CN212567359U - On-spot settlement monitoring integrated device of supervising of building engineering - Google Patents

On-spot settlement monitoring integrated device of supervising of building engineering Download PDF

Info

Publication number
CN212567359U
CN212567359U CN202021114265.1U CN202021114265U CN212567359U CN 212567359 U CN212567359 U CN 212567359U CN 202021114265 U CN202021114265 U CN 202021114265U CN 212567359 U CN212567359 U CN 212567359U
Authority
CN
China
Prior art keywords
fixedly connected
integrated device
monitoring integrated
settlement monitoring
bolt
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021114265.1U
Other languages
Chinese (zh)
Inventor
唐迅
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Urban Construction Engineering Consulting Group Co ltd
Original Assignee
Sichuan Urban Construction Engineering Supervision Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Urban Construction Engineering Supervision Co ltd filed Critical Sichuan Urban Construction Engineering Supervision Co ltd
Priority to CN202021114265.1U priority Critical patent/CN212567359U/en
Application granted granted Critical
Publication of CN212567359U publication Critical patent/CN212567359U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Buildings Adapted To Withstand Abnormal External Influences (AREA)

Abstract

The utility model discloses a building engineering scene is prised and is managed settlement monitoring integrated device, mesa top surface fixedly connected with anchor clamps, mesa top surface fixedly connected with right arm lock, right arm lock side threaded connection has the bolt, and runs through right arm lock and extend to left arm lock right flank, bolt left end threaded connection has adjusting nut, bolt right-hand member threaded connection has fixation nut, two symmetrical spouts have been seted up at mesa bottom surface middle part, the inside sliding connection of spout has the slider, slider bottom surface fixedly connected with support frame. This building engineering scene is prised reason and is subsided monitoring integrated device can realize pressing from both sides tightly to subsiding the detector through anchor clamps, realizes dismantling of subsiding the detector, the operation of being more convenient for, subsides the detector through the anchor clamps mountable, can realize the settlement detection to the road basement floor through oil pipe, and two kinds of detection device simultaneous workings realize detecting simultaneously, the more regulation and the removal of being convenient for.

Description

On-spot settlement monitoring integrated device of supervising of building engineering
Technical Field
The utility model relates to a subside and detect technical field, specifically be a building engineering scene prison settlement monitoring integrated device.
Background
The settlement observation is that observation is carried out according to observation points arranged on the building and fixed (permanent level points) measuring points, the settlement degree is measured and expressed by data, the settlement observation is set for more than one layer of buildings and building design requirements, and the observation points are set for manpower, soil foundations (sand foundations) and the like, and observation and recording are carried out according to the time or the layer progress in the construction until completion.
Present subside detection device adjusts waste time, and inefficiency, use inconvenient, the operation process is loaded down with trivial details, and current settlement monitoring device function singleness, most can only be to separately detect extravagant manpower and materials above the horizontal plane or below the horizontal plane.
SUMMERY OF THE UTILITY MODEL
Technical problem to be solved
Not enough to prior art, the utility model provides a building engineering scene is prison and is managed settlement monitoring integrated device has solved the problem that the background art provided.
(II) technical scheme
In order to achieve the above object, the utility model provides a following technical scheme: the on-site supervision and settlement monitoring integrated device for the building engineering comprises a table board, wherein a clamp is fixedly connected to the top surface of the table board, a right clamp arm is fixedly connected to the top surface of the table board, a left clamp arm is slidably connected to the inner wall of the right clamp arm, a bolt is in threaded connection with the side surface of the right clamp arm and extends to the right side surface of the left clamp arm, an adjusting nut is in threaded connection with the left end of the bolt, a fixing nut is in threaded connection with the right end of the bolt, two symmetrical chutes are formed in the middle of the bottom surface of the table board, a sliding block is slidably connected inside the chutes, a supporting frame is fixedly connected to the bottom surface of the sliding block, two symmetrical oil pipes are fixedly embedded inside the supporting frame, a rubber plug is slidably connected to the bottom end inside each oil pipe, every equal sliding connection in inside upper end of oil pipe has the floating block, every oil pipe surface upper end all is equipped with the scale.
As a further description of the above technical solution, two sets of symmetrical telescopic rods are fixedly connected to the periphery of the bottom surface of the table top, a sleeve is fixedly sleeved at the bottom end of each telescopic rod, and the lifting function of the detection device can be realized through the cooperation of the telescopic rods and the sleeves.
As a further description of the above technical solution, a universal wheel is fixedly connected to the bottom surface of each sleeve.
As further description of the technical scheme, hydraulic oil is arranged inside the oil pipe, and the universal wheels are used for facilitating movement of the detection equipment.
As the further description of the technical scheme, the support frame is fixedly connected to the bottom surface of the sliding block, and the support frame is connected with the table top in a sliding mode through the support frame, so that the foundation settlement can be detected conveniently.
As the further description of the technical scheme, the top surface of the right clamping arm is fixedly connected with the cushion pad, and the protection of the settlement monitor can be effectively realized through the cushion pad.
As a further description of the above technical solution, the surface of the table top is fixedly connected with a pushing handle, and the movement of the sedimentation detection device can be more convenient through the pushing handle.
(III) advantageous effects
The utility model provides a building engineering scene prison settlement monitoring integrated device possesses following beneficial effect:
(1) this building engineering scene is prised reason and is subsided monitoring integrated device through anchor clamps, can realize pressing from both sides tightly to subsiding the detector, realizes dismantling of subsiding the detector, the operation of being more convenient for, subsides the detector through the anchor clamps mountable, can realize the settlement detection to the road floor through oil pipe, and two kinds of detection device simultaneous workings realize detecting simultaneously, the more be convenient for adjust and remove.
(2) This building engineering field prison settlement monitoring integrated device, through telescopic link and telescopic cooperation, can realize the function to the check out test set lift, be convenient for through the universal wheel to the removal of check out test set, can reach energy transfer through hydraulic oil, wear-resisting, the system is lubricated, it is anticorrosive, rust-resistant, effect such as cooling, be convenient for more to the detection that the ground subsides through support frame and mesa sliding connection, through the blotter, can effectively realize the protection to the settlement monitor, can more conveniently remove to settlement detection device through pushing hands.
Drawings
FIG. 1 is a front view of the structure of the present invention;
FIG. 2 is an enlarged view of the structural jig of the present invention;
FIG. 3 is an enlarged view of the joint of the structural support frame of the present invention;
fig. 4 is a sectional view of the structure of the present invention.
In the figure: 1 table top, 2 telescopic rods, 3 sleeves, 4 universal wheels, 5 clamps, 501 right clamping arms, 502 left clamping arms, 503 bolts, 504 fixing nuts, 505 adjusting nuts, 6 sliding grooves, 7 sliding blocks, 8 supporting frames, 9 oil pipes, 10 hydraulic oil, 11 rubber plugs, 12 connecting rods, 13 conical heads, 14 floating blocks, 15 scales, 16 cushion pads and 17 pushing hands.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-4, the present invention provides a technical solution: the utility model provides a building engineering field prison settlement monitoring integrated device, including mesa 1, 1 peripheral fixedly connected with two sets of symmetrical telescopic links 2 in mesa bottom surface, 2 bottom of every telescopic link all fixed cup joints sleeve 3, cooperation through telescopic link 2 and sleeve 3, can realize the function to the check out test set lift, the equal fixedly connected with universal wheel 4 in every sleeve 3 bottom surface, be convenient for the removal to check out test set through universal wheel 4, 1 top surface fixedly connected with anchor clamps 5 of mesa, 1 top surface fixedly connected with right arm lock 501 of mesa, right arm lock 501 top surface fixedly connected with blotter 16, through blotter 16, can effectively realize the protection to the settlement monitor, right arm lock 501 inner wall sliding connection has left arm lock 502, right arm lock 501 side threaded connection has bolt 503, and run through right arm lock 501 and extend to left arm lock 502 right flank.
The left end of the bolt 503 is in threaded connection with an adjusting nut 505, the right end of the bolt 503 is in threaded connection with a fixing nut 504, the middle part of the bottom surface of the table board 1 is provided with two symmetrical chutes 6, the inside of each chute 6 is in sliding connection with a slider 7, the bottom surface of the slider 7 is fixedly connected with a support frame 8, the detection of the foundation settlement is more convenient through the sliding connection of the support frame 8 and the table board 1, the inside of the support frame 8 is fixedly embedded with two symmetrical oil pipes 9, the inside of each oil pipe 9 is provided with hydraulic oil 10, the effects of energy transfer, wear resistance, system lubrication, corrosion resistance, rust resistance, cooling and the like can be achieved through the hydraulic oil 10, the bottom end inside each oil pipe 9 is in sliding connection with a rubber plug 11, the bottom surface of each rubber plug 11 is fixedly connected with a connecting rod 12, the bottom end, the surface of the table board 1 is fixedly connected with a push handle 17, and the movement of the settlement detection device can be more convenient through the push handle 17.
The working principle is as follows: the regulation through adjusting nut 505 drives the rotation of bolt 503, and then adjust the distance of right arm lock 501 and left arm lock 502 and then press from both sides tight settlement detector, through the height to the telescopic link adjustment mesa, and then to settlement detector altitude mixture control, slide to support frame 8 through 6 sliders 7 of spout of mesa 1 lower part, make 8 roll-off mesas of support frame 1 outside observe, make circular cone head 13 place in the earth's surface, act on connecting rod 12 through circular cone head 13, and then promote plug 11, make hydraulic oil 10 float, float and then raise floating block 14 through hydraulic oil 10, make floating block 14 be higher than scale 15 zero line, and then detect ground settlement.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a building engineering scene prison settlement monitoring integrated device, includes mesa (1), its characterized in that: the table top comprises a table top (1), a clamp (5) is fixedly connected to the top surface of the table top (1), a right clamping arm (501) is fixedly connected to the top surface of the table top (1), a left clamping arm (502) is slidably connected to the inner wall of the right clamping arm (501), a bolt (503) is threadedly connected to the side surface of the right clamping arm (501) and penetrates through the right clamping arm (501) and extends to the right side surface of the left clamping arm (502), an adjusting nut (505) is threadedly connected to the left end of the bolt (503), a fixing nut (504) is threadedly connected to the right end of the bolt, two symmetrical chutes (6) are formed in the middle of the bottom surface of the table top (1), a sliding block (7) is slidably connected to the inside of each chute (6), a support frame (8) is fixedly connected to the bottom surface of each sliding block (7), two symmetrical oil pipes, every equal fixedly connected with connecting rod (12) in plug (11) bottom surface, every equal fixedly connected with circular cone head (13) in connecting rod (12) bottom, every equal sliding connection in oil pipe (9) upper end has floating block (14), every oil pipe (9) surface upper end all is equipped with scale (15).
2. The construction engineering on-site supervision settlement monitoring integrated device as claimed in claim 1, wherein: the table top is characterized in that two symmetrical telescopic rods (2) are fixedly connected to the periphery of the bottom surface of the table top (1), and a sleeve (3) is fixedly sleeved at the bottom end of each telescopic rod (2).
3. The construction engineering on-site supervision settlement monitoring integrated device as claimed in claim 2, wherein: each bottom surface of the sleeve (3) is fixedly connected with a universal wheel (4).
4. The construction engineering on-site supervision settlement monitoring integrated device as claimed in claim 1, wherein: and hydraulic oil (10) is arranged in the oil pipe (9).
5. The construction engineering on-site supervision settlement monitoring integrated device as claimed in claim 1, wherein: the top surface of the right clamping arm (501) is fixedly connected with a cushion pad (16).
6. The construction engineering on-site supervision settlement monitoring integrated device as claimed in claim 1, wherein: the surface of the table board (1) is fixedly connected with a push handle (17).
CN202021114265.1U 2020-06-16 2020-06-16 On-spot settlement monitoring integrated device of supervising of building engineering Active CN212567359U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021114265.1U CN212567359U (en) 2020-06-16 2020-06-16 On-spot settlement monitoring integrated device of supervising of building engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021114265.1U CN212567359U (en) 2020-06-16 2020-06-16 On-spot settlement monitoring integrated device of supervising of building engineering

Publications (1)

Publication Number Publication Date
CN212567359U true CN212567359U (en) 2021-02-19

Family

ID=74635916

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021114265.1U Active CN212567359U (en) 2020-06-16 2020-06-16 On-spot settlement monitoring integrated device of supervising of building engineering

Country Status (1)

Country Link
CN (1) CN212567359U (en)

Similar Documents

Publication Publication Date Title
CN209279963U (en) A kind of slope detection device
CN104406568B (en) Device and method for monitoring settlement of ground surface in deep water area
CN214143845U (en) Convenient high-efficient detection device of drilling bored concrete pile pore-forming quality
CN212567359U (en) On-spot settlement monitoring integrated device of supervising of building engineering
CN206540552U (en) A kind of concealed observation pier
CN204214437U (en) Profundal zone surface subsidence monitoring device
CN211421125U (en) Pile driver for civil engineering
CN212178066U (en) Municipal administration pipeline is with subsiding check out test set
CN105155596A (en) Structure and method for testing steel pipe inclined pile load box
CN204849858U (en) Steel tube pile self -balance method load box test structure
CN211401163U (en) Highway subgrade settlement observation device
CN212026372U (en) Foundation pit deformation monitoring device
CN210597410U (en) Foundation detection equipment
CN211552823U (en) Flatness detection device for highway engineering
CN204849859U (en) Bridge steel tube pile self -balance method load box test structure
CN112982512A (en) House foundation detection device and application method thereof
CN214883945U (en) Slip casting self-balancing load box
CN206496756U (en) Excavation Settlement monitor
CN110671094A (en) Oil pumping unit control system, control method and oil pumping unit
CN206353102U (en) A kind of Concrete and reinforced concrete drainage and sewer pipes external load test device
CN217951856U (en) Water level monitor fixed bolster
CN209961207U (en) House wall body safety inclinometer
CN211826125U (en) Portable water flow velocity measuring device for water conservancy detection
RU123929U1 (en) DEVICE FOR MEASURING THE HEIGHT OF THE SEDIMENT LAYER IN THE WELLS OF THE SEWER NETWORK
CN108797661A (en) A kind of load box of engineering pile foundation detection ballasting system

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CP01 Change in the name or title of a patent holder

Address after: 610000 846, southern section of Tianfu Avenue, Huayang street, Tianfu New District, Chengdu, Sichuan

Patentee after: Sichuan Urban Construction Engineering Consulting Group Co.,Ltd.

Address before: 610000 846, southern section of Tianfu Avenue, Huayang street, Tianfu New District, Chengdu, Sichuan

Patentee before: SICHUAN URBAN CONSTRUCTION ENGINEERING SUPERVISION CO.,LTD.

CP01 Change in the name or title of a patent holder