CN212895754U - Novel compound road surface construction banding structure of grout - Google Patents

Novel compound road surface construction banding structure of grout Download PDF

Info

Publication number
CN212895754U
CN212895754U CN202021189745.4U CN202021189745U CN212895754U CN 212895754 U CN212895754 U CN 212895754U CN 202021189745 U CN202021189745 U CN 202021189745U CN 212895754 U CN212895754 U CN 212895754U
Authority
CN
China
Prior art keywords
road surface
layer
waterproof roll
roll material
material layer
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021189745.4U
Other languages
Chinese (zh)
Inventor
高保旭
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangsu Easttrans Engineering Design Consultant Co ltd
Original Assignee
Jiangsu Easttrans Engineering Design Consultant Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangsu Easttrans Engineering Design Consultant Co ltd filed Critical Jiangsu Easttrans Engineering Design Consultant Co ltd
Priority to CN202021189745.4U priority Critical patent/CN212895754U/en
Application granted granted Critical
Publication of CN212895754U publication Critical patent/CN212895754U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Road Paving Structures (AREA)

Abstract

The utility model relates to a novel compound road surface construction banding structure of grout, including flexible road surface grout blanket, lay waterproof roll material layer in the side portion of flexible road surface grout blanket, the part on waterproof roll material layer is pressed in the lower part of flexible road surface grout blanket, another part on waterproof roll material layer is in the side portion of flexible road surface grout blanket, set up first foaming layer and the second foaming layer of caulking in the outside on waterproof roll material layer, through the fixed waterproof roll material layer of first foaming layer and the second foaming layer of caulking, the outside on first foaming layer of caulking is road surface limit portion, the outside on second foaming layer of caulking is adjacent road surface. The utility model discloses a combination banding structure can effective performance stop the excessive effect of slurry, is applicable to the condition of the banding difficulty that causes because of various reasons, and the sealing is effectual, furthest reduces construction cost. The edge sealing structure has very wide application value.

Description

Novel compound road surface construction banding structure of grout
Technical Field
The utility model relates to a compound road surface, specific theory relate to a novel compound road surface construction banding structure of grout.
Background
The grouting composite pavement is a novel pavement with good rigidity and flexibility and good anti-rutting performance formed by pouring cement-based grouting materials into a macroporous asphalt mixture matrix. The pouring of the cement-based grouting material is a very important step in the construction of grouting composite pavements, which directly affects the pavement appearance and construction quality, the cement-based grouting material used in the construction of the grouting composite pavements is black or gray, if precautionary measures are not made during grouting construction, greening between adjacent pavements and roadside can be polluted by the cement-based grouting material, the grouting area has a problem of being raised relative to the original pavement or the edge of the grouting area has no kerbstone, kerbstone and the like to block the construction, and the edge sealing is also carried out by adopting a traditional method: the periphery of a grouting area is subjected to edge sealing treatment or is only horizontally covered with a film, then a large amount of manpower is adopted to continuously enclose and block mortar by brushes on two sides of a road, and because the mortar has good fluidity, the enclosing and blocking effect is not ideal, and adjacent asphalt pavements cannot be prevented from being polluted, so that the appearance and the construction quality of the semi-flexible pavement are influenced.
Disclosure of Invention
The problem that the regional original road surface of grout raised relatively of grout region to compound road surface stops the constitution with regional limit portion of grout does not have curb, curb etc. and leads to the grout in-process, and the slurry flows from the regional limit portion of grout, pollutes adjacent bituminous paving problem, the utility model provides a half flexible compound road surface construction banding structure of grout formula, this structure encapsulation is effectual, and maneuverability is strong.
In order to achieve the purpose, the utility model discloses a realize through following technical scheme:
the utility model relates to a novel compound road surface construction banding structure of grout, including flexible road surface grout blanket, lay waterproof roll material layer in the side portion of flexible road surface grout blanket, the part on waterproof roll material layer is pressed in the lower part of flexible road surface grout blanket, another part on waterproof roll material layer is in the side portion of flexible road surface grout blanket, set up first foaming layer and the second foaming layer of caulking in the outside on waterproof roll material layer, through the fixed waterproof roll material layer of first foaming layer and the second foaming layer of caulking, the outside on first foaming layer of caulking is road surface limit portion, the outside on second foaming layer of caulking is adjacent road surface.
The utility model discloses a further improvement lies in: the thickness of the waterproof roll material layer is more than 5cm larger than that of the flexible pavement grouting layer.
The utility model discloses a further improvement lies in: the length of the waterproof roll material layer pressed on the lower part of the flexible pavement grouting layer is 10-20 cm.
The utility model has the advantages that: the utility model discloses a combined edge sealing structure of waterproof coiled material layer and earth and stock form foaming joint filling layer, under the prerequisite that different structural layers, grouting area differ from the height of former road surface, other pitch road surface smoothness of the regional limit portion of grout is not good, can effectively exert the effect of stopping the excessive slurry, be applicable to the condition of the difficult banding because of various reasons, waterproofing membrane provides the skeleton for the banding in this structure, earth plays and supports waterproofing membrane, polyurethane foaming joint filling agent can seal the gap and the hole of waterproofing membrane and road surface, this kind of combination can adapt to the road surface condition of different roughness, it is effectual to seal the thick liquid; this combination banding structure construction is simple, maneuverability is strong, and the grout construction back is bare leaking the waterproofing membrane manual work outside all around to the region of will being in the milk and is demolishd, furthest reduces construction cost. The edge sealing structure has very wide application value.
Drawings
Fig. 1 is the utility model discloses compound road surface construction banding structure section view of grout.
Fig. 2 is the utility model discloses compound road surface construction banding structure top view of grout.
Detailed Description
In the following description, for purposes of explanation, numerous implementation details are set forth in order to provide a thorough understanding of the present invention. It should be understood, however, that these implementation details should not be used to limit the invention. That is, in some embodiments of the invention, details of these implementations are not necessary. In addition, some conventional structures and components are shown in simplified schematic form in the drawings.
As shown in fig. 1-2, the utility model relates to a novel grouting composite road surface construction edge sealing structure, which comprises a flexible road surface grouting layer 1, wherein the flexible road surface grouting layer is a large-aperture asphalt mixture paving layer, a waterproof roll material layer 3 is paved at the side edge part of the flexible road surface grouting layer 1, the waterproof roll material is a high-polymer modified waterproof roll material, is a curlable sheet-shaped waterproof material, has the length of 10m, the width of 1.5m and the thickness of 2mm, can be randomly cut into different shapes, the waterproof roll material is cut according to the field condition, the cutting thickness of the waterproof roll material layer 3 is ensured to be more than 5cm higher than the thickness of the flexible road surface grouting layer 1, the part of the waterproof roll material layer 3 is pressed at the lower part of the flexible road surface grouting layer 1, the length of the lower part of the flexible road surface grouting layer 1 is 10, the other part of the waterproof roll material layer 3 is arranged at the side edge part of the flexible pavement grouting layer 1, a first foaming joint filling layer 4-1 and a second foaming joint filling layer 4-2 are arranged at the outer side of the waterproof roll material layer 3, the waterproof roll material layer 3 is fixed through the first foaming joint filling layer 4-1 and the second foaming joint filling layer 4-2, clay or sand or gravel is randomly obtained at the periphery of a grouting area by the clay and the polyurethane foaming joint filling layer, local materials are obtained, the purpose of supporting the waterproof roll material is achieved, a polyurethane foaming joint filling agent, specifically a polyurethane foaming filling elastic sealing material, is selected in the foaming joint filling layer in the clay and polyurethane foaming joint filling layer, and is sprayed to a part to be constructed through a matched glue applying gun or a manual spray pipe during construction, so that the forming, foaming, bonding and sealing processes can be completed in a short time, the foaming joint mixture is a quick-drying joint mixture with the surface drying time within 15 minutes, the outer side of the first foaming joint mixture layer 4-1 is a pavement edge part 5, and the outer side of the second foaming joint mixture layer 4-2 is an adjacent pavement 2.
The utility model discloses the concrete operating procedure of banding structure as follows:
before the macroporous asphalt mixture, namely the flexible pavement grouting layer 1, is paved, waterproof coiled materials are sequentially paved on the edge of an asphalt mixture area needing to be paved, so that part of the waterproof coiled materials can be pressed under the macroporous asphalt mixture, and part of the waterproof coiled materials is outside the asphalt mixture, then the macroporous asphalt mixture is paved, after the macroporous asphalt mixture is paved, half of the waterproof coiled materials which are not pressed under the macroporous asphalt mixture are folded by 90 degrees along the edge of the matrix asphalt mixture, and the waterproof coiled materials are fixed by matching of foaming joint mixture and soil.
The above description is only an embodiment of the present invention, and is not intended to limit the present invention. Various modifications and changes may occur to those skilled in the art. Any modification, equivalent replacement, improvement, etc. made within the spirit and principle of the present invention should be included in the scope of the claims of the present invention.

Claims (3)

1. The utility model provides a novel compound road surface construction banding structure of grout, includes flexible road surface grout blanket (1), its characterized in that: waterproof roll material layer (3) are laid to the side portion of flexible pavement grout blanket (1), the part of waterproof roll material layer (3) is pressed the lower part of flexible pavement grout blanket (1), another part of waterproof roll material layer (3) is in the side portion of flexible pavement grout blanket (1) set up first foaming layer of caulking (4-1) and second foaming layer of caulking (4-2) in the outside of waterproof roll material layer (3), it is fixed through first foaming layer of caulking (4-1) and second foaming layer of caulking (4-2) waterproof roll material layer (3), the outside of first foaming layer of caulking (4-1) is road surface limit portion (5), the outside of second foaming layer of caulking (4-2) is adjacent road surface (2).
2. The novel grouting composite pavement construction edge sealing structure according to claim 1, characterized in that: the thickness of the waterproof roll material layer (3) is more than 5cm larger than that of the flexible pavement grouting layer (1).
3. The novel grouting composite pavement construction edge sealing structure according to claim 1, characterized in that: the length of the waterproof roll material layer (3) pressed at the lower part of the flexible pavement grouting layer (1) is 10-20 cm.
CN202021189745.4U 2020-06-24 2020-06-24 Novel compound road surface construction banding structure of grout Active CN212895754U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021189745.4U CN212895754U (en) 2020-06-24 2020-06-24 Novel compound road surface construction banding structure of grout

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021189745.4U CN212895754U (en) 2020-06-24 2020-06-24 Novel compound road surface construction banding structure of grout

Publications (1)

Publication Number Publication Date
CN212895754U true CN212895754U (en) 2021-04-06

Family

ID=75279993

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021189745.4U Active CN212895754U (en) 2020-06-24 2020-06-24 Novel compound road surface construction banding structure of grout

Country Status (1)

Country Link
CN (1) CN212895754U (en)

Similar Documents

Publication Publication Date Title
CN103669207B (en) A kind of prefabricated bituminous concrete steel bridge surface paving structure and paving method thereof
CN105926406B (en) A kind of joining method and structure on old road new in reorganization and expansion pavement construction
CN103114526B (en) Steel bridge deck pavement cold mixing maintenance material and manufacturing method thereof
KR100687210B1 (en) Precast concrete panel for paving of road and method for preparation thereof
KR100710892B1 (en) A concrete panel for pavement and pavement construction method using it
US5630677A (en) Method for repair of cracked pavement
CN101982610A (en) Hot-distribution rubber bituminous pavement and construction method thereof
CN107178018A (en) A kind of new old asphalt pavement lapping construction method and bridging arrangement
US20140272369A1 (en) Pervious concrete permeable grout
CN207685618U (en) A kind of Old cement concrete transform asphalt pavement structure as
CN102051848B (en) HMA/CC (Hot-Mix Asphalt)/(Cement Concrete) composite type pavement structure and constructing method thereof
CN104652261A (en) Method and system for fast repairing expansion joint based on elastic concrete
CN214090643U (en) Waterproof structure of concrete roof layer
CN107354834A (en) The construction technique and reinforced structure complex in Civil Aviation Airport field road
KR100961967B1 (en) Structure of loess paving layer and construction method using thereof
CN207846123U (en) Reinforced structure complex
EP0469222B1 (en) method of constructing a continuous surfacing for roads and airfields and its use
CN212895754U (en) Novel compound road surface construction banding structure of grout
CN103334364A (en) Micro-surface pavement structure and micro-surface pavement construction method
CN211395218U (en) Cold regeneration basic unit road surface structure of emulsified asphalt plantmix
US20180037500A1 (en) Polymer modified cement adhesive for providing high friction surfacing
CN202787014U (en) Asphalt pavement structure formed by modifying cement pavement
US6682260B2 (en) Roller compacted concrete paving sealing method
CN110453570A (en) A kind of urban road water conservation temperature reduction construction of compound road surface method
US1955421A (en) Concrete structure and method of

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant