CN212926955U - Movable operation frame for constructional engineering - Google Patents

Movable operation frame for constructional engineering Download PDF

Info

Publication number
CN212926955U
CN212926955U CN202021581219.2U CN202021581219U CN212926955U CN 212926955 U CN212926955 U CN 212926955U CN 202021581219 U CN202021581219 U CN 202021581219U CN 212926955 U CN212926955 U CN 212926955U
Authority
CN
China
Prior art keywords
wall
screw
rod
groups
movable base
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021581219.2U
Other languages
Chinese (zh)
Inventor
李伟
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021581219.2U priority Critical patent/CN212926955U/en
Application granted granted Critical
Publication of CN212926955U publication Critical patent/CN212926955U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model discloses a mobile operation frame for building engineering in the technical field of building engineering, which comprises a mobile base, wherein the left side and the right side of the top of the mobile base are both provided with a sleeve, a telescopic rod is movably inserted at the top of the sleeve, a slide block is arranged in a slide groove in a sliding way, a thread sleeve of the slide block is arranged on the outer wall of an adjusting screw rod, when the operation frame is needed, a rotatable screw enables a propping block to be close to the ground under the limit of a limiting rod, the propping block tightly props against the ground to fix the mobile base, the safety of the operation frame can be improved, when the height of an operation plate is adjusted, the adjusting screw rod can be rotated only by pulling out the positioning rod, the adjusting screw rod is a bidirectional screw rod, the two groups of slide blocks of the outer wall can be mutually close to each other and far away from driving an inclined strut to lift, the ejector rod and, the telescopic rod and the ejector rod are fixed, misoperation of the operating board is avoided, and use safety of the operating frame is improved.

Description

Movable operation frame for constructional engineering
Technical Field
The utility model relates to a building engineering technical field specifically is a remove handling frame for building engineering.
Background
With the development of the building industry, in the construction process of building and plastering an on-site enclosing wall, considering that the building of a steel pipe scaffold wastes time and labor, and the input of large manpower and material resources and other adverse factors, a mobile operation frame which is simple and easy to use and convenient to use is needed to be provided.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a remove handling frame for building engineering to solve the problem that proposes among the above-mentioned background art.
In order to achieve the above object, the utility model provides a following technical scheme: a movable operation frame for building engineering comprises a movable base, wherein the movable base is provided with left and right side cavities, two groups of cavities are provided with adjusting screw rods through bearings on the inner wall of one side opposite to each other, one ends of the adjusting screw rods are extended to the outer side of the movable base to be provided with rocking handles, the movable base is connected with the adjusting screw rods through bearings, two groups of main pipes are arranged on the middle part of the outer wall of the top of the movable base at equal intervals in the front and back directions, ejector rods are movably inserted in the tops of the main pipes, top plates are welded on the tops of the two groups of ejector rods, an operation plate is arranged on the top of each top plate, sleeves are arranged on the left and right sides of the top of the movable base, two groups of telescopic rods are arranged on the front and back of each sleeve, telescopic rods are movably inserted, the slider threaded sleeve is established at adjusting screw outer wall, telescopic link outer wall cover is equipped with solid fixed ring, gu fixed ring all articulates there is the diagonal brace about the both sides, the diagonal brace bottom articulates at the slider top, the terminal surface slides before being responsible for and inserts and is equipped with the locating lever, the terminal surface is equipped with the high locating hole with locating lever matched with before the ejector pin.
Further, the fixed ring comprises an upper arc plate and a lower arc plate, the two ends of the outer wall on one side, opposite to the upper arc plate, of the upper arc plate are provided with flanges, the top of each flange is provided with a screw hole which is communicated with the upper portion and the lower portion, the two sets of screw holes are internally threaded and sleeved with fixing bolts, the two sets of screw holes are vertically arranged, the middle portion of the outer wall on one side, opposite to the upper arc plate, of the lower arc plate is provided with threaded holes, the threaded holes are internally.
Furthermore, the front and rear sets of sleeves are welded on one side, away from the main pipe, of the sleeves, and grooves matched with the inclined support rods are formed in the outer walls of the two sets of pedals on the opposite sides.
Further, two sets of fixed blocks around the outer wall of the left and right sides of the movable base is equipped with, screw that link up from top to bottom is seted up to fixed block top outer wall, and the screw thread cover is equipped with the screw, the piece that supports is installed through the bearing to the screw bottom, the fixed block is equipped with the gag lever post with the outside activity of screwed connection department is inserted, gag lever post bottom with support tight piece top fixed connection, it is equipped with anti-skidding line to support tight piece bottom outer wall.
Furthermore, rib plates are welded on the left side and the right side of the outer wall of the bottom of the top plate, the bottoms of the rib plates are welded with the outer wall of the ejector rod, positioning pins are movably inserted into the tops of the front end faces of the sleeves, and height adjusting holes matched with the positioning pins are formed in the front end faces of the telescopic rods.
Compared with the prior art, the beneficial effects of the utility model are that: when needs are used, the rotatable screw makes the piece of supporting be close to ground under the spacing of gag lever post, it can be fixed with the removal base to support tight piece to support tight ground, can improve the security of using the handling frame, when carrying out height control to the operation panel, only need extract the locating lever, can rotate adjusting screw, adjusting screw is two-way lead screw, rotatory two sets of sliders that make the outer wall are close to each other and keep away from and drive the diagonal brace lift, make ejector pin and operation panel lift and carry out height control, after accomplishing the adjustment, insert locating lever and locating pin, it is fixed with telescopic link and ejector pin, avoid the operation panel maloperation, improve the security that the handling frame used.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic view of the fixing ring structure of the present invention.
In the figure: 1. moving the base; 2. a cavity; 3. a chute; 4. a slider; 5. adjusting the screw rod; 6. a sleeve; 7. a telescopic rod; 8. an operation panel; 9. positioning pins; 10. a fixing ring; 101. an arc-shaped plate; 102. fixing the bolt; 103. aligning columns; 104. positioning holes; 11. a diagonal brace; 12. a foot pedal; 13. a main pipe; 14. a top rod; 15. a top plate; 16. a rib plate; 17. positioning a rod; 18. a height positioning hole; 19. a fixed block; 20. a screw; 21. a propping block; 22. a limiting rod.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The utility model provides a technical scheme: a movable operation frame for building engineering, please refer to fig. 1, which includes a movable base 1, the movable base 1 is provided with left and right side cavities 2, two sets of cavities 2 are provided with adjusting screws 5 through bearings at inner walls of opposite sides, opposite ends of the two sets of adjusting screws 5 extend to the outer side of the movable base 1 and are provided with rocking handles, the movable base 1 is connected with the adjusting screws 5 through bearings, two sets of main pipes 13 are arranged at the front and back of the middle part of the outer wall of the top of the movable base 1 at equal intervals, ejector rods 14 are movably inserted at the tops of the main pipes 13, top plates 15 are welded at the tops of the two sets of ejector rods 14, ribbed plates 16 are welded at the left and right sides of the outer wall of the bottom of the ejector rods 15, the ribbed plates 16 can reinforce the top plates 15, so as to improve the connection strength and the bearing performance of an operation panel 8, positioning;
referring to fig. 1, the left and right sides of the top of the movable base 1 are provided with sleeves 6, two sets of sleeves 6 are arranged in front and back, telescopic rods 7 are movably inserted into the tops of the sleeves 6, the telescopic rods 7 are welded at the bottom of an operating plate 8, sliding grooves 3 are arranged at the left and right sides of the joint of the outer wall of the top of the movable base 1 and the sleeves 6, sliding blocks 4 are slidably arranged in the sliding grooves 3, the sliding blocks 4 are threadedly sleeved on the outer wall of an adjusting screw 5, a fixing ring 10 is sleeved on the outer wall of the telescopic rods 7, inclined support rods 11 are hinged at the left and right sides of the fixing ring 10, the bottoms of the inclined support rods 11 are hinged at the tops of the sliding blocks 4, a positioning rod 17 is slidably inserted in the front end face of a main pipe 13, when the height of the operating plate 8 is adjusted, the adjusting screw 5 can, the ejector rod 14 and the operation plate 8 are lifted to adjust the height, after the adjustment is finished, the positioning rod 17 and the positioning pin 9 are inserted, the telescopic rod 7 and the ejector rod 14 are fixed, the misoperation of the operation plate 8 is avoided, the use safety of the operation frame is improved, and the front end face is provided with a height positioning hole 18 matched with the positioning rod 17;
referring to fig. 2, the fixing ring 10 includes upper and lower two sets of arc plates 101 adapted to the shape of the telescopic rod 7, the two ends of the outer wall of the upper and lower two sets of arc plates 101 opposite to each other are provided with flanges, the top of the flange is provided with vertically through screw holes, the upper and lower two sets of screw holes are internally threaded with fixing bolts 102, the middle parts of the outer walls of the upper and lower two sets of arc plates 101 opposite to each other are provided with threaded holes, the threaded holes are internally threaded with alignment posts 103, the outer wall of the telescopic rod 7 is provided with positioning holes 104 matched with the alignment posts 103, so that alignment installation is facilitated, the firmness of connection between the fixing ring;
referring to fig. 1, foot pedals 12 are welded on the sides of the front and rear sets of sleeves 6 away from the main pipe 13, grooves matched with the inclined stay bars 11 are formed in the outer walls of the two sets of foot pedals 12 on the opposite sides, and an operator can climb to the top of the operating plate 8 through the foot pedals 12 as long as the operation of limiting the ascending and descending of the inclined stay bars 11 is achieved;
referring to fig. 1, the outer walls of the left side and the right side of the movable base 1 are provided with a front fixing block and a rear fixing block 19, the outer wall of the top of each fixing block 19 is provided with a screw hole which is through up and down, a screw 20 is sleeved in the screw hole, a propping block 21 is installed at the bottom of the screw 20 through a bearing, a limiting rod 22 is movably inserted at the outer side of the joint of the fixing block 19 and the screw 20, the bottom of the limiting rod 22 is fixedly connected with the top of the propping block 21, and anti-skid grains are arranged on the outer wall of the bottom of the propping block 21.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (5)

1. A remove handling frame for building engineering, including removing base (1), its characterized in that: the movable base (1) is provided with cavities (2) on the left side and the right side, two groups of cavities (2) are respectively provided with an adjusting screw (5) through a bearing on the inner wall on one side opposite to each other, two groups of adjusting screws (5) are respectively provided with an adjusting screw at one end opposite to each other and extend to the outer side of the movable base (1) to be provided with a rocking handle, the movable base (1) is connected with the adjusting screws (5) through the bearing, two groups of main pipes (13) are arranged on the outer wall of the top of the movable base (1) in the front-back direction at equal intervals, ejector rods (14) are movably inserted in the tops of the main pipes (13), a top plate (15) is welded on the tops of the two groups of ejector rods (14), an operating plate (8) is arranged on the top of the top plate (15), sleeves (6), the telescopic link (7) is welded in the bottom of the operating plate (8), the left side and the right side of the joint of the outer wall of the top of the movable base (1) and the sleeve (6) are respectively provided with a sliding groove (3), the sliding groove (3) is internally provided with a sliding block (4), the sliding block (4) is sleeved on the outer wall of the adjusting screw rod (5) in a threaded manner, the outer wall of the telescopic link (7) is sleeved with a fixing ring (10), the left side and the right side of the fixing ring (10) are respectively hinged with an inclined stay bar (11), the bottom of the inclined stay bar (11) is hinged to the top of the sliding block (4), the front end face of the main pipe (13) is slidably inserted with a positioning rod (17).
2. A mobile handling frame for construction work according to claim 1, characterised in that: the fixing ring (10) comprises an upper arc plate (101) and a lower arc plate (101), the upper arc plate and the lower arc plate are arranged at two ends of the outer wall on one side opposite to the arc plates (101), screw holes which are communicated with each other are formed in the top of the flange, fixing bolts (102) are sleeved in the upper screw hole and the lower screw hole in a two-group mode, the upper screw hole and the lower screw hole are arranged in the middle of the outer wall on one side opposite to the arc plates (101), aligning columns (103) are sleeved in the screw holes in a threaded mode, and positioning holes (104) matched with.
3. A mobile handling frame for construction work according to claim 1, characterised in that: the front and rear groups of the sleeves (6) are welded with foot pedals (12) on one side far away from the main pipe (13), and grooves matched with the inclined support rods (11) are formed in the outer walls of the two groups of the foot pedals (12) on the opposite sides.
4. A mobile handling frame for construction work according to claim 1, characterised in that: remove base (1) left and right sides outer wall and all be equipped with around two sets of fixed block (19), the screw that link up from top to bottom is seted up to fixed block (19) top outer wall, and screw thread bush is equipped with screw (20), support tight piece (21) is installed through the bearing in screw (20) bottom, fixed block (19) are inserted with the outside activity of screw (20) junction and are equipped with gag lever post (22), gag lever post (22) bottom and support tight piece (21) top fixed connection, support tight piece (21) bottom outer wall and be equipped with anti-skidding line.
5. A mobile handling frame for construction work according to claim 1, characterised in that: floor (16) have all been welded to roof (15) bottom outer wall left and right sides, floor (16) bottom and ejector pin (14) outer wall welding, terminal surface top activity is inserted before sleeve pipe (6) and is equipped with locating pin (9), the terminal surface is seted up with locating pin (9) matched with altitude mixture control hole before telescopic link (7).
CN202021581219.2U 2020-08-03 2020-08-03 Movable operation frame for constructional engineering Expired - Fee Related CN212926955U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021581219.2U CN212926955U (en) 2020-08-03 2020-08-03 Movable operation frame for constructional engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021581219.2U CN212926955U (en) 2020-08-03 2020-08-03 Movable operation frame for constructional engineering

Publications (1)

Publication Number Publication Date
CN212926955U true CN212926955U (en) 2021-04-09

Family

ID=75334357

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021581219.2U Expired - Fee Related CN212926955U (en) 2020-08-03 2020-08-03 Movable operation frame for constructional engineering

Country Status (1)

Country Link
CN (1) CN212926955U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113654501A (en) * 2021-04-28 2021-11-16 温州广业建设有限公司 Floor height detection device for building construction quality inspection
CN113859429A (en) * 2021-11-23 2021-12-31 上海船舶研究设计院(中国船舶工业集团公司第六0四研究院) Mast and ship

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113654501A (en) * 2021-04-28 2021-11-16 温州广业建设有限公司 Floor height detection device for building construction quality inspection
CN113859429A (en) * 2021-11-23 2021-12-31 上海船舶研究设计院(中国船舶工业集团公司第六0四研究院) Mast and ship

Similar Documents

Publication Publication Date Title
CN212926955U (en) Movable operation frame for constructional engineering
CN219196718U (en) Frame beam template reinforced structure
CN210049577U (en) Aluminum alloy template system structure for building
CN215406824U (en) Supporting structure of steel bar truss floor bearing plate
CN212384902U (en) Straight ladder manufacturing mold
CN212295658U (en) Angle formwork supporting device used during secondary concrete pouring of intersection of precast beam and slab
CN212249262U (en) Assembled wall body installation auxiliary assembly
CN112144892B (en) Steel frame construction equipment for building engineering
CN212498245U (en) Supporting device for internal mold of hollow beam plate
CN212317146U (en) Assembly structure of prefabricated frame roof beam and prefabricated frame post
CN212802437U (en) Scaffold with prevent empting function
CN112692499A (en) Adjustable hydraulic anti-deformation clamp
CN218324048U (en) Anti-falling device is used in construction steel structure engineering construction
CN217299838U (en) Supporting rod
CN215925711U (en) A assembled construction platform device for construction of bridge tie beam stand
CN218234260U (en) Adjustable telescopic building construction platform
CN212376274U (en) Movable formwork supporting system for cast-in-place concrete assembly
CN217631161U (en) High-rise flower basket type overhanging scaffold supporting structure
CN217840896U (en) Aluminum alloy template for external wall insulation
CN221296010U (en) Simple lifting installation tool for pipeline
CN213297193U (en) Precast concrete board assembly quality of building engineering
CN218093083U (en) Multi-channel filling hydraulic support system suitable for thin coal seam
CN212897494U (en) Retractable elevartor shaft integral lifting operation platform
CN218715458U (en) Can assemble inclined ladder
CN108413157B (en) Method and device for fine tuning of position of large pipeline

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210409

CF01 Termination of patent right due to non-payment of annual fee