CN213091197U - Pressure debugging equipment - Google Patents

Pressure debugging equipment Download PDF

Info

Publication number
CN213091197U
CN213091197U CN202022501864.5U CN202022501864U CN213091197U CN 213091197 U CN213091197 U CN 213091197U CN 202022501864 U CN202022501864 U CN 202022501864U CN 213091197 U CN213091197 U CN 213091197U
Authority
CN
China
Prior art keywords
water
pipe
outlet pipe
water outlet
pressure
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022501864.5U
Other languages
Chinese (zh)
Inventor
宋旭贵
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Chongqing Emperor Sanitary Ware Co ltd
Original Assignee
Chongqing Emperor Sanitary Ware Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Chongqing Emperor Sanitary Ware Co ltd filed Critical Chongqing Emperor Sanitary Ware Co ltd
Priority to CN202022501864.5U priority Critical patent/CN213091197U/en
Application granted granted Critical
Publication of CN213091197U publication Critical patent/CN213091197U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Examining Or Testing Airtightness (AREA)

Abstract

The utility model provides a pressure debugging device, which comprises a main water pipe, a first water distribution pipe, a second water distribution pipe and a third water distribution pipe, wherein the main water pipe is connected with a water pump, the first water distribution pipe, the second water distribution pipe and the third water distribution pipe are respectively connected with the first water distribution pipe, the second water distribution pipe and the third water distribution pipe in parallel, and the water outlets of the first water outlet pipe, the second water outlet pipe and the third water outlet pipe are respectively fixedly connected and integrally formed; the water outlets of the first water outlet pipe, the second water outlet pipe and the third water outlet pipe are respectively connected with a high-pressure hose, and the high-pressure hoses correspond to the pressure test equipment to be tested. The utility model discloses every first minute water pipe, second minute water pipe and third minute water pipe are because the pipe diameter is different, and the delivery port water pressure from first outlet pipe, second outlet pipe and third outlet pipe is different after connecting through the water pump to treat through high-pressure hose and examine pressure test equipment and the intelligent closestool that awaits measuring and carry out the functional test, practiced thrift the cost.

Description

Pressure debugging equipment
Technical Field
The utility model relates to an intelligent closestool and ordinary toilet bowl test field, concretely relates to pressure debugging equipment.
Background
When intelligent closestool and ordinary toilet bowl function test, need carry out the function detection to the product under multiple standard pressure, and if carry out the function detection to it on the existing market, often all purchase test equipment alone, and often the cost is higher like this.
SUMMERY OF THE UTILITY MODEL
The to-be-solved problem of the utility model is to provide a pressure debugging equipment through the main water pipe and arrange the difference and carry out the functional test to intelligent closestool and ordinary toilet bowl to the aforesaid that exists among the prior art not enough, practiced thrift the cost.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides a pressure debugging equipment, includes main water pipe, first minute water pipe, second minute water pipe and third minute water pipe diameter are different, main water piping connection water pump, main water piping connection first minute water pipe, second minute water pipe and third minute water pipe, first minute water pipe, second minute water pipe and third minute water pipe parallel connection respectively first minute water pipe, second minute water pipe and third minute water pipe, first minute water pipe, second minute water pipe and third minute water pipe communicate the water inlet of first outlet pipe, second outlet pipe and third outlet pipe respectively perpendicularly, second outlet pipe both sides respectively with first outlet pipe and third outlet pipe fixed connection, first outlet pipe passes second minute water pipe and third minute water pipe, the second outlet pipe passes third minute water pipe, first outlet pipe, The water outlets of the second water outlet pipe and the third water outlet pipe are respectively fixedly connected and integrally formed, fixing ends are arranged at the water outlets of the first water outlet pipe, the second water outlet pipe and the third water outlet pipe, a horizontal channel is arranged in each fixing end, a piston rod is arranged in each horizontal channel, the piston rod is matched with the horizontal channel, and a first through hole, a second through hole and a third through hole are respectively arranged on each piston rod; when the first through hole is communicated with the water outlet of the first water outlet pipe, the piston rod plugs the water outlets of the second water outlet pipe and the third water outlet pipe, when the second through hole is communicated with the water outlet of the second water outlet pipe, the piston rod plugs the water outlets of the first water outlet pipe and the third water outlet pipe, and when the third through hole is communicated with the third water outlet pipe, the piston rod plugs the water outlets of the first water outlet pipe and the second water outlet pipe; and the water outlets of the first water outlet pipe, the second water outlet pipe and the third water outlet pipe are respectively connected with a high-pressure hose, and the high-pressure hoses correspond to pressure test equipment to be tested.
Compared with the prior art, the utility model discloses following beneficial effect has: the utility model discloses a thereby with the water pump of main water piping connection respectively to first minute water pipe, second minute water pipe and third minute water pipe supply water, every first minute water pipe, second minute water pipe and third minute water pipe pressure regulating valve are adjusted, through follow after the water pump is connected the delivery port water pressure of first outlet pipe, second outlet pipe and third outlet pipe is different to treat through high-pressure hose and survey pressure test equipment and the intelligent closestool that awaits measuring and ordinary toilet bowl carry out the functional test, practiced thrift the cost, will simultaneously first outlet pipe passes second minute water pipe and third minute water pipe, the second outlet pipe passes the third minute water pipe, the delivery port of first outlet pipe, second outlet pipe and third outlet pipe is fixed connection and integrated into one piece respectively, thereby has avoided the water pipe to turn round, has practiced thrift the water pipe cost.
Additional advantages, objects, and features of the invention will be set forth in part in the description which follows and in part will become apparent to those having ordinary skill in the art upon examination of the following or may be learned from practice of the invention.
Drawings
Fig. 1 is the structure diagram of the pressure debugging device of the present invention.
Fig. 2 is a partial top view of the third water dividing pipe of the present invention.
Fig. 3 is a partial top view of the second water dividing pipe of the present invention.
Detailed Description
In order to make the utility model realize that technical means, creation characteristics, achievement purpose and effect are clearer and easily understand, it is right to combine below the figure and the detailed implementation mode the utility model discloses do further explanation:
the utility model provides a pressure debugging device, which comprises a main water pipe 1, a first water dividing pipe 2, a second water dividing pipe 3 and a third water dividing pipe 4, wherein the pipe diameter of the main water pipe 1 is larger than any pipe diameter of the first water dividing pipe 2, the second water dividing pipe 3 and the third water dividing pipe 4, the pipe diameters of the first water dividing pipe 2, the second water dividing pipe 3 and the third water dividing pipe 4 are different, the main water pipe 1 is connected with a water pump, water pressure is generated when the water is supplied to the main water pipe 1 through the water pump, because the pipe diameters of the first water dividing pipe 2, the second water dividing pipe 3 and the third water dividing pipe 4 are different, the water pressure passing through the first water dividing pipe 2, the second water dividing pipe 3 and the third water dividing pipe 4 is also different, so as to perform function test on a pressure testing device to be tested and an intelligent closestool, the first water dividing pipe 2, the second water dividing pipe 3 and the, the first water distribution pipe 2, the second water distribution pipe 3 and the third water distribution pipe 4 are respectively connected with the first water distribution pipe 2, the second water distribution pipe 3 and the third water distribution pipe 4 in parallel, the first water distribution pipe 2, the second water distribution pipe 3 and the third water distribution pipe 4 are arranged in parallel to enable the water distribution pipes to be arranged evenly and orderly, the first water distribution pipe 2, the second water distribution pipe 3 and the third water distribution pipe 4 are respectively and vertically communicated with the water inlets of a first water outlet pipe 5, a second water outlet pipe 6 and a third water outlet pipe 7, the third water distribution pipe 4 is provided with a first connecting port 9, the first connecting port 9 is communicated with the water inlet of the third water outlet pipe 7, when water flows in the third water distribution pipe 4, the water bypasses the first water outlet pipe 5 and the second water outlet pipe 6 which vertically penetrate through the second water distribution pipe 4, the second water distribution pipe 3 is provided with a second connecting port 8, and the second, when water flows in the second water distribution pipe 3, the water bypasses the first water outlet pipe 5 vertically penetrating through the second water distribution pipe 3, the first water distribution pipe 2 is communicated with a plurality of first water outlet pipes 5, the second water distribution pipe 3 is communicated with a plurality of second water outlet pipes 6, the third water distribution pipe 4 is communicated with a plurality of third water outlet pipes 7, every adjacent one of the first water outlet pipes 5, the second water outlet pipes 6 and the third water outlet pipes 7 forms a group of corresponding single intelligent closestool to be tested, so that the function test can be carried out on the plurality of intelligent closestools to be tested, the first water outlet pipes 5, the second water outlet pipes 6 and the third water outlet pipes 7 are respectively provided with a water inlet and a water outlet, the water inlets of the first water outlet pipes 5, the second water outlet pipes 6 and the third water outlet pipes 7 are respectively communicated with the first water distribution pipe 2, the second water distribution pipe 3 and the third water distribution pipe 4, two sides of the second water outlet pipes 6 are respectively fixedly connected with the first, the first water outlet pipe 5 penetrates through the second water distribution pipe 3 and the third water distribution pipe 4, the second water outlet pipe 6 penetrates through the third water distribution pipe 4, water outlets of the first water outlet pipe 5, the second water outlet pipe 6 and the third water outlet pipe 7 are respectively fixedly connected and integrally formed, fixing ends 10 are arranged at the water outlets of the first water outlet pipe 5, the second water outlet pipe 6 and the third water outlet pipe 7, a horizontal channel is arranged in each fixing end 10, a piston rod 11 is arranged in each horizontal channel, the piston rod 11 is matched with the horizontal channel, the piston rod 11 can move left and right on the horizontal channel, the piston rod 11 blocks the water outlets of the first water outlet pipe 5, the second water outlet pipe 6 and the third water outlet pipe 7, and a first through hole 12, a second through hole 13 and a third through hole 14 are respectively arranged on the piston rod 11; when the first through hole 12 is communicated with the water outlet of the first water outlet pipe 5, the piston rod 11 blocks the water outlets of the second water outlet pipe 6 and the third water outlet pipe 7, when the second through hole 13 is communicated with the water outlet of the second water outlet pipe 6, the piston rod 11 blocks the water outlets of the first water outlet pipe 5 and the third water outlet pipe 7, and when the third through hole 14 is communicated with the third water outlet pipe 7, the piston rod 11 blocks the water outlets of the first water outlet pipe 5 and the second water outlet pipe 6; the water outlets of the first water outlet pipe 5, the second water outlet pipe 6 and the third water outlet pipe 7 are respectively connected with a high-pressure hose, the high-pressure hose corresponds to pressure testing equipment to be tested, and the pressure testing equipment to be tested is an intelligent closestool; when the water outlet of the first water outlet pipe 5 needs to be opened, the piston rod 11 is moved to enable the first through hole 12 to be communicated with the first water outlet pipe 5, and at the moment, the second through hole 13 and the third through hole 14 are not communicated with the water outlets of the second water outlet pipe 6 and the third water outlet pipe 7; when the water outlet of the second water outlet pipe 6 needs to be opened, the piston rod 11 is moved to enable the second through hole 13 to be communicated with the second water outlet pipe 6, and at the moment, the first through hole 12 and the third through hole 14 are not communicated with the water outlets of the first water outlet pipe 5 and the third water outlet pipe 7; when the water outlet of the third water outlet pipe 7 needs to be opened, the piston rod 11 is moved to enable the third through hole 14 to be communicated with the third water outlet pipe 7, at the moment, the first through hole 12 and the second through hole 13 are not communicated with the water outlets of the first water outlet pipe 5 and the second water outlet pipe 6, the piston rod 11 is moved to enable the water outlets of the first water outlet pipe 5, the second water outlet pipe 6 and the third water outlet pipe 7 to be opened differently, and the first water outlet pipe 5, the second water outlet pipe 6 and the third water outlet pipe 7 are sequentially attached to each other to be integrally formed so that the pipe wall shared between the first water outlet pipe 5 and the second water outlet pipe 6 and between the second water outlet pipe 6 and the third water outlet pipe 7 can save cost.
Finally, although the present invention has been described in detail with reference to the preferred embodiments, it should be understood by those skilled in the art that the present invention can be modified or replaced by other means without departing from the spirit and scope of the present invention, which should be construed as limited only by the appended claims.

Claims (1)

1. A pressure debugging device characterized by: comprises a main water pipe (1), a first water dividing pipe (2), a second water dividing pipe (3) and a third water dividing pipe (4), wherein the pipe diameters of the first water dividing pipe (2), the second water dividing pipe (3) and the third water dividing pipe (4) are different, the main water pipe (1) is connected with a water pump, the main water pipe (1) is connected with the first water dividing pipe (2), the second water dividing pipe (3) and the third water dividing pipe (4), the first water dividing pipe (2), the second water dividing pipe (3) and the third water dividing pipe (4) are respectively connected in parallel with the water inlets of the first water dividing pipe (2), the second water dividing pipe (3) and the third water dividing pipe (4) which are respectively and vertically communicated with a first water outlet pipe (5), a second water outlet pipe (6) and a third water outlet pipe (7), and the two sides of the second water outlet pipe (6) are respectively and fixedly connected with the first water outlet pipe (5) and the third water outlet pipe (7), the first water outlet pipe (5) penetrates through the second water distribution pipe (3) and the third water distribution pipe (4), the second water outlet pipe (6) penetrates through the third water distribution pipe (4), water outlets of the first water outlet pipe (5), the second water outlet pipe (6) and the third water outlet pipe (7) are respectively fixedly connected and integrally formed, a fixed end (10) is arranged at the water outlet of the first water outlet pipe (5), the second water outlet pipe (6) and the third water outlet pipe (7), a horizontal channel is arranged in the fixed end (10), a piston rod (11) is arranged in the horizontal channel, the piston rod (11) is matched with the horizontal channel, and a first through hole (12), a second through hole (13) and a third through hole (14) are respectively formed in the piston rod (11); when the first through hole (12) is communicated with the water outlet of the first water outlet pipe (5), the piston rod (11) plugs the water outlets of the second water outlet pipe (6) and the third water outlet pipe (7), when the second through hole (13) is communicated with the water outlet of the second water outlet pipe (6), the piston rod (11) plugs the water outlets of the first water outlet pipe (5) and the third water outlet pipe (7), and when the third through hole (14) is communicated with the third water outlet pipe (7), the piston rod (11) plugs the water outlets of the first water outlet pipe (5) and the second water outlet pipe (6); the water outlets of the first water outlet pipe (5), the second water outlet pipe (6) and the third water outlet pipe (7) are respectively connected with a high-pressure hose, and the high-pressure hoses correspond to pressure testing equipment to be tested.
CN202022501864.5U 2020-11-03 2020-11-03 Pressure debugging equipment Active CN213091197U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022501864.5U CN213091197U (en) 2020-11-03 2020-11-03 Pressure debugging equipment

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022501864.5U CN213091197U (en) 2020-11-03 2020-11-03 Pressure debugging equipment

Publications (1)

Publication Number Publication Date
CN213091197U true CN213091197U (en) 2021-04-30

Family

ID=75614597

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022501864.5U Active CN213091197U (en) 2020-11-03 2020-11-03 Pressure debugging equipment

Country Status (1)

Country Link
CN (1) CN213091197U (en)

Similar Documents

Publication Publication Date Title
CN205048064U (en) Feed pipe pressure testing device
CN213091197U (en) Pressure debugging equipment
CN206905853U (en) Water meters in series connection testing stand
CN208109786U (en) A kind of gas path distributor of situ of drilling well
CN202066754U (en) Pressure testing device of high-pressure oil tube
CN204064559U (en) The stiffening ring leakage testing device that a kind of pressure stability is high
CN208917537U (en) A kind of high efficiency one drags more washing machine automatic feeding systems
CN105910842A (en) Whole-performance detection system of gas pressure regulator
CN213091198U (en) Toilet bowl function test equipment
CN209085841U (en) Suppress platform tap device
CN204239386U (en) A kind of pressure measurement tee union
CN202433162U (en) Air cylinder unit water pressure test device
CN203259321U (en) Instrument pipeline pressure test device
CN208595431U (en) Buckle-type pipe water outlet pressure test device
CN218156890U (en) Ultrahigh pressure automatic detection and monitoring device of multichannel well control device
CN103411777B (en) Cylinder block flow resistance measurement system
CN206683847U (en) The complete pressurized equipment performance detection testing bench of secondary water-supply
CN215965297U (en) Flushing tool for header pipe tester
CN110474258A (en) A kind of high-efficiency pipeline threading system and construction method
CN204788831U (en) Device that leaks hunting of high -pressure gas spare part
CN205642742U (en) Airtight test device
CN220490298U (en) Multi-station fire-fighting spray header leakage-proof testing machine
CN205027485U (en) Hydraulic anchor detection device and hydraulic anchor detection equipment
CN210108869U (en) Portable hydrostatic test distributor
CN214305823U (en) Multi-channel gas circuit converter

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant