CN212982120U - Water conservancy construction pipe laying pay-off - Google Patents

Water conservancy construction pipe laying pay-off Download PDF

Info

Publication number
CN212982120U
CN212982120U CN202021878516.3U CN202021878516U CN212982120U CN 212982120 U CN212982120 U CN 212982120U CN 202021878516 U CN202021878516 U CN 202021878516U CN 212982120 U CN212982120 U CN 212982120U
Authority
CN
China
Prior art keywords
water conservancy
pipe laying
conservancy construction
motor
construction pipe
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021878516.3U
Other languages
Chinese (zh)
Inventor
宫立强
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021878516.3U priority Critical patent/CN212982120U/en
Application granted granted Critical
Publication of CN212982120U publication Critical patent/CN212982120U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Sewage (AREA)

Abstract

The utility model discloses a water conservancy construction pipe laying pay-off, which comprises an outer shell, the standing groove has been seted up to one side on shell surface, the inside of standing groove is provided with the line book, the box is placed to the opposite side fixedly connected with motor of standing groove, the inside that the box was placed to the motor is provided with driving motor, driving motor's output rotates the connecting line through the pivot and rolls up the mount, the skin weld that the box was placed to the motor has the rotating turret, the fixed surface of rotating turret is connected with the mount, the inside of mount is provided with rotatable rack, the inside fixedly connected with light of rack, one side welding of shell has the fixed station, the skin weld of fixed station has. This water conservancy construction pipe laying pay-off sets up the baffle through the line book both sides, prevents that the line when more, and the line can drop from the reel, adjusts the height of line through the telescopic link, prevents that the line from hanging and breaks off on the stone, controls wire speed through driving motor, has improved this water conservancy construction pipe laying pay-off's stability.

Description

Water conservancy construction pipe laying pay-off
Technical Field
The utility model relates to a hydraulic engineering technical field specifically is a water conservancy construction pipe laying pay-off.
Background
Hydraulic engineering is an engineering built for controlling and allocating surface water and underground water in the nature to achieve the purposes of removing harm and benefiting, and is also called water engineering; water is a valuable resource essential for human production and life, but the naturally existing state of water does not completely meet the needs of human beings; only when water conservancy projects are built, water flow can be controlled, flood disasters are prevented, and water quantity is adjusted and distributed to meet the requirements of people on water resources in life and production; hydraulic engineering needs to build different types of hydraulic buildings such as dams, dikes, spillways, water gates, water inlets, channels, transition troughs, rafts, fishways and the like so as to achieve the aims.
In recent years, the scale of hydraulic engineering construction in China is continuously enlarged, and in the hydraulic construction process, the buried pipe is often required to be laid in a pipeline, the existing buried pipe pay-off device for hydraulic engineering is used for winding and reeling a wire, the wound wire is concentrated at one position, when the wound wire is more, the wire can fall off from a reel, the wire is knotted and wound, the buried pipe pay-off in the construction process is influenced, due to the fact that the construction site is uneven, the released wire is extremely easy to hang on a stone to be disconnected, meanwhile, when the pipeline runs out, the pipeline cannot be quickly replaced, the construction is slowed down, and therefore a device which is stable in pay-off speed and convenient for disassembling the pipeline needs to be designed.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a water conservancy construction pipe laying pay-off has solved the problem that proposes in the above-mentioned background art.
(II) technical scheme
In order to achieve the above purpose, the utility model discloses a following technical scheme realizes: the utility model provides a water conservancy construction pipe laying pay-off, includes the shell, the standing groove has been seted up to one side on shell surface, the inside of standing groove is provided with the coil of wire, the box is placed to the opposite side fixedly connected with motor of standing groove, the inside that the box was placed to the motor is provided with driving motor, driving motor's output rotates the connecting wire through the pivot and rolls up the mount, the surperficial welding that the box was placed to the motor has the rotating turret, the fixed surface of rotating turret is connected with the mount, the inside of mount is provided with rotatable rack, the inside fixedly connected with light of rack, the welding of one side of shell has the fixed station, the skin weld of fixed station has the telescopic link, the fixed surface of telescopic link is.
Optionally, a placing hole is formed in one side of the housing.
Optionally, a motor support frame is fixedly mounted inside the motor placing box.
Optionally, a screw hole is formed in one side of the surface of the supporting rod of the telescopic rod, and a thread is formed in one side of the surface of the supporting rod.
Optionally, the size of the slot of the coil is matched with that of the coil fixing frame.
Optionally, the bottom welding of shell has the universal wheel, the quantity of universal wheel is four, four the universal wheel is the bottom of rectangle array form welding at the shell.
(III) advantageous effects
The utility model provides a water conservancy construction pipe laying pay-off possesses following beneficial effect:
1. this water conservancy construction pipe laying pay-off sets up the baffle through the line book both sides, prevents that the line when more, and the line can drop from the reel, adjusts the height of line through the telescopic link, prevents that the line from hanging and breaks off on the stone, controls wire speed through driving motor, has improved this water conservancy construction pipe laying pay-off's stability.
2. This water conservancy construction pipe laying pay-off through the setting of light, has played the effect of the illumination of being convenient for, and the reserve reel that sets up prevents that the reel from using up, through the draw-in groove of reel and the cooperation of reel mount, can be quick change reserve reel, it is more convenient to use.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic structural view of the driving motor of the present invention;
fig. 3 is a schematic structural view of the rotating frame of the present invention.
In the figure: 1. a housing; 2. a placement groove; 3. coiling the wire; 4. a motor placing box; 5. a drive motor; 6. a coil holder; 7. a rotating frame; 8. a fixed mount; 9. placing a rack; 10. an illuminating lamp; 11. a fixed table; 12. a telescopic rod; 13. a fixing hole; 14. placing holes; 15. a motor support frame; 16. a universal wheel.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments.
Referring to fig. 1 to 3, the present invention provides a technical solution: a water conservancy construction pipe laying and paying-off device comprises a shell 1, wherein one side of the surface of the shell 1 is provided with a placing groove 2 for placing a wire coil 3, the inside of the placing groove 2 is provided with the wire coil 3, the wire coil 3 is used for winding a wire, the other side of the placing groove 2 is fixedly connected with a motor placing box 4 for placing a driving motor 5, the inside of the motor placing box 4 is provided with the driving motor 5 for providing power for a wire coil fixing frame 6, the output end of the driving motor 5 is rotatably connected with the wire coil fixing frame 6 through a rotating shaft and is used for installing the wire coil 3, a rotating frame 7 is welded on the surface of the motor placing box 4, the surface of the rotating frame 7 is fixedly connected with a fixing frame 8, the inside of the fixing frame 8 is provided with a rotatable placing frame 9, the inside of the placing frame 9 is fixedly connected with an illuminating lamp 10, the illuminating lamp 10 can be rotated up and down, the surface of the fixed platform 11 is welded with a telescopic rod 12, the height of the fixed hole 13 can be adjusted through the telescopic rod 12, and the surface of the telescopic rod 12 is fixedly connected with the fixed hole 13;
place hole 14 has been seted up to one side of shell 1, the line passes through placing hole 14, the inside fixed mounting that box 4 was placed to the motor has motor support frame 15, a be used for fixed driving motor 5, prevent the shake, the screw is seted up to branch surface one side of telescopic link, screw thread has been seted up to bracing piece surface one side, fix through the bolt, draw-in groove and the size phase-match of line book mount 6 of line book 3, make things convenient for line book 3 to carry out the joint, the bottom welding of shell 1 has universal wheel 16, the quantity of universal wheel 16 is four, four universal wheels 16 are the form welding of rectangular array in the bottom of shell 1, make things convenient for the device to remove.
To sum up, this water conservancy construction pipe laying pay-off uses the step as follows:
the device is moved to a required position through a universal wheel 16, the telescopic rod 12 is adjusted to a proper height according to the field condition, the wire coil 3 is driven to rotate through the driving motor 5, and the wire passes through the placing hole 14 and then passes through the fixing hole 13 for use;
when the line on the coil of wire 3 runs out, through taking away coil of wire 3 in the standing groove 2, change, when unclear, through opening light 10, through the position of having adjusted of rotating turret 7 and rack 9, begin to use.
The above, only be the concrete implementation of the preferred embodiment of the present invention, but the protection scope of the present invention is not limited thereto, and any person skilled in the art is in the technical scope of the present invention, according to the technical solution of the present invention and the utility model, the concept of which is equivalent to replace or change, should be covered within the protection scope of the present invention.

Claims (6)

1. The utility model provides a water conservancy construction pipe laying pay-off, includes shell (1), its characterized in that: a placing groove (2) is formed in one side of the surface of the shell (1), a coil (3) is arranged in the placing groove (2), a motor placing box (4) is fixedly connected to the other side of the placing groove (2), a driving motor (5) is arranged in the motor placing box (4), the output end of the driving motor (5) is rotatably connected with a coil fixing frame (6) through a rotating shaft, a rotating frame (7) is welded on the surface of the motor placing box (4), a fixing frame (8) is fixedly connected to the surface of the rotating frame (7), a rotatable placing frame (9) is arranged in the fixing frame (8), an illuminating lamp (10) is fixedly connected in the placing frame (9), a fixing table (11) is welded on one side of the shell (1), and a telescopic rod (12) is welded on the surface of the fixing table (11), the surface of the telescopic rod (12) is fixedly connected with a fixing hole (13).
2. The water conservancy construction pipe laying and paying-off device according to claim 1, characterized in that: a placing hole (14) is formed in one side of the shell (1).
3. The water conservancy construction pipe laying and paying-off device according to claim 1, characterized in that: and a motor support frame (15) is fixedly arranged in the motor placing box (4).
4. The water conservancy construction pipe laying and paying-off device according to claim 1, characterized in that: screw holes are formed in one side of the surface of the supporting rod of the telescopic rod (12), and threads are formed in one side of the surface of the supporting rod.
5. The water conservancy construction pipe laying and paying-off device according to claim 1, characterized in that: the clamping groove of the wire coil (3) is matched with the size of the wire coil fixing frame (6).
6. The water conservancy construction pipe laying and paying-off device according to claim 1, characterized in that: the bottom welding of shell (1) has universal wheel (16), the quantity of universal wheel (16) is four, four the universal wheel (16) are the bottom of rectangle array's form welding in shell (1).
CN202021878516.3U 2020-09-01 2020-09-01 Water conservancy construction pipe laying pay-off Expired - Fee Related CN212982120U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021878516.3U CN212982120U (en) 2020-09-01 2020-09-01 Water conservancy construction pipe laying pay-off

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021878516.3U CN212982120U (en) 2020-09-01 2020-09-01 Water conservancy construction pipe laying pay-off

Publications (1)

Publication Number Publication Date
CN212982120U true CN212982120U (en) 2021-04-16

Family

ID=75435968

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021878516.3U Expired - Fee Related CN212982120U (en) 2020-09-01 2020-09-01 Water conservancy construction pipe laying pay-off

Country Status (1)

Country Link
CN (1) CN212982120U (en)

Similar Documents

Publication Publication Date Title
CN212982120U (en) Water conservancy construction pipe laying pay-off
CN109160366A (en) A kind of electric transmission line erection take-up and pay-off device
CN109205404A (en) A kind of open air construction of line retractable cable equipment
CN213270239U (en) Hydraulic engineering construction drainage device
CN217038233U (en) Tree hoisting tool
CN212869556U (en) But wisdom lamp pole of automatically regulated rotation direction
CN208916469U (en) A kind of electric transmission line erection take-up and pay-off device
CN214192711U (en) Aeration device for biochemical sewage treatment tank
CN213802638U (en) A hoist device for utility tunnel
CN212459002U (en) Sampling device that municipal administration sewage treatment used
CN212091321U (en) Environmental protection dust collecting equipment of building engineering construction
CN204569248U (en) Automatic help tripod
CN209171213U (en) A kind of fixation bracket and aerator for crawl aerator
CN208603613U (en) Mast type hoisting device for electromechanical equipment of super high-rise building
CN213445888U (en) Pipe burying device for garden pipeline construction
CN207015389U (en) A kind of water conservancy construction handling device
CN215215047U (en) Hoisting equipment for integral installation and laying construction of river-crossing pipeline
CN214828102U (en) Hydraulic and hydroelectric engineering is with device of sunkening cord
CN213207540U (en) Underground adjustable lighting lamp holder
CN218169126U (en) Feeding device of laser cutting machine for production of stirring tank
CN215562741U (en) Underwater pin removing device for caisson installation
CN107809620A (en) Applied to underwater monitoring structure used for aquiculture between multigroup adjacent net cage
CN221348201U (en) Municipal administration water supply and drainage construction pipeline docking equipment
CN217296543U (en) Water hose collator
CN218465242U (en) Movable cable winding and unwinding frame

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210416