Prior art keywords
ceiling
railway
cross
sliding rails
upright columns
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020380966.3U
Other languages
Chinese (zh)
Inventor
吴俊�
刘长卿
张勇
武秀军
胡卓航
王坤
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway Beijing Engineering Group Co Ltd
Fifth Engineering Co Ltd of China Railway Beijing Engineering Group Co Ltd
Original Assignee
China Railway Beijing Engineering Group Co Ltd
Fifth Engineering Co Ltd of China Railway Beijing Engineering Group Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway Beijing Engineering Group Co Ltd, Fifth Engineering Co Ltd of China Railway Beijing Engineering Group Co Ltd filed Critical China Railway Beijing Engineering Group Co Ltd
Priority to CN202020380966.3U priority Critical patent/CN212611977U/en
Application granted granted Critical
Publication of CN212611977U publication Critical patent/CN212611977U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Tents Or Canopies (AREA)

Abstract

The utility model discloses a stride protection rack of railway line, include: the railway track comprises upright columns, cross beams, sliding rails and a ceiling, wherein the upright columns are distributed on two sides of a railway line in parallel, the cross beams are installed on the top ends of the upright columns along the railway extending direction, the sliding rails with upward openings are installed on the top ends of the cross beams, the ceiling is installed at the upper ends of the sliding rails, at least four sliding blocks are arranged at the bottom of the ceiling, and the sliding blocks freely slide inside the sliding rails. The movable sectional ceiling is adopted, so that the movable sectional ceiling can be moved, and the ceiling can be installed and disassembled in a sectional manner, so that the movable sectional ceiling is practical and convenient, and saves manpower; because the cooperation of slide rail and slider is used, can follow the ceiling that slides from beginning to end in certain direction, and pass through the connecting rod through first through-hole and the second through-hole on the slider and connect, can fix a position fast and fixed ceiling, avoid the ceiling to slide along the slide rail.

Description

Protective shed frame crossing railway line
Technical Field
The utility model relates to a technical field at construction appurtenance, more specifically say, the utility model relates to a stride protection rack of railway line.
Background
With the construction of large-scale roads and bridges, in order to not influence the smoothness of the existing roads, temporary protective shed frames are usually erected on the existing roads. At present, a hoisting method for binding I-shaped steel by using a steel wire rope is adopted when construction units carry out construction, workers often have difficulty in dismounting when binding or removing the steel wire rope on a protective shed frame, the workers are dangerous in picking up the steel wire rope in high-altitude operation, and the time and the work efficiency are low. However, when the protective shed frame is removed after the construction of the newly-built line is completed, the newly-built line is formed, and the hoisting equipment cannot directly stretch into the shed roof to remove the shed frame, so that great trouble is caused to the engineering construction, and the safety risk in the removal process is extremely high.
In order to ensure that the installation and disassembly and assembly processes are completed in a short time, so that the influence on the railway passage is reduced to the greatest extent, the construction cost is reduced, the short-time construction requirement is met, and a novel protective shed frame is urgently needed.
SUMMERY OF THE UTILITY MODEL
It is an object of the present invention to solve at least the above problems and to provide at least the advantages which will be described later.
It is yet another object of the present invention to provide a sliding ceiling which is simple and secure to prevent the ceiling from moving back and forth.
In order to achieve these objects and other advantages in accordance with the purpose of the invention, there is provided a protection shed frame crossing a railway line, comprising: the railway track comprises upright columns, cross beams, sliding rails and a ceiling, wherein the upright columns are distributed on two sides of a railway line in parallel, the cross beams are installed on the top ends of the upright columns along the railway extending direction, the sliding rails with upward openings are installed on the top ends of the cross beams, the ceiling is installed at the upper ends of the sliding rails, at least four sliding blocks are arranged at the bottom of the ceiling, and the sliding blocks freely slide inside the sliding rails.
Preferably, the slide block is provided with a first through hole, a plurality of pairs of corresponding second through holes are drilled on two side walls of the slide rail at equal intervals, and the first through hole and the second through hole are connected through a connecting rod.
Preferably, a rubber layer is arranged at a position corresponding to the sliding block inside the two side walls of the sliding rail.
Preferably, the ceiling is a sectional ceiling, and the length of each sectional ceiling is 3 meters.
Preferably, the ceiling is provided with a drainage slope.
Preferably, the cross beam is H-shaped steel.
Preferably, the sliding block is a steel sliding block.
Preferably, a cross brace is arranged between the upright posts.
The utility model discloses at least, include following beneficial effect: the movable sectional ceiling is adopted, so that the ceiling can be installed and disassembled in a moving mode in a sectional mode, and the movable sectional ceiling is practical and convenient and saves labor; because the cooperation of slide rail and slider is used, can follow the ceiling that slides from beginning to end in certain direction, and pass through the connecting rod through first through-hole and the second through-hole on the slider and connect, can fix a position fast and fixed ceiling, avoid the ceiling to slide along the slide rail.
Additional advantages, objects, and features of the invention will be set forth in part in the description which follows and in part will become apparent to those having ordinary skill in the art upon examination of the following or may be learned from practice of the invention.
Drawings
FIG. 1 is a front view of a protective canopy frame according to an embodiment of the present invention;
fig. 2 is a schematic view illustrating the connection between the slide rail and the slide block according to an embodiment of the present invention;
reference numerals: 1. a column; 2. a cross beam; 3. a slide rail; 31. a second through hole; 4. a ceiling; 5. a slider; 51. a first through hole; 6. a connecting rod.
Detailed Description
The present invention is further described in detail below with reference to the drawings so that those skilled in the art can implement the invention with reference to the description.
It will be understood that terms such as "having," "including," and "comprising," as used herein, do not preclude the presence or addition of one or more other elements or groups thereof.
Fig. 1 shows an implementation form according to the present invention, which includes: stand 1, crossbeam, 2, slide rail 3 and ceiling 4, stand 1 distributes in the railway line both sides that need protect parallelly, crossbeam 2 along the railway extending direction install in the top of stand 1, the length of crossbeam 2 equals the length that stand 1 distributes along the railway line, the ascending slide rail 3 of opening is installed along its length direction in the top of crossbeam 2, ceiling 4 install in the upper end of slide rail 3, just the bottom of ceiling 4 is equipped with four at least sliders 5, slider 5 supports ceiling 4, and can follow slide rail 3 takes ceiling 4 freely slides.
According to the technical scheme, various materials of the protective shed frame can be prefabricated and processed in the early stage and then transported to a construction site for installation, during installation, the plurality of upright columns 1 are installed on two sides of a railway line needing to be protected in parallel, the cross beam 2 is installed at the top ends of the upright columns 1 along the railway extending direction, the slide rails 3 are installed at the top ends of the cross beams 2, the ceiling 4 is hoisted to the slide rails 3 by a crane and then moved to a specified position along the slide rails 3, and after the ceiling 4 is moved along the slide rails 3 until all railway lines needing to be protected are covered, the protective shed frame installation across the railway line is completed. When the roof is dismounted, the ceiling 4 is firstly slid to dismount, and then the sliding rails 3, the cross beams 2 and the upright posts 1 are sequentially dismounted.
Fig. 2 shows an implementation form of the present invention, wherein a first through hole 51 is provided on the slider 5, a plurality of pairs of corresponding second through holes 31 are drilled equidistantly on two side walls of the slide rail 3, and the first through hole 51 and the second through holes 31 are connected by a connecting rod 6. When in use, the positions of the second through holes 31 can be arranged according to a fixed distance, the sizes of the first through holes and the second through holes can be slightly larger than that of steel rods used in construction, and steel rods left on site can be used for sequentially penetrating through the second through holes, the first through holes and the second through holes in construction to be connected and fixed; the first through hole and the first through hole can also be threaded holes, and after alignment, the screw rod is used for connection and fixation.
One implementation manner of the slide rail 3 in the above scheme is as follows: rubber layers are arranged at positions corresponding to the sliding blocks 5 in the two side walls of the sliding rail 3. The rubber layer can be tightly attached to the sliding block 5, so that the sliding block 5 is prevented from moving before the connecting rod 6 is used, and the sliding block 5 is prevented from moving in the width direction of the sliding rail 3 after the connecting rod is fixedly connected.
One implementation of the ceiling 4 in the above scheme is as follows: the ceiling 4 is a sectional ceiling, and the length of each section of ceiling is 3 meters. With the sectional type ceiling, the multi-section type ceiling can be transported to the site in batches, can be installed and disassembled section by section, and is connected by using the connecting pieces to form an integral structure.
One implementation of the ceiling 4 in the above scheme is as follows: and a drainage slope is arranged on the ceiling 4. When meeting rainfall scheduling problem in the use, can in time discharge the rainwater on the ceiling, avoid the rainwater to pile up the pressure that increases the ceiling top, cause the problem that ceiling life reduces and easily corrodes.
One implementation manner of the beam 2 in the above scheme is as follows: the beam is H-shaped steel. The H-shaped steel is an economic section efficient section with more optimized cross-sectional area distribution and more reasonable strength-to-weight ratio, and has the advantages of strong bending resistance, simplicity in construction, cost saving, light structure weight and the like.
One implementation manner of the slider 5 in the above scheme is as follows: the sliding block 5 is a steel sliding block. The steel slide block has stronger bearing capacity compared with other materials, and can support the ceiling 4 and drive the ceiling to move.
One implementation way of the protective shed frame crossing the railway line in the scheme is as follows: and a cross brace is arranged between the upright posts 1. The cross brace is the diagonal brace of protection canopy frame, plays the vertical stable effect to protection canopy frame, strengthens vertical rigidity, improves whole steady setting.
The number of apparatuses and the scale of the process described here are intended to simplify the description of the present invention. Applications, modifications and variations of the present invention will be apparent to those skilled in the art.
As described above, according to the present invention, since the movable sectional ceiling is adopted, the ceiling can be installed and disassembled in a movable manner, which is practical and convenient and saves manpower; because the cooperation of slide rail and slider is used, can follow the ceiling that slides from beginning to end in certain direction, and pass through the connecting rod through first through-hole and the second through-hole on the slider and connect, can fix a position fast and fixed ceiling, avoid the ceiling to slide along the slide rail.
While embodiments of the invention have been disclosed above, it is not intended to be limited to the applications listed in the specification and the examples. It can be applicable to various and be fit for the utility model discloses a field completely. Additional modifications will readily occur to those skilled in the art. The invention is therefore not to be limited to the specific details and illustrations shown and described herein, without departing from the general concept defined by the claims and their equivalents.

Claims (8)

1. A protective shed frame for crossing railway lines, comprising: the railway track comprises upright columns, cross beams, sliding rails and a ceiling, wherein the upright columns are distributed on two sides of a railway line in parallel, the cross beams are installed on the top ends of the upright columns along the railway extending direction, the sliding rails with upward openings are installed on the top ends of the cross beams, the ceiling is installed at the upper ends of the sliding rails, at least four sliding blocks are arranged at the bottom of the ceiling, and the sliding blocks freely slide inside the sliding rails.
2. The protective shelving across a railway line as claimed in claim 1, further comprising: the slide block is provided with a first through hole, a plurality of pairs of corresponding second through holes are drilled on two side walls of the slide rail at equal intervals, and the first through hole is connected with the second through holes through a connecting rod.
3. The shelter frame for crossing railway lines as claimed in claim 1, wherein a rubber layer is provided inside the two side walls of the slide rail at a position corresponding to the slide block.
4. The shelter frame for a cross-rail line of claim 1, wherein the canopy is a segmented canopy and each segment of canopy is 3 meters in length.
5. The shelter frame for a railway line as claimed in claim 1, wherein a drainage ramp is provided on the roof.
6. The shelter frame for a railway line as claimed in claim 1, wherein the cross-beams are H-section steel.
7. The shelter frame for a cross-rail line of claim 1, wherein the slider is a steel slider.
8. The shelter frame for a cross-rail line of claim 1, wherein cross braces are provided between the uprights.
CN202020380966.3U 2020-03-23 2020-03-23 Protective shed frame crossing railway line Active CN212611977U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020380966.3U CN212611977U (en) 2020-03-23 2020-03-23 Protective shed frame crossing railway line

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020380966.3U CN212611977U (en) 2020-03-23 2020-03-23 Protective shed frame crossing railway line

Publications (1)

Publication Number Publication Date
CN212611977U true CN212611977U (en) 2021-02-26

Family

ID=74708627

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020380966.3U Active CN212611977U (en) 2020-03-23 2020-03-23 Protective shed frame crossing railway line

Country Status (1)

Country Link
CN (1) CN212611977U (en)

Similar Documents

Publication Publication Date Title
CN107338868B (en) Large spherical screen mounting system and construction method thereof
CN108360380B (en) Bridge pier column construction operation platform and construction method thereof
CN104929373A (en) Large-span square steel pipe truss and accumulative sliding construction method thereof
CN114961334B (en) High-altitude large-span overhanging structure closed protection dismantling system and construction method thereof
CN112796528B (en) Construction method for high-altitude in-situ splicing of large-span steel truss
CN107060098A (en) A kind of high-altitude wire frame Steel Structure Installation method based on sliding platform
CN114876239B (en) High-altitude overhanging structure closed protection dismantling system and construction method thereof
CN205954489U (en) Stride cast -in -place space of business line steel structure construction protection on bridge and move movable support
CN108412187B (en) Construction device and construction method for outer frame structure of ultra-high conjoined group tower
CN212611977U (en) Protective shed frame crossing railway line
CN210563531U (en) Steel structure support for building protection
CN205955164U (en) Portable steel truss operation platform
CN114108480A (en) Full-section downward-sliding erection structure of suspension bridge catwalk and construction method thereof
CN106522566A (en) Roof steel truss slipping rail and dismounting and installing method thereof
CN114575251A (en) Large-span steel truss arch bridge construction system and construction method
US4201275A (en) Means for the renovating and refurbishing of overhead structures
CN113202280A (en) Conversion bracket type steel structure for steel structure high-altitude construction and construction method thereof
CN113309008A (en) Steel case roof beam temporary support construction safety work platform
CN112726426A (en) Novel movable protective shed of bracket and steel pipe column combined gantry type
CN112796498A (en) Double-column type electric construction platform with truss girder and working method thereof
CN111516137A (en) Hydraulic integral movable prefabricated box girder web plate reinforcing steel bar jig frame and construction method
CN110761485A (en) Method for installing C-shaped closed stock ground portal steel frame structure
CN216076209U (en) Adjust nimble outer hanging handling frame of building
CN214061284U (en) A assembled construction platform for pier stud tie beam construction
CN217324999U (en) Large-span steel truss arch bridge construction system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant