CN212404998U - Flexible berthing pile wharf structure with upper opening and lower opening - Google Patents

Flexible berthing pile wharf structure with upper opening and lower opening Download PDF

Info

Publication number
CN212404998U
CN212404998U CN202020745569.1U CN202020745569U CN212404998U CN 212404998 U CN212404998 U CN 212404998U CN 202020745569 U CN202020745569 U CN 202020745569U CN 212404998 U CN212404998 U CN 212404998U
Authority
CN
China
Prior art keywords
pile
ship
berthing
leaning
transverse
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020745569.1U
Other languages
Chinese (zh)
Inventor
郑福萍
刘瑞
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Communications Guangzhou Construction Co ltd
Original Assignee
China Communications Guangzhou Construction Co ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Communications Guangzhou Construction Co ltd filed Critical China Communications Guangzhou Construction Co ltd
Priority to CN202020745569.1U priority Critical patent/CN212404998U/en
Application granted granted Critical
Publication of CN212404998U publication Critical patent/CN212404998U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Classifications

    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A10/00TECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE at coastal zones; at river basins
    • Y02A10/11Hard structures, e.g. dams, dykes or breakwaters
    • YGENERAL TAGGING OF NEW TECHNOLOGICAL DEVELOPMENTS; GENERAL TAGGING OF CROSS-SECTIONAL TECHNOLOGIES SPANNING OVER SEVERAL SECTIONS OF THE IPC; TECHNICAL SUBJECTS COVERED BY FORMER USPC CROSS-REFERENCE ART COLLECTIONS [XRACs] AND DIGESTS
    • Y02TECHNOLOGIES OR APPLICATIONS FOR MITIGATION OR ADAPTATION AGAINST CLIMATE CHANGE
    • Y02ATECHNOLOGIES FOR ADAPTATION TO CLIMATE CHANGE
    • Y02A30/00Adapting or protecting infrastructure or their operation
    • Y02A30/30Adapting or protecting infrastructure or their operation in transportation, e.g. on roads, waterways or railways

Landscapes

  • Revetment (AREA)

Abstract

The utility model relates to a wharf structure technical field specifically indicates a flexible fender pile wharf structure of suitable for reading. The anchor system comprises front row pile walls and anchors which are arranged at intervals along the transverse direction; the front row pile wall is a retaining wall formed by a plurality of ship leaning piles which are arranged at intervals; the lower end of the ship leaning pile is placed on a steel pipe pile on a rock stratum below the ship leaning pile, and a crown beam is arranged at the upper end of the ship leaning pile; the crown beam is provided with a vertical tensioning structure of which the lower end penetrates through the berthing pile and extends into a rock stratum; the anchorage is a reinforced concrete retaining wall structure, and a transverse connecting structure is arranged between the anchorage and the front row pile wall; reinforced concrete is filled in the berthing piles, and a queen-twisted block is filled at the lower end of the outer side of the berthing pile; and sand stones are filled between the front row of pile walls and the anchorage to form the wharf main body. The utility model discloses a pier simple structure, construction convenience, the last flexible buffer structure that is about the front row pile wall, the stress that produces is dispersed to impact or stormy waves that can be fine, and structural stability is good, has very big spreading value.

Description

Flexible berthing pile wharf structure with upper opening and lower opening
Technical Field
The utility model relates to a wharf structure technical field specifically indicates a flexible fender pile wharf structure of suitable for reading.
Background
The coastal engineering construction is a favored choice no matter the newly purchased construction materials are brought in, or the building waste residues are abandoned, and the marine transportation is carried out. In order to solve the problem that various building materials transfer ships to lean on the shore and also serve as a platform for people to get on and off a traffic wharf, a temporary wharf working platform is built. When the wharf is designed, firstly, the influence of water area conditions of a quayside area to be built and natural factors such as wind, water flow, geology and the like is comprehensively considered, the draught requirement of a ship is combined, and the structural form of the temporary wharf is determined according to requirements such as contribution to project construction and the like. The temporary wharf is divided into a high pile type, a sheet pile type (jetty type) and a pontoon type. Secondly, after the structural form of the wharf is determined, the using function of the wharf is fully considered, the plane size of the temporary wharf is reasonably determined according to the use of various mechanical equipment, the requirements of ship berthing and the requirements of material transportation and storage, and finally the temporary wharf is required to be reasonably arranged, so that the field construction, the actual use and the later turnover are facilitated.
The upper portion of the traditional flexible berthing pile wharf is hinged to the connecting platform, and the bottom of the traditional flexible berthing pile wharf is vibrated into rocks or hammered into rocks. For example, the chinese utility model patent entitled "opposite pulling type steel pipe sheet pile wharf structure" with patent number "CN 201620242337.8" is that the wharf structure protected by the patent is the rock-entering structure adopted, the wharf structure has two rows of pile walls, and the two rows of pile walls are anchored at the bank by adopting a mode of rock-entering at the lower end, although the structure has better stability, the construction difficulty is large, the construction cost is high, and if the rock strength below is large, the steel pipe pile rock-entering difficulty in the traditional vibration rock-entering mode is very large; the lower ends of the two rows of pile walls are anchored in the rock, and after the two rows of pile walls are impacted by ships, the stress acts on the joint of the pile walls and the rock, so that the pile wall structure can be seriously damaged.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the technical problem mentioned in the background art and providing a flexible berthing pile wharf structure with upper and lower ports.
The technical scheme of the utility model is that: the utility model provides a flexible ship stake wharf structure of keeping to ship of suitable for reading, its characterized in that: the anchor system comprises front row pile walls and anchors which are arranged at intervals along the transverse direction; the front row pile wall is a retaining wall formed by a plurality of ship leaning piles which are arranged at intervals; the lower end of the ship leaning pile is placed on a lower rock stratum, and a crown beam is arranged at the upper end of the ship leaning pile; the crown beam is provided with a vertical tensioning structure of which the lower end penetrates through the berthing pile and extends into a rock stratum; the anchorage is of a reinforced concrete retaining wall structure, and a transverse connecting structure is arranged between the anchorage and the front row pile wall; reinforced concrete is filled in the berthing piles, and a wrest king block is filled at the lower end of the outer side of the berthing pile; and sand stones are filled between the front row pile wall and the anchorage to form the wharf main body.
The vertical tensioning structure further comprises a vertical pull rod; the upper end of the vertical pull rod is anchored in the crown beam, and the lower end of the vertical pull rod penetrates through the ship leaning pile to be anchored in a rock stratum below the ship leaning pile and is used for vertically tensioning the crown beam.
The transverse connecting structure further comprises a first waist beam fixed on the outer side of the front row of pile walls; the first wale is fixed on the ship-leaning piles along the horizontal longitudinal direction, and a transverse pull rod arranged along the horizontal transverse direction penetrates through the first wale between the adjacent ship-leaning piles; one end of the transverse pull rod is anchored on the first waist beam, and the other end of the transverse pull rod is anchored on the anchorage.
The front row pile walls further comprise longitudinal pile walls formed by a plurality of ship-leaning piles which are arranged at intervals in the longitudinal direction and transverse pile walls which are positioned at two ends of the longitudinal pile walls and formed by a plurality of ship-leaning piles which are arranged at intervals in the transverse direction; the horizontal pile walls are located on the inner sides of the longitudinal pile walls, and a longitudinal connecting structure which is horizontally and longitudinally arranged and used for connecting the horizontal pile walls on the two sides is arranged between the two groups of horizontal pile walls at the two ends of the longitudinal pile walls.
The longitudinal connecting structure further comprises a second waist beam fixed on the outer side of the transverse pile wall; the second wales are cross beams horizontally and transversely arranged, and a longitudinal pull rod horizontally and longitudinally arranged is arranged between the two second wales of the two rows of transverse pile walls.
A bracket extending along the horizontal direction is further arranged on the inner side of the crown beam; and the upper ends of the bracket and the anchorage are provided with panels serving as wharf loading platforms.
And a plurality of inflatable rubber backup balls for the ship are arranged outside the first waist rail.
The utility model has the advantages that: 1. the utility model discloses the front row pile wall is shelved on the rock stratum of below, need not to lean on the ship stake to shake and sink into the rock, has reduced the degree of difficulty and the construction cost of pier construction by a wide margin, and adopt the mode of vertical tension structure into the rock anchor to make the below of leaning on the ship stake form flexible construction, can be fine when receiving the stress that the dissipation striking produced when boats and ships striking, can not cause the damage to the lower extreme of leaning on the ship stake, provide the safety in utilization of pier structure;
2. the utility model has the advantages that the crown beam and the berth-keeping pile are fixedly connected into a whole through the vertical pull rod, the berth-keeping pile is fixed on the rock stratum through tensioning, the construction structure is very simple, the flexible buffering capacity is good, the structure is stable, and the inside of the berth-keeping pile is filled with solid concrete so as to prevent the stress concentration caused by local extrusion on the berth-keeping pile when the platform is loaded;
3. the utility model discloses a transversely include along the horizontal transverse arrangement's of level transverse pull rod, connect front row pile wall and anchorage as an organic whole through transverse pull rod, make the upper end of front row pile wall form good flexible buffer structure to provide horizontal restraint for front row pile wall, structural stability is good;
4. the utility model discloses a front row pile wall is U type structure, is provided with vertical connection structure in the U mouth, has guaranteed that the fender pile part of front row pile wall U mouth both sides can form stable pile foundation revetment structure, blocks the flow of pier filling grit;
5. the longitudinal connecting structure of the utility model comprises the second waist rail and the longitudinal pull rod, the structure is simple, and the installation and construction are convenient;
6. the utility model is provided with a bracket for supporting at the inner side of the crown beam, and the crown beam is fixed on the ship-leaning pile through the vertical pull rod, namely when the bearing acting force above the wharf acts on the crown beam, the ship-leaning pile only bears the vertical load, thereby further improving the structural stability of the front row pile wall;
7. the utility model discloses set up and lean on the ball, be convenient for avoid producing the rigidity collision to the buffering of berthhing boats and ships and cause the damage.
The utility model discloses a pier simple structure, construction convenience has solved the rock stratum and has inserted and beat the big problem of the ship stake construction degree of difficulty, and the upper and lower flexible buffer structure that is of front-seat pile wall, and the stress that can be fine impact or stormy waves impact the production dissipates, and structural stability is good, has very big spreading value.
Drawings
FIG. 1: the utility model discloses a wharf structure elevation schematic diagram;
FIG. 2: the arrangement structure of the transverse pull rod and the longitudinal pull rod of the wharf structure of the utility model is shown schematically;
wherein: 1-berthing a boat pile; 2, anchorage; 3-a crown beam; 4-twisting queen block; 5-sandstone; 6, a vertical pull rod; 7-first waist rail; 8, a transverse pull rod; 9-a second wale; 10-longitudinal tie rod; 11-a bracket; 12-a panel; 13-marine inflatable rubber back ball.
Detailed Description
The present invention will be described in further detail with reference to the following drawings and specific embodiments.
As shown in fig. 1 to 2, the wharf structure of this embodiment includes front row pile walls and anchors 2 arranged at intervals in the transverse direction, where the anchors 2 are reinforced concrete anchor structures, the front row pile walls are retaining wall structures formed by a plurality of boat-leaning piles 1 arranged at intervals, and the front row pile walls include longitudinal pile walls formed by a plurality of boat-leaning piles 1 arranged at intervals in the longitudinal direction and transverse pile walls formed by a plurality of boat-leaning piles 1 arranged at intervals in the transverse direction and located at two ends of the longitudinal pile walls. The transverse pile walls are positioned at the inner sides of the two ends of the longitudinal pile wall and form a U-shaped structure on the longitudinal pile wall.
The berthing ship pile 1 is a steel pipe pile with the lower end placed on a rock stratum below, a crown beam 3 is arranged at the upper end of the berthing ship pile 1, vertical pull rods 6 arranged vertically are arranged on the crown beam 3 in a penetrating mode, the vertical pull rods 6 are anchored on the crown beam 3, the lower end of the berthing ship pile 1 penetrates through the berthing ship pile 1 to stretch into a rock stratum below the berthing ship pile 1 and be anchored in the rock stratum, the crown beam 3 is fixedly connected with the berthing ship pile 1 through vertical tensioning, and the berthing ship pile 1 is fixed with the rock stratum below.
As shown in fig. 1 to 2, the anchorage 2 of the present embodiment is connected to the front row pile wall through a transverse connection structure, and the transverse connection structure includes a first wale 7 fixed to the outer side of the front row pile wall. The first wale 7 is fixed on the berthing piles 1 along the horizontal longitudinal direction, a transverse pull rod 8 arranged along the horizontal transverse direction penetrates through the first wale 7 between the adjacent berthing piles 1, one end of the transverse pull rod 8 is anchored on the first wale 7, and the other end of the transverse pull rod 8 is anchored on the anchor 2.
In addition, the longitudinal connecting structure which is arranged along the horizontal longitudinal direction and is used for connecting the transverse pile walls on the two sides is arranged between the two groups of transverse pile walls at the two ends of the longitudinal pile wall. As shown in fig. 2, the longitudinal connecting structure includes second wales 9 fixed on the outer sides of the transverse pile walls, the second wales 9 are horizontal transverse beams, and a horizontal longitudinal tie 10 is arranged between the two second wales 9 of the two rows of transverse pile walls.
Reinforced concrete is filled in the berthing piles 1, and the vertical pull rod 6 and the berthing piles 1 form an integral structure through the reinforced concrete. The lower end of the outer side of the berthing pile 1 is filled with a queen turning block 4, and a sandstone 5 is filled between the front row pile wall and the anchorage 2 to form a wharf main body. And a bracket 11 extending along the horizontal direction is arranged on the inner side of the crown beam 3, and a panel 12 serving as a wharf loading platform is arranged at the upper ends of the bracket 11 and the anchorage 2.
For the convenience of parking, as shown in fig. 1-2, a plurality of inflatable rubber backup balls 13 for the ship are arranged outside the first wale 7.
The actual construction comprises the following steps:
the first step is as follows: cleaning and polishing stone
And (5) cleaning the riprap at the construction position of the wharf by adopting an excavator.
The second step is that: lowering of berthing piles 1 and construction of waist rails
The berthing ship pile 1 is manufactured by processing thick steel plates with the thickness of more than 10mm, the berthing ship pile 1 is put down while excavating the foundation pit, when 2 berthing ship piles 1 are hung, the periphery of the berthing ship pile 1 needs to be backfilled by broken stones and filled, after one berthing ship pile 1 is placed, the queen turning block 4 is regularly stacked on the outer side immediately, and after the berthing ship pile 1 is embedded, the berth ship pile 1 is manufactured by processing thick steel plates with the thickness of more than 10mmThe outer side of the berthing pile 1 is transversely welded with double-spliced HN 500X 200 type steel wale (comprising a first wale 7 and a second wale 9) for connection, so that the berthing pile 1 can be integrally connected on one hand, and the berthing pile 1 can be ensured to be on the same horizontal line on the other hand. Additionally welded in the longitudinal and transverse directions
Figure BDA0002483039280000051
The other end of the horizontal pull rod 8 is pre-buried in the back of C30 for fixing, and the distance is 1 m. The double-spliced HN 500X 200 section steel waist beam is provided with ribbed plates at equal intervals on the inner side, the ribbed plates are made of 8mm Q235 steel, the local rigidity of the section steel is increased, and the intervals are consistent with the arrangement intervals of the pull rods.
The third step: and (3) pouring concrete in the berthing pile 1.
After the berthing piles 1 are placed, immediately pouring concrete inside the berthing piles, adopting C30 concrete, pre-burying 3 PVC pipes with the diameter of 60mm in each berthing pile 1 before pouring to serve as grouting holes of the vertical pull rod 6, wherein the height of each PVC pipe is at least 70cm higher than the surface of the protection cylinder. The concrete is delivered into the mould by a crane and distributed in layers. When pouring, the straightness and the plane position of the pile are controlled by using a measuring instrument, and before pouring, 5 piles are pre-embedded on a single ship-leaning pile 1
Figure BDA0002483039280000052
The reinforcing steel bar is connected with the crown beam 3.
The fourth step: and backfilling the sandstone 5 at one time.
After the sandstone 5 is transported to the site, an excavator is adopted to cooperate with a dump truck to transport the material. Unloading and paving are carried out simultaneously, and a high-power bulldozer is adopted for forward paving. And (4) rolling by using a smooth road roller, wherein specific rolling parameters are determined on site. The corner of the structure is not easy to be compacted by a rolling machine and is compacted by a small-sized tamping machine. And the sand stone 5 is rolled in layers in the backfilling process, and the rolling thickness of each layer is not more than 30cm, so that the backfilling is guaranteed to be compact. The once backfilling thickness is slightly lower than the pre-buried height positions of the transverse pull rod 8 and the longitudinal pull rod 10, and the backfilling can be continued after the construction of the transverse pull rod 8 and the longitudinal pull rod 10 is completed and the designed elevation is reached. And thin steel plates with equal length are welded on the inner side and the outer side of the ship-leaning pile 1, the bottom is ensured to be embedded into the filling soil, cement paste is poured on the inner side of the ship-leaning pile 1 for reinforcement after the installation is finished, and the filling soil and the rockfill loss caused by seawater scouring are prevented.
The fifth step: anchorage 2 construction
And completing the construction of the anchorage 2 while backfilling the gravel 5. The anchor 2 is made of C30 concrete, the integral anchor is embedded into a part of the flakelite, and the rest part of the integral anchor is embedded into the sandstone 5. In the construction process of the anchorage 2, the transverse pull rod 8 connected with the first waist beam 7 penetrates through the anchorage 2 to be embedded, and the anchorage 2, the horizontal pull rod 2 and the ship leaning pile 11 are ensured to be tensioned.
And a sixth step: the transverse pull rod 8 and the longitudinal pull rod 10 are constructed.
The transverse pull rod 8 and the longitudinal pull rod 10 adopt
Figure BDA0002483039280000061
The finish-rolled deformed steel bar of (2) has a length of not less than 15 m. During construction, firstly, a waist beam is perforated according to a gap between ship-leaning piles 1, the hole position is phi 40, and then a transverse pull rod 8 and a longitudinal pull rod 10 are connected with the waist beam and then are screwed and fixed by using steel gaskets and bolts; when the other end is constructed by the anchorage 2, the transverse pull rod 8 is buried in the anchorage 2, and the part protruding out of the front end of the anchorage 2 is fixed by a steel gasket and a bolt, so that the anchoring capability is enhanced.
The seventh step: construction of crown beam 3
The method is characterized in that a crown beam 3 is arranged at the concrete top position of a berthing pile 1, the cross section size of the crown beam is 130cm multiplied by 60cm, the length is determined according to the actual size on site, a hinged bracket 11 is arranged on the inner side of the crown beam 3, and the position of the crown beam 3 is 10cm inward offset of the outer edge of the berthing pile 1.
Eighth step: secondary backfilling sandstone 5
And after the construction of the crown beam 3 is finished, carrying out secondary backfilling on the foundation immediately, and backfilling to the designed elevation position.
The ninth step: vertical pull rod 6 drilling construction
Arranging a drilling machine in place according to the embedded hole position in the berthing pile 1, adjusting the drilling angle of a drill rod, wherein the depth of an anchor hole is at least 12m, and immediately inserting the vertical pull rod 6 after drilling.
The tenth step: grouting
In the grouting process, the grouting pipe is slowly drawn out from the bottom of the hole, grouting can be stopped when the hole emits grout for more than 10 seconds and is stable, and in order to ensure that the vertical pull rod 5 is tightly combined with the surrounding soil body, a grout stop plug is arranged at the hole and is screwed.
The eleventh step: tensioning and anchor sealing
The tensioning equipment is selected according to the material of the vertical pull rod 6 and the size of the locking force. And after the concrete in the ship-leaning pile 1 reaches the strength and the slurry strength of the anchoring section reaches the designed strength, tensioning can be carried out. After tensioning and locking are finished, cutting off redundant vertical pull rods 6 by using a grinding wheel cutting machine, coating the anchorage and the exposed vertical pull rods 6 by using epoxy resin, and chiseling and washing the concrete around the anchorage before sealing.
The twelfth step: construction panel 12
After the backfilled sandstone 5 has a compactness of more than 95%, the panel 12 can be constructed. The panel 12 is a 20m x 14m x 0.35m reinforced concrete slab. Before the construction of the panel 12, a concrete cushion layer with the thickness of 10cm is poured on the surface of the backfilled gravel, the strength grade of the concrete is C20, and then the work of binding steel bars is carried out on the concrete cushion layer.
The thirteenth step: mounting attachment structure
The auxiliary structure mainly comprises a marine inflatable rubber backup ball 8 and a mooring rope pier.
The fourteenth step is that: static load test
After foundation backfill is completed and compaction reaches the standard, a load test is immediately carried out on the filled foundation and the concrete member, the load is taken as the load working condition in the most unfavorable state, namely the sum of the maximum prefabricated pier column weight, the maximum prefabricated beam weight and the weight of the selected crawler crane, and the pre-compaction coefficient is considered to be 1.1 times. The load test is carried out by selecting a water bag (or other load) prepressing mode, 3 rows of settlement and displacement observation points are arranged at the positions of the top of the hat beam at the end head and the back top at the tail part, and each row has 3 observation points.
As shown in fig. 1, the lateral direction of the present embodiment refers to the left-right direction in fig. 1, the vertical direction refers to the up-down direction in fig. 1, and the longitudinal direction refers to the direction perpendicular to the paper surface in fig. 1.
The foregoing shows and describes the general principles, essential features, and advantages of the invention. It will be understood by those skilled in the art that the present invention is not limited to the above embodiments, and that the foregoing embodiments and descriptions are provided only to illustrate the principles of the present invention without departing from the spirit and scope of the present invention. The scope of the invention is defined by the appended claims and equivalents thereof.

Claims (7)

1. The utility model provides a flexible ship stake wharf structure of keeping to ship of suitable for reading, its characterized in that: comprises front row pile walls and anchor blocks (2) which are arranged at intervals along the transverse direction; the front row pile wall is a retaining wall formed by a plurality of ship leaning piles (1) which are arranged at intervals; the lower end of the ship leaning pile (1) is a steel pipe pile which is arranged on a rock stratum below the ship leaning pile, and a crown beam (3) is arranged at the upper end of the ship leaning pile (1); the crown beam (3) is provided with a vertical tensioning structure of which the lower end penetrates through the berthing pile (1) and extends into a rock stratum; the anchorage (2) is of a reinforced concrete retaining wall structure, and a transverse connecting structure is arranged between the anchorage (2) and the front row pile wall; reinforced concrete is filled in the berthing piles (1), and a wrest king block (4) is filled at the lower end of the outer side of the berthing pile (1); and sand stones (5) are filled between the front row pile wall and the anchorage (2) to form a wharf main body.
2. The upper and lower port flexible berthing pile wharf structure of claim 1, wherein: the vertical tensioning structure comprises a vertical pull rod (6); the upper end of the vertical pull rod (6) is anchored in the crown beam (3), and the lower end of the vertical pull rod penetrates through the berthing pile (1) to be anchored in a rock stratum below the berthing pile for vertically tensioning the crown beam (3).
3. The upper and lower port flexible berthing pile wharf structure of claim 1, wherein: the transverse connecting structure comprises a first waist beam (7) fixed on the outer side of the front row of pile walls; the first wale (7) is fixed on the ship-leaning piles (1) along the horizontal longitudinal direction, and a transverse pull rod (8) arranged along the horizontal transverse direction penetrates through the first wale (7) positioned between the adjacent ship-leaning piles (1); one end of the transverse pull rod (8) is anchored on the first waist beam (7), and the other end is anchored on the anchorage (2).
4. The upper and lower port flexible berthing pile wharf structure of claim 1, wherein: the front row pile wall comprises a longitudinal pile wall formed by a plurality of ship-leaning piles (1) which are arranged at intervals in the longitudinal direction and transverse pile walls which are positioned at two ends of the longitudinal pile wall and formed by a plurality of ship-leaning piles (1) which are arranged at intervals in the transverse direction; the horizontal pile walls are located on the inner sides of the longitudinal pile walls, and a longitudinal connecting structure which is horizontally and longitudinally arranged and used for connecting the horizontal pile walls on the two sides is arranged between the two groups of horizontal pile walls at the two ends of the longitudinal pile walls.
5. The port and pier structure of claim 4, wherein: the longitudinal connecting structure comprises a second wale (9) fixed on the outer side of the transverse pile wall; the second wales (9) are cross beams horizontally and transversely arranged, and a longitudinal pull rod (10) horizontally and longitudinally arranged is arranged between the two second wales (9) of the two rows of transverse pile walls.
6. The upper and lower port flexible berthing pile wharf structure of claim 1, wherein: the inner side of the crown beam (3) is provided with a bracket (11) extending along the horizontal direction; and the upper ends of the bracket (11) and the anchorage (2) are provided with a panel (12) as a wharf loading platform.
7. The upper and lower port flexible berthing pile wharf structure of claim 3, wherein: a plurality of inflatable rubber leaning balls (13) for the ship are arranged on the outer side of the first waist rail (7).
CN202020745569.1U 2020-05-08 2020-05-08 Flexible berthing pile wharf structure with upper opening and lower opening Active CN212404998U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020745569.1U CN212404998U (en) 2020-05-08 2020-05-08 Flexible berthing pile wharf structure with upper opening and lower opening

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020745569.1U CN212404998U (en) 2020-05-08 2020-05-08 Flexible berthing pile wharf structure with upper opening and lower opening

Publications (1)

Publication Number Publication Date
CN212404998U true CN212404998U (en) 2021-01-26

Family

ID=74375886

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020745569.1U Active CN212404998U (en) 2020-05-08 2020-05-08 Flexible berthing pile wharf structure with upper opening and lower opening

Country Status (1)

Country Link
CN (1) CN212404998U (en)

Similar Documents

Publication Publication Date Title
CN103321241B (en) Deep water open type combination foundation harbour and construction method thereof
CN108060683A (en) A kind of middle weathering geology top-down construction method
CN210104758U (en) Foundation pit supporting system of soil nail bored concrete pile anchor cable combination
CN112982431A (en) Construction method of foundation pit supporting structure
JP7149919B2 (en) Improvement structure and improvement method of existing wharf
CN212404998U (en) Flexible berthing pile wharf structure with upper opening and lower opening
CN115961590A (en) Efficient engineering construction method and system for water transport wharf
Bittner et al. Design and construction of the Sutong Bridge foundations
CN112854117B (en) L-shaped wharf construction method
CN215252629U (en) Full-straight-pile wharf suitable for construction of deepwater port
KR20110046209A (en) Method Of Construction For Scour Prevension And Reinforcement Of Bridge Pier, And Structure Of The Same
CN111155429A (en) Construction method for bridge sand blowing island building in still water deep water area
CN111321701B (en) Dock main body backfilling process
CN212375698U (en) Ultrahigh composite reinforced earth abutment combined with prestressed anchor cable
CN210621610U (en) Gravity wharf based on rigid frame structure
CN218345979U (en) Deep soft soil foundation separating cabin type raft culvert structure and connecting structure
CN212612255U (en) Wharf upgrading and transforming structure
JPH0913343A (en) Revetment structure and its construction method
CN214143747U (en) H formula combination cling compound structure with prestressed anchorage cable
CN213805183U (en) Novel gravity cylinder type beam plate wharf structure
JP7489350B2 (en) Improvement structure and method of existing wharf
JP7495904B2 (en) Improvement structure and method of existing wharf
CN212129034U (en) Pull rod mounting structure
CN217203965U (en) Integral lock chamber structure based on longitudinal and transverse pull rods and bottom support
CN212405170U (en) Foundation pit supporting structure

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant