CN212801050U - Municipal administration road bad soil foundation stabilization structure - Google Patents

Municipal administration road bad soil foundation stabilization structure Download PDF

Info

Publication number
CN212801050U
CN212801050U CN202021025180.6U CN202021025180U CN212801050U CN 212801050 U CN212801050 U CN 212801050U CN 202021025180 U CN202021025180 U CN 202021025180U CN 212801050 U CN212801050 U CN 212801050U
Authority
CN
China
Prior art keywords
layer
soil
roadbed
filling
road
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021025180.6U
Other languages
Chinese (zh)
Inventor
曹阳
郭涛
刘国春
任清顺
黎朝
何依迹
王宇
王伟
胡治龙
万亚玲
郭芸杉
彭磊
吴富强
袁贤荣
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Southwest Jiaoda Civil Engineering Design Co ltd
Original Assignee
Sichuan Southwest Jiaoda Civil Engineering Design Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Southwest Jiaoda Civil Engineering Design Co ltd filed Critical Sichuan Southwest Jiaoda Civil Engineering Design Co ltd
Priority to CN202021025180.6U priority Critical patent/CN212801050U/en
Application granted granted Critical
Publication of CN212801050U publication Critical patent/CN212801050U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Consolidation Of Soil By Introduction Of Solidifying Substances Into Soil (AREA)

Abstract

The bad soil foundation of town road consolidates the structure to furthest guarantees road bed compactness, stability and bearing capacity. The soil replacement and filling device comprises a roadbed filled on the ground, wherein a shallow layer replacement and filling layer is arranged below the roadbed, and a grouting reinforcement layer formed by pressure injection of cement slurry and soil body particle cementation into an undisturbed soil layer through grouting holes is arranged below the shallow layer replacement and filling layer. The roadbed in the thick-layer miscellaneous filling road section of the urban road is processed in a mode of combining deep grouting and shallow replacement filling, so that the compactness, stability and bearing capacity of the roadbed can be ensured to the maximum extent, and the strength of the roadbed is obviously improved.

Description

Municipal administration road bad soil foundation stabilization structure
Technical Field
The utility model relates to a town road subgrade, in particular to town road soil foundation stabilization structure that harms.
Background
In the design and construction of road engineering, the compaction and treatment of non-soft foundation road sections (such as miscellaneous filling soil and the like) lack sufficient attention, so that the problem of post-construction settlement is caused, thick-layer miscellaneous filling soil has great harmfulness to highway subgrade, especially is used as a road embankment base part, and if the treatment is improper, the strength and the stability of the base are insufficient, the base is unstable, post-construction settlement and even collapse are caused, and the use function and the driving safety of roads are further influenced.
With the continuous development of cities, road networks such as secondary roads, branches and the like around mature plots are continuously perfected, but poor soil layers such as newly filled soil, miscellaneous filled soil, plain filled soil and the like are frequently formed in roadbed upper covering soil layers in the construction process. The poor soil has the characteristics of complex filling components, loose structure, low basic allowable value of bearing capacity, poor mechanical uniformity and the like, and in view of the characteristics that the depth of some poor soil is thick and buildings on two sides of a road are formed, the depth requirement cannot be met by conventional filling and replacing treatment, and the measures such as dynamic compaction, pile foundation composite foundation treatment and the like have great influence on peripheral buildings; if a conventional direct grouting method is adopted, the implementation of municipal road matching pipelines is inconvenient.
SUMMERY OF THE UTILITY MODEL
The utility model aims to solve the technical problem that a municipal road bad soil foundation stabilization structure is provided to furthest guarantees road bed compactness, stability and bearing capacity, is showing and is improving road bed intensity.
The utility model provides a technical scheme that its technical problem adopted as follows:
the utility model discloses a bad soil foundation reinforcement structure of town road, including filling the road bed on above-ground, characterized by: a shallow layer backfill layer is arranged under the ground below the roadbed, and a grouting reinforcement layer formed by pressure injection of cement slurry and soil body particle cementation into an undisturbed soil layer through grouting holes is arranged below the shallow layer backfill layer.
The cross section of the shallow layer backfill layer is in an inverted trapezoid shape and consists of a sand gravel backfill part and qualified soil backfill parts on two transverse sides; the cross section of the sand gravel backfilling part is trapezoidal, and the roadbed is located on the top surface of the sand gravel backfilling part; the cross section of the qualified soil backfilling part is in an inverted triangle shape and is filled outside the sand gravel backfilling part.
The utility model has the advantages that the roadbed in the thick-layer miscellaneous filling section of the urban road is treated by combining deep grouting and shallow replacement filling, so that the compactness, stability and bearing capacity of the roadbed can be ensured to the maximum extent, and the strength of the roadbed is obviously improved; only the bad soil body with local depth is processed, so that the foundation processing requirement is met, and the road construction cost is favorably reduced; the construction has little influence on buildings and residents around the road, and the construction is fast.
Drawings
The specification includes the following two figures:
FIG. 1 is a sectional view of the municipal road poor soil foundation reinforcement structure of the utility model;
FIG. 2 is a schematic diagram of the arrangement of grouting holes in the municipal road poor soil foundation reinforcing structure of the invention;
the figures show the components and corresponding references: the device comprises a roadbed 10, a ground surface D, a gravel backfilling part 21, a qualified soil backfilling part 22, a grouting reinforcing layer 30 and grouting holes 31.
Detailed Description
The present invention will be further explained with reference to the drawings and examples.
Referring to fig. 1, the utility model discloses a bad soil foundation reinforcement structure of town road, including filling the road bed 10 on ground D. A shallow layer backfill layer is arranged below the roadbed 10 and below the ground D, and a grouting reinforcement layer 30 formed by pressure injection of cement slurry and soil body particle cementation into an undisturbed soil layer through grouting holes 31 is arranged below the shallow layer backfill layer. The roadbed at the thick-layer miscellaneous filling road section of the urban road is treated in a mode of combining deep grouting with shallow replacement filling, so that the compactness, stability and bearing capacity of the roadbed can be ensured to the maximum extent, the strength of the roadbed is obviously improved, the foundation treatment requirement is met only by treating bad soil at local depth, and the construction cost of the road is favorably reduced; the construction has little influence on buildings and residents around the road, and the construction is fast.
Referring to fig. 1, the cross section of the shallow backfill layer is in an inverted trapezoid shape and is composed of a sand gravel backfill part 21 and qualified soil backfill parts 22 at two transverse sides. The cross section of the sand gravel backfilling part 21 is trapezoidal, and the roadbed 10 is located on the top surface of the sand gravel backfilling part 21. The cross section of the qualified soil backfilling part 22 is in an inverted triangle shape and is filled outside the sand gravel backfilling part 21. The depth of the shallow backfill layer is usually 1-3 m.
Referring to fig. 2, the grouting holes 31 are arranged in a quincunx shape on the undisturbed soil layer plane.
The utility model discloses a construction steps of town road bad soil foundation reinforcement structure is as follows:
firstly, constructing a grouting reinforcement layer 30:
measuring and paying off, lofting according to the size of a plane layout drawing and a section drawing of the grouting holes 31, controlling the spacing error within 10cm, and clearly marking, wherein the planes of the grouting holes 31 are uniformly distributed according to a quincunx, and the hole spacing is 1.5 m;
accurately positioning a drilling machine according to the position of a site measuring point, and correcting the verticality of a drill rod, wherein the vertical deviation is less than 1%, the diameter of a final hole is not less than 91mm, and the depth of the hole is 2 m;
and (4) burying the pipe, namely inserting the processed grouting pipe 31 with the diameter of 40mm into the formed hole, and filling concrete into the hole to seal the hole.
Grouting, wherein the grouting sequence is that edge holes are firstly grouted, then middle holes are grouted, grouting is carried out in the same row, and the holes are constructed at intervals (at least two holes). The slurry is single-liquid grouting mainly comprising pure cement, the cement is ordinary portland cement, and the water cement ratio is 0.6: 1-1: 1. the grouting pressure is 0.2-0.4 Mpa (reading of an orifice pressure gauge), and the final injection pressure is 0.2-0.5 Mpa;
cleaning and removing, filling (sealing) the hole with mortar after grouting is finished, wherein the sealing depth is not less than 30cm, and moving to the next hole for grouting after final setting;
and (3) detecting the grouting effect, wherein the grouting foundation is required to reach a CBR (cubic boron reactor) of not less than 2% and a compaction degree of not less than 90%.
And secondly, after grouting reinforcement, pre-pressing the foundation with the miscellaneous filling soil to 92% of compactness, and performing next shallow layer filling layer replacement construction after detection is qualified. The shallow layer is changed and is filled the layer and is given first place to mechanical work, and the earthwork adopts excavator to dig dress, the tipper transportation, and the loader is leveled, and the vibrated roller is compacted.
The shallow layer is preferably filled with coarse-grained soil with good gradation, when the roadbed is filled with different fillers, the roadbed is filled with different fillers in layers, each horizontal layer is filled with the same type of fillers, the usable fillers are removed from the upper layer of the roadbed grouting reinforcement section, the ultra-large-grain-size soil blocks in the horizontal layer need to be mechanically decomposed and reduced, the maximum grain size is less than 150mm, and then the ultra-large-grain-size soil blocks can be used.
And (5) filling construction, wherein the filling is constructed according to longitudinal subsection and transverse layering. The maximum loose paving thickness is controlled to be 40cm during filling, and the design width of the roadbed should be widened by 50cm at two sides of the filling width. In filling construction, each layer is marked by adopting a square grid for line drawing and paving. In the construction process, a specially-assigned person commands the dump truck to dump materials, the materials are horizontally layered, the materials are firstly discharged from the low side, then discharged from the high side, and then discharged from the two sides and then discharged from the center, so that each square grid is enabled to dump the materials, and the materials are paved and pushed flat by a loader after the materials reach a certain amount.
The above is only used for illustrating some principles of the municipal road bad soil foundation reinforcement structure, and the utility model is not limited to the specific structure and the application scope shown and described, so all corresponding modifications and equivalents that may be utilized all belong to the patent scope applied by the utility model.

Claims (4)

1. Bad soil foundation reinforcement structure of town road is including road bed (10) of filling on ground (D), characterized by: a shallow layer backfill layer is arranged below the roadbed (10) and below the ground (D), and a grouting reinforcement layer (30) formed by pressure injection of cement slurry and cementation of soil body particles into an undisturbed soil layer through grouting holes (31) is arranged below the shallow layer backfill layer.
2. The municipal road poor soil foundation reinforcement structure according to claim 1, wherein: the cross section of the shallow layer backfill layer is in an inverted trapezoid shape and consists of a sand gravel backfill part (21) and qualified soil backfill parts (22) at two transverse sides; the cross section of the sand gravel backfilling part (21) is trapezoidal, and the roadbed (10) is located on the top surface of the sand gravel backfilling part (21); the cross section of the qualified soil backfilling part (22) is in an inverted triangle shape and is filled outside the sand gravel backfilling part (21).
3. The municipal road poor soil foundation reinforcement structure according to claim 1 or 2, wherein: the depth of the shallow layer filling layer is 1-3 m.
4. The municipal road poor soil foundation reinforcement structure according to claim 1, wherein: the grouting holes (31) are distributed on the plane of the undisturbed soil layer in a plum blossom shape.
CN202021025180.6U 2020-06-06 2020-06-06 Municipal administration road bad soil foundation stabilization structure Active CN212801050U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021025180.6U CN212801050U (en) 2020-06-06 2020-06-06 Municipal administration road bad soil foundation stabilization structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021025180.6U CN212801050U (en) 2020-06-06 2020-06-06 Municipal administration road bad soil foundation stabilization structure

Publications (1)

Publication Number Publication Date
CN212801050U true CN212801050U (en) 2021-03-26

Family

ID=75094833

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021025180.6U Active CN212801050U (en) 2020-06-06 2020-06-06 Municipal administration road bad soil foundation stabilization structure

Country Status (1)

Country Link
CN (1) CN212801050U (en)

Similar Documents

Publication Publication Date Title
CN204059124U (en) A kind of sand drain strong rammer grouting behind shaft or drift lining foundation reinforcing structure
CN104278608A (en) Novel highway embankment widened structure and construction method
CN107419630A (en) A kind of the soft soil foundation high-filled embankment and construction method of effectively control settlement after construction
CN101634143A (en) Method for treating spiral oil-extruding filling pile composite foundation in stratum containing soft clay
CN206902488U (en) A kind of soft soil foundation high-filled embankment of effectively control settlement after construction
CN103174074B (en) Sedimentation control structure of passable road highway roadbed and construction method
CN107447778A (en) The heightening and consolidation structure and method of a kind of in-service reinforced concrete retaining wall
CN115288162B (en) Reinforcing method for soft soil foundation filling side slope
CN110924254A (en) Construction process for filling carbonaceous shale roadbed
CN110777588A (en) Pressure filling construction method for soil-stone mixed high-filling roadbed
CN106592608A (en) Differential settlement control method for new foundation and old roadbed of utility tunnel
CN207331740U (en) A kind of heightening and consolidation structure of in-service reinforced concrete retaining wall
CN106676993A (en) Roadbed reinforcing system of reinforced gravel framework structure and reinforcing method of roadbed reinforcing system
CN207331739U (en) A kind of heightening and consolidation structure of in-service reinforced concrete retaining wall
CN206625096U (en) A kind of reinforced rubble frame structure subgrade strengthening system
CN108824412B (en) Soft foundation treatment method based on gabion wall reinforced soil and dynamic compaction combination
CN107881987A (en) Deep covering layer top panel Rockfill Dam based moisture barrier structure
CN102839683B (en) Granular pile-permeable concrete stake dual compound foundation and processing method
CN104695419A (en) Soft soil roadbed construction method
CN212001226U (en) Backfill miscellaneous soil composite foundation structure
CN110029626B (en) Reinforcing treatment method for revetment foundation on soft stratum slope
CN116377780A (en) Mountain highway high-fill roadbed filling construction method
CN215976663U (en) Excavation area composite foundation treatment structure crossing under high-voltage line
CN112813756A (en) Roadbed based on municipal soft soil and construction method
CN212801050U (en) Municipal administration road bad soil foundation stabilization structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant