CN212865939U - Steel-pipe pile locating rack is built to landing stage and construction platform on water - Google Patents

Steel-pipe pile locating rack is built to landing stage and construction platform on water Download PDF

Info

Publication number
CN212865939U
CN212865939U CN202020698248.0U CN202020698248U CN212865939U CN 212865939 U CN212865939 U CN 212865939U CN 202020698248 U CN202020698248 U CN 202020698248U CN 212865939 U CN212865939 U CN 212865939U
Authority
CN
China
Prior art keywords
pipe pile
steel
horizontal
construction
platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020698248.0U
Other languages
Chinese (zh)
Inventor
周伏萍
敖小平
尧在雨
胡培强
李刚
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Jiangxi Geo Engineering Group Corp
Original Assignee
Jiangxi Geo Engineering Group Corp
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Jiangxi Geo Engineering Group Corp filed Critical Jiangxi Geo Engineering Group Corp
Priority to CN202020698248.0U priority Critical patent/CN212865939U/en
Application granted granted Critical
Publication of CN212865939U publication Critical patent/CN212865939U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Placing Or Removing Of Piles Or Sheet Piles, Or Accessories Thereof (AREA)

Abstract

The utility model discloses a steel-pipe pile locating rack is built to landing stage and construction platform on water belongs to construction locating rack field, and landing stage and construction platform on water build steel-pipe pile locating rack and include horizontal location frame and horizontal operation frame, horizontal operation frame upper berth is equipped with positioning platform, positioning platform central authorities are provided with the locating hole, horizontal operation frame with link to each other through the inclined ladder between the horizontal location frame, horizontal operation frame upper berth is equipped with the operation platform, operation platform central authorities are provided with the operation hole. The utility model discloses a landing stage and construction platform build steel-pipe pile locating rack on water, will the locating hole is aimed at the adjacent location steel-pipe pile that has been under construction, aims at the operation steel-pipe pile this moment the operation hole is accomplished the location and the construction of operation steel-pipe pile have solved the problem that the steel-pipe pile is difficult to the location installation when construction on water.

Description

Steel-pipe pile locating rack is built to landing stage and construction platform on water
Technical Field
The utility model relates to a construction locating rack field especially relates to a steel-pipe pile locating rack is built to landing stage and construction platform on water.
Background
In the construction of harbors, wharfs and bridge construction projects, a construction trestle and a construction platform are the most important methods for solving the problems of construction transportation on water, water and electricity pipelines and building material supply. The foundation of both the construction trestle and the construction platform is basically a steel pipe pile, and the positioning of the steel pipe pile is very important. During construction on water, the position of the steel pipe pile to be driven cannot be directly reached manually due to the action of water flow, so that the problem that how to determine the position of the steel pipe pile needs to be solved during construction is solved.
SUMMERY OF THE UTILITY MODEL
In order to overcome the defects of the prior art, the utility model aims to solve the technical problem that a steel-pipe pile locating rack is built to landing stage and construction platform on water is provided, utilizes the locating hole on the locating rack as the benchmark, confirms the proposed position of steel-pipe pile in the rivers.
To achieve the purpose, the utility model adopts the following technical proposal:
the utility model provides a steel pipe pile positioning frame is built to landing stage and construction platform on water, including horizontal positioning frame, horizontal positioning frame upper berth is equipped with positioning platform, positioning platform central authorities are provided with the locating hole, horizontal operation frame with link to each other through the inclined ladder between the horizontal positioning frame, horizontal operation frame upper berth is equipped with operation platform, operation platform central authorities are provided with the operation hole;
preferably, the fixing device further comprises a bailey frame, a fixing hole is formed in the bottom of the horizontal positioning frame, and a bolt or a screw for fixing the horizontal positioning frame penetrates through the fixing hole to fix the horizontal positioning frame on the front end portion of the bailey frame;
preferably, the horizontal positioning frame, the inclined ladder and the horizontal operation frame are provided with guardrails;
preferably, the guardrail is formed by welding a plurality of transverse channel steel, horizontal channel steel and vertical channel steel;
preferably, the horizontal positioning frame and the inclined ladder are provided with step plates for people to walk, and the step plates are transversely welded between the horizontal positioning frame and the inclined ladder.
The utility model has the advantages that:
the distance between the positioning hole and the operation hole is determined, the positioning hole is aligned to the adjacent constructed positioning steel pipe piles, the operation steel pipe piles are aligned to the operation hole at the moment, positioning and construction of the operation steel pipe piles can be completed, and the problem that the position of the steel pipe piles is difficult to determine in water construction is solved.
Drawings
Fig. 1 is a side view of a positioning frame for setting up a steel pipe pile on an above-water trestle and a construction platform provided in the embodiment of the present invention;
fig. 2 is a top view of the steel pipe pile positioning frame built on the water trestle and the construction platform provided in the specific embodiment of the present invention.
In the figure:
1. positioning the steel pipe pile; 2. a bailey frame; 3. a fixing hole; 4. a horizontal positioning frame; 5. an inclined ladder; 6. A horizontal working frame; 7. operating the steel pipe pile; 8. a guardrail; 811. transverse channel steel; 812. horizontal channel steel; 813. vertical channel steel; 9. a step plate; 10. positioning the platform; 11. positioning holes; 12. An operation platform; 13. and (6) working holes.
Detailed Description
The technical solution of the present invention is further explained by the following embodiments with reference to the accompanying drawings.
As shown in fig. 1 and 2, in the above-water trestle and construction platform provided in this embodiment, a steel pipe pile positioning frame is built, a horizontal positioning frame 4 is paved with a positioning platform 10, a positioning hole 11 is arranged in the center of the positioning platform 10, the horizontal working frame 6 is connected with the horizontal positioning frame 4 through an inclined ladder 5, a working platform 12 is paved on the horizontal working frame 6, a working hole 13 is arranged in the center of the working platform 12, the horizontal positioning frame 4 adopts two 22# channel steels as a framework, the length is L (-1600, +900) mm (L is the distance between steel pipe columns), the width is 1200mm, the positioning platform 10 is made of a 10mm thick steel plate, and a circular hole which is about 100mm larger than the diameter of a steel pipe pile during actual construction, namely the positioning hole 11, is cut in the center of the steel plate; horizontal operation frame 6 is enclosed into the square by four 22# channel-section steel welding, the length of side is decided to 1200mm, operation platform 12 is made by the steel sheet of 10mm thickness, cut a circular entrance to a cave about 100mm greater than steel-pipe pile diameter when actual construction at the steel sheet center, operation hole 13 promptly, inclined ladder 5 height is 1000mm, width is the same with the width between the horizontal operation frame 4, 5 inclinations of inclined ladder are 45, inclined ladder 5 adopts 22# channel-section steel to make, carry out the recheck with the center of locating hole 11 on the locating platform 10 and the center distance of operation hole 13 on the operation platform 12, its qualified standard is the distance: l +/-100 mm, aligning the positioning hole 11 to the constructed steel pipe pile position, overlapping the projection of the constructed steel pipe pile position with the positioning hole 11, wherein the position of the operation hole 13 on the operation platform 12 is the position of the steel pipe pile to be driven, and when the positioning frame for building the steel pipe pile on the water trestle and the construction platform is moved to the next station, the positioning frame is integrally hoisted to the next station only through a crane.
In order to build the steel pipe pile locating rack to fix landing stage and construction platform on water, further, horizontal locating rack 4 bottom is provided with fixed orifices 3, and the bolt or the screw rod that are used for fixed horizontal locating rack 4 pass fixed orifices 3 and are fixed in horizontal locating rack 4 in bei lei frame 2 front end portion, go on rechecking after the installation, landing stage and construction platform on water build the steel pipe pile locating rack axis and the axis overlap of bei lei frame 2.
In order to improve the safety of construction, the horizontal positioning frame 4, the inclined ladder 5 and the horizontal working frame 6 are further provided with guardrails 8.
In order to improve the stability of the guardrail, the guardrail 8 is further formed by welding a plurality of transverse channels 811, horizontal channels 812 and vertical channels 813.
In order to facilitate the walking of workers on the positioning frame, the horizontal positioning frame 4 and the inclined ladder 5 are provided with step plates 9 for people to walk, the step plates 9 are transversely welded between the horizontal positioning frame 4 and the inclined ladder 5, the step distance between the step plates 9 is 300mm, and the step plates are made of 20# channel steel.
While the invention has been described with reference to a preferred embodiment, it will be understood by those skilled in the art that various changes may be made and equivalents may be substituted for elements thereof without departing from the spirit and scope of the invention. The present invention is not to be limited by the specific embodiments disclosed herein, and other embodiments that fall within the scope of the claims of the present application are intended to be within the scope of the present invention.

Claims (5)

1. The utility model provides a steel-pipe pile locating rack is built to landing stage and construction platform on water for the position of steel-pipe pile when confirming construction on water, its characterized in that, landing stage and construction platform on water build the steel-pipe pile locating rack and include:
the device comprises a horizontal positioning frame (4), wherein a positioning platform (10) is laid on the horizontal positioning frame (4), and a positioning hole (11) is formed in the center of the positioning platform (10);
the horizontal operation frame (6) is connected with the horizontal positioning frame (4) through an inclined ladder (5), an operation platform (12) is laid on the horizontal operation frame (6), and an operation hole (13) is formed in the center of the operation platform (12);
and aligning the positioning hole (11) with the adjacent positioning steel pipe pile (1) which is already constructed, aligning the operation steel pipe pile (7) with the operation hole (13) at the moment, and finishing the positioning and construction of the operation steel pipe pile (7).
2. The steel pipe pile positioning frame for water trestle and construction platform construction according to claim 1, which is characterized in that:
the mine rack also comprises a bailey rack (2);
the bottom of the horizontal positioning frame (4) is provided with a fixing hole (3), and a bolt or a screw for fixing the horizontal positioning frame (4) penetrates through the fixing hole (3) to fix the horizontal positioning frame (4) on the front end part of the Bailey frame (2).
3. The steel pipe pile positioning frame for water trestle and construction platform construction according to claim 1, which is characterized in that:
and guardrails (8) are arranged on the horizontal positioning frame (4), the inclined ladder (5) and the horizontal operation frame (6).
4. The steel pipe pile positioning frame for water trestle and construction platform construction according to claim 3, which is characterized in that:
the guardrail (8) is formed by welding a plurality of transverse channel steel (811), horizontal channel steel (812) and vertical channel steel (813).
5. The steel pipe pile positioning frame for water trestle and construction platform construction according to claim 1, which is characterized in that:
the horizontal positioning frame (4) and the inclined ladder (5) are provided with a step plate (9) for people to walk;
the step plate (9) is transversely welded between the horizontal positioning frame (4) and the inclined ladder (5).
CN202020698248.0U 2020-04-29 2020-04-29 Steel-pipe pile locating rack is built to landing stage and construction platform on water Active CN212865939U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020698248.0U CN212865939U (en) 2020-04-29 2020-04-29 Steel-pipe pile locating rack is built to landing stage and construction platform on water

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020698248.0U CN212865939U (en) 2020-04-29 2020-04-29 Steel-pipe pile locating rack is built to landing stage and construction platform on water

Publications (1)

Publication Number Publication Date
CN212865939U true CN212865939U (en) 2021-04-02

Family

ID=75186904

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020698248.0U Active CN212865939U (en) 2020-04-29 2020-04-29 Steel-pipe pile locating rack is built to landing stage and construction platform on water

Country Status (1)

Country Link
CN (1) CN212865939U (en)

Similar Documents

Publication Publication Date Title
CN107489098B (en) Concrete prefabricated welding type guardrail and installation construction method
CN110374612B (en) Shield machine receiving platform applied to near-empty state and construction process
CN109083203B (en) Vertical laying method for HDPE (high-density polyethylene) film
CN111851302A (en) Rapid construction method of steel trestle
CN111335171A (en) Construction method of steel trestle
CN110565667B (en) Steel sheet pile cofferdam with grouting platform
CN106703073B (en) Super High building hoist exempts from return back to top steel beam foundation and its construction method
CN212865939U (en) Steel-pipe pile locating rack is built to landing stage and construction platform on water
CN210315224U (en) High mound turns over mould construction safety passageway system
CN111395183A (en) System and method for electric bridge type scaffold platform for double-column pier construction
CN217078829U (en) Position structure of bridge pile foundation and subway tunnel
CN202745057U (en) Integrated structural steel guide frame device used for vibrating and sinking steel pile
CN203531002U (en) Steel platform tower crane foundation
CN211257025U (en) Steel sheet pile cofferdam with slip casting platform
CN211313380U (en) Ultrahigh independent frame beam template supporting system
CN210946870U (en) Vertical and horizontal positioner of lattice column
CN209854576U (en) Trolley for construction of cover plate culvert or channel
CN206599994U (en) One kind is exempted to pierce formula form bracing system branch head part
CN216947900U (en) Steel box girder limb construction platform
CN213837426U (en) Steel stair that is used for workman to go up and down operation before prefabricated stair do not install
CN218643330U (en) Steel-pipe pile is inserted and is beaten construction platform
CN220433662U (en) Operating device with pile head overspray mould
CN218116532U (en) Full-rotation drilling machine foundation for protecting underground structures
CN208563111U (en) Mobile reinforcement locating rack
CN109519009A (en) The top-down construction method of the above structure in the ground of large-scale pump house