CN212561889U - Integrated assembly type prefabricated steel member for green building - Google Patents

Integrated assembly type prefabricated steel member for green building Download PDF

Info

Publication number
CN212561889U
CN212561889U CN202020807684.7U CN202020807684U CN212561889U CN 212561889 U CN212561889 U CN 212561889U CN 202020807684 U CN202020807684 U CN 202020807684U CN 212561889 U CN212561889 U CN 212561889U
Authority
CN
China
Prior art keywords
prefabricated steel
main part
steel
fixing
steel member
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020807684.7U
Other languages
Chinese (zh)
Inventor
何纯钢
王智龙
石林
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Sichuan Jianglong Construction Engineering Co ltd
Original Assignee
Sichuan Jianglong Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Sichuan Jianglong Construction Engineering Co ltd filed Critical Sichuan Jianglong Construction Engineering Co ltd
Priority to CN202020807684.7U priority Critical patent/CN212561889U/en
Application granted granted Critical
Publication of CN212561889U publication Critical patent/CN212561889U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Joining Of Building Structures In Genera (AREA)

Abstract

The utility model relates to an integrated assembly type prefabricated steel member for green buildings, belonging to the technical field of steel members; its technical essential includes prefabricated steel component main part, prefabricated steel component main part offers the first installing port that is used for installing the steel sheet and is used for installing the second installing port of steel pipe, just prefabricated steel component main part is equipped with the first fixed subassembly that goes on fixing the steel sheet in the periphery side of first installing port, prefabricated steel component main part is equipped with the second fixed subassembly that goes on fixing the steel pipe in the week side of second installing port. The utility model discloses not only can install steel sheet and steel pipe simultaneously, can also improve the monolithic connection stability of steel sheet, steel pipe and prefabricated steel component main part.

Description

Integrated assembly type prefabricated steel member for green building
Technical Field
The utility model belongs to the technical field of the technique of prefabricated steel component and specifically relates to a green for building integration assembled prefabricated steel component is related to.
Background
A steel member is a structure for assembling or connecting steel plates or steel pipes. The steel member can be used not only in civil engineering works of buildings and bridges, high-rise buildings, etc., but also in shipbuilding, aviation industry and general machine industry. Structures in these fields use various methods including welding, bolting, etc. to achieve the assembly of steel plates or beams. Welding is not a common method because of the difficulty of welding and corrosion problems during operation, and bolts are currently used for joining.
The prior Chinese utility model patent with the publication number of CN207813056U discloses an integrated assembly type prefabricated steel member for green buildings, which comprises a prefabricated steel member main body arranged in a columnar shape, wherein one side of the prefabricated steel member main body is provided with a first splicing port with a rectangular cross section along the height direction of the prefabricated steel member main body, and the first splicing port is used for connecting steel plates; and the prefabricated steel component main body is provided with a plurality of first through fixing openings on the adjacent side walls of the first splicing openings, and the plurality of first through fixing openings are uniformly distributed along the height direction of the first splicing openings. The steel plate is assembled on the prefabricated steel component main body by screwing the fixing bolt into the first through fixing port.
The above prior art solutions have the following drawbacks: the prefabricated steel component in the prior art can only be used for connecting steel plates, but cannot be used for connecting the steel plates and the steel pipes simultaneously, and is not suitable for being used when the steel plates or the steel pipes are required to be connected simultaneously in the construction process.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art exists, the utility model aims at providing a green for building integration assembled prefabricated steel member not only can install steel sheet and steel pipe simultaneously, can also improve the overall stability of steel sheet, steel pipe and prefabricated steel member.
The above utility model discloses an above-mentioned utility model purpose can realize through following technical scheme:
the utility model provides a green building is with prefabricated steel member of integration assembled, includes prefabricated steel member main part, prefabricated steel member main part offers the first installing port that is used for installing the steel sheet and is used for installing the second installing port of steel pipe, just prefabricated steel member main part is equipped with the first fixed subassembly that goes on fixing the steel sheet in the periphery side of first installing port, prefabricated steel member main part is equipped with the second fixed subassembly that goes on fixing the steel pipe in the week side of second installing port.
By adopting the technical scheme, the prefabricated steel component main body is provided with the first mounting opening and the second mounting opening, the first mounting opening can be used for mounting a steel plate, and the second mounting opening can be used for mounting a steel pipe, so that the prefabricated steel component main body can simultaneously mount the steel plate and the steel pipe; in addition, this prefabricated steel component main part is equipped with the first fixed subassembly that fixes the steel sheet and the fixed subassembly of second that fixes to the steel pipe, is favorable to improving the overall connection stability of steel sheet, steel pipe and prefabricated steel component main part.
The present invention may be further configured in a preferred embodiment as: the first fixing assembly comprises a first fixing seat arranged on the side wall of the prefabricated steel component body, and a first fixing threaded hole with a central shaft penetrating through the steel plate is formed in the first fixing seat.
Through adopting above-mentioned technical scheme, after the steel sheet has been installed, can be toward screw in set screw in the first fixed screw hole, make set screw penetrate the steel sheet in, can consolidate the steel sheet of installing in the prefabricated steel member main part.
The present invention may be further configured in a preferred embodiment as: the first fixing seat comprises a first fixing block arranged on the side wall of the prefabricated steel component body, a second fixing block perpendicular to the first fixing block and a reinforcing connecting block arranged between the first fixing block and the second fixing block; wherein, the angle of strengthening the connecting block sets up, just strengthen the connecting block and prefabricate steel member main part, install the steel sheet formation triangle stable area in the prefabricate steel member main part.
Through adopting above-mentioned technical scheme, form a triangle stable area between strengthening connection piece, prefabricated steel member main part and the steel sheet, be favorable to improving the stability of being connected of steel sheet and prefabricated steel member main part.
The present invention may be further configured in a preferred embodiment as: the second fixing assembly comprises a second fixing seat, two fixing rings are installed on the second fixing seat, the inner ring of each fixing ring is annularly arranged on the outer peripheral side of the steel pipe, and the two fixing rings are hinged to the second fixing seat on one side and detachably connected to one side, far away from the second fixing seat, of each fixing ring.
Through adopting above-mentioned technical scheme, after installing the steel pipe in the second spread groove, encircle two fixed rings and establish the periphery side at the steel pipe, the rethread connecting bolt links together two solid fixed ring one side of keeping away from the second fixing base, is favorable to improving the connection stability of steel pipe and prefabricated steel component main part.
The present invention may be further configured in a preferred embodiment as: the inside of prefabricated steel component main part is seted up the direction of height of one end along prefabricated steel component main part and is the cavity that the opening set up, cavity and first installing port, second installing port intercommunication, just there is the spliced pole along the direction of height sliding connection of prefabricated steel component main part in the cavity, the position that the spliced pole corresponds first installing port is equipped with the first spread groove of being connected with the steel sheet, the position that the spliced pole corresponds the second installing port is equipped with the second spread groove of being connected with the steel pipe.
By adopting the technical scheme, the connecting column is arranged in the main body of the prefabricated steel component, the first connecting groove for installing the steel plate is formed in the connecting column corresponding to the first installing opening, the second connecting groove for installing the steel pipe is formed in the connecting column corresponding to the second installing opening, and the connecting stability of the steel plate and the steel pipe is improved.
The present invention may be further configured in a preferred embodiment as: the spliced pole is close to the open-ended one end of cavity and is equipped with the locating piece, the constant head tank with locating piece looks adaptation is seted up in the open-ended one end of cavity to precast steel member main part, just the locating piece is equipped with the locating component with the locating piece spacing in the constant head tank.
Through adopting above-mentioned technical scheme, set up the locating piece in the week of spliced pole, prefabricated steel member main part sets up the constant head tank with locating piece looks adaptation, and the locating piece is pegged graft to the back in the constant head tank, and the locating component on the rethread locating piece is spacing the locating piece in the constant head tank, can be spacing the spliced pole in the cavity.
The present invention may be further configured in a preferred embodiment as: the positioning assembly comprises a positioning threaded hole arranged on the positioning block, a positioning threaded groove arranged on the bottom wall of the positioning groove and corresponding to the positioning threaded hole, and a positioning bolt matched with the positioning threaded hole and the positioning threaded groove.
By adopting the technical scheme, after the positioning bolt is screwed into the positioning threaded hole and the positioning threaded groove, the positioning bolt is in threaded fit with the positioning threaded groove on the prefabricated steel component main body, so that the positioning block is connected with the prefabricated steel component main body, and the connecting column is positioned in the cavity of the prefabricated steel component main body.
The present invention may be further configured in a preferred embodiment as: the positioning bolt is a countersunk head bolt, and the positioning threaded hole is a countersunk head threaded hole.
Through adopting above-mentioned technical scheme, positioning bolt adopts countersunk head bolt, and positioning screw hole is the countersunk head screw hole with countersunk head bolt looks adaptation, after in screwing in countersunk head screw hole with countersunk head bolt, can keep the planarization at prefabricated steel component main part top.
To sum up, the utility model discloses a following at least one useful technological effect:
1. the prefabricated steel member main body is provided with a first mounting opening and a second mounting opening, the first mounting opening can be used for mounting a steel plate, and the second mounting opening can be used for mounting a steel pipe, so that the prefabricated steel member main body can be used for mounting the steel plate and the steel pipe at the same time; in addition, the prefabricated steel component main body is provided with a first fixing component for fixing the steel plate and a second fixing component for fixing the steel pipe, so that the integral connection stability of the steel plate, the steel pipe and the prefabricated steel component main body is improved;
2. after the steel plate is installed, fixing screws can be screwed into the first fixing threaded holes, so that the fixing screws penetrate into the steel plate, and the steel plate installed on the prefabricated steel member main body can be reinforced;
3. a triangular stable area is formed among the reinforced connecting blocks, the prefabricated steel component main body and the steel plate, so that the connection stability of the steel plate and the prefabricated steel component main body is improved;
4. after installing the steel pipe in the second spread groove, encircle two fixed rings and establish the periphery side at the steel pipe, the rethread connecting bolt links together two solid fixed ring one side of keeping away from the second fixing base, is favorable to improving the stability of being connected of steel pipe and prefabricated steel component main part.
Drawings
FIG. 1 is a schematic structural view of a main body of a prefabricated steel member according to the present embodiment;
FIG. 2 is a schematic structural diagram of the connecting column of the present embodiment;
fig. 3 is a schematic structural view of the prefabricated steel member of the present embodiment.
In the figure, 1, a prefabricated steel member main body; 11. a cavity; 12. a first mounting port; 13. a second mounting opening; 14. positioning a groove; 15. positioning a thread groove; 2. connecting columns; 21. a first connecting groove; 22. a second connecting groove; 23. positioning blocks; 231. countersunk threaded holes; 3. a countersunk bolt; 4. a first fixed seat; 41. a first fixed block; 42. a second fixed block; 421. a first fixing threaded hole; 43. reinforcing the connecting block; 51. a second fixed seat; 52. a fixing ring; 53. and connecting the bolts.
Detailed Description
The present invention will be described in further detail with reference to the accompanying drawings.
In this embodiment: referring to fig. 1 and 2, do the utility model discloses a green for building integration assembled prefabricated steel member, including prefabricated steel member main part 1, prefabricated steel member main part 1 is the square column setting, and the cross section of prefabricated steel member main part 1 is the quadrangle. Wherein, cavity 11 has been seted up by the top towards the bottom along its direction of height to prefabricated steel member main part 1, and the top of cavity 11 is the opening setting, and the cross section of cavity 11 also is the quadrangle. The cavity 11 is internally provided with a connecting column 2, the shape and the size of the connecting column 2 are matched with those of the cavity 11, and the outer side wall of the connecting column 2 is abutted against the inner wall of the cavity 11. One of them lateral wall of spliced pole 2 has seted up first connecting groove 21 along the direction of height of spliced pole 2, and the longitudinal section of first connecting groove 21 is the quadrangle, and just prefabricated steel component main part 1 corresponds first connecting groove 21 and has seted up first installing port 12, and the steel sheet can run through first installing port 12 and be connected with first connecting groove 21. The connecting column 2 is provided with a second connecting groove 22 on the adjacent side wall provided with the first connecting groove 21, the longitudinal section of the second connecting groove 22 is circular, the prefabricated steel component main body 1 is provided with a second mounting opening 13 corresponding to the second connecting groove 22, and the steel pipe penetrates through the second mounting opening 13 and is connected with the second connecting groove 22.
Referring to fig. 1 and 2, in order to limit the connecting column 2, in this embodiment, the prefabricated steel component main body 1 is symmetrically provided with two positioning grooves 14 around the opening of the cavity 11, the top of the connecting column 2 is provided with two positioning blocks 23, the two positioning blocks 23 are respectively matched with the two positioning grooves 14, and the positioning blocks 23 are provided with positioning components for limiting the positioning blocks 23 in the positioning grooves 14. Specifically, the positioning assembly comprises a positioning threaded hole arranged on the positioning block 23, a positioning threaded groove 15 arranged on the bottom wall of the positioning groove 14 and opposite to the positioning threaded hole, and a positioning bolt in threaded fit with the positioning threaded hole and the positioning threaded groove 15. Wherein, the length direction of the positioning bolt is vertical to the positioning block 23. In addition, in order to maintain the flatness of the top of the prefabricated steel member body 1, in this embodiment, the positioning bolt specifically adopts the countersunk head bolt 3, and the positioning threaded hole is the countersunk head threaded hole 231.
In order to reinforce the steel plates and the steel pipes mounted on the prefabricated steel member body 1, in the embodiment, two sets of first fixing assemblies are symmetrically arranged on the outer periphery side of the first mounting opening 12 of the prefabricated steel member body 1, and a second fixing assembly is arranged on the outer periphery side of the second mounting opening 13 of the prefabricated steel member body 1. Wherein, when prefabricated steel member main part 1 was placed vertically, two sets of first fixed subassemblies were located the upper and lower both sides of first installing port 12 respectively.
Referring to fig. 1 and 3, the first fixing assembly includes a first fixing seat 4 and a first fixing threaded hole 421. Wherein, first fixing base 4 includes first fixed block 41, with first fixed block 41 looks vertically second fixed block 42 and be used for connecting first fixed block 41 and second fixed block 42's reinforcing connecting block 43, reinforcing connecting block 43 slope setting. Specifically, the first fixing block 41 is fixedly installed on the prefabricated steel member body 1, the first fixing block 41 of the first fixing assembly located on the upper side of the first installation opening 12 is located above the first installation opening 12, and the first fixing block 41 of the first fixing assembly located on the lower side of the first installation opening 12 is located below the first installation opening 12. In addition, the lower surface of the second fixing block 42 of the first fixing assembly located at the upper side of the first mounting opening 12 is flush with the top of the first mounting opening 12, and the upper surface of the second fixing block 42 of the first fixing assembly located at the lower side of the first mounting opening 12 is flush with the bottom of the first mounting opening 12. The first fixing screw hole 421 is opened on the second fixing block 42, and the center axis of the second screw hole passes through the steel plate installed in the first connecting groove 21.
After the steel plate is installed, the fixing screws can be screwed into the first fixing threaded holes 421, so that the fixing screws penetrate into the steel plate, and the steel plate installed on the prefabricated steel member main body 1 can be reinforced. And at this moment, a triangular stable area is formed among the reinforced connecting block 43, the prefabricated steel component main body 1 and the steel plate, which is beneficial to improving the connection stability of the steel plate and the prefabricated steel component main body 1.
Referring to fig. 1 and 3, the second fixing assembly includes a second fixing base 51, two fixing rings 52 capable of being opened and closed, and a connecting bolt 53 for connecting the two fixing rings 52. Wherein, the second fixing base 51 is installed on the week side of second installing port 13, and the size of the inner circle of two solid fixed rings 52 equals with the external diameter of steel pipe, and articulated the installing in second fixing base 51 in one side of two solid fixed rings 52, and the connection can be dismantled through connecting bolt 53 in one side that second fixing base 51 was kept away from to two solid fixed rings 52.
After the steel pipe is installed in the second connecting groove 22, the two fixing rings 52 are embraced at the outer peripheral side of the steel pipe, and then the two fixing rings 52 are connected together at the side far away from the second fixing seat 51 through the connecting bolt 53, which is beneficial to improving the connection stability of the steel pipe and the prefabricated steel component main body 1.
The implementation principle of the embodiment is as follows: the prefabricated steel member main body 1 is provided with a first mounting opening 12 and a second mounting opening 13, the first mounting opening 12 can be used for mounting a steel plate, and the second mounting opening 13 can be used for mounting a steel pipe, so that the prefabricated steel member main body 1 can be used for mounting the steel plate and the steel pipe at the same time; in addition, this prefabricated steel component main part 1 is equipped with the fixed subassembly of first fixed subassembly and second, and first reinforcement subassembly can be consolidated the steel sheet of connection on prefabricated steel component main part 1, and the second reinforcement subassembly can be consolidated the steel pipe of connection on prefabricated steel component main part 1, is favorable to improving the overall connection stability of steel sheet, steel pipe and prefabricated steel component main part 1.
The embodiment of this specific implementation mode is the preferred embodiment of the present invention, not limit according to this the utility model discloses a protection scope, so: all equivalent changes made according to the structure, shape and principle of the utility model are covered within the protection scope of the utility model.

Claims (8)

1. The utility model provides a green for building integrated assembly formula prefabricated steel member, includes prefabricated steel member main part (1), its characterized in that: first installation mouth (12) that are used for installing the steel sheet and second installation mouth (13) that are used for installing the steel pipe are seted up to prefabricated steel component main part (1), just prefabricated steel component main part (1) is equipped with the first fixed subassembly that fixes the steel sheet in the periphery side of first installation mouth (12), prefabricated steel component main part (1) is equipped with the second fixed subassembly that fixes the steel pipe in the periphery side of second installation mouth (13).
2. The integrally assembled prefabricated steel member for green buildings according to claim 1, wherein: first fixed subassembly is including locating first fixing base (4) of prefabricated steel member main part (1) lateral wall, first fixed screw hole (421) that the center pin passed the steel sheet are seted up in first fixing base (4).
3. The integrally assembled prefabricated steel member for green buildings according to claim 2, wherein: the first fixing seat (4) comprises a first fixing block (41) arranged on the side wall of the prefabricated steel member main body (1), a second fixing block (42) perpendicular to the first fixing block (41), and a reinforcing connecting block (43) arranged between the first fixing block (41) and the second fixing block (42); wherein, strengthen connecting block (43) slope setting, just strengthen connecting block (43) and prefabricated steel component main part (1), install the steel sheet formation triangle stable area on prefabricated steel component main part (1).
4. The integrally assembled prefabricated steel member for green buildings according to claim 1, wherein: the fixed subassembly of second includes second fixing base (51), two solid fixed rings (52), two are installed in second fixing base (51) the periphery side at the steel pipe is established to the inner circle ring of solid fixed ring (52), and two one side of solid fixed ring (52) articulates in second fixing base (51), two gu fixed ring (52) keep away from one side of second fixing base (51) can dismantle the connection.
5. The integrally assembled prefabricated steel member for green buildings according to claim 1, wherein: the inside of prefabricated steel component main part (1) is seted up cavity (11) that one end is the opening setting along the direction of height of prefabricated steel component main part (1), cavity (11) and first installing port (12), second installing port (13) intercommunication, just there is spliced pole (2) along the direction of height sliding connection of prefabricated steel component main part (1) in cavity (11), the position that spliced pole (2) correspond first installing port (12) is equipped with first spread groove (21) of being connected with the steel sheet, the position that spliced pole (2) correspond second installing port (13) is equipped with carries out the second spread groove (22) of being connected with the steel pipe.
6. The integrally assembled prefabricated steel member for green buildings according to claim 5, wherein: spliced pole (2) are close to the open-ended one end of cavity (11) and are equipped with locating piece (23), prefabricated steel member main part (1) is seted up in the open-ended one end of cavity (11) with locating piece (23) looks adaptation constant head tank (14), just locating piece (23) are equipped with the locating component of spacing locating piece (23) in constant head tank (14).
7. The integrally assembled prefabricated steel member for green buildings according to claim 6, wherein: the positioning assembly comprises a positioning threaded hole arranged on the positioning block (23), a positioning threaded groove (15) arranged on the bottom wall of the positioning groove (14) and corresponding to the positioning threaded hole, and a positioning bolt matched with the positioning threaded hole and the positioning threaded groove (15).
8. The integrally assembled prefabricated steel member for green buildings according to claim 7, wherein: the positioning bolt is a countersunk head bolt (3), and the positioning threaded hole is a countersunk head threaded hole (231).
CN202020807684.7U 2020-05-15 2020-05-15 Integrated assembly type prefabricated steel member for green building Expired - Fee Related CN212561889U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020807684.7U CN212561889U (en) 2020-05-15 2020-05-15 Integrated assembly type prefabricated steel member for green building

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020807684.7U CN212561889U (en) 2020-05-15 2020-05-15 Integrated assembly type prefabricated steel member for green building

Publications (1)

Publication Number Publication Date
CN212561889U true CN212561889U (en) 2021-02-19

Family

ID=74624087

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020807684.7U Expired - Fee Related CN212561889U (en) 2020-05-15 2020-05-15 Integrated assembly type prefabricated steel member for green building

Country Status (1)

Country Link
CN (1) CN212561889U (en)

Similar Documents

Publication Publication Date Title
CN110056085B (en) FRP section beam column node capable of being assembled quickly
CN111485653B (en) Prefabricated floor convenient to firm installation
CN108661329B (en) Mounting bracket for prefabricated part, prefabricated wall body comprising same and mounting method of prefabricated wall body
CN212561889U (en) Integrated assembly type prefabricated steel member for green building
CN111809861B (en) Formwork supporting die for construction of building components on two sides of deformation joint and working method
CN211396109U (en) Steel pipe column combination wall
CN115233834B (en) High-rise modularized box structure connecting node
CN215802322U (en) Connecting node of assembled box type column and building comprising same
CN215519486U (en) Supporting beam convenient to mount for steel structure building
CN113293866A (en) Door type steel frame system
CN212865961U (en) Detachable building foundation pit supporting beam
CN212317146U (en) Assembly structure of prefabricated frame roof beam and prefabricated frame post
CN210858229U (en) Assembled precast concrete enclosure
CN216920699U (en) Door type steel frame system
CN219548160U (en) Building house structure post
CN214784713U (en) Prefabricated assembled concrete beam column node
CN210238789U (en) Steel house convenient to installation and dismantlement
CN218894396U (en) External corner reinforcing device for wall column formwork
CN220301844U (en) Reinforcement tool for masonry corner constructional column
CN218758719U (en) Vertical cast-in-place shutoff template of EVE shear force wall
CN216689916U (en) Side flat welded assembled perforated steel plate shear wall structure
CN220451474U (en) Guardrail device for vertical hole
CN212001636U (en) Floor and wallboard connecting structure of prefabricated building
CN218881572U (en) Plane template and mould
CN214739014U (en) Steel plate connecting structure of prefabricated shear wall

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210219

CF01 Termination of patent right due to non-payment of annual fee