CN212641453U - Building pile foundation demolishs device - Google Patents

Building pile foundation demolishs device Download PDF

Info

Publication number
CN212641453U
CN212641453U CN202020925316.2U CN202020925316U CN212641453U CN 212641453 U CN212641453 U CN 212641453U CN 202020925316 U CN202020925316 U CN 202020925316U CN 212641453 U CN212641453 U CN 212641453U
Authority
CN
China
Prior art keywords
pile foundation
mounting groove
platform
lifting
building pile
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020925316.2U
Other languages
Chinese (zh)
Inventor
刘福林
郑恩梅
杜学平
付忠涛
罗帅
叶派
龚荣鑫
李裕钱
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sinohydro Bureau 9 Co Ltd
Original Assignee
Sinohydro Bureau 9 Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sinohydro Bureau 9 Co Ltd filed Critical Sinohydro Bureau 9 Co Ltd
Priority to CN202020925316.2U priority Critical patent/CN212641453U/en
Application granted granted Critical
Publication of CN212641453U publication Critical patent/CN212641453U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Working Measures On Existing Buildindgs (AREA)

Abstract

The utility model provides a building pile foundation demolishs device, include work platform, moving mechanism, lift platform, demolish mechanism and elevating system. At least three moving mechanisms are connected to the bottom of the working platform, and a lifting mechanism is arranged between the lifting platform and the working platform. The dismounting mechanism is arranged at the bottom of the lifting platform. After the demolition mechanism is connected with the pile foundation, external force is applied to the demolition mechanism, and then the pile foundation is moved out of the ground in a connected mode. The action of violence breaking does not exist in the whole process, and pile foundations such as pine piles can be continuously used after being pulled out, so that the utilization efficiency of building materials is increased, and the building material is more environment-friendly and energy-saving.

Description

Building pile foundation demolishs device
Technical Field
The utility model belongs to the technical field of building pile foundation technique and specifically relates to indicate a building pile foundation demolishs device.
Background
In the prior art, often adopt pine stake to carry out soft base and handle, pine stake composite foundation compares with other composite foundations, except that the material of stake is different, all other similar parts all have, its reinforcement mechanism: firstly, the supporting function of the pile body: the pine pile composite foundation replaces low-modulus and low-strength soil with the same volume as a pile body by the pine pile, and when bearing external load, the stress in the foundation is redistributed according to the pile-soil stress ratio. The stress is gradually concentrated to the pile body, the stress born by the soil body around the pile is correspondingly reduced, and most of the load is born by the pine pile. Because the strength and the deformation resistance of the pile are superior to those of the soil body, the bearing capacity and the modulus of the formed composite foundation are superior to those of the original soil body, and therefore the effects of reducing deformation and improving the bearing capacity are achieved. Secondly, compaction function: when the loose wood pile is constructed, the loose wood pile is hammered and driven, and the original soil body at the position of the pile hole is forced to be extruded laterally, so that the compactness of the soil layer in a certain range around the pile is improved, and the compaction effect is achieved. The compaction effect of the pine pile composite foundation on soil bodies among piles in construction enables the soil among the piles to be compact, so that the bearing capacity of the soil among the piles is improved, and the compressibility is reduced.
In the prior art, the temporary support of the pine stump is generally directly destroyed and removed with brute force, so that the pine stump cannot be pulled out for repeated use, and the building material is greatly wasted. To solve this problem, we propose a building pile foundation demolition apparatus to solve the above-mentioned problems.
SUMMERY OF THE UTILITY MODEL
The utility model discloses the technical problem that will solve is: a device for dismantling the pile foundation of building is disclosed.
In order to solve the technical problem, the utility model discloses a technical scheme be: the building pile foundation demolition device comprises a working platform, a moving mechanism, a lifting platform, a demolition mechanism and a lifting mechanism;
the bottom of the working platform is connected with at least three moving mechanisms, and a lifting mechanism is arranged between the lifting platform and the working platform;
the dismounting mechanism is arranged at the bottom of the lifting platform.
Further, demolish the mechanism and include driving motor, shaft coupling and screw thread drilling rod, driving motor fixes lift platform's bottom, driving motor passes through the shaft coupling connect in the screw thread drilling rod, be provided with connecting portion on the shaft coupling.
Further, be provided with first mounting groove and second mounting groove on the shaft coupling, first mounting groove with the second mounting groove is in on the same axis, first mounting groove with all be provided with the screw hole that link up with the lateral wall on the second mounting groove, be connected with fastening bolt on the screw hole, driving motor's axis of rotation passes through fastening bolt installs in the first mounting groove, the screw thread drilling rod passes through fastening bolt installs in the second mounting groove.
Furthermore, the lifting platform is further provided with a connecting piece and a sliding groove, the first end of the connecting piece is connected to the sliding groove in a sliding mode, the connecting portions are through connecting holes, the number of the connecting pieces is two, and the second end of the connecting piece is movably inserted into the connecting holes.
Further, a second end of the connecting piece is provided with a magnetic device, and the two magnetic devices are magnetically connected.
Further, elevating system is the jacking cylinder, the jacking cylinder includes cylinder body and the flexible end of cylinder, cylinder body fixed connection in work platform, the flexible end fixed connection of cylinder in elevating platform.
The beneficial effects of the utility model reside in that: moving mechanism is installed to work platform's below, consequently the utility model provides a comparatively nimble when building pile foundation demolishs device uses. Be provided with elevating system between elevating system and the work platform, the mechanism is demolishd to elevating system's bottom installation, consequently can make the mechanism of demolishing be close to the pile foundation under elevating system's effect, then advances to connect and demolish the pile foundation. After the demolition mechanism is connected with the pile foundation, external force is applied to the demolition mechanism, and then the pile foundation is moved out of the ground in a connected mode. The action of violence breaking does not exist in the whole process, and pile foundations such as pine piles can be continuously used after being pulled out, so that the utilization efficiency of building materials is increased, and the building material is more environment-friendly and energy-saving.
Drawings
The specific structure of the present invention is detailed below with reference to the accompanying drawings:
fig. 1 is a perspective view of the present invention;
FIG. 2 is a front view of the present invention;
FIG. 3 is a sectional view taken along line A-A of the present invention;
fig. 4 is a cross-sectional view of the coupling of the present invention.
Detailed Description
In order to explain technical contents, structural features, and objects and effects of the present invention in detail, the following description is given in conjunction with the embodiments and the accompanying drawings.
Reference will now be made in detail to embodiments of the present invention, examples of which are illustrated in the accompanying drawings, wherein like reference numerals refer to the same or similar elements or elements having the same or similar function throughout. The embodiments described below with reference to the drawings are exemplary and intended to be used for explaining the present invention, and should not be construed as limiting the present invention.
Referring to fig. 1 to 4, the utility model provides a building pile foundation demolishs device, including work platform 1, moving mechanism 2, lift platform 3, demolishs mechanism 4 and elevating system 5.
Work platform 1 is the support body structure, and in this embodiment, work platform 1 is the rectangle frame construction, is provided with a plurality of moving mechanism 2 in work platform 1's bottom, and whole device is convenient and flexible when using with the help of moving mechanism 2 change workplace, and moving mechanism 2's quantity is three at least, just can provide the support for whole device steadily.
The lifting platform 3 is a beam or beam plate-shaped structure and is arranged above the working platform 1, and a lifting mechanism 5 is arranged between the working platform 1 and the lifting platform 3. Meanwhile, the bottom of the lifting platform 3 is connected with a dismantling mechanism 4. After placing the position that needs to break the pile foundation with building pile foundation demolishs the device, will demolish mechanism 4 through elevating system 5 and be close to pine stake or other pile foundations, demolish mechanism 4 and pile foundation and establish after being connected, through applying external force to demolishing mechanism 4, extract the pine pile foundation from ground. In the process of demolishing the pile foundation, no violent damage exists, the demolished pile foundation can be reused, the cyclic utilization of building materials is increased, and the building cost is saved. As a preferred, in this embodiment, elevating system 5 is the jacking cylinder, and the jacking cylinder includes cylinder body and the flexible end of cylinder, and cylinder body fixed mounting is on work platform 1, the flexible end fixed connection of cylinder is in elevating platform 3, through the motion of jacking cylinder, controls elevating platform 3's motion in order.
Specifically, the demolition mechanism 4 includes a drive motor 41, a coupling 42, and a threaded drill rod 43. The driving motor 41 is fixed at the bottom of the lifting platform, and the driving motor 41 is connected with the threaded drill rod 43 through the coupler 42. Under the drive of the driving motor 41, the threaded drill rod 43 is connected with the pile foundation, when the threaded drill rod 43 penetrates into the pine pile, the driving motor 41 is separated from the coupler 42, meanwhile, external force is applied to the connecting portion 423 on the coupler 42, and then the pile foundation is pulled out from the ground, and the pile foundation can be repeatedly used without damage in the process.
Specifically, in this embodiment, the coupling 42 is provided with a first mounting groove 421 and a second mounting groove 422, the first mounting groove 421 and the second mounting groove 422 are on the same axis, the side walls of the first mounting groove 421 and the second mounting groove 422 are both provided with threaded holes penetrating through the side walls, and corresponding fastening bolts 424 are arranged in the threaded holes. The rotation shaft of the driving motor 41 is installed in the first installation groove 421 and then fixed by the fastening bolt 424, and the threaded drill rod 43 is installed in the second installation groove 422 and then fixed by the fastening bolt 424. As can be seen from the above, the coupling 42 can flexibly connect the driving motor 41 and the threaded drill rod 43 together.
As an optimization, after the pile foundation is connected with the threaded drill rod 43, the pile foundation and the lifting platform 3 are directly connected, the pile foundation is pulled out through the lifting mechanism 5, the working platform 1 does not need to be moved at the moment, and the use is more convenient and flexible. Specifically, a sliding groove 31 and a connecting member 32 are provided on the lifting platform 3, and a first end of the connecting member 32 can slide along the sliding groove 31, so as to change the distance between the two connecting members 32. The connecting portion 423 is a through connecting hole, and in this embodiment, two connecting members 32 are provided on the lifting platform 3 and can be inserted into the connecting holes from two ends, respectively. As described above, after the threaded drill rod 43 is inserted into the pile foundation, the connector 32 is inserted into the connecting portion 423, and the pile foundation can be pulled out by the upward movement of the elevating mechanism 5. Further, in order to ensure stability when the connecting member 32 exerts a tensile force in the connecting portion 423, the magnetic devices 321 are provided at the second ends of the two connecting members 32, and the two magnetic devices 321 are magnetically connected to each other, so that the connecting member can be prevented from falling out of the connecting portion 423 when the pile foundation is lifted. The magnetic device 321 is preferably an electromagnet, and the timing of its operation can be controlled. In the process, the dismounting device does not move, the coupler 42 does not need to be dismounted, and the dismounting of the pile foundation is directly completed.
From the above description, the beneficial effects of the present invention are: moving mechanism is installed to work platform's below, consequently the utility model provides a comparatively nimble when building pile foundation demolishs device uses. Be provided with elevating system between elevating system and the work platform, the mechanism is demolishd to elevating system's bottom installation, consequently can make the mechanism of demolishing be close to the pile foundation under elevating system's effect, then advances to connect and demolish the pile foundation. After the demolition mechanism is connected with the pile foundation, external force is applied to the demolition mechanism, and then the pile foundation is moved out of the ground in a connected mode. The action of violence breaking does not exist in the whole process, and pile foundations such as pine piles can be continuously used after being pulled out, so that the utilization efficiency of building materials is increased, and the building material is more environment-friendly and energy-saving. Set up the connecting piece on lift platform, can directly take out the pile foundation through lift platform, avoided changing equipment position many times, just can take out the process of pile foundation, increased work efficiency.
The above only is the embodiment of the present invention, not limiting the patent scope of the present invention, all the equivalent structures or equivalent processes that are used in the specification and the attached drawings or directly or indirectly applied to other related technical fields are included in the patent protection scope of the present invention.

Claims (6)

1. The utility model provides a building pile foundation demolishs device which characterized in that: comprises a working platform, a moving mechanism, a lifting platform, a dismounting mechanism and a lifting mechanism;
the bottom of the working platform is connected with at least three moving mechanisms, and a lifting mechanism is arranged between the lifting platform and the working platform;
the dismounting mechanism is arranged at the bottom of the lifting platform.
2. The building pile foundation demolition apparatus as defined in claim 1 wherein: the dismounting mechanism comprises a driving motor, a coupler and a threaded drill rod, the driving motor is fixed to the bottom of the lifting platform, the driving motor is connected to the threaded drill rod through the coupler, and a connecting portion is arranged on the coupler.
3. The building pile foundation demolition apparatus as defined in claim 2 wherein: the improved drill pipe joint is characterized in that a first mounting groove and a second mounting groove are formed in the coupler, the first mounting groove and the second mounting groove are located on the same axis, threaded holes communicated with the side wall are formed in the first mounting groove and the second mounting groove, fastening bolts are connected to the threaded holes, the rotating shaft of the driving motor is installed in the first mounting groove through the fastening bolts, and a threaded drill pipe passes through the fastening bolts and is installed in the second mounting groove.
4. A building pile foundation demolition apparatus as claimed in claim 3, wherein: the lifting platform is further provided with connecting pieces and sliding grooves, the first ends of the connecting pieces are connected to the sliding grooves in a sliding mode, the connecting portions are through connecting holes, the number of the connecting pieces is two, and the second ends of the connecting pieces are movably inserted into the connecting holes.
5. The building pile foundation demolition apparatus as defined in claim 4 wherein: and a second end of the connecting piece is provided with a magnetic device, and the two magnetic devices are magnetically connected.
6. The building pile foundation demolition apparatus as defined in claim 1 wherein: the lifting mechanism is a jacking cylinder, the jacking cylinder comprises a cylinder body and a cylinder telescopic end, the cylinder body is fixedly connected to the working platform, and the cylinder telescopic end is fixedly connected to the lifting platform.
CN202020925316.2U 2020-05-27 2020-05-27 Building pile foundation demolishs device Active CN212641453U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020925316.2U CN212641453U (en) 2020-05-27 2020-05-27 Building pile foundation demolishs device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020925316.2U CN212641453U (en) 2020-05-27 2020-05-27 Building pile foundation demolishs device

Publications (1)

Publication Number Publication Date
CN212641453U true CN212641453U (en) 2021-03-02

Family

ID=74796549

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020925316.2U Active CN212641453U (en) 2020-05-27 2020-05-27 Building pile foundation demolishs device

Country Status (1)

Country Link
CN (1) CN212641453U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115075248A (en) * 2022-06-16 2022-09-20 中国水利水电第九工程局有限公司 Pile head chiseling device for pile foundation construction

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN115075248A (en) * 2022-06-16 2022-09-20 中国水利水电第九工程局有限公司 Pile head chiseling device for pile foundation construction
CN115075248B (en) * 2022-06-16 2024-06-04 中国水利水电第九工程局有限公司 Pile head chiseling device for pile foundation construction

Similar Documents

Publication Publication Date Title
US5492437A (en) Self-aligning devices and methods for lifting and securing structures
CN102292504B (en) Pile driver for use in a confined space with limited head room
US6872031B2 (en) Apparatus and method of supporting a structure with a pier
CN212641453U (en) Building pile foundation demolishs device
US7044686B2 (en) Apparatus and method for supporting a structure with a pier
KR102261901B1 (en) Multi points extension apparatus for underground steel pipe
CN213358613U (en) Pulling device for steel pipe slope protection pile
KR102344567B1 (en) Steel pipe pile section extension method using multi points extension apparatus for underground steel pipe
CN212026256U (en) Guide platform for building
CN111236683B (en) Column body reinforcing and pile body static pressure construction device under shearing damage and construction method
CN108468337B (en) Recyclable foundation pit supporting pile, dismounting device and using method
CN211872996U (en) Anchor rod static pile press
KR102224526B1 (en) Partial extension apparatus for underground pipe and composite cast in place pile method using the same
CN218373842U (en) Chain-driven small-sized large-tonnage pile pressing equipment
CN116623676B (en) Excavation side slope pre-reinforcement pile wall supporting structure
CN220183984U (en) Foundation pit backfilling compaction device
CN211922713U (en) A difference settlement orthotic devices for underground pipe gallery construction
CN214328850U (en) Foundation pile structure of foundation engineering
CN212641542U (en) Impact spade for rapid construction of manual hole digging pile
CN102926383B (en) A kind of single shaft SMW engineering method stake machine
CN217231862U (en) Folding pin-connected panel roadbed case that can act as fender pile guide wall
CN219604341U (en) Bored concrete pile construction equipment
CN214738203U (en) Pile foundation mechanism convenient to install
CN221072623U (en) Single-clamp quick switching device
EP4187018A1 (en) Pile foundation and method for installing a pile foundation

Legal Events

Date Code Title Description
GR01 Patent grant