with the two rails, respectively, to avoid the rails.
The lower side of the blade 51 is provided with a plurality of blade tips 69 at intervals in the left-right direction.
The width of blade 51 perpendicular to the rail direction is greater than the length of the ties.
The left and right sides of the front machine body 11 and the rear machine body 12 are respectively provided with a rail locking device 3 and a track descending device 4.
The rail locking device 3 is composed of a rail locking device support 31, a rail locking hydraulic cylinder 32 and rail locking pliers 33, wherein the rail locking device support 31 is installed on the front machine body 11 or the rear machine body 12, the rail locking pliers 33 are installed on the rail locking device support 31, a cylinder body of the rail locking hydraulic cylinder 32 is installed on the rail locking device support 31, and the end part of a cylinder rod faces downwards and is hinged with the rail locking pliers 33 to control the opening and closing of the two pliers arms.
The lower machine 4 is composed of a lower hydraulic cylinder 41 and a lower wheel 42, the lower hydraulic cylinder 41 is mounted on the front body 11 or the rear body 12, and the lower wheel 42 is rotatably mounted on the end of a cylinder rod facing downward of the lower hydraulic cylinder 41.
The sleeper crane 2 is a crawler excavator.
The track of the sleeper crane 2 is a rubber track, so that the track and the sleeper can be prevented from being damaged.
The working principle is as follows:
when the sleeper-changing machine is used, the ballast pushing machine 1 is pulled by the sleeper crane 2 to move on a rail, and the ballast pushing machine 1 and a hydraulic system on the sleeper crane 2 respectively control the operation of the ballast pushing machine 1 and the sleeper crane.
When the sleeper crane 2 drives the ballast pushing machine 1 to operate to a specified working position, the ballast pushing machine 1 is locked on a rail through the rail locking devices 3 on the front machine body 11 and the rear machine body 12, and the ballast pushing machine 1 is prevented from moving under stress when the ballast is pushed. The tilting hydraulic cylinder 53 is controlled to stretch and retract to drive the push shovel 51 to change the pitch angle, the left lifting hydraulic cylinder 56 and the right lifting hydraulic cylinder 57 are controlled to stretch and retract to drive the push shovel 51 to ascend and descend, and the left push-pull hydraulic cylinder 58 and the right push-pull hydraulic cylinder 59 are controlled to stretch and retract to drive the push shovel 51 to move back and forth. When the push shovel 51 ascends and descends, because the cylinder bodies of the left push-pull hydraulic cylinder 58 and the right push-pull hydraulic cylinder 59 are hinged with the rear machine body 12, the cylinder rod ends of the left push-pull hydraulic cylinder 58 and the right push-pull hydraulic cylinder 59 can swing up and down along with the lifting of the push shovel 51, and when the cylinder bodies of the left push-pull hydraulic cylinder 58 and the right push-pull hydraulic cylinder 59 are parallel to the left consequent beam 14 and the right consequent beam 15, the cross beam 52 can be pushed to drive the push shovel 51, the left sliding sleeve 54, the right sliding sleeve 55, the left lifting hydraulic cylinder 56 and the right lifting hydraulic cylinder 57 to move back and forth on the left consequent beam.
After the pressure pads and nuts between the sleepers and the rails to be replaced are loosened manually, the push shovel 51 can push the railway ballast and the sleepers to loosen the sleepers and fall into ballast pits, and then the push shovel 51 retreats to leave a sleeper hanging space for the sleeper crane 2. When the sleeper is hoisted, the excavating arm 21 of the sleeper crane 2 extends downwards into the space between two rails from the gap between the left longitudinal beam and the right longitudinal beam, the sleeper gripper 22 at the front end of the excavating arm firstly grips the sleeper to be replaced, then the sleeper gripper 22 carries the sleeper to horizontally rotate for 90 degrees, so that the direction of the sleeper is the same as that of the rails, the excavating arm 21 can be lifted, and the sleeper is hoisted out from the space between the left longitudinal beam 14 and the right longitudinal beam 15 and placed on a roadbed or other positions. The process of replacing the sleeper is basically the same, the sleeper crane 2 firstly hoists the sleeper into the lower part of two rails from the position between the left and right longitudinal beams 14 and 15, then horizontally rotates the sleeper by 90 degrees to enable the sleeper to be vertical to the rails, and then lifts the sleeper to enable the upper side of the sleeper to lean against the bottom surface of the rails. At the moment, the ballast pulling device 6 can be started, the downward extending hydraulic cylinder 64 is controlled to extend, the bottom plate 67 is driven to extend downwards to the lowest position, the ballast pulling hydraulic cylinder 66 is controlled to extend and contract, and the ballast pulling plate 65 can pull the road ballasts in the related range to the positions below the two ends of the sleeper so as to prevent the sleeper from falling. After the ballast-removing track is removed, the ballast-removing device 6 is controlled to retract upwards to the original position, and then the sleeper is installed on the rail by a press pad and a nut manually, so that the sleeper gripper can be loosened, and other sleepers can be replaced. After the sleepers are replaced, ballast pits below the sleepers and between the sleepers are filled with ballast by using the push shovels 51, and finally, sleeper replacement is completed. The ballast cleaning machine is convenient to cooperate with the replacement of the sleeper, and the sleeper replacement efficiency is higher.
When the sleeper replacing machine avoids a train to get off the track, firstly, the connection between the ballast pushing machine 1 and the sleeper crane 2 needs to be disconnected, the ballast pushing machine 1 can get off from the rail by using the track descending device 4 and a lower rail, and the sleeper crane 2 can be automatically driven off from the rail.

Claims (10)

1. The hydraulic ballast lifting sleeper replacing machine is composed of a ballast pushing machine (1) and a sleeper crane (2), and is characterized in that: the ballast pushing machine (1) comprises a front machine body (11) and a rear machine body (12) which are spaced from each other front and back, rail wheels (13), rail locking devices (3) and a track descending device (4) are respectively arranged on the front machine body (11) and the rear machine body (12), the upper portions of the left side and the right side of the front machine body (11) and the rear machine body (12) are respectively connected with each other through a left longitudinal beam (14) and a right longitudinal beam (15) which are parallel to each other, a pushing shovel mechanism (5) is arranged on the ballast pushing machine (1), the pushing shovel mechanism (5) is composed of a pushing shovel (51), a cross beam (52), a turning hydraulic cylinder (53), a left sliding sleeve (54), a right sliding sleeve (55), a left lifting hydraulic cylinder (56), a right lifting hydraulic cylinder (57), a left pushing hydraulic cylinder (58) and a right pushing hydraulic cylinder (59), the pushing shovel (51) and the cross beam (52) are respectively and transversely arranged below the left longitudinal beam (14) and the right longitudinal beam (15) in front and back, the left side and right side of the rear portion of the, the cylinder body of the turning hydraulic cylinder (53) is hinged with the upper side of the middle part of the cross beam (52), the end part of the cylinder rod is hinged with the middle part of the upper side of the push shovel (51) forwards, a left sliding sleeve (54) and a right sliding sleeve (55) are respectively arranged on the left consequent beam (14) and the right consequent beam (15) in a sliding way along the front-back direction, the left end and the right end of the cross beam (52) are respectively provided with a left upright post (60) and a right upright post (61) which are respectively matched with the left sliding sleeve (54) and the right sliding sleeve (55) in a sliding way up and down, the lower ends of the cylinder rod are transversely connected with the cross beam (52), the cylinder bodies of the left push-pull hydraulic cylinder (58) and the right push-pull hydraulic cylinder (59) are respectively hinged with the left side and the right side of the rear machine body (12), and the end parts of the cylinder rod are respectively hinged with the left side and the right side of the cross beam (52) forwards, the ballast pushing machine (1) is provided with a hydraulic pump station (16) and a hydraulic distributor (17) which are respectively connected with each hydraulic cylinder through an oil pipe, the sleeper crane (2) is located in front of the ballast pushing machine (1) and is connected with the front machine body (11), the sleeper crane (2) is provided with an excavating arm (21), and the front end of the excavating arm (21) is provided with a sleeper gripper (22).
2. The hydraulic ballast-pushing sleeper-changing machine according to claim 1, characterized in that ballast-pulling devices (6) are respectively arranged on the left side and the right side of the rear portion of the front machine body (11), each ballast-pulling device is composed of a ballast-pulling device support (62), a square slide rod (63), a downward-extending hydraulic cylinder (64), a ballast-pulling plate (65) and a ballast-pulling hydraulic cylinder (66), the ballast-pulling device support (62) is positioned on the left side and the right side of the rear portion of the front machine body (11) and is respectively installed on the front machine body (11), the square slide rod (63) is installed on the ballast-pulling device support (62) in a sliding manner along the vertical direction, a bottom plate (67) is arranged at the lower end of the square slide rod (63), a cylinder body of the downward-extending hydraulic cylinder (64) is installed on the ballast-pulling device support (62), the end portion of the cylinder rod is downwards connected with the bottom plate (67), the front side of the ballast-pulling plate (65) is hinged and horizontally and rotatably matched with the bottom plate (67, The tail end of the cylinder rod is hinged with a ballast drawing plate (65).
3. The hydraulic ballast lifting sleeper exchanger according to claim 1, wherein the left and right sides of the lower side of the push shovel (51) are respectively provided with notches (68) which are respectively matched with the two rails to avoid the rails.
4. The hydraulic ballast lifting sleeper exchanger according to claim 1, wherein a plurality of shovel tips (69) are arranged on the lower side of the push shovel (51) at intervals in the left-right direction.
5. The hydraulic ballast lifting sleeper exchanger according to claim 1, wherein the width of the push shovel (51) perpendicular to the rail direction is greater than the length of a sleeper.
6. The hydraulic ballast lifting sleeper replacing machine according to claim 1, wherein rail locking devices (3) and track descending devices (4) are respectively arranged on the left side and the right side of the front machine body (11) and the rear machine body (12).
7. The hydraulic ballast-pushing sleeper-changing machine according to claim 1, wherein the rail locking device (3) is composed of a rail locking device support (31), a rail locking hydraulic cylinder (32) and rail locking pliers (33), the rail locking device support (31) is installed on the front machine body (11) or the rear machine body (12), the rail locking pliers (33) are installed on the rail locking device support (31), a cylinder body of the rail locking hydraulic cylinder (32) is installed on the rail locking device support (31), and the end portion of a cylinder rod is hinged with the rail locking pliers (33) downwards to control the opening and closing of the two pliers arms.
8. The hydraulic ballast lifting sleeper exchanger according to claim 1, wherein the lower track device (4) is composed of a lower track hydraulic cylinder (41) and a lower track wheel (42), the cylinder body of the lower track hydraulic cylinder (41) is mounted on the front machine body (11) or the rear machine body (12), and the lower track wheel (42) is rotatably mounted at the end of a cylinder rod of the lower track hydraulic cylinder (41) facing downward.
9. The hydraulic ballast lifting sleeper replacement machine according to claim 1, wherein the sleeper crane (2) is a crawler excavator.
10. The hydraulic ballast lifting sleeper exchanger according to claim 9, wherein the caterpillar track of the sleeper crane (2) is a rubber caterpillar track.
CN202021778030.2U 2020-08-24 2020-08-24 Hydraulic ballast hanging bolster replacing machine Active CN213232987U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021778030.2U CN213232987U (en) 2020-08-24 2020-08-24 Hydraulic ballast hanging bolster replacing machine

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021778030.2U CN213232987U (en) 2020-08-24 2020-08-24 Hydraulic ballast hanging bolster replacing machine

Publications (1)

Publication Number Publication Date
CN213232987U true CN213232987U (en) 2021-05-18

Family

ID=75902298

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021778030.2U Active CN213232987U (en) 2020-08-24 2020-08-24 Hydraulic ballast hanging bolster replacing machine

Country Status (1)

Country Link
CN (1) CN213232987U (en)

Similar Documents

Publication Publication Date Title
CN101718066B (en) Fast rail-exchanging vehicle for jointless track and rail-exchanging method
CN106592351B (en) Pillow device and method are changed in a kind of overhaul
CN103696335B (en) Railway sleeper replacement vehicle
US5156639A (en) Railway maintenance vehicle
CN108797238B (en) Ballast-removing sleeper-changing machine
CN215479244U (en) Auxiliary operation platform device for monorail crane
CN213232987U (en) Hydraulic ballast hanging bolster replacing machine
CN206666948U (en) Railway changes pillow machine
CN212611736U (en) Railway ballast excavating gear
CA1109734A (en) Track tamper
CN210621352U (en) Suspension type manual longitudinal moving stool beam device
CN219174905U (en) Integral dismantling and replacing tool for ballastless track bed board
CN217499805U (en) Integrated rail-uncut replacement and recovery sleeper operation vehicle
CN206015534U (en) The self-propelled running gear of cantilever box beam Hanging Basket
CN114892458A (en) Integrated rail-uncut replacement and recovery sleeper operation vehicle
CN219547455U (en) Combined light pillow changing machine
CN209741588U (en) ballast drawing machine
CN208668182U (en) A kind of screen scarifier being suitble to narrow work surface
CN103669134B (en) The manufacture method that railroad sleeper is more changed trains
CN2400500Y (en) Drop hammer compacting machine
CN204875395U (en) Receive pillow device
CN203625732U (en) Railway sleeper replacing cart
CN215718959U (en) Pipe supporting device