CN213014349U - Building elevator fixing device - Google Patents

Building elevator fixing device Download PDF

Info

Publication number
CN213014349U
CN213014349U CN202021215229.4U CN202021215229U CN213014349U CN 213014349 U CN213014349 U CN 213014349U CN 202021215229 U CN202021215229 U CN 202021215229U CN 213014349 U CN213014349 U CN 213014349U
Authority
CN
China
Prior art keywords
fixed
fixing
fixedly connected
groove
pin
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021215229.4U
Other languages
Chinese (zh)
Inventor
袁晓华
刘高彬
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021215229.4U priority Critical patent/CN213014349U/en
Application granted granted Critical
Publication of CN213014349U publication Critical patent/CN213014349U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Lift-Guide Devices, And Elevator Ropes And Cables (AREA)

Abstract

The utility model discloses a building lift fixing device, the on-line screen storage device comprises a fixed base, unable adjustment base's lower extreme fixedly connected with fixed pin, the lower extreme fixedly connected with round pin head of fixed pin, the mounting groove has been seted up to unable adjustment base's upper end intermediate position, first hole that leaks has been seted up to the lower extreme of mounting groove, the inside joint of mounting groove has the fixed connection groove, the elevator mount has been cup jointed in the fixed connection groove, first recess has been seted up to the inboard of elevator mount. Through the unable adjustment base who sets up, the fixed pin, and fixed connection groove can be better fix the lift mount in fixed connection groove, then the first hole and the second that leak through setting up leak can be better with rainwater exhaust to prevent that the rainwater from taking place the gathering in fixed connection groove and mounting groove, then through the fixed pin that sets up and the messenger fixed pin that the round pin head can be better insert soil, thereby make its more fixed.

Description

Building elevator fixing device
Technical Field
The utility model belongs to the technical field of the construction machinery, especially, relate to a building elevator fixing device.
Background
The SSD construction elevator is an upright tetragonal body support, suspension cages are arranged on the left side and the right side of the tetragonal body support, the frame of the tetragonal body can be in a balanced stress state, only the bottom support extending outside is used for balancing weights in the front and the back of the bottom, so that the tetragonal body support is in a stable and non-falling state, and potential safety hazards can exist if external force impacts or wind is strong.
The fixing effect of the fixing device of the existing building construction lifter is not good enough, so that the progress and the safety of a project are influenced, the fixing device of most building construction lifters is not convenient to disassemble and assemble, and rainwater on the connecting plate cannot be discharged.
SUMMERY OF THE UTILITY MODEL
The problem to prior art exists, the utility model provides a building lift fixing device, unable adjustment base through setting up, the fixed pin, and fixed connection groove can be better fix the lift mount in fixed connection groove, then leak the hole through the first hole that leaks that sets up and the second can be better with rainwater discharge, thereby prevent that the rainwater from taking place the gathering in fixed connection groove and mounting groove, then can be better through the fixed pin that sets up and round pin head make the fixed pin insert in soil, thereby make its more fixed.
The utility model discloses a realize like this, the on-line screen storage device comprises a fixed base, unable adjustment base's lower extreme fixedly connected with fixed pin, the lower extreme fixedly connected with round pin head of fixed pin, the mounting groove has been seted up to unable adjustment base's upper end intermediate position, the first hole that leaks has been seted up to the lower extreme of mounting groove, the inside joint of mounting groove has the fixed connection groove, the second hole that leaks has been seted up to the bottom of fixed connection groove, the elevator mount has been cup jointed in the fixed connection groove, first recess has been seted up to the inboard of elevator mount, the outside both sides fixedly connected with protecting crust of fixed connection groove, the inside fixedly connected with nut of protecting crust, first fixed screw has been cup jointed in the first recess, nut threaded connection in first fixed screw runs through elevator mount and fixed connection groove and the protecting crust.
As the utility model discloses it is preferred, first connecting groove has been seted up to unable adjustment base's upper end four corners department, the bracing piece has been cup jointed in the first connecting groove, the upper end fixedly connected with fixed plate of bracing piece, the lower extreme of bracing piece runs through the inside that first connecting groove extends to the fixed pin, the lower extreme both sides fixedly connected with horizontal pole of bracing piece.
As the utility model discloses it is preferred, the barb mouth has been seted up to the left and right sides of fixed pin, the inner wall fixedly connected with connecting block of the below fixed pin of barb mouth, swing joint has the connection pivot in the connecting block, it has cup jointed the barb to connect the pivot, the barb mouth evenly is provided with a plurality ofly in the left and right sides of fixed pin.
As the utility model discloses it is preferred, the inside bottom fixedly connected with stopper of fixed pin.
As the utility model discloses it is preferred, the first fixed block of unable adjustment base's up end fixedly connected with, the outside upper end fixedly connected with second fixed block of fixed connection groove, fixedly connected with anchor strut between first fixed block and the second fixed block.
As the utility model discloses it is preferred, the second spread groove has been seted up at both ends about the fixed plate, fixed connection hole has been seted up to the both sides in the first spread groove in unable adjustment base's upper end, second fixed screw has been cup jointed to fixed connection hole and second spread groove.
Compared with the prior art, the beneficial effects of the utility model are as follows:
1. the utility model discloses a first connecting groove, bracing piece, fixed plate and the horizontal pole that sets up, can be better fix unable adjustment base, move down through the bracing piece to make the horizontal pole ejecting with the barb at fixed pin both ends, thereby make the contact of fixed pin and soil firm more, thereby make unable adjustment base stability more.
2. The utility model discloses a barb mouth, connecting block, connection pivot and barb that set up can make things convenient for the barb to roll out in the pivoted in-process barb mouth to make during the barb extrudes into soil, better fix unable adjustment base.
3. The utility model discloses a stopper that sets up, the distance that moves down of restriction bracing piece that can be better to the home range of better restriction bracing piece.
4. The utility model discloses a first fixed block, second fixed block and the anchor strut that sets up, what can be better connects fixed connection groove and unable adjustment base, makes being connected more firm between its unable adjustment base and the fixed connection groove, makes the more stability of lift mount moreover.
5. The utility model discloses a second spread groove, fixed connection hole and the second fixed screw that set up, can be better fix the fixed plate to make fixed plate and unable adjustment base be connected more firmly.
Drawings
Fig. 1 is a schematic structural diagram provided in an embodiment of the present invention;
fig. 2 is an enlarged view of a point a in fig. 1 according to an embodiment of the present invention;
fig. 3 is an enlarged view of fig. 1 at B according to an embodiment of the present invention;
fig. 4 is an enlarged view of a point C in fig. 1 according to an embodiment of the present invention.
In the figure: 1. a fixed base; 2. a fixing pin; 3. a pin head; 4. mounting grooves; 5. a first water leakage hole; 6. fixing and connecting grooves; 7. a second water leakage hole; 8. a first connecting groove; 9. a support bar; 10. a first fixed block; 11. a reinforcing rod; 12. a second fixed block; 13. a lifter mount; 14. a fixing plate; 15. a limiting block; 16. a barb port; 17. connecting blocks; 18. connecting the rotating shaft; 19. a barb; 20. a cross bar; 21. a protective shell; 22. a nut; 23. a first groove; 24. a first fixing screw; 25. fixing the connecting hole; 26. a second connecting groove; 27. and a second fixing screw.
Detailed Description
In order to further understand the contents, features and effects of the present invention, the following embodiments are illustrated and described in detail with reference to the accompanying drawings.
The structure of the present invention will be described in detail with reference to the accompanying drawings.
As shown in fig. 1 to 4, the embodiment of the utility model provides a pair of building elevator fixing device, including unable adjustment base 1, unable adjustment base 1's lower extreme fixedly connected with fixed pin 2, fixed pin 2's lower extreme fixedly connected with round pin head 3, unable adjustment base 1's upper end intermediate position has seted up mounting groove 4, first hole 5 that leaks has been seted up to mounting groove 4's lower extreme, mounting groove 4's inside joint has fixed connection groove 6, second hole 7 that leaks has been seted up to fixed connection groove 6's bottom, the cover has connect lift mount 13 in the fixed connection groove 6, first recess 23 has been seted up to lift mount 13's inboard, fixed connection 6's outside both sides fixedly connected with protecting crust 21, the inside fixedly connected with nut 22 of protecting crust 21, first fixed screw 24 has been cup connected in the first recess 23, first fixed screw 24 runs through the nut 22 threaded connection in lift mount 13 and fixed connection groove 6 and the protecting crust 21.
Referring to fig. 1 and 2, a first connecting groove 8 is formed at four corners of the upper end of the fixing base 1, a supporting rod 9 is sleeved in the first connecting groove 8, a fixing plate 14 is fixedly connected to the upper end of the supporting rod 9, the lower end of the supporting rod 9 penetrates through the first connecting groove 8 and extends to the inside of the fixing pin 2, and a cross rod 20 is fixedly connected to two sides of the lower end of the supporting rod 9.
Adopt above-mentioned scheme: through the first connecting groove 8, bracing piece 9, fixed plate 14 and the horizontal pole 20 that set up, can be better fix unable adjustment base 1, move down through bracing piece 9 to make horizontal pole 20 ejecting with the barb 19 at fixed pin 2 both ends, thereby make fixed pin 2 more firm with the contact of soil, thereby make unable adjustment base 1 more stable.
Referring to fig. 1 and 2, barb mouth 16 has been seted up to the left and right sides of fixed pin 2, and the inner wall fixedly connected with connecting block 17 of the below fixed pin 2 of barb mouth 16, swing joint has the connection pivot 18 in the connecting block 17, connects pivot 18 and has cup jointed barb 19, and barb mouth 16 evenly is provided with a plurality ofly in the left and right sides of fixed pin 2.
Adopt above-mentioned scheme: through barb mouth 16, the connecting block 17 that sets up, connect pivot 18 and barb 19, thereby can make things convenient for barb 19 to roll out in pivoted in-process barb mouth 16 to make during barb 19 extrudes into soil, better fix unable adjustment base 1.
Referring to fig. 1 and 2, a limiting block 15 is fixedly connected to the inner bottom end of the fixing pin 2.
Adopt above-mentioned scheme: the limiting block 15 can better limit the downward moving distance of the supporting rod 9, so that the moving range of the supporting rod 9 can be better limited.
Referring to fig. 1, a first fixing block 10 is fixedly connected to an upper end surface of a fixing base 1, a second fixing block 12 is fixedly connected to an outer upper end of a fixing connecting groove 6, and a reinforcing rod 11 is fixedly connected between the first fixing block 10 and the second fixing block 12.
Adopt above-mentioned scheme: through the first fixed block 10, the second fixed block 12 and the anchor strut 11 that set up, can be better connect fixed connection groove 6 and fixed base 1, make the firm more of being connected between its fixed base 1 and the fixed connection groove 6, make lift mount 13 more stable moreover.
Referring to fig. 1 and 4, the left and right ends of the fixing plate 14 are provided with second connecting grooves 26, the two sides of the first connecting groove 8 at the upper end of the fixing base 1 are provided with fixing connecting holes 25, and the fixing connecting holes 25 and the second connecting grooves 26 are sleeved with second fixing screws 27.
Adopt above-mentioned scheme: through the second connecting groove 26, the fixed connecting hole 25 and the second fixing screw 27, the fixing plate 14 can be better fixed, so that the fixing plate 14 is more firmly connected with the fixing base 1.
The utility model discloses a theory of operation:
when in use, the fixing pin 2 and the pin head 3 at the bottom end of the fixing base 1 are firstly inserted into soil, then the elevator fixing frame 13 is placed into the fixing connection groove 6, then the elevator fixing frame 13 is fixed with the fixing connection groove 6 through the first fixing screw 24, thereby being better connected with the fixing base 1, then the elevator fixing frame is rotated in the fixing connection hole 25 by rotating the second fixing screw 27, then the fixing plate 14 is connected with the fixing base 1, when the fixing plate 14 is pushed to descend by the second fixing screw 27, the support rod 9 moves downwards in the first connection groove 8 at the same time, meanwhile, the barb 19 is pushed through the cross rod 20 arranged on the support rod 9, thereby being rotated, thereby the barb 19 is rotated out from the barb opening 16, thereby inserting the barb 19 into soil, thereby making the fixing base 1 more stable, then the rainwater that falls into fixed connection groove 6 and mounting groove 4 when rainy weather appears is discharged through first hole 5 and the second hole 7 that leaks to better protection the device not receive the erosion of rainwater.
In summary, the following steps: the fixing device of the building elevator solves the problem that the fixing effect of the fixing device of the existing building construction elevator is not good enough through the matching use of the fixing base 1, the fixing pin 2, the pin head 3, the mounting groove 4, the first water leakage hole 5, the fixing connecting groove 6, the second water leakage hole 7, the first connecting groove 8, the supporting rod 9, the first fixing block 10, the reinforcing rod 11, the second fixing block 12, the elevator fixing frame 13, the fixing plate 14, the limiting block 15, the barb opening 16, the connecting block 17, the connecting rotating shaft 18, the barb 19, the cross rod 20, the protective shell 21, the nut 22, the first groove 23, the first fixing screw 24, the fixing connecting hole 25, the second connecting groove 26 and the second fixing screw 27, thereby influenced the progress and the security of engineering, it is convenient inadequately to construct construction elevator fixing device dismouting moreover mostly, the unable exhaust problem of rainwater on the connecting plate.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a building elevator fixing device, includes unable adjustment base (1), its characterized in that: the lower end of the fixed base (1) is fixedly connected with a fixed pin (2), the lower end of the fixed pin (2) is fixedly connected with a pin head (3), the middle position of the upper end of the fixed base (1) is provided with a mounting groove (4), the lower end of the mounting groove (4) is provided with a first water leakage hole (5), the inner part of the mounting groove (4) is clamped with a fixed connecting groove (6), the bottom of the fixed connecting groove (6) is provided with a second water leakage hole (7), a lifter fixing frame (13) is sleeved in the fixed connecting groove (6), the inner side of the lifter fixing frame (13) is provided with a first groove (23), the two outer sides of the fixed connecting groove (6) are fixedly connected with a protective shell (21), the inner part of the protective shell (21) is fixedly connected with a nut (22), and the first groove (23) is sleeved with a first fixed screw, the first fixing screw (24) penetrates through the elevator fixing frame (13) and the fixed connecting groove (6) and is in threaded connection with the nut (22) in the protective shell (21).
2. A construction elevator fixing apparatus as defined in claim 1, wherein: first connecting groove (8) have been seted up to the upper end four corners department of unable adjustment base (1), the bracing piece (9) has been cup jointed in first connecting groove (8), the upper end fixedly connected with fixed plate (14) of bracing piece (9), the lower extreme of bracing piece (9) runs through the inside that first connecting groove (8) extended to fixed pin (2), the lower extreme both sides fixedly connected with horizontal pole (20) of bracing piece (9).
3. A construction elevator fixing apparatus as defined in claim 1, wherein: barb mouth (16) have been seted up to the left and right sides of fixed pin (2), inner wall fixedly connected with connecting block (17) of the below fixed pin (2) of barb mouth (16), swing joint has connection pivot (18) in connecting block (17), barb (19) have been cup jointed in connection pivot (18), barb mouth (16) evenly are provided with a plurality ofly in the left and right sides of fixed pin (2).
4. A construction elevator fixing apparatus as defined in claim 1, wherein: the inside bottom fixedly connected with stopper (15) of fixed pin (2).
5. A construction elevator fixing apparatus as defined in claim 1, wherein: the fixing device is characterized in that a first fixing block (10) is fixedly connected to the upper end face of the fixing base (1), a second fixing block (12) is fixedly connected to the upper end of the outer portion of the fixing connecting groove (6), and a reinforcing rod (11) is fixedly connected between the first fixing block (10) and the second fixing block (12).
6. A construction elevator fixing apparatus as defined in claim 2, wherein: second connecting grooves (26) are formed in the left end and the right end of the fixing plate (14), fixed connecting holes (25) are formed in two sides of the first connecting groove (8) in the upper end of the fixing base (1), and second fixing screws (27) are sleeved on the fixed connecting holes (25) and the second connecting grooves (26).
CN202021215229.4U 2020-06-28 2020-06-28 Building elevator fixing device Expired - Fee Related CN213014349U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021215229.4U CN213014349U (en) 2020-06-28 2020-06-28 Building elevator fixing device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021215229.4U CN213014349U (en) 2020-06-28 2020-06-28 Building elevator fixing device

Publications (1)

Publication Number Publication Date
CN213014349U true CN213014349U (en) 2021-04-20

Family

ID=75498369

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021215229.4U Expired - Fee Related CN213014349U (en) 2020-06-28 2020-06-28 Building elevator fixing device

Country Status (1)

Country Link
CN (1) CN213014349U (en)

Similar Documents

Publication Publication Date Title
CN207348252U (en) A kind of damping type building
CN213014349U (en) Building elevator fixing device
CN110749427A (en) General test device for testing structural performance of prefabricated staircase
CN210653836U (en) Mortar weighing device convenient to operation
CN108980570A (en) A kind of photography-assisting tool for digital building mapping
CN208039328U (en) A kind of architectural engineering static load of pile foundation detection device
CN211396541U (en) Earthquake-resistant reinforcing structure for building support
CN209413248U (en) A kind of support scaffolding for building
CN210289043U (en) Anti-toppling scaffold
CN208363551U (en) A kind of moveable construction frame
CN208563945U (en) Outer protective frame sets up tooling and outer protective frame system
CN204751818U (en) Novel solar energy elevator
CN207664656U (en) A kind of charging pile of intelligent charging
CN215519813U (en) Outer wall scaffold safety device
CN111236606A (en) Isolation system of overhanging scaffold
CN214402640U (en) Installation mechanism of steel frame for building
CN219589672U (en) Building engineering straightness detection device that hangs down
CN220351568U (en) Stabilizing mean for building tower machine
CN210465341U (en) Wall defect detection equipment for real estate assessment
CN116379302B (en) Mapping instrument positioning equipment and positioning method thereof
CN211666231U (en) Support is used in civil engineering construction
CN218480687U (en) Safety auxiliary tool
CN214061301U (en) Anti-overturning hanging basket device for bridge construction
CN220414191U (en) Foundation reinforcing device for building
CN209313364U (en) Distribution box fittable slackening device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210420

Termination date: 20210628

CF01 Termination of patent right due to non-payment of annual fee