CN212426782U - Prestressed beam string tensioning structure - Google Patents

Prestressed beam string tensioning structure Download PDF

Info

Publication number
CN212426782U
CN212426782U CN202021835336.7U CN202021835336U CN212426782U CN 212426782 U CN212426782 U CN 212426782U CN 202021835336 U CN202021835336 U CN 202021835336U CN 212426782 U CN212426782 U CN 212426782U
Authority
CN
China
Prior art keywords
plate
board
hole
beam string
arc
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202021835336.7U
Other languages
Chinese (zh)
Inventor
王攀科
张祥瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Hubei Yichang Panke Pre Stress Technology Services Co ltd
Original Assignee
Hubei Yichang Panke Pre Stress Technology Services Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Hubei Yichang Panke Pre Stress Technology Services Co ltd filed Critical Hubei Yichang Panke Pre Stress Technology Services Co ltd
Priority to CN202021835336.7U priority Critical patent/CN212426782U/en
Application granted granted Critical
Publication of CN212426782U publication Critical patent/CN212426782U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Rod-Shaped Construction Members (AREA)

Abstract

The utility model provides a prestressed beam string tensioning structure, including fixed plate and fly leaf, fixed plate and fly leaf structure are the same and through to wearing the screw rod connection, the fixed plate includes integrated welding and shaping and arranges first board, second board and the third board that sets up in proper order, first board, second board and third board are the rectangle structure, first board one side is provided with the U-shaped opening, second board center sets up the second hole, the third board is formed by the butt joint of two boards of symmetry setting, forms the third hole in the middle of; arc structures are arranged on one sides of the second hole and the third hole, the size and the position of each arc structure correspond to those of the arc part of the U-shaped opening, and the other sides of the arc structures are closed through holes; and the edges of the four corners of the first plate, the second plate and the third plate are provided with corresponding positioning holes. The utility model has simple structure, adopts reasonable tool fixtures, is simple and convenient to operate and has low working strength; the construction cost is reduced, and the social benefit is increased.

Description

Prestressed beam string tensioning structure
Technical Field
The utility model relates to a building field especially relates to a prestressing force beam string structure.
Background
The beam string structure is a novel mixed structure formed by combining a rigid member, a flexible inhaul cable and a support rod connected in the middle, and belongs to one of large-span space structures. In the practical application process, the stress principle of the beam string structure is that the rigid upper chord member generates reverse deflection through the prestress applied by the lower chord stay cable of the flexible member in the use process, and the deflection is reduced under the action of building load, so that the building structure presents a balanced state. At present, in the construction of large-span engineering, the prestressed beam string structure is widely applied, the stability and the reliability of a building structure are effectively improved, and the quality of the building engineering is also effectively improved. However, with the continuous change of times, the defects of the prestressed beam string structure in the engineering construction are more and more obvious, so that certain innovation and innovation are needed to be carried out on the construction technology, the construction quality of the construction engineering can be effectively improved, and the development of the construction industry in China is promoted.
The existing beam string tensioning mode generally adopts a clamp to clamp an ear plate and the upper end of an adjusting rod for tensioning, and the mode has a complex structure and is inconvenient to implement; or the steel pull rod is used for tensioning, the structure is heavy, and the labor intensity is high during tensioning. Therefore, a tensioning structure and a tensioning method which are simple in structure and convenient to operate need to be designed.
SUMMERY OF THE UTILITY MODEL
The utility model provides a stretch-draw end stretch-draw structure of beam string, simple structure, easily installation, easy operation, low in labor strength.
The utility model provides a prestressing force beam string stretching end tension structure, including fixed plate and fly leaf, fixed plate and fly leaf structure are the same and connect through to wearing the screw rod, the fixed plate includes integrated welding shaping's and arrange the first board, second board and the third board that sets up in proper order, first board, second board and third board are the rectangle structure, first board one side is provided with the U-shaped opening, second board center sets up the second hole, the third board is formed by the butt joint of two symmetrical boards that set up, and the centre forms the third hole; arc structures are arranged on one sides of the second hole and the third hole, and the size and the position of each arc structure correspond to those of the arc part of the U-shaped opening; and the edges of the four corners of the first plate, the second plate and the third plate are provided with corresponding positioning holes.
The utility model has simple structure, adopts reasonable tool clamp, utilizes the U-shaped opening to position the tensioning tool, can realize tensioning operation by only one calibrated jack, and has simple and convenient operation and low working strength; the construction cost is reduced, and the social benefit is increased.
Drawings
Fig. 1 is a schematic cross-sectional view of a prestressed beam string structure according to an embodiment of the present invention.
Fig. 2 is a schematic structural view of a first plate of a prestressed beam string structure according to an embodiment of the present invention.
Fig. 3 is a second schematic plate structure diagram of a prestressed beam string structure according to an embodiment of the present invention.
Fig. 4 is a schematic structural view of a third plate of a prestressed beam string structure according to an embodiment of the present invention.
The reference numbers are as follows:
1. a first plate; 2. a second plate; 3. a third plate; 4. a U-shaped hole; 5. a second hole; 6. a third aperture; 7. a fixing plate; 8. A movable plate; 9. a screw.
Detailed Description
In order to make the objects, technical solutions and advantages of the present invention more clearly understood, the present invention is further described in detail below with reference to the accompanying drawings and embodiments. It should be understood that the specific embodiments described herein are merely illustrative of the invention and are not intended to limit the invention.
As shown in fig. 1 to 4, a prestressed beam string tensioning structure comprises a fixed plate 7 and a movable plate 8, wherein the fixed plate 7 and the movable plate 8 have the same structure and are connected through a through screw 9, the fixed plate 7 comprises a first plate 1, a second plate 2 and a third plate 3 which are integrally welded and arranged in sequence, the first plate 1, the second plate 2 and the third plate 3 are all rectangular structures, a U-shaped opening is formed in one side of the first plate 1, a second hole 5 is formed in the center of the second plate 2, the third plate 3 is formed by butt-jointing two symmetrically arranged plates, and a third hole 6 is formed in the middle of the third plate; arc-shaped structures are arranged on one sides of the second hole 5 and the third hole 6, the size and the position of each arc-shaped structure correspond to those of the arc-shaped part of the U-shaped opening, and the other sides of the arc-shaped structures are closed through holes; the four corners of the first plate 1, the second plate 2 and the third plate 3 are provided with corresponding positioning holes.
As shown in fig. 1, the fixed and movable plates 7 and 3 each comprise at least one first plate 1 and at least one third plate 3, and at least two second plates 2 disposed between the first plate 1 and the third plate 3.
As shown in fig. 2 to 4, the first plate 1, the second plate 2, and the third plate 3 are all rectangular plates having the same size and shape.
As shown in fig. 4, a gap is formed at the butt joint of the third plate 3.
Aiming at the tension structure tensioning method of the prestressed beam string structure of the embodiment, the method comprises the following steps:
s1, determining the dimension specifications of the first plate 1, the second plate 2 and the third plate 3 according to the specification of the cable body and the structure dimension of the tension end lug plate;
s2, processing the first plate 1, the second plate 2 and the third plate 3;
s3, placing the first plate 1 on the bottom layer, the second plate 2 on the second layer and the third plate 3 on the third layer; after aligning the positioning holes, welding the first plate 1, the second plate 2 and the third plate 3 together; two parts, namely a fixed plate 7 and a movable plate 8, are welded together;
s4, hanging the fixed plate 7 on the pin of the tension end ear plate, fixing the fixed plate by using a jig, and connecting the movable plate 8 to the outer side of the fixed plate 7 by using the opposite-penetrating screw rod 9;
s5, sequentially penetrating the steel strands for stretching through the central holes of the fixed plate 7 and the movable plate 8, and fixing the steel strands outside the movable plate 8;
and S6, performing tensioning operation by using the calibrated jack.
Specifically, the jack is arranged between the fixed plate 7 and the movable plate 8, the opposite penetrating screw rod 9 is loosened, the screw rod 9 plays a guiding role, the distance between the movable plate 8 and the fixed plate 7 is increased by utilizing the jacking force of the jack, and the tensioning effect is achieved.
In this method, the welding method in step S3 is edge full welding.
In this method, in step S5, the fixing device of the steel strand is engaged with the gap of the third plate 3. Fixing device can set up as required, generally sets up to the pull ring of taking self-locking mechanism, and pull ring one end and steel strand wires rigid coupling, the other end are fixed on the check lock lever, and the check lock lever joint takes place to rotate in the clearance when can preventing the stretch-draw steel strand wires.
The above description is only exemplary of the present invention and should not be taken as limiting the scope of the present invention, as any modifications, equivalents, improvements and the like made within the spirit and principles of the present invention are intended to be included within the scope of the present invention.

Claims (4)

1. The prestressed beam string tensioning structure is characterized by comprising a fixed plate and a movable plate, wherein the fixed plate and the movable plate are identical in structure and are connected through a through screw, the fixed plate comprises a first plate, a second plate and a third plate which are integrally welded and sequentially arranged, the first plate, the second plate and the third plate are all rectangular in structure, a U-shaped opening is formed in one side of the first plate, a second hole is formed in the center of the second plate, the third plate is formed by butt joint of two symmetrically arranged plates, and a third hole is formed in the middle of the third plate; arc structures are arranged on one sides of the second hole and the third hole, the size and the position of each arc structure correspond to those of the arc part of the U-shaped opening, and the other sides of the arc structures are closed through holes; and the edges of the four corners of the first plate, the second plate and the third plate are provided with corresponding positioning holes.
2. The prestressed beam string structure as claimed in claim 1, wherein the fixed plate and the movable plate each comprise at least one first plate and at least one third plate, and at least two second plates disposed between the first plate and the third plate.
3. The prestressed beam string structure as claimed in claim 2, wherein the first plate, the second plate and the third plate are rectangular plates having the same size and shape.
4. The prestressed beam string structure as claimed in claim 3, wherein a gap is formed at the butt joint of the third plates.
CN202021835336.7U 2020-08-27 2020-08-27 Prestressed beam string tensioning structure Active CN212426782U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021835336.7U CN212426782U (en) 2020-08-27 2020-08-27 Prestressed beam string tensioning structure

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021835336.7U CN212426782U (en) 2020-08-27 2020-08-27 Prestressed beam string tensioning structure

Publications (1)

Publication Number Publication Date
CN212426782U true CN212426782U (en) 2021-01-29

Family

ID=74274126

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021835336.7U Active CN212426782U (en) 2020-08-27 2020-08-27 Prestressed beam string tensioning structure

Country Status (1)

Country Link
CN (1) CN212426782U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111877181A (en) * 2020-08-27 2020-11-03 湖北宜昌攀科预应力技术服务有限公司 Prestressed beam string tensioning structure and tensioning method thereof

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN111877181A (en) * 2020-08-27 2020-11-03 湖北宜昌攀科预应力技术服务有限公司 Prestressed beam string tensioning structure and tensioning method thereof

Similar Documents

Publication Publication Date Title
CN106894523B (en) Connecting joint of rectangular steel pipe concrete column and steel reinforced concrete beam
KR101229472B1 (en) Steel pipe girder for bridge
CN212426782U (en) Prestressed beam string tensioning structure
CN109653531B (en) External prestress steel strand connector and matched tensioning device
CN205894286U (en) Prestressed cable body ground tackle ball joint point
CN212742226U (en) Steel bar positioning device
CN111877181A (en) Prestressed beam string tensioning structure and tensioning method thereof
CN207228325U (en) A kind of steel connection structure
CN211772903U (en) A pour template device for bridge construction
CN215978060U (en) Steel pipe column
CN211114074U (en) Prefabricated assembled post connecting device
CN210340110U (en) Two T board hoisting structure of large-span assembled
CN207078905U (en) One kind fork body
CN211173113U (en) Clamp for connecting I-shaped beam and channel steel in large template
CN220908684U (en) Connecting structure is assembled in steel house
CN217998381U (en) Fixing device suitable for steel construction assembled installation encorbelments
CN219451278U (en) Pile foundation reinforcement cage sleeve bolting anti-deviation tight butt-joint type mechanical connecting device
CN211142846U (en) Bridge shear nail template assembly
CN221118227U (en) Otic placode-lug adjustable inclination connection structure and jib arched bridge
CN212773164U (en) Assembled vertical component based on dry-type connecting device
CN217458561U (en) Ultra-long supporting arm structure of tower crane
CN205444457U (en) Energy dissipation brace assembled concrete frame structure concatenation type node
CN219990899U (en) Prestressing force broken line roof truss hoist device
CN221001651U (en) High-rise building structure connecting beam
CN219031632U (en) Reinforcing apparatus suitable for two hydraulic lifting mechanism supports

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant