Desilting ship for hydraulic and hydroelectric engineering Download PDF

Info

Publication number
CN212506184U
CN212506184U CN202020735909.2U CN202020735909U CN212506184U CN 212506184 U CN212506184 U CN 212506184U CN 202020735909 U CN202020735909 U CN 202020735909U CN 212506184 U CN212506184 U CN 212506184U
Authority
CN
China
Prior art keywords
rubbish
storehouse
desilting
fixed mounting
water
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202020735909.2U
Other languages
Chinese (zh)
Inventor
许林涛
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Fujian Minhu Water Conservancy And Hydropower Construction Engineering Co ltd
Original Assignee
Fujian Minhu Water Conservancy And Hydropower Construction Engineering Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Fujian Minhu Water Conservancy And Hydropower Construction Engineering Co ltd filed Critical Fujian Minhu Water Conservancy And Hydropower Construction Engineering Co ltd
Priority to CN202020735909.2U priority Critical patent/CN212506184U/en
Application granted granted Critical
Publication of CN212506184U publication Critical patent/CN212506184U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Filtration Of Liquid (AREA)

Abstract

The utility model relates to a hydraulic engineering technical field just discloses a hydraulic and hydroelectric engineering's desilting ship, including bow controlling means, bow controlling means's one end fixed mounting has rubbish to stack the storehouse, the both sides fixed mounting that the storehouse was stacked to rubbish has cement separation strainer pump, the fixed desilting pipeline that has cup jointed in top of cement separation strainer pump. The utility model discloses a both sides at bow controlling means set up two rotatory rollers and drive the salvage conveyer belt rotatory, make the salvage conveyer belt can salvage the rubbish of the surface of water, and carry on the screen cloth through lower conveyer belt, the reliability of device has been improved, thereby avoid accomplishing a large amount of floating rubbish in the back surface of water at desilting work, still need clear up the work again, a large amount of work has been increased, the cost has been increased in the intangible, and a large amount of rubbish is floated to the surface of water, if clear up can lead to water pollution inadequately in time, the practicality of device has been improved greatly.

Description

Desilting ship for hydraulic and hydroelectric engineering
Technical Field
The utility model relates to a hydraulic engineering technical field specifically is a hydraulic and hydroelectric engineering's desilting ship.
Background
The desilting ship, i.e. the tool for removing the sediment at the bottom of water, has two types of power, i.e. diesel engine and motor. The hull body is the body, adopt and assemble the box structure, there is the desilting device, power device, conveyer etc. by power drive desilting device clear away submarine deposit, send out the assigned position by conveyer, but current desilting ship most does not have the function of collecting the surface of water rubbish, and some rubbish that subsides in the bottom can float up when the desilting, if do not clear up will be the surface of water and become dirty and disorderly, and current desilting ship does not have the function of blockking all, make massive rubbish enter into in the desilting pipeline, lead to the pipeline jam, provide a hydraulic and hydroelectric engineering's desilting ship for this.
SUMMERY OF THE UTILITY MODEL
Not enough to prior art, the utility model provides a hydraulic and hydroelectric engineering's desilting ship possesses the clearance surface of water rubbish, puts the advantage of jam, has solved the problem that above-mentioned background art provided.
The utility model provides a following technical scheme: the utility model provides a hydraulic and hydroelectric engineering's desilting ship, includes bow controlling means, bow controlling means's one end fixed mounting has rubbish to stack the storehouse, rubbish stacks the both sides fixed mounting in storehouse has cement separation strainer, the fixed cover in top of cement separation strainer has connect the desilting pipeline, and the fixed cover in other both sides of desilting pipeline has connect silt discharge pipe and water source discharge pipe respectively, rubbish stacks the afterbody fixed mounting in storehouse and has last screen cloth, and the outside activity of just rubbish stacking the storehouse afterbody has cup jointed the quant, the top fixed mounting that rubbish stacked the storehouse both sides has rotatory roller, swing joint has salvage conveyer belt on the rotatory roller, the middle part fixed mounting that rubbish stacked the storehouse top has lower conveyer belt.
Carefully, the fixed filter screen cloth that has cup jointed in the bottom of desilting pipeline, the clearance of filter screen cloth slit can be changed as required.
Carefully, the top of silt discharge pipe runs through the lateral wall that the storehouse was stacked to rubbish, the fixed cover in top that silt discharge pipe corresponds water source discharge pipe has connect the impoundment storehouse, the fixed outlet that has cup jointed in the outside in impoundment storehouse.
Carefully selecting, the side of rotatory roller is fixed mounting has the transport baffle, and the bottom of rotatory roller is fixed to be cup jointed the roating sphere.
Carefully, the rotary ball is fixedly provided with a telescopic rod, and the telescopic rod is fixedly provided with a garbage salvage net.
And in selection, the conveying direction of the lower conveying belt faces to the direction of the garbage stacking bin, and the edge of the lower conveying belt is fixedly provided with a side baffle.
Compared with the prior art, the utility model discloses possess following beneficial effect:
1. the utility model discloses a both sides at bow controlling means set up two rotatory rollers and drive the salvage conveyer belt rotatory, make the salvage conveyer belt can salvage the rubbish of the surface of water, and carry on the screen cloth through lower conveyer belt, the reliability of device has been improved, thereby avoid accomplishing a large amount of floating rubbish in the back surface of water at desilting work, still need clear up the work again, a large amount of work has been increased, the cost has been increased in the intangible, and a large amount of rubbish is floated to the surface of water, if clear up can lead to water pollution inadequately in time, the practicality of device has been improved greatly.
2. The utility model discloses a both sides in storehouse are stacked to rubbish set up two cement separation strainer pumps, thereby utilize cement separation strainer pump drive desilting pipeline to aspirate the silt of bottom, and set up a filter screen cloth in the bottom of desilting pipeline, silt on every side filters, avoid massive silt or stone to enter into in the desilting pipeline, lead to cement separation strainer pump to damage at last, the security of device has been improved, set up a telescopic link at the middle part of rubbish salvage net simultaneously, make the length that can salvage the net through telescopic link control rubbish, thereby can come to clear up the appointed scope of the surface of water as required, the use flexibility of device has been improved.
Drawings
FIG. 1 is a schematic structural view of the present invention;
fig. 2 is a schematic side view of the structure of the present invention.
In the figure: 1. a bow control device; 2. a garbage stacking bin; 3. a cement separation filter pump; 4. dredging a pipeline; 5. filtering the screen; 6. a sludge discharge pipe; 7. a water source discharge conduit; 8. a water storage bin; 9. feeding a screen mesh; 10. a paddle; 11. a rotating roller; 12. fishing the conveying belt; 13. a conveying baffle; 14. rotating the ball; 15. a telescopic rod; 16. a garbage salvage net; 17. a lower conveyor belt; 18. side dams.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
Referring to fig. 1-2, a dredging boat for water conservancy and hydropower engineering comprises a bow control device 1, a garbage piling bin 2 is fixedly installed at one end of the bow control device 1, cement separating and filtering pumps 3 are fixedly installed at two sides of the garbage piling bin 2, a dredging pipeline 4 is fixedly sleeved at the top end of each cement separating and filtering pump 3, a filtering screen 5 is fixedly sleeved at the bottom of the dredging pipeline 4, gaps among tooth gaps of the filtering screen 5 can be replaced as required, one filtering screen 5 is arranged at the bottom of the dredging pipeline 4, so that stone silt blocks at the bottom of the water are screened by the filtering screen 5, larger stones and the like are prevented from entering the dredging pipeline 4, then the cement separating and filtering pump 3 is damaged, the safety of the device is improved, meanwhile, the filtering screens 5 with different tooth gaps can be replaced as required, and the device is more flexible and safer to use, and the other two sides of the dredging pipeline 4 are respectively fixedly sleeved with a sludge discharge pipeline 6 and a water source discharge pipeline 7, the top end of the sludge discharge pipeline 6 penetrates through the side wall of the garbage piling bin 2, the top end of the sludge discharge pipeline 6, which corresponds to the water source discharge pipeline 7, is fixedly sleeved with a water storage bin 8, the outer side of the water storage bin 8 is fixedly sleeved with a water outlet, the top end of the sludge discharge pipeline 6 is fixedly sleeved at the side edge of the garbage piling bin 2, and the top end of the water source discharge pipeline 7 is fixedly sleeved at the side edge of the water storage bin 8, so that the sludge is discharged into the garbage piling bin 2 through the sludge discharge pipeline 6, a water source is discharged into the water storage bin 8 through the water source discharge pipeline 7 and is meshed with the water outlet at the side edge of the water storage bin 8 for discharging, thereby the smooth proceeding of dredging work is ensured, the reliability of the, and the outer side of the tail part of the garbage piling bin 2 is movably sleeved with a paddle 10, the tops of the two sides of the garbage piling bin 2 are fixedly provided with rotating rollers 11, the side surfaces of the rotating rollers 11 are fixedly provided with conveying baffle plates 13, the bottom of each rotating roller 11 is fixedly sleeved with a rotating ball 14, the side surfaces of the rotating rollers 11 are provided with the conveying baffle plates 13, so that the side surfaces of the salvage conveying belts 12 are blocked by the conveying baffle plates 13 when the salvage conveying belts 12 convey garbage, the condition that the garbage drops in the conveying process is avoided, the feasibility of the device is improved, the rotating balls 14 are fixedly provided with telescopic rods 15, the telescopic rods 15 are fixedly provided with garbage salvage nets 16, the rotating balls 14 are used for adjusting the direction of the telescopic rods 15, the telescopic rods 15 can rotate at a certain angle, the telescopic characteristics of the telescopic rods 15 can be used for adjusting the length of the garbage salvage nets 16, and the garbage salvage nets 16 can obtain a maximum range through The rubbish that encloses is salvaged, also can appoint a scope as required to salvage, the flexibility of device has been improved, swing joint has salvage conveyer belt 12 on the rotatory roller 11, the middle part fixed mounting at 2 tops in storehouse is stacked to rubbish has lower conveyer belt 17, the direction of delivery of lower conveyer belt 17 stacks the direction in storehouse 2 towards rubbish, and the edge fixed mounting of lower conveyer belt 17 has side shield 18, utilize conveyer belt 17 to carry salvage the rubbish that conveyer belt 12 carried down and stack in storehouse 2 in rubbish, the reliability of device has been improved, the edge of conveyer belt 17 sets up a side shield 18 under simultaneously, thereby utilize side shield 18 to shelter from the side of conveyer belt 17 down, avoid the condition that the ship dropped rubbish in the in-process of marcing, the stability of device has been improved.
The working principle is as follows: during the use, at first, the starting drive begins the desilting work, utilize cement to separate filter pump 3 drive desilting pipeline 4 and aspirate the bottom, and utilize filter screen 5 to block bold stone silt piece, then utilize cement to separate filter pump 3 with silt and water source, and discharge silt and water source respectively through silt discharge tube 6 and water source discharge tube 7 and stack storehouse 2 and the storehouse 8 in the rubbish, the rubbish of surface of water gathers to salvage conveyer belt 12 under the effect of rubbish salvage net 16 and is in, and is salvaged on lower conveyer belt 17 by salvage conveyer belt 12 rotation, convey last screen cloth 9 on, accomplish the salvage to the rubbish of surface of water, can.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or apparatus that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or apparatus. Simultaneously in the utility model discloses an in the drawing, fill the pattern and just do not do any other injecions for distinguishing the picture layer.
Although embodiments of the present invention have been shown and described, it will be appreciated by those skilled in the art that changes, modifications, substitutions and alterations can be made in these embodiments without departing from the principles and spirit of the invention, the scope of which is defined in the appended claims and their equivalents.

Claims (6)

1. The utility model provides a hydraulic and hydroelectric engineering's desilting ship, includes bow controlling means (1), its characterized in that: one end fixed mounting of prow controlling means (1) has rubbish to stack storehouse (2), rubbish is stacked the both sides fixed mounting in storehouse (2) and is had cement separation strainer pump (3), the fixed cover in top of cement separation strainer pump (3) has been cup jointed desilting pipeline (4), and the fixed cover in other both sides of desilting pipeline (4) has been cup jointed silt discharge pipe way (6) and water source discharge pipe way (7) respectively, rubbish is stacked the afterbody fixed mounting in storehouse (2) and is gone up screen cloth (9), and the outside activity of rubbish stack storehouse (2) afterbody has cup jointed oar (10), the top fixed mounting that rubbish was stacked storehouse (2) both sides has rotatory roller (11), swing joint has salvage conveyer belt (12) on rotatory roller (11), the middle part fixed mounting that rubbish was stacked storehouse (2) top has lower conveyer belt (17).
2. A dredging vessel for water conservancy and hydropower engineering according to claim 1, characterized in that: the bottom of desilting pipeline (4) is fixed to be cup jointed and is filtered screen cloth (5), the clearance of filtering screen cloth (5) slot can be changed as required.
3. A dredging vessel for water conservancy and hydropower engineering according to claim 1, characterized in that: the top of silt discharge pipe way (6) runs through the lateral wall that rubbish stacked storehouse (2), the fixed cover in top that silt discharge pipe way (6) corresponds water source discharge pipe way (7) has connect retaining storehouse (8), the outside in retaining storehouse (8) is fixed to be cup jointed the outlet.
4. A dredging vessel for water conservancy and hydropower engineering according to claim 1, characterized in that: the side of the rotating roller (11) is fixedly provided with a conveying baffle (13), and the bottom of the rotating roller (11) is fixedly sleeved with a rotating ball (14).
5. A dredging vessel for water conservancy and hydropower engineering according to claim 4, characterized in that: the rotary ball (14) is fixedly provided with a telescopic rod (15), and the telescopic rod (15) is fixedly provided with a garbage salvage net (16).
6. A dredging vessel for water conservancy and hydropower engineering according to claim 1, characterized in that: the conveying direction of the lower conveying belt (17) faces the direction of the garbage stacking bin (2), and a side baffle (18) is fixedly installed at the edge of the lower conveying belt (17).
CN202020735909.2U 2020-05-07 2020-05-07 Desilting ship for hydraulic and hydroelectric engineering Expired - Fee Related CN212506184U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020735909.2U CN212506184U (en) 2020-05-07 2020-05-07 Desilting ship for hydraulic and hydroelectric engineering

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020735909.2U CN212506184U (en) 2020-05-07 2020-05-07 Desilting ship for hydraulic and hydroelectric engineering

Publications (1)

Publication Number Publication Date
CN212506184U true CN212506184U (en) 2021-02-09

Family

ID=74445509

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020735909.2U Expired - Fee Related CN212506184U (en) 2020-05-07 2020-05-07 Desilting ship for hydraulic and hydroelectric engineering

Country Status (1)

Country Link
CN (1) CN212506184U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114873865A (en) * 2022-06-07 2022-08-09 中国水利水电科学研究院 Artificial wetland modular system for urban sewage treatment
CN115637685A (en) * 2022-10-27 2023-01-24 江苏省海洋水产研究所 Marine floater fishing device and environmental protection salvage ship

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN114873865A (en) * 2022-06-07 2022-08-09 中国水利水电科学研究院 Artificial wetland modular system for urban sewage treatment
CN115637685A (en) * 2022-10-27 2023-01-24 江苏省海洋水产研究所 Marine floater fishing device and environmental protection salvage ship

Similar Documents

Publication Publication Date Title
CN212506184U (en) Desilting ship for hydraulic and hydroelectric engineering
CN201027320Y (en) Novel multifunctional dredge boat
CN105672390B (en) A kind of river chain-bucket dredger and its Dredging Construction method
CN107716090B (en) Complete equipment for efficiently removing granular impurities in river and lake sludge
CN203174656U (en) Channel cleanout device
CN110559736B (en) Environment-friendly river sludge cleaning treatment method
CN103334469A (en) Processing system and processing technology for removing river pollution bottom silt in central urban area
CN105539745A (en) Service ship for ocean environment protection engineering
CN203140134U (en) Waste residue washing equipment
CN105926701A (en) Port sludge processing device and method
CN108275861A (en) A kind of environment-friendly type river bottom mud dehydration and drying ship
CN111646669A (en) Ecological dredging sludge online dewatering system and process
CN112319712A (en) Marine oil stain cleaning ship with oil-electricity hybrid power
CN210917523U (en) River course environmental protection desilting ship
CN104016498A (en) A sand-water separator
KR101702266B1 (en) Dredging apparatus for water quality improvement and disposal dredge soil
CN203049654U (en) Silt remover
CN210946958U (en) Trailing suction dredger
CN213539124U (en) On-line moving circulating type dredging device
CN216550093U (en) Intelligent city desilting curing system
CN213267789U (en) River sewage treatment device
CN113944202A (en) Inland river jet suction type dredging and curing integrated workboat and working method thereof
CN207276477U (en) A kind of city river sludge drying sludge-water separating system
CN110341899A (en) A kind of intelligence marine refuse recycling ship
CN113666592A (en) Ship-borne sludge dewatering and curing equipment for inland river and dewatering and curing method

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20210209

Termination date: 20210507