CN212983550U - Road cementation of fissures device is used in town road construction - Google Patents

Road cementation of fissures device is used in town road construction Download PDF

Info

Publication number
CN212983550U
CN212983550U CN202021404884.4U CN202021404884U CN212983550U CN 212983550 U CN212983550 U CN 212983550U CN 202021404884 U CN202021404884 U CN 202021404884U CN 212983550 U CN212983550 U CN 212983550U
Authority
CN
China
Prior art keywords
connecting rod
road
puddler
workbin
loop bar
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021404884.4U
Other languages
Chinese (zh)
Inventor
苏瑞瑞
张婷婷
李芳�
吴学梅
丰涛
郑彩云
张成翠
王莎
任建强
宋卫星
刘志强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021404884.4U priority Critical patent/CN212983550U/en
Application granted granted Critical
Publication of CN212983550U publication Critical patent/CN212983550U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Repair (AREA)
  • Road Paving Structures (AREA)

Abstract

The utility model discloses a road cementation of fissures device is used in town road construction, including base, workbin and motor, the base upper end is equipped with the workbin, and workbin upper end left side is equipped with the feed inlet, and the workbin upper end is equipped with the support, and the support right-hand member is equipped with the motor, and the motor lower extreme is equipped with the puddler, and the puddler runs through the workbin upper end, and both ends all are equipped with a plurality of stirring rods about the puddler, the puddler right side is equipped with the connecting rod, and is equipped with the belt link gear between puddler and the connecting rod, workbin. The utility model discloses during the use, when the puddler rotated, also driven connecting rod, square pole, loop bar and brush rotation through the belt link gear that sets up, the brush was convenient for sweep away the dust in the road surface gap, then the fan blew off the dust in the road surface gap through connecting pipe and shower nozzle again, was convenient for clear away the dust in the gap to the quality of road surface crack pouring has been improved.

Description

Road cementation of fissures device is used in town road construction
Technical Field
The utility model relates to a municipal works technical field specifically is a road cementation of fissures device is used in town road construction.
Background
Municipal works refer to municipal infrastructure construction works. In China, municipal infrastructure refers to various buildings, structures, equipment and the like which are arranged in planning and construction ranges of urban areas and towns (villages) and provide paid or unpaid public products and services for residents based on government responsibilities and obligations. Various public infrastructure construction supporting in urban life all belong to municipal works category, for example common urban road, bridge, subway, underground pipeline, tunnel, river course, track traffic, sewage treatment, refuse treatment processing etc. engineering, for example again with the life closely relevant various pipelines: rainwater, sewage, water supply, reclaimed water, electric power (parts except red lines), telecommunication, heating power, gas and the like, and construction of squares, urban greening and the like belong to the municipal engineering category.
The road crack pouring work is used in current town road construction, comparatively wastes time and energy, and the road surface gap content easily accumulates the dust, influences the crack pouring quality. Therefore, the utility model provides a road cementation of fissures device is used in town road construction to solve the above-mentioned problem that proposes.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a road cementation of fissures device is used in town road construction to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme:
the utility model provides a road cementation of fissures device is used in town road construction, includes base, workbin and motor, the base upper end is equipped with the workbin, and workbin upper end left side is equipped with the feed inlet, and the workbin upper end is equipped with the support, and the support right-hand member is equipped with the motor, and the motor lower extreme is equipped with the puddler, and the puddler runs through the workbin upper end, and both ends all are equipped with a plurality of stirring rods about the puddler, the puddler right side is equipped with the connecting rod, and is equipped with belt link gear between puddler and the connecting rod, workbin lower extreme right side is equipped with the discharge gate, and the discharge gate lower extreme is equipped with the cementation of fissures mouth, is equipped with the valve on the discharge gate, the base right-hand member is equipped with the fixed plate, and the connecting.
As a further scheme of the utility model, be equipped with the backup pad on the loop bar, and loop bar and backup pad junction are equipped with the bearing, and the loop bar rotates joint support board.
As the utility model discloses further scheme again, the backup pad upper end left and right sides all is equipped with the slide bar, and the slide bar runs through the fixed plate.
As the utility model discloses scheme further again, all the cover is equipped with the spring on the slide bar, and both ends are fixed connection fixed plate and backup pad respectively about the spring.
As the utility model discloses further scheme again, the shower nozzle upper end is equipped with the connecting pipe, and the connecting pipe other end is connected with fan, fan lower extreme fixed connection fixed plate.
As a further proposal of the utility model, the upper end of the connecting rod is provided with an axle seat and an axle seat upper end fixed connection bracket.
Compared with the prior art, the beneficial effects of the utility model are that:
1. the utility model discloses during the use, the staff promotes the handle and removes this device to work area through the universal wheel, aims at the road surface gap with the cementation of fissures mouth, opens the valve and makes the cementation of fissures raw materials in the workbin flow from discharge gate and cementation of fissures mouth, carries out the cementation of fissures operation, easy operation, labour saving and time saving to the road surface gap.
2. The utility model discloses during the use, the motor drives puddler and stirring rod and rotates, is convenient for stir the required raw materials of cementation of fissures in the workbin, makes raw materials stirring.
3. The utility model discloses during the use, when the puddler rotated, also driven connecting rod, square pole, loop bar and brush rotation through the belt link gear that sets up, the brush was convenient for sweep away the dust in the road surface gap, then the fan blew off the dust in the road surface gap through connecting pipe and shower nozzle again, was convenient for clear away the dust in the gap to the quality of road surface crack pouring has been improved.
Drawings
FIG. 1 is a schematic structural diagram of a road crack sealing device for municipal road construction.
FIG. 2 is a schematic view of a structure at A position in a road joint grouting device for municipal road construction.
FIG. 3 is a schematic view of a three-dimensional structure of a connecting rod and a square rod in the road joint grouting device for municipal road construction.
In the figure: 1. a base; 2. a material box; 3. a feed inlet; 4. a support; 5. a motor; 6. a stirring rod; 7. a stirring rod; 8. a belt linkage mechanism; 9. a connecting rod; 10. a discharge port; 11. pouring a seam; 12. a valve; 13. a fixing plate; 14. a square rod; 15. a loop bar; 16. a brush; 17. a support plate; 18. a slide bar; 19. a spring; 20. a spray head; 21. a connecting pipe; 22. a fan; 23. a universal wheel.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-3, in the embodiment of the present invention, a road crack sealing device for municipal road construction comprises a base 1, a material box 2 and a motor 5, wherein the material box 2 is arranged at the upper end of the base 1, a feed inlet 3 is arranged at the left side of the upper end of the material box 2, a bracket 4 is arranged at the upper end of the material box 2, the motor 5 is arranged at the right end of the bracket 4, a stirring rod 6 is arranged at the lower end of the motor 5, the stirring rod 6 penetrates through the upper end of the material box 2, a plurality of stirring rods 7 are respectively arranged at the left and right ends of the stirring rod 6, an axle seat is arranged at the upper end of the connecting rod 9, the bracket 4 is fixedly connected at the upper end of the axle seat, a connecting rod 9 is arranged at the right side of the stirring rod 6, a belt linkage mechanism 8 is arranged between the stirring rod 6 and the connecting rod 9, a, the lower extreme of connecting rod 9 is equipped with square pole 14, and the cartridge of the 14 lower extremes of square pole has loop bar 15, and loop bar 15 lower extreme is equipped with brush 16, be equipped with backup pad 17 on the loop bar 15, and loop bar 15 and backup pad 17 junction are equipped with the bearing, and loop bar 15 rotates joint support board 17, the backup pad 17 upper end left and right sides all is equipped with slide bar 18, and slide bar 18 runs through fixed plate 13, all overlap on the slide bar 18 and be equipped with spring 19, spring 19 upper and lower both ends are fixed connection fixed plate 13 and backup pad 17 respectively, and brush 16 left side is equipped with shower nozzle 20, shower nozzle 20 upper end is equipped with connecting pipe 21, and the connecting pipe 21 other end is connected with fan 22, fan 22 lower extreme fixed connection fixed plate 13, base 1 lower extreme.
The utility model discloses a theory of operation is:
the utility model discloses during the use, the staff promotes the handle and passes through universal wheel 23 and remove this device to work area, aim at road surface gap with cementation of fissures mouth 11, open valve 12 and make the cementation of fissures raw materials in the workbin 2 flow from discharge gate 10 and cementation of fissures mouth 11, carry out the cementation of fissures operation to the road surface gap, moreover, the steam generator is simple in operation, time saving and labor saving, motor 5 drives puddler 6 and puddler 7 and rotates, be convenient for stir the required raw materials of cementation of fissures in the workbin 2, when puddler 6 rotates, also drive connecting rod 9 through the belt link gear 8 that sets up, square pole 14, loop bar 15 and brush 16 rotate, brush 16 is convenient for sweep the dust in the road surface gap, then fan 22 blows off the dust in the road surface gap again through connecting pipe 21 and shower nozzle 20, be convenient for clear away the dust in the gap, thereby the quality of road surface cementation of fissures has been improved, the loop bar 15 that sets up, The slide bar 18 and the spring 19 facilitate the brush 16 to be pressed against the ground.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The road crack pouring device for municipal road construction comprises a base (1), a material box (2) and a motor (5), and is characterized in that the material box (2) is arranged at the upper end of the base (1), a feed inlet (3) is formed in the left side of the upper end of the material box (2), a support (4) is arranged at the upper end of the material box (2), the motor (5) is arranged at the right end of the support (4), a stirring rod (6) is arranged at the lower end of the motor (5), the stirring rod (6) penetrates through the upper end of the material box (2), a plurality of stirring rods (7) are arranged at the left end and the right end of the stirring rod (6), a connecting rod (9) is arranged at the right side of the stirring rod (6), a belt linkage mechanism (8) is arranged between the stirring rod (6) and the connecting rod (9), a discharge outlet (10) is formed in the right side of the, base (1) right-hand member is equipped with fixed plate (13), and connecting rod (9) run through fixed plate (13), and connecting rod (9) lower extreme is equipped with square pole (14), and square pole (14) lower extreme cartridge has loop bar (15), and loop bar (15) lower extreme is equipped with brush (16), and brush (16) left side is equipped with shower nozzle (20), base (1) lower extreme four corners department all is equipped with universal wheel (23).
2. The road crack sealing device for the municipal road construction according to claim 1, wherein a support plate (17) is arranged on the loop bar (15), a bearing is arranged at the joint of the loop bar (15) and the support plate (17), and the loop bar (15) is rotatably connected with the support plate (17).
3. The road crack sealing device for the municipal road construction according to claim 2, wherein slide bars (18) are arranged on the left and right sides of the upper end of the support plate (17), and the slide bars (18) penetrate through the fixing plate (13).
4. The road crack sealing device for the municipal road construction according to claim 3, wherein the sliding rod (18) is sleeved with a spring (19), and the upper end and the lower end of the spring (19) are respectively fixedly connected with the fixing plate (13) and the supporting plate (17).
5. The road crack sealing device for the municipal road construction according to claim 1, wherein a connecting pipe (21) is arranged at the upper end of the spray head (20), a fan (22) is connected to the other end of the connecting pipe (21), and the lower end of the fan (22) is fixedly connected with the fixing plate (13).
6. The road crack sealing device for the municipal road construction according to claim 1, wherein an axle seat is arranged at the upper end of the connecting rod (9), and a bracket (4) is fixedly connected to the upper end of the axle seat.
CN202021404884.4U 2020-07-16 2020-07-16 Road cementation of fissures device is used in town road construction Expired - Fee Related CN212983550U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021404884.4U CN212983550U (en) 2020-07-16 2020-07-16 Road cementation of fissures device is used in town road construction

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021404884.4U CN212983550U (en) 2020-07-16 2020-07-16 Road cementation of fissures device is used in town road construction

Publications (1)

Publication Number Publication Date
CN212983550U true CN212983550U (en) 2021-04-16

Family

ID=75427860

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021404884.4U Expired - Fee Related CN212983550U (en) 2020-07-16 2020-07-16 Road cementation of fissures device is used in town road construction

Country Status (1)

Country Link
CN (1) CN212983550U (en)

Similar Documents

Publication Publication Date Title
CN108625260B (en) Municipal construction is with concrete terrace device that levels
CN111254790A (en) Highway road surface crack repair equipment
CN212983550U (en) Road cementation of fissures device is used in town road construction
CN207498791U (en) A kind of road surface repairing device
CN212742137U (en) Road cementation of fissures device for municipal works
CN210341592U (en) Highway subgrade maintenance road surface cementation of fissures device
CN212026569U (en) Dredging device for municipal underground pipeline
CN214459486U (en) Municipal administration road surface patching device
CN214401303U (en) Bituminous paving construction equipment
CN213761459U (en) Civil engineering is with agitating unit convenient to wash
CN214337344U (en) Line support device for municipal works
CN213571471U (en) Road embedment device for municipal works
CN214143489U (en) Highway is concrete repair device for bridge maintenance
CN210726281U (en) Green spraying tool that plants for town road
CN207091895U (en) A kind of highway pavement breaker
CN215518558U (en) Dredging equipment is used in municipal administration
CN214831799U (en) Hand propelled road cementation of fissures equipment that municipal works construction was used
CN212417767U (en) Mixing arrangement for municipal construction
CN218308625U (en) Water sprinkling equipment
CN215353157U (en) Civil engineering material mixing stirring device
CN221000687U (en) Multi-angle warning device for municipal construction
CN218147702U (en) Road cementation of fissures device for municipal works
CN218263666U (en) Base plane cleaning device is laid to waterproofing membrane
CN214138632U (en) Municipal works construction sweeps collection device
CN212505789U (en) Road prosthetic devices for municipal works

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210416