CN212896422U CN202022258196.8U CN202022258196U CN212896422U CN 212896422 U CN212896422 U CN 212896422U CN 202022258196 U CN202022258196 U CN 202022258196U CN 212896422 U CN212896422 U CN 212896422U
Authority
CN
China
Prior art keywords
pit
deep basal
drainage
outside
retaining wall
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202022258196.8U
Other languages
Chinese (zh)
Inventor
苗恩新
余健
高兴
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Construction Fourth Engineering Division Corp Ltd
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Original Assignee
China Construction Fourth Engineering Division Corp Ltd
Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Construction Fourth Engineering Division Corp Ltd, Sixth Construction Co Ltd of China Construction Fourth Engineering Division Co Ltd filed Critical China Construction Fourth Engineering Division Corp Ltd
Priority to CN202022258196.8U priority Critical patent/CN212896422U/en
Application granted granted Critical
Publication of CN212896422U publication Critical patent/CN212896422U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Underground Structures, Protecting, Testing And Restoring Foundations (AREA)

Abstract

The utility model discloses a deep basal pit cuts drainage device, the device include along the fender pile that the deep basal pit periphery was arranged and set up respectively at the outside pit outside with deep basal pit inside precipitation well and the pit in precipitation well, be provided with the bearing structure who is connected with the fender pile at the oral area of deep basal pit, pour at the top of fender pile and hat the roof beam, it has the retaining wall to build by laying bricks or stones on hat the roof beam, the escape canal has been buried underground on the slope top backfill earthwork in the retaining wall outside, the sump pit has been buried underground according to the certain interval simultaneously, escape canal and sump pit connect. The utility model breaks through the traditional mode of adopting brick drainage ditches and water collecting wells, adopts half-corrugated pipe drainage ditches and steel water collecting wells to replace, overcomes the defects of material waste and long construction period of the traditional mode, and the water intercepting and draining device is made of shaped recyclable materials, and is convenient, rapid and efficient to install; the requirements of water interception and drainage of the slope top of the foundation pit can be met, sustainable use is facilitated, and the purposes of energy conservation and environmental protection are achieved.

Description

Deep foundation pit water intercepting and draining device
Technical Field
The utility model relates to a deep basal pit cuts drainage device belongs to industry and civil building engineering technical field.
Background
In the deep foundation pit constructional engineering work process, the internal and external precipitation of foundation pit and ground water interception facility have certainly existed for the internal and external water level of deep foundation pit keeps at certain elevation, at the drainage in-process that falls, foundation pit sloping top must set up and cut drainage system, and traditional way adopts brick drainage ditch and water collection well as cutting drainage system, and this kind of mode construction speed is slow, with high costs.
Disclosure of Invention
An object of the utility model is to provide a deep basal pit cuts drainage device, the device installation is convenient, quick, high-efficient, has both satisfied the drainage and the construction requirement that ground dams, can guarantee the safety control of deep basal pit construction again.
In order to achieve the above purpose, the utility model adopts the following technical scheme: the utility model provides a deep basal pit cuts drainage device, includes the fender pile that arranges along the deep basal pit periphery and sets up respectively at the outside pit precipitation well and the pit in the pit inside of deep basal pit outside and deep basal pit, is provided with the bearing structure who is connected with the fender pile in the oral area of deep basal pit, has pour the hat roof beam at the top of fender pile, has built by laying bricks or stones retaining wall on the hat roof beam, has buried the escape canal in the slope top backfill earthwork in the retaining wall outside, has buried the sump pit according to the certain interval simultaneously, escape canal and sump pit connection, pour the slope top sclerosis layer in the slope top backfill earthwork, and slope top sclerosis layer has a certain slope and inclines to the escape canal direction, all is provided with the immersible pump in pit outer precipitation well and the pit in the precipitation well, and the immersible pump in pit outer precipitation well and the pit in the pit all is connected with the sump pit through the drain pipe.
Further, the retaining wall is higher than the slope top backfill earthwork outside the deep foundation pit.
Further, the elevation of escape canal and the oral area parallel and level of sump pit.
Since the technical scheme is used, the utility model discloses an advantage has below: the utility model breaks through the traditional mode of adopting brick drainage ditches and water collecting wells, adopts half-corrugated pipe drainage ditches and steel water collecting wells to replace, overcomes the defects of material waste and long construction period of the traditional mode, and the water intercepting and draining device is made of shaped recyclable materials, and is convenient, rapid and efficient to install; the requirements of water interception and drainage of the slope top of the foundation pit can be met, sustainable use is facilitated, and the purposes of energy conservation and environmental protection are achieved.
Drawings
Fig. 1 is a schematic structural diagram of the present invention;
fig. 2 is a schematic view of a connection structure of a drainage ditch and a collector well.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
The embodiment of the utility model provides a: referring to fig. 1, a deep foundation pit intercepting and draining device comprises fender posts 1 arranged along the periphery of a deep foundation pit, and an out-pit dewatering well 4 and an in-pit dewatering well 5 respectively arranged outside and inside the deep foundation pit, a supporting structure 2 connected with the fender post 1 is arranged at the opening part of the deep foundation pit, a crown beam 3 is poured at the top part of the fender post 1, a retaining wall 6 is built on the crown beam 3, a drainage ditch 8 is buried in the slope top backfill earthwork outside the retaining wall 6, meanwhile, water collecting wells 7 are buried at certain intervals, the drainage ditch 8 is connected with the water collecting wells 7, a slope top hardened layer 9 is poured on the slope top backfill earthwork, the slope top hardened layer 9 has a certain gradient and inclines towards the drainage ditch 8, submersible pumps 10 are arranged in the precipitation well 4 outside the pit and the precipitation well 5 in the pit, and the submersible pumps 10 in the precipitation well 4 outside the pit and the precipitation well 5 in the pit are connected with the water collecting well 7 through drain pipes 11. And the retaining wall 6 is higher than the slope top backfill earthwork at the outer side of the deep foundation pit. The elevation of the drainage ditch 8 is flush with the opening of the water collecting well 7.
When the deep foundation pit water intercepting and draining device is used for deep foundation pit water intercepting and draining construction, the following steps can be adopted:
firstly, arranging fender posts 1 along the periphery of a deep foundation pit, respectively digging an out-pit dewatering well 4 and an in-pit dewatering well 5 outside the deep foundation pit and inside the deep foundation pit, then pouring a crown beam 3 on the top of the fender posts 1, building a retaining wall 6 on the crown beam 3, and backfilling the top earthwork of the foundation pit at the outer side of the retaining wall 6; burying drainage ditches 8 in the slope top backfilling earthwork outside the retaining wall 6, burying water collecting wells 7 at certain intervals, connecting the drainage ditches 8 with the water collecting wells 7, and pouring a slope top hardened layer 9 on the slope top backfilling earthwork to ensure that the slope top hardened layer 9 has a certain gradient and inclines towards the drainage ditches 8 so as to facilitate water interception;
before earth excavation, putting a submersible pump 10 into the out-of-pit dewatering well 4 and the in-pit dewatering well 5, connecting the submersible pump 10 with the water collecting well 7 through a drain pipe 11, pumping water in the out-of-pit dewatering well 4 and the in-pit dewatering well 5 into the water collecting well 7, and then enabling water overflowing from the water collecting well 7 to flow into a third-stage sedimentation tank through a drainage ditch 8 and be discharged into a municipal pipe network after being purified by the third-stage sedimentation tank;
and step three, after the rainfall reaches the design requirement, arranging a supporting structure 2 connected with the fender post 1 at the opening part of the deep foundation pit, continuously excavating earthwork in the deep foundation pit after the supporting structure 2 reaches the design strength until the underground structure is constructed, and stopping the rainfall after the earthwork of the deep foundation pit is backfilled.
Referring to fig. 2, in the embodiment, the drainage ditch 8 is a half-bellows drainage ditch manufactured by cutting a corrugated pipe with a diameter of 300-350 mm from the middle; the water collecting well 7 is a steel water collecting well formed by welding stainless steel plates, semicircular notches are symmetrically formed in two sides of an opening of the water collecting well 7, and the drainage ditch 8 is connected to the semicircular notches.
In this embodiment, fender pile 1 is campshed + waterproof curtain, underground continuous wall, SMW worker method stake or TRD + I-steel, bearing structure 2 is concrete support, steel shotcrete or anchor rope, retaining wall 6 is brick retaining wall, concrete retaining wall or spray anchor.
In summary, the utility model breaks through the traditional mode of adopting brick drainage ditches and water collecting wells, adopts half-corrugated pipe drainage ditches and steel water collecting wells to replace, overcomes the defects of material waste and long construction period of the traditional mode, and is made of shaped recyclable materials, convenient, rapid and efficient to install; the requirements of water interception and drainage of the slope top of the foundation pit can be met, sustainable use is facilitated, and the purposes of energy conservation and environmental protection are achieved.

Claims (3)

1. The utility model provides a deep basal pit cuts drainage device, includes fender pile (1) and the interior precipitation well (5) of pit (4) and pit that set up respectively outside the deep basal pit and inside the deep basal pit along the peripheral fender post (1) of arranging of deep basal pit, its characterized in that: be provided with bearing structure (2) of being connected with fender pile (1) at the oral area of deep basal pit, pour crown beam (3) at the top of fender pile (1), build by laying bricks or stones retaining wall (6) on crown beam (3), bury drainage ditch (8) underground on the slope top backfill earthwork in the retaining wall (6) outside, bury sump pit (7) according to a determining deviation simultaneously, drainage ditch (8) and sump pit (7) be connected, pour slope top sclerosis layer (9) on the slope top backfill earthwork, and slope top sclerosis layer (9) have certain slope and to the slope of drainage ditch (8) direction, all be provided with immersible pump (10) in precipitation well (5) outside the pit and in the pit, and immersible pump (10) in precipitation well (4) outside the pit and the pit in precipitation well (5) all are connected with sump pit (7) through drain pipe (11).
2. The deep foundation pit intercepting drainage device of claim 1, wherein: and the retaining wall (6) is higher than the slope top backfill earthwork at the outer side of the deep foundation pit.
3. The deep foundation pit intercepting drainage device of claim 1, wherein: the elevation of the drainage ditch (8) is flush with the opening of the water collecting well (7).
CN202022258196.8U 2020-10-12 2020-10-12 Deep foundation pit water intercepting and draining device Expired - Fee Related CN212896422U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022258196.8U CN212896422U (en) 2020-10-12 2020-10-12 Deep foundation pit water intercepting and draining device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022258196.8U CN212896422U (en) 2020-10-12 2020-10-12 Deep foundation pit water intercepting and draining device

Publications (1)

Publication Number Publication Date
CN212896422U true CN212896422U (en) 2021-04-06

Family

ID=75260263

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022258196.8U Expired - Fee Related CN212896422U (en) 2020-10-12 2020-10-12 Deep foundation pit water intercepting and draining device

Country Status (1)

Country Link
CN (1) CN212896422U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112095644A (en) * 2020-10-12 2020-12-18 中国建筑第四工程局有限公司 Deep foundation pit water intercepting and draining device and construction method thereof
CN113605428A (en) * 2021-07-30 2021-11-05 中煤长江基础建设有限公司 Method for rapidly treating soft construction surface of pile foundation in sandy soil area
CN114032935A (en) * 2021-11-02 2022-02-11 上海市基础工程集团有限公司 A formula drainage system is buried to foundation ditch secretly for having a deck bridge plate
CN114855821A (en) * 2022-05-27 2022-08-05 广东南方建设集团有限公司 Foundation pit reinforcing system of sponge foundation and construction method
CN115323862A (en) * 2022-08-24 2022-11-11 中国十七冶集团有限公司 Drainage construction process for slope tops around anti-infiltration foundation pit

Cited By (6)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112095644A (en) * 2020-10-12 2020-12-18 中国建筑第四工程局有限公司 Deep foundation pit water intercepting and draining device and construction method thereof
CN113605428A (en) * 2021-07-30 2021-11-05 中煤长江基础建设有限公司 Method for rapidly treating soft construction surface of pile foundation in sandy soil area
CN114032935A (en) * 2021-11-02 2022-02-11 上海市基础工程集团有限公司 A formula drainage system is buried to foundation ditch secretly for having a deck bridge plate
CN114855821A (en) * 2022-05-27 2022-08-05 广东南方建设集团有限公司 Foundation pit reinforcing system of sponge foundation and construction method
CN114855821B (en) * 2022-05-27 2023-10-13 广东南方建设集团有限公司 Foundation pit reinforcing system of sponge foundation and construction method
CN115323862A (en) * 2022-08-24 2022-11-11 中国十七冶集团有限公司 Drainage construction process for slope tops around anti-infiltration foundation pit

Similar Documents

Publication Publication Date Title
CN212896422U (en) Deep foundation pit water intercepting and draining device
CN102418347B (en) Drainage construction method for blind drain and sump wells in deep foundation pit
CN111733828A (en) Large-section deep foundation pit fender pile and prestressed anchor cable supporting construction technology
CN104711994A (en) Foundation pit deep well rainfall and plugging construction method
CN112095644A (en) Deep foundation pit water intercepting and draining device and construction method thereof
CN102454167A (en) Construction method for large ultra-deep well
CN100510281C (en) Semi-reverse construction method for ultra-large-diameter and ultra-buried depth storage tank
CN113266392B (en) Pipe jacking construction method for penetrating through existing anchor cable group
CN216475132U (en) Quick dewatering system of foundation ditch
CN110438999A (en) A kind of deep basal pit slope excavation construction method of rich groundwater
CN110847199A (en) Construction method for drainage of underground water of deep foundation pit
CN114411756A (en) Construction method and construction device for water-rich sand layer subway station open excavation foundation pit without precipitation
CN215105880U (en) Concrete inverted well suitable for connecting new and old water supply and drainage pipelines
CN110093965A (en) A kind of water discharge method of construction site
CN112302136A (en) Connecting structure of new and old drainage pipelines under non-closure working condition and construction method thereof
CN104328836B (en) A kind of environment-friendly type prefabricated pair of case deep hole type catch pit and construction method thereof
CN104846837B (en) The construction method of ultra-deep well in a kind of bright draining foundation ditch
CN103866787B (en) A kind of spacious reverse masonry method concrete cut that digs builds construction technology
CN217399744U (en) Basement side wall sluicing decompression structure
CN216075134U (en) Rich water district faces lake sandy soil deep basal pit hillside top construction road structure
CN212336250U (en) Pipe jacking connection guide row structure
CN210315908U (en) Immersed tube type inspection well
CN209585078U (en) Strong drainage system for ultra-large deep foundation pit
CN111894103A (en) Pipe jacking connection guide row structure and pipe jacking connection method
CN111719575A (en) Foundation pit anti-settling drainage method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210406

Termination date: 20211012

CF01 Termination of patent right due to non-payment of annual fee