CN213123414U - Real operation panel of instructing in electronic information engineering laboratory - Google Patents

Real operation panel of instructing in electronic information engineering laboratory Download PDF

Info

Publication number
CN213123414U
CN213123414U CN202022102447.3U CN202022102447U CN213123414U CN 213123414 U CN213123414 U CN 213123414U CN 202022102447 U CN202022102447 U CN 202022102447U CN 213123414 U CN213123414 U CN 213123414U
Authority
CN
China
Prior art keywords
air
fixedly connected
electronic information
air outlet
information engineering
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022102447.3U
Other languages
Chinese (zh)
Inventor
李振勇
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Guilin Normal College
Original Assignee
Guilin Normal College
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Guilin Normal College filed Critical Guilin Normal College
Priority to CN202022102447.3U priority Critical patent/CN213123414U/en
Application granted granted Critical
Publication of CN213123414U publication Critical patent/CN213123414U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Devices For Use In Laboratory Experiments (AREA)

Abstract

The utility model discloses a real operation panel of instructing in electronic information engineering laboratory, comprises an operation bench, a plurality of mounting holes have been seted up on the operation panel top, the smooth laminating of the interior lateral wall of mounting hole has a plurality of fixed blocks, and is a plurality of the common fixedly connected with dead lever of fixed block, dead lever top fixedly connected with goes out the chimney, it is connected with the guide plate to go out the chimney inside wall rotation, the guide plate bottom is rotated and is connected with the threaded rod, the utility model discloses a set up threaded rod and guide plate, the threaded rod is convenient for better angle and the intensity of adjusting the air-out with setting up of guide plate, and the smaller air-out intensity is higher with the clearance that goes out chimney inside wall top on the guide plate top, and the device easy operation, result of use follows better, is convenient for.

Description

Real operation panel of instructing in electronic information engineering laboratory
Technical Field
The utility model relates to a heat dissipation instrument field especially relates to a real operation panel of instructing in electronic information engineering laboratory.
Background
At present, a practical training operating platform is a place for learning and workers to learn, and various instrument devices are mostly arranged on a table top of the practical training operating platform.
The instrument equipment that places on the current real standard operation panel leads to the inside subassembly temperature to rise easily for a long time during operation, and then influences the steady operation of equipment, and the radiating effect that relies on self cooling system is not good, and is difficult to clear up after the equipment is stained with the dust and needs the fan to blow, and the great pertinence that is unfavorable for of current fan blows grey to we design the real standard operation panel in electronic information engineering laboratory.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the shortcoming that exists among the prior art, and the real operation panel of instructing in electronic information engineering laboratory that proposes.
In order to achieve the above purpose, the utility model adopts the following technical scheme: a practical training operating platform for an electronic information engineering laboratory comprises an operating platform, wherein a plurality of mounting holes are formed in the top end of the operating platform, a plurality of fixing blocks are smoothly attached to the inner side walls of the mounting holes, a fixing rod is fixedly connected to the plurality of fixing blocks together, an air outlet cylinder is fixedly connected to the top end of the fixing rod, a guide plate is rotatably connected to the inner side wall of the air outlet cylinder, a threaded rod is rotatably connected to the bottom of the guide plate, the bottom of the threaded rod penetrates through the air outlet cylinder and is fixedly connected with a rotating block, an air guide pipe is fixedly connected to the air inlet end of the air outlet cylinder, a connecting cover is fixedly connected to one end, away from the air outlet cylinder, of the air guide pipe, a top rod is fixedly connected to the inner side wall of the connecting cover, the connecting cover is in threaded connection with one of the air outlet pipes, and the inner side wall of the air box is located at the tops of the air outlet pipes and is connected with wind shields in a hinge mode.
As a further description of the above technical solution:
the ejector rod is smoothly attached to the wind shield and made of alloy materials, and one end, close to the wind shield, of the ejector rod is in an arc shape.
As a further description of the above technical solution:
the deep bead lateral wall is laminated with the play smooth laminating of tuber pipe lateral wall, the deep bead is made for the rubber material.
As a further description of the above technical solution:
the cross section of the air outlet pipe is circular, the connecting cover is made of alloy materials, and the thickness of the connecting cover is not less than three centimeters.
As a further description of the above technical solution:
the air guide pipe is made of rubber materials, and the section of the air guide pipe is circular.
As a further description of the above technical solution:
the section of the mounting hole is circular, and the mounting hole is distributed on the top of the operating platform in a rectangular array.
As a further description of the above technical solution:
the air-out section of thick bamboo cross-section is the rectangle, the air-out section of thick bamboo is made for the alloy material, air-out section of thick bamboo inside wall and the smooth laminating of guide plate lateral wall.
The utility model discloses following beneficial effect has:
1. the utility model discloses a set up threaded rod and guide plate, the threaded rod is convenient for better angle and the intensity of adjusting the air-out with setting up of guide plate, and the air-out intensity is higher more for the smaller air-out in the clearance on guide plate top and play dryer inside wall top, the device easy operation, the result of use is with better, is convenient for better blowing the ash, is convenient for better dispel the heat to equipment.
2. The utility model discloses a set up ejector pin, deep bead and connection lid, ejector pin, deep bead and the setting of being connected the lid be convenient for better utilize the wind that blows off the air-blower, can not the outflow air in the air-out pipe when the play tuber pipe is not installed the connection lid, the better use of being convenient for, the ejector pin is convenient for better deriving wind-force with the setting of deep bead, improves wind-force utilization ratio, the device easy operation, the result of use is better, convenient to use.
3. The utility model discloses a set up fixed block and dead lever, the fixed block is convenient for better regulation play between section of thick bamboo and the operation panel with setting up of dead lever, and the better utilization of being convenient for is by play dryer exhaust wind, the device easy operation, and the result of use is better.
Drawings
Fig. 1 is a side view of a practical training operating table in an electronic information engineering laboratory according to the present invention;
FIG. 2 is an enlarged view of FIG. 1 at A;
fig. 3 is an enlarged view of fig. 1 at B.
Illustration of the drawings:
1. an operation table; 2. mounting holes; 3. an air box; 4. a blower; 5. an air outlet pipe; 6. a top rod; 7. a wind deflector; 8. a connecting cover; 9. an air guide pipe; 10. fixing the rod; 11. an air outlet cylinder; 12. a threaded rod; 13. a baffle; 14. and (5) fixing blocks.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
In the description of the present invention, it should be noted that the terms "center", "upper", "lower", "left", "right", "vertical", "horizontal", "inner", "outer", and the like indicate orientations or positional relationships based on the orientations or positional relationships shown in the drawings, and are only for convenience of description and simplification of description, but do not indicate or imply that the device or element referred to must have a specific orientation, be constructed and operated in a specific orientation, and thus, should not be construed as limiting the present invention; the terms "first," "second," and "third" are used for descriptive purposes only and are not to be construed as indicating or implying relative importance, and furthermore, unless otherwise explicitly stated or limited, the terms "mounted," "connected," and "connected" are to be construed broadly and may be, for example, fixedly connected, detachably connected, or integrally connected; can be mechanically or electrically connected; they may be connected directly or indirectly through intervening media, or they may be interconnected between two elements. The specific meaning of the above terms in the present invention can be understood in specific cases to those skilled in the art.
Referring to fig. 1-3, the present invention provides an embodiment: a practical training operating platform for an electronic information engineering laboratory comprises an operating platform 1, a plurality of mounting holes 2 are formed in the top end of the operating platform 1, a plurality of fixing blocks 14 are smoothly attached to the inner side walls of the mounting holes 2, a fixing rod 10 is fixedly connected to the plurality of fixing blocks 14 together, an air outlet cylinder 11 is fixedly connected to the top end of the fixing rod 10, a guide plate 13 is rotatably connected to the inner side wall of the air outlet cylinder 11, a threaded rod 12 is rotatably connected to the bottom of the guide plate 13, the bottom of the threaded rod 12 penetrates through the air outlet cylinder 11 and is fixedly connected with a rotating block, an air guide pipe 9 is fixedly connected to the air inlet end of the air outlet cylinder 11, a connecting cover 8 is fixedly connected to the end, far away from the air outlet cylinder 11, of the air guide pipe 9, a push rod 6 is fixedly connected to the inner side wall, the connecting cover 8 is in threaded connection with one of the air outlet pipes 5, and the inner side wall of the air box 3 is located at the tops of the air outlet pipes 5 and is connected with a wind shield 7 in a hinge mode.
The ejector rod 6 is smoothly attached to the wind shield 7, the ejector rod 6 is made of alloy materials, and one end, close to the wind shield 7, of the ejector rod 6 is in an arc shape, so that the wind shield 7 is prevented from being damaged by the ejector rod 6. The lateral wall of the wind shield 7 is smoothly attached to the lateral wall of the air outlet pipe 5, and the wind shield 7 is made of rubber. The section of the air outlet pipe 5 is circular, the connecting cover 8 is made of alloy materials, and the thickness of the connecting cover 8 is not less than three centimeters. The air guide pipe 9 is made of rubber materials, and the cross section of the air guide pipe 9 is circular. The section of mounting hole 2 is circular, and mounting hole 2 is rectangular array and distributes at 1 top of operation panel, the better play dryer 11 of placing of being convenient for. The section of the air outlet cylinder 11 is rectangular, the air outlet cylinder 11 is made of alloy materials, the inner side wall of the air outlet cylinder 11 is smoothly attached to the outer side wall of the guide plate 13, and the air outlet cylinder 11 can be adjusted to have a better blowing angle and strength.
The working principle is as follows: connecting the connecting cover 8 with the air outlet pipe 5, when in connection, the ejector rod 6 inside the connecting cover 8 pushes the wind shield 7 to change the inclination angle between the wind shield 7 and the inner side wall of the air box 3, so that the air inside the air box 3 can enter the air outlet pipe 5, inserting the fixed rod 10 into the mounting hole 2, because the fixed block 14 is attached to the inner side wall of the mounting hole 2, and the fixed rod 10 is fixedly connected with a plurality of fixed blocks 14 on the periphery side, the fixed rod 10 can adjust the depth inserted into the mounting hole 2, so that the height of the air outlet cylinder 11 can be adjusted, when in work, the air blower 4 guides the external air into the air box 3, the air is discharged from the air outlet pipe 5, the connecting cover 8, the air guide pipe 9 and the air outlet cylinder 11, and rotates the threaded rod 12 as required, so that the threaded rod 12 rotates and drives the guide plate 13 to move away from the hinge connection part to adjust the inclination angle between, the air led out from the air outlet cylinder 11 can be used for equipment heat dissipation and equipment cleaning.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications and variations can be made in the embodiments or in part of the technical features of the embodiments without departing from the spirit and the scope of the invention.

Claims (7)

1. The utility model provides a real operation panel of instructing in electronic information engineering laboratory, includes operation panel (1), its characterized in that: the air-conditioning device is characterized in that a plurality of mounting holes (2) are formed in the top end of the operating platform (1), a plurality of fixing blocks (14) are smoothly attached to the inner side wall of each mounting hole (2), a fixing rod (10) is fixedly connected to the plurality of fixing blocks (14) together, an air outlet cylinder (11) is fixedly connected to the top end of each fixing rod (10), a guide plate (13) is rotatably connected to the inner side wall of the air outlet cylinder (11), a threaded rod (12) is rotatably connected to the bottom of each guide plate (13), the bottom of each threaded rod (12) penetrates through the air outlet cylinder (11) and is fixedly connected with a rotating block, an air guide pipe (9) is fixedly connected to the air inlet end of the air outlet cylinder (11), a connecting cover (8) is fixedly connected to one end, far away from the air outlet cylinder (11), of each air guide pipe (9), an air blower (, air-blower (4) air-out end fixedly connected with bellows (3), bellows (3) air-out end fixedly connected with a plurality of play tuber pipes (5), connect lid (8) and one of them play tuber pipe (5) threaded connection, the equal hinge connection in top that bellows (3) inside wall is located a plurality of play tuber pipes (5) has deep bead (7).
2. The practical training operating table for the electronic information engineering laboratory according to claim 1, characterized in that: ejector pin (6) and deep bead (7) smooth laminating, ejector pin (6) are made for the alloy material, one end that ejector pin (6) are close to deep bead (7) is the arcuation.
3. The practical training operating table for the electronic information engineering laboratory according to claim 1, characterized in that: the side wall of the wind shield (7) is smoothly attached to the outer side wall of the air outlet pipe (5), and the wind shield (7) is made of rubber.
4. The practical training operating table for the electronic information engineering laboratory according to claim 1, characterized in that: the section of the air outlet pipe (5) is circular, the connecting cover (8) is made of alloy materials, and the thickness of the connecting cover (8) is not less than three centimeters.
5. The practical training operating table for the electronic information engineering laboratory according to claim 1, characterized in that: the air guide pipe (9) is made of rubber materials, and the section of the air guide pipe (9) is circular.
6. The practical training operating table for the electronic information engineering laboratory according to claim 1, characterized in that: the section of the mounting hole (2) is circular, and the mounting hole (2) is distributed on the top of the operating platform (1) in a rectangular array.
7. The practical training operating table for the electronic information engineering laboratory according to claim 1, characterized in that: go out a section of thick bamboo (11) section and be the rectangle, it makes for the alloy material to go out a section of thick bamboo (11), go out a section of thick bamboo (11) inside wall and the smooth laminating of guide plate (13) lateral wall.
CN202022102447.3U 2020-09-23 2020-09-23 Real operation panel of instructing in electronic information engineering laboratory Expired - Fee Related CN213123414U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022102447.3U CN213123414U (en) 2020-09-23 2020-09-23 Real operation panel of instructing in electronic information engineering laboratory

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022102447.3U CN213123414U (en) 2020-09-23 2020-09-23 Real operation panel of instructing in electronic information engineering laboratory

Publications (1)

Publication Number Publication Date
CN213123414U true CN213123414U (en) 2021-05-04

Family

ID=75664467

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022102447.3U Expired - Fee Related CN213123414U (en) 2020-09-23 2020-09-23 Real operation panel of instructing in electronic information engineering laboratory

Country Status (1)

Country Link
CN (1) CN213123414U (en)

Similar Documents

Publication Publication Date Title
CN209592750U (en) A kind of distribution box with temperature control device
CN203661466U (en) Fan type outdoor rack
CN213123414U (en) Real operation panel of instructing in electronic information engineering laboratory
CN205986590U (en) Energy -saving electric control cabinet
CN205266101U (en) Adopt scattered hot air duct's of U type feeder automation tester
CN210275003U (en) Heat radiator for industry electrical control box
CN111181417A (en) Frequency converter cabinet
CN208538420U (en) Outdoor display screen
CN214586736U (en) Positioning server case with good heat dissipation effect
CN206249227U (en) A kind of efficient computer heat radiating device
CN212851626U (en) Electronic information anti-interference device
CN204425826U (en) Headstock
CN211378605U (en) Emergent radiating data micromodule computer lab
CN209946776U (en) Dustproof cooling device for computer
CN210578332U (en) Fastening type frequency converter
CN215775186U (en) Moon cake cooling device
CN214581485U (en) Storage device for central air conditioner outdoor unit fast in heat dissipation
CN212209143U (en) Box-type transformer for constructional engineering
CN218630658U (en) Self-cooling machine case of computer
CN206893761U (en) A kind of air-cooled battery pack structure
CN212849374U (en) High airtight high-efficient dust removal heat dissipation power cabinet
CN211508925U (en) Frequency converter cabinet
CN218261654U (en) Ventilation and cooling device for crane cab
CN220023419U (en) High-efficient heat dissipation type PLC switch board
CN213485454U (en) Based on intelligent house is with box that charges

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210504

Termination date: 20210923

CF01 Termination of patent right due to non-payment of annual fee