CN212769012U - Pay-off for building engineering - Google Patents

Pay-off for building engineering Download PDF

Info

Publication number
CN212769012U
CN212769012U CN202021457149.XU CN202021457149U CN212769012U CN 212769012 U CN212769012 U CN 212769012U CN 202021457149 U CN202021457149 U CN 202021457149U CN 212769012 U CN212769012 U CN 212769012U
Authority
CN
China
Prior art keywords
fixedly connected
bottom plate
bearing
pay
plate
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021457149.XU
Other languages
Chinese (zh)
Inventor
冯寿
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Individual
Original Assignee
Individual
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Individual filed Critical Individual
Priority to CN202021457149.XU priority Critical patent/CN212769012U/en
Application granted granted Critical
Publication of CN212769012U publication Critical patent/CN212769012U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Storing, Repeated Paying-Out, And Re-Storing Of Elongated Articles (AREA)

Abstract

The utility model belongs to the technical field of pay-off, especially, be a pay-off for building engineering, comprising a base plate, the top fixedly connected with fixed block of bottom plate, the top fixedly connected with motor of fixed block, fixedly connected with driving gear on the output shaft of motor, the surface meshing of driving gear has driven gear, driven gear's left end fixedly connected with pivot, the top fixedly connected with first backup pad of bottom plate, wear to be equipped with first bearing in the first backup pad, the left end of pivot passes first bearing and rotates and be connected with the second bearing, the left end fixedly connected with second backup pad of second bearing; the utility model discloses, the output shaft through setting up the motor rotates and drives the driving gear and rotate to drive driven gear and rotate, then drive the pivot and rotate and can drive the reel and rotate, thereby carry out the rolling to the cable conductor, reduced staff's intensity of labour.

Description

Pay-off for building engineering
Technical Field
The utility model belongs to the technical field of pay-off, concretely relates to pay-off for building engineering.
Background
The building engineering refers to an engineering entity formed by the construction of various house buildings and auxiliary facilities thereof and the installation activities of lines, pipelines and equipment matched with the house buildings, wherein the house buildings refer to projects which have top covers, beam columns, walls and foundations and can form internal spaces and meet the requirements of production, living, learning and public activities of people, cables are required to be used in the existing building engineering, and cable paying-off devices are usually required to be used when workers and people perform wiring.
The existing pay-off device is inconvenient to move, the labor intensity of workers is improved, a lighting lamp is not arranged in the existing pay-off device, the workers cannot work conveniently at night, and the working efficiency of construction engineering construction is reduced.
SUMMERY OF THE UTILITY MODEL
To solve the problems set forth in the background art described above. The utility model provides a pay-off for building engineering has and conveniently removes, conveniently carries out characteristics such as work at night.
In order to achieve the above object, the utility model provides a following technical scheme: a pay-off device for constructional engineering comprises a bottom plate, wherein a fixed block is fixedly connected to the top end of the bottom plate, a motor is fixedly connected to the top end of the fixed block, a driving gear is fixedly connected to an output shaft of the motor, a driven gear is meshed with the surface of the driving gear, a rotating shaft is fixedly connected to the left end of the driven gear, a first supporting plate is fixedly connected to the top end of the bottom plate, a first bearing is arranged in the first supporting plate in a penetrating mode, the left end of the rotating shaft penetrates through the first bearing and is rotatably connected with a second bearing, a second supporting plate is fixedly connected to the left end of the second bearing, the bottom end of the second supporting plate is fixedly connected to the bottom plate, a winding drum is fixedly connected to the surface of the rotating shaft, a sleeve is fixedly connected to the top end of the bottom plate, the rear end of the bolt penetrates through the sleeve and is connected in the threaded hole in a threaded mode.
Preferably, all set up flutedly in first backup pad and the second backup pad, two equal fixedly connected with electric putter in the recess, two the equal fixedly connected with slider in electric putter's bottom, two equal sliding connection in the recess in both ends about the slider.
Preferably, the bottom end of the sliding block is fixedly connected with fixing rods, two through holes are formed in the bottom plate, and the surfaces of the two fixing rods penetrate through the through holes.
Preferably, the right end of the supporting rod is fixedly connected with a connecting plate, and the bottom end of the connecting plate is fixedly connected with an illuminating lamp.
Preferably, the surface of the winding drum is provided with a buckle, and the bottom end of the bottom plate is provided with two rollers.
Preferably, the top end fixedly connected with button switch of bottom plate, button switch passes through wire electric connection with motor, electric putter and light respectively.
Compared with the prior art, the beneficial effects of the utility model are that:
the utility model discloses, output shaft through setting up the motor rotates and drives the driving gear rotation, thereby drive driven gear rotation, then drive the pivot and rotate and to drive the reel and rotate, thereby carry out the rolling to the cable conductor, staff's intensity of labour has been reduced, can reciprocate the bracing piece through in the threaded hole with bolt threaded connection in the difference, conveniently adjust the height of light, make things convenient for the staff to use, it can drive the dead lever downstream to slide in the recess to drive the slider through electric putter extension, thereby make the dead lever insert in the ground, fix pay-off firmly subaerial, prevent that pay-off from removing at the during operation, the work efficiency of influence unwrapping wire, the gyro wheel can conveniently remove pay-off.
Drawings
The accompanying drawings are included to provide a further understanding of the invention, and are incorporated in and constitute a part of this specification, illustrate embodiments of the invention, and together with the description serve to explain the invention and not to limit the invention. In the drawings:
fig. 1 is a schematic front view of a cross-sectional structure of the present invention;
FIG. 2 is an enlarged schematic view of the structure at A in FIG. 1;
FIG. 3 is an enlarged schematic view of the structure at B in FIG. 1;
in the figure: 1. a base plate; 2. a push button switch; 3. a fixed block; 4. a motor; 5. a driving gear; 6. a driven gear; 7. a rotating shaft; 8. a first support plate; 9. a first bearing; 10. a second bearing; 11. a second support plate; 12. a reel; 13. buckling; 14. a groove; 15. an electric push rod; 16. a slider; 17. fixing the rod; 18. a through hole; 19. a sleeve; 20. a support bar; 21. a bolt; 22. a threaded hole; 23. a connecting plate; 24. an illuminating lamp; 25. and a roller.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Examples
Referring to fig. 1-3, the present invention provides the following technical solutions: a pay-off device for constructional engineering comprises a bottom plate 1, wherein a fixed block 3 is fixedly connected to the top end of the bottom plate 1, a motor 4 is fixedly connected to the top end of the fixed block 3, a driving gear 5 is fixedly connected to an output shaft of the motor 4, a driven gear 6 is meshed on the surface of the driving gear 5, a rotating shaft 7 is fixedly connected to the left end of the driven gear 6, a first supporting plate 8 is fixedly connected to the top end of the bottom plate 1, a first bearing 9 penetrates through the first supporting plate 8, the left end of the rotating shaft 7 penetrates through the first bearing 9 and is rotatably connected with a second bearing 10, a second supporting plate 11 is fixedly connected to the left end of the second bearing 10, the bottom end of the second supporting plate 11 is fixedly connected to the bottom plate 1, a winding drum 12 is fixedly connected to the surface of the rotating shaft 7, and the driving, thereby drive driven gear 6 and rotate, then drive pivot 7 and rotate and can drive reel 12 and rotate to carry out the rolling to the cable conductor, reduced staff's intensity of labour, bottom plate 1's top fixedly connected with sleeve 19, 19 endotheca have connect bracing piece 20 in the sleeve, be provided with bolt 21 in the sleeve 19, a plurality of screw hole 22 has been seted up in the bracing piece 20, 19 threaded connection of sleeve are passed to bolt 21's rear end in screw hole 22, can reciprocate bracing piece 20 in the screw hole 22 of difference through with bolt 21 threaded connection, conveniently adjust the height of light 25, make things convenient for the staff to use.
Specifically, all set up fluted 14 in first backup pad 8 and the second backup pad 11, two equal fixedly connected with electric putter 15, two in the recess 14 equal fixedly connected with slider 16 in electric putter 15's the equal fixedly connected with slider 16 in bottom, two the equal sliding connection in both ends about slider 16 is in recess 14, and it can drive dead lever 17 downstream to drive slider 16 to slide in recess 14 through electric putter 15 extension to make dead lever 17 insert in the ground, with pay-off firmly fixed subaerial, prevent that pay-off from removing at the during operation, influence the work efficiency of unwrapping wire.
Specifically, the bottom end of the sliding block 16 is fixedly connected with a fixing rod 17, two through holes 18 are formed in the bottom plate 1, and the surfaces of the fixing rods 17 penetrate through the through holes 18.
Specifically, the right end of the support rod 20 is fixedly connected with a connecting plate 23, and the bottom end of the connecting plate 23 is fixedly connected with a lighting lamp 25.
Specifically, the surface of reel 12 is provided with buckle 13, the bottom of bottom plate 1 is provided with two gyro wheels 26, and gyro wheel 26 can conveniently remove pay-off.
Specifically, the top fixedly connected with button switch 2 of bottom plate 1, button switch 2 passes through wire electric connection with motor 4, electric putter 15 and light 25 respectively.
The utility model discloses a theory of operation and use flow: when the utility model is used, the sleeve 19 is pushed, the pay-off device is driven to move under the cooperation of the roller 26, after the pay-off device is moved to a proper position, the sleeve 19 is stopped to be pushed, then the button switch 2 is clicked, the two electric push rods 15 start working, the two electric push rods 15 extend to drive the two sliders 16 to slide downwards in the grooves 14, so as to drive the two fixing rods 17 to move downwards, when the pay-off device is moved to the ground, the button switch 2 is clicked, the two electric push rods 15 stop working, the pay-off device is firmly fixed on the ground, then the button switch 2 is clicked, the motor 4 starts working, the output shaft of the motor 4 rotates to drive the driving gear 5 to rotate, so as to drive the driven gear 6 to rotate, then the rotating shaft 7 to rotate, finally the winding drum 12 is driven to rotate, so as to pay off the cable, after, when being in the environment of dark, rotation bolt 21, make bolt 21 break away from screw hole 22, then promote bracing piece 20, make bracing piece 20 upwards slide in sleeve 19, slide to suitable position after, stop promoting bracing piece 20, then rotation bolt 21, with bolt 21 threaded connection in suitable screw hole 22, fix bracing piece 20, thereby adjust light 25 to suitable height, then click button switch 2, light 25 begins work, light 25 provides light for the staff, the illumination is accomplished the back, click button switch 2, light 25 stop work.
Finally, it should be noted that: although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments described in the foregoing embodiments, or equivalents may be substituted for elements thereof. Any modification, equivalent replacement, or improvement made within the spirit and principle of the present invention should be included in the protection scope of the present invention.

Claims (6)

1. The utility model provides a pay-off for building engineering, includes bottom plate (1), its characterized in that: the top end of the bottom plate (1) is fixedly connected with a fixed block (3), the top end of the fixed block (3) is fixedly connected with a motor (4), an output shaft of the motor (4) is fixedly connected with a driving gear (5), the surface of the driving gear (5) is meshed with a driven gear (6), the left end of the driven gear (6) is fixedly connected with a rotating shaft (7), the top end of the bottom plate (1) is fixedly connected with a first supporting plate (8), a first bearing (9) is arranged in the first supporting plate (8) in a penetrating mode, the left end of the rotating shaft (7) penetrates through the first bearing (9) to be rotatably connected with a second bearing (10), the left end of the second bearing (10) is fixedly connected with a second supporting plate (11), the bottom end of the second supporting plate (11) is fixedly connected onto the bottom plate (1), and the surface of the rotating shaft (7, the top end of the bottom plate (1) is fixedly connected with a sleeve (19), a supporting rod (20) is sleeved in the sleeve (19), a bolt (21) is arranged in the sleeve (19), a plurality of threaded holes (22) are formed in the supporting rod (20), and the rear end of the bolt (21) penetrates through the sleeve (19) and is connected in the threaded holes (22) in a threaded mode.
2. The line laying device for construction engineering according to claim 1, characterized in that: all set up recess (14) in first backup pad (8) and second backup pad (11), two equal fixedly connected with electric putter (15) in recess (14), two the equal fixedly connected with slider (16) in bottom of electric putter (15), two the equal sliding connection in recess (14) in both ends about slider (16).
3. The line laying device for construction engineering according to claim 2, wherein: the bottom ends of the two sliding blocks (16) are fixedly connected with fixing rods (17), two through holes (18) are formed in the bottom plate (1), and the surfaces of the two fixing rods (17) penetrate through the through holes (18).
4. The line laying device for construction engineering according to claim 1, characterized in that: the right end fixedly connected with connecting plate (23) of bracing piece (20), the bottom fixedly connected with light (25) of connecting plate (23).
5. The line laying device for construction engineering according to claim 1, characterized in that: the surface of the winding drum (12) is provided with a buckle (13), and the bottom end of the bottom plate (1) is provided with two rollers (26).
6. The line laying device for construction engineering according to claim 1, characterized in that: the top end of the bottom plate (1) is fixedly connected with a button switch (2), and the button switch (2) is respectively electrically connected with the motor (4), the electric push rod (15) and the illuminating lamp (25) through wires.
CN202021457149.XU 2020-07-22 2020-07-22 Pay-off for building engineering Expired - Fee Related CN212769012U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021457149.XU CN212769012U (en) 2020-07-22 2020-07-22 Pay-off for building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021457149.XU CN212769012U (en) 2020-07-22 2020-07-22 Pay-off for building engineering

Publications (1)

Publication Number Publication Date
CN212769012U true CN212769012U (en) 2021-03-23

Family

ID=75026695

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021457149.XU Expired - Fee Related CN212769012U (en) 2020-07-22 2020-07-22 Pay-off for building engineering

Country Status (1)

Country Link
CN (1) CN212769012U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114172084A (en) * 2022-01-24 2022-03-11 北京城建集团有限责任公司 Construction method for cable laying

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114172084A (en) * 2022-01-24 2022-03-11 北京城建集团有限责任公司 Construction method for cable laying
CN114172084B (en) * 2022-01-24 2023-07-07 北京城建集团有限责任公司 Construction method for cable laying

Similar Documents

Publication Publication Date Title
CN211556691U (en) Threading construction device that hand propelled building electrical engineering used
CN212769012U (en) Pay-off for building engineering
CN210074624U (en) Cable laying device that stability is high
CN214674030U (en) Tray straight-through energy-saving cable bridge
CN211084000U (en) A remove support device for tunnel construction illumination
CN113788358A (en) Cable pay-off for electric power construction
CN210620056U (en) Hoist engine that building engineering used
CN217153548U (en) Safety monitoring device for construction
CN215934313U (en) Threading construction auxiliary device for building electrical engineering
CN205070312U (en) Cable kinking device
CN211148311U (en) Steel bar strength detection device based on constructional engineering
CN210710107U (en) A intraductal electric wire tractive device for building intelligent installation engineering
CN214399374U (en) Optical cable pay-off
CN214255447U (en) Interim overhead line device of electric power transmission
CN211351487U (en) Cable erection is with supplementary draw off mechanism
CN216351440U (en) Pipeline optical cable construction pay-off
CN214798629U (en) Light current construction winding displacement device
CN220209814U (en) Cable positioning construction auxiliary equipment
CN213185283U (en) Cable erecting device for building electromechanical installation
CN218415572U (en) Building electrical construction threading device
CN220453332U (en) Property management supervisory equipment
CN215167828U (en) Construction platform for housing construction engineering
CN217201393U (en) Lightning protection detects automatic take-up for building engineering
CN214230733U (en) Garden design is with supplementary show model
CN221295960U (en) Sewage pipeline lays uses hoist device

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210323

Termination date: 20210722