CN212390540U - Air cooling device for construction site - Google Patents

Air cooling device for construction site Download PDF

Info

Publication number
CN212390540U
CN212390540U CN202020479918.XU CN202020479918U CN212390540U CN 212390540 U CN212390540 U CN 212390540U CN 202020479918 U CN202020479918 U CN 202020479918U CN 212390540 U CN212390540 U CN 212390540U
Authority
CN
China
Prior art keywords
air
water tank
shaft
bevel gear
air suction
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020479918.XU
Other languages
Chinese (zh)
Inventor
王章俊
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Anhui Xuangu Construction Engineering Co.,Ltd.
Original Assignee
王章俊
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by 王章俊 filed Critical 王章俊
Priority to CN202020479918.XU priority Critical patent/CN212390540U/en
Application granted granted Critical
Publication of CN212390540U publication Critical patent/CN212390540U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Cooling Or The Like Of Electrical Apparatus (AREA)

Abstract

The utility model belongs to the technical field of the air cooling is handled, especially, an air cooling device for construction site uses, to the direct cooling that uses the fan in current site operation more, at first the cooling effect is not good, secondly can not filter the dust in the air, can not satisfy user demand's problem, the following scheme is proposed at present, and it includes the bottom plate, the top fixedly connected with power supply control equipment of bottom plate, the top fixedly connected with water tank of bottom plate, be provided with dust filtration collection structure in the water tank, be provided with the refrigerator in the water tank, the top fixedly connected with section of thick bamboo of breathing in of water tank, the section of thick bamboo internal rotation of breathing in is connected with the air shaft, and the fixed cover in the outside of air shaft is equipped with the air fan of breathing in, and one side intercommunication of water tank has. The utility model discloses can effectually cool down and filter the air to collect the dust, can satisfy the user demand.

Description

Air cooling device for construction site
Technical Field
The utility model relates to an air cooling handles technical field, especially relates to an air cooling device for construction site.
Background
In the building construction process, summer is a very difficult period, not only the air temperature is high, and the on-site produces a large amount of polluted gases such as dust easily, has seriously influenced job site staff's work and rest, because be in air pollution and high temperature operational environment for a long time, seriously influence staff's health, consequently need improve the on-site operation environment.
Use the fan directly to cool down in the site operation of current more, at first the cooling effect is not good, secondly can not filter the dust in the air, can not satisfy the user demand.
SUMMERY OF THE UTILITY MODEL
The utility model aims at solving the existing field construction and using the fan directly to cool down, at first the cooling effect is not good, secondly can not filter the dust in the air, can not satisfy user demand's shortcoming, and the air cooling device for the construction site who provides.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
the utility model provides an air cooling device for construction site, comprising a base plate, the top fixedly connected with power supply control equipment of bottom plate, the top fixedly connected with water tank of bottom plate, be provided with dust filtration collection structure in the water tank, be provided with the refrigerator in the water tank, the top fixedly connected with section of thick bamboo of breathing in of water tank, the section of thick bamboo internal rotation of breathing in is connected with the axle of breathing in, the fixed cover in the outside of the axle of breathing in is equipped with the fan of breathing in, one side intercommunication of water tank has the air blowing section of thick bamboo, the section of thick bamboo internal rotation of blowing is connected with the axle of blowing, the fixed cover in the outside of the axle of blowing is equipped with the.
Preferably, a transverse shaft and a first bevel gear are fixedly mounted on two output shafts of the double-shaft motor respectively, a vertical shaft is vertically and rotatably connected to the air blowing cylinder, a second bevel gear is fixedly mounted at the top of the vertical shaft and meshed with the first bevel gear, a first bevel gear is fixedly mounted at the bottom of the vertical shaft, a second bevel gear is fixedly mounted on the outer side of the air blowing shaft and meshed with the first bevel gear.
Preferably, one end of the transverse shaft extends into the air suction cylinder and is fixedly provided with a driving gear, a driven gear is fixedly sleeved on the outer side of the air suction shaft and is meshed with the driving gear, the bottom of the air suction cylinder is communicated with an air guide pipe, and a plurality of air suction pipes are fixedly communicated with the outer side of the air suction cylinder.
Preferably, the power supply control equipment comprises a protection box, a battery and a controller, wherein the protection box is rotatably connected with a box door, and the battery and the controller are both arranged in the protection box.
Preferably, the dust filters and collects the structure and includes two guides, filter and collect box and connecting strip, the through-hole has been seted up to one side of water tank, filter and collect box and through-hole swing joint, it has seted up a plurality of filtration holes to filter on collecting the bottom inner wall of box, two guides are fixed mounting respectively on the both sides inner wall of water tank, filter and collect box and two guides sliding connection, two guides are U type structure, one side fixed connection of box is collected with filtering to the connecting strip, the outside cover of filtering and collecting the box is equipped with the sealing washer, sealing washer and through-hole sealing connection, connecting strip and water tank fixed connection.
Preferably, the bottom of bottom plate is provided with four universal wheels, and four universal wheels all are provided with the brake block, and the top of water tank is provided with the filler, and one side intercommunication of water tank has the outlet, and the top slope of bottom plate is provided with and pushes away the handle.
Compared with the prior art, the utility model has the advantages of:
(1) according to the scheme, the bottom plate is moved to a proper position through the universal wheels, the refrigerator refrigerates cooling water in the water tank, the air suction shaft drives the air suction fan to rotate, air is sucked into the air suction cylinder through the air suction pipes and is guided into the cooling water in the water tank through the air guide pipe, dust is filtered through the cooling water, meanwhile, the cooling water can cool the air, and the dust is sunk into the filtering and collecting box under the action of gravity after being dissolved into the water;
(2) the blowing shaft drives the blowing fan to rotate, so that the dust-removed and cooled air can be led out to the outside, and the outside can be cooled;
(3) according to the scheme, the connecting strip is disassembled, the connecting strip is pulled to pull out the filtering and collecting box, dust in the filtering and collecting box is cleaned, and the filtering and collecting box can be used after being re-installed;
the utility model discloses can effectually cool down and filter the air to collect the dust, can satisfy the user demand.
Drawings
FIG. 1 is a schematic structural view of an air cooling device for a construction site according to the present invention;
FIG. 2 is a schematic view of the three-dimensional structure of the water tank, the connecting strip, the water inlet, the air suction cylinder and the air blowing cylinder of the air cooling device for the construction site provided by the utility model;
FIG. 3 is a schematic perspective view of a filtering and collecting box and a connecting strip of the air cooling device for a construction site according to the present invention;
fig. 4 is a schematic view of the structure of the air suction tube and the air suction pipe of the air cooling device for the construction site according to the present invention.
In the figure: the device comprises a base plate 1, a water tank 2, a guide member 3, a filtering and collecting box 4, a water filling port 5, a refrigerator 6, an air suction cylinder 7, an air suction shaft 8, an air suction fan 9, an air suction pipe 10, a double-shaft motor 11, a vertical shaft 12, a first bevel gear 13, a second bevel gear 14, a transverse shaft 15, an air blowing cylinder 16, an air blowing shaft 17, an air blowing fan 18, a protective box 19, a controller 20, a battery 21, a universal wheel 22, a connecting strip 23 and an air guide pipe 24.
Detailed Description
The technical solutions in the embodiments will be described clearly and completely with reference to the drawings in the embodiments, and it is obvious that the described embodiments are only a part of the embodiments, but not all embodiments.
Example one
Referring to fig. 1-4, an air cooling device for a building construction site comprises a bottom plate 1, a power supply control device is fixedly connected to the top of the bottom plate 1, a water tank 2 is fixedly connected to the top of the bottom plate 1, a dust filtering and collecting structure is arranged in the water tank 2, a refrigerator 6 is arranged in the water tank 2, a refrigerating surface of the refrigerator 6 is located in the water tank 2, a radiating surface of the refrigerator 6 is located on the outer side of the water tank 2, an air suction cylinder 7 is fixedly connected to the top of the water tank 2, an air suction shaft 8 is rotatably connected to the air suction cylinder 7, an air suction fan 9 is fixedly sleeved on the outer side of the air suction shaft 8, an air blowing cylinder 16 is communicated to one side of the water tank 2, the air blowing cylinder 16 is rotatably connected to an air blowing shaft 17, an air blowing fan 18 is fixedly sleeved on the outer side of the air blowing shaft.
In this embodiment, a transverse shaft 15 and a first bevel gear 13 are respectively fixedly mounted on two output shafts of a double-shaft motor 11, a vertical shaft 12 is vertically and rotatably connected to a gas blowing cylinder 16, a second bevel gear 14 is fixedly mounted on the top of the vertical shaft 12, the first bevel gear 13 is meshed with the second bevel gear 14, a first bevel gear is fixedly mounted at the bottom of the vertical shaft 12, a second bevel gear is fixedly mounted on the outer side of the gas blowing shaft 17, the first bevel gear is meshed with the second bevel gear, the vertical shaft 12 is driven by the first bevel gear 13 through the second bevel gear 14 to rotate, due to the arrangement of the two first bevel gears and the second bevel gear, the vertical shaft 12 drives the gas blowing shaft 17 to rotate, and the gas blowing shaft 17 drives a gas blowing fan 18 to rotate, so that the dust-removed.
In this embodiment, one end of the transverse shaft 15 extends into the air suction cylinder 7 and is fixedly provided with a driving gear, a driven gear is fixedly sleeved outside the air suction shaft 8, the driving gear is meshed with the driven gear, the bottom of the air suction cylinder 7 is communicated with an air duct 24, the outer side of the air suction cylinder 7 is fixedly communicated with a plurality of air suction pipes 10, and the transverse shaft 15 drives the air suction shaft 8 to rotate through the driving gear and the driven gear.
In this embodiment, the power supply control device includes a protection box 19, a battery 21 and a controller 20, a box door is rotatably connected to the protection box 19, the battery 21 and the controller 20 are both disposed in the protection box 19, the protection box 19 is disposed to prevent an outsider from operating the controller 20 at will, and the battery 21 can be charged.
In this embodiment, the dust filters and collects the structure and includes two guides 3, filter and collect box 4 and connecting strip 23, the through-hole has been seted up to one side of water tank 2, filter and collect box 4 and through-hole swing joint, a plurality of filtration holes of crossing have been seted up on the bottom inner wall of filter collection box 4, two guides 3 are fixed mounting respectively on the both sides inner wall of water tank 2, filter and collect box 4 and 3 sliding connection of two guides, two guides 3 are U type structure, one side fixed connection of box 4 is collected with the filtration to connecting strip 23, the outside cover of filter collection box 4 is equipped with the sealing washer, sealing washer and through-hole sealing connection, connecting strip 23 and 2 fixed connection of water tank, it is used for collecting the dust to set up filter collection box 4, avoid the dust to fall into on the bottom inner wall of water tank 2 simultaneously, avoid causing the pollution to refrigerator 6, filter collection box 4.
In this embodiment, the bottom of bottom plate 1 is provided with four universal wheels 22, and four universal wheels 22 all are provided with the brake block, and the brake block can be fixed universal wheel 22, and the top of water tank 2 is provided with filler 5, and one side intercommunication of water tank 2 has the outlet, and the top slope of bottom plate 1 is provided with pushes away the handle.
Example two
Referring to fig. 1-4, an air cooling device for a building construction site comprises a bottom plate 1, a power supply control device is fixedly connected to the top of the bottom plate 1 through screws, a water tank 2 is fixedly connected to the top of the bottom plate 1 through screws, a dust filtering and collecting structure is arranged in the water tank 2, a refrigerator 6 is arranged in the water tank 2, a refrigerating surface of the refrigerator 6 is arranged in the water tank 2, a heat radiating surface of the refrigerator 6 is arranged on the outer side of the water tank 2, an air suction cylinder 7 is fixedly connected to the top of the water tank 2 through screws, an air suction shaft 8 is rotatably connected to the air suction cylinder 7 through a bearing, an air suction fan 9 is fixedly sleeved on the outer side of the air suction shaft 8, one side of the water tank 2 is communicated with an air blowing cylinder 16, an air blowing shaft 17 is rotatably connected to the air blowing cylinder 16 through a bearing, an air, the air suction shaft 8 and the air blowing shaft 17 are matched with the double-shaft motor 11.
In this embodiment, a transverse shaft 15 and a first bevel gear 13 are fixedly mounted on two output shafts of a double-shaft motor 11 by welding, a vertical shaft 12 is vertically and rotatably connected to a gas blowing cylinder 16 by a bearing, a second bevel gear 14 is fixedly mounted on the top of the vertical shaft 12 by welding, the first bevel gear 13 is meshed with the second bevel gear 14, a first bevel gear is fixedly mounted at the bottom of the vertical shaft 12 by welding, a second bevel gear is fixedly mounted on the outer side of a gas blowing shaft 17 by welding, the first bevel gear is meshed with the second bevel gear, the vertical shaft 12 is driven by the first bevel gear 13 through the second bevel gear 14 to rotate, and the vertical shaft 12 drives the gas blowing shaft 17 to rotate, and the gas blowing shaft 17 drives a gas blowing fan 18 to rotate so as to guide the dust-removed and cooled air to the outside.
In this embodiment, one end of the transverse shaft 15 extends into the air suction cylinder 7 and is fixedly provided with a driving gear by welding, the outer side of the air suction shaft 8 is fixedly sleeved with a driven gear, the driving gear is meshed with the driven gear, the bottom of the air suction cylinder 7 is communicated with an air duct 24, the outer side of the air suction cylinder 7 is fixedly communicated with a plurality of air suction pipes 10, and the transverse shaft 15 drives the air suction shaft 8 to rotate through the driving gear and the driven gear.
In this embodiment, the power supply control device includes a protection box 19, a battery 21 and a controller 20, a box door is rotatably connected to the protection box 19, the battery 21 and the controller 20 are both disposed in the protection box 19, the protection box 19 is disposed to prevent an outsider from operating the controller 20 at will, and the battery 21 can be charged.
In the embodiment, the dust filtering and collecting structure comprises two guide pieces 3, a filtering and collecting box 4 and a connecting strip 23, a through hole is arranged on one side of a water tank 2, the filtering and collecting box 4 is movably connected with the through hole, a plurality of filtering holes are arranged on the inner wall of the bottom of the filtering and collecting box 4, the two guide pieces 3 are respectively fixedly arranged on the inner walls of two sides of the water tank 2 by welding, the filtering and collecting box 4 is in sliding connection with the two guide pieces 3, the two guide pieces 3 are both in a U-shaped structure, the connecting strip 23 is fixedly connected with one side of the filtering and collecting box 4 by screws, a sealing ring is sleeved on the outer side of the filtering and collecting box 4 and is in sealing connection with the through hole, the connecting strip 23 is fixedly connected with the water tank 2 by screws, meanwhile, dust is prevented from falling into the inner wall of the bottom of the water tank 2, the refrigerator 6 is prevented from being polluted, and the filter collecting box 4 can be detached.
In this embodiment, the bottom of bottom plate 1 is provided with four universal wheels 22, and four universal wheels 22 all are provided with the brake block, and the brake block can be fixed universal wheel 22, and the top of water tank 2 is provided with filler 5, and one side intercommunication of water tank 2 has the outlet, and the top slope of bottom plate 1 is provided with pushes away the handle.
In the embodiment, when the dust collector is used, electrical equipment is connected with a battery 21 and a controller 20, cooling water is added through a water adding port 5 and enters a water tank 2, the water level of the cooling water is higher than the bottom opening of an air guide pipe 24 and lower than the horizontal position of a gas blowing cylinder 16, a bottom plate 1 is moved to a proper position through a universal wheel 22, a refrigerator 6 and a double-shaft motor 11 are started, the refrigerator 6 refrigerates the cooling water in the water tank 2, the double-shaft motor 11 drives a transverse shaft 15 and a first bevel gear 13 to rotate, the transverse shaft 15 drives an air suction shaft 8 to rotate through a driving gear and a driven gear, the air suction shaft 8 drives an air suction fan 9 to rotate, air is sucked into an air suction cylinder 7 through a plurality of air suction pipes 10 and is guided into the cooling water inside the water tank 2 through the air guide pipe 24, dust is filtered through the cooling water, meanwhile, the cooling water can cool air, the dust is dissolved into water and then falls, first bevel gear 13 passes through second bevel gear 14 and drives vertical axis 12 and rotate, owing to set up two first bevel gear and second bevel gear, make vertical axis 12 drive the axle 17 of blowing and rotate, the axle 17 of blowing drives the fan 18 of blowing and rotates and can lead out the air that removes dust and cool down to the external world, can cool down to the external world, accomplish the back of using, stop biax motor 11 and refrigerator 6, after using a period, open the drain, discharge the cooling water, dismantle connecting strip 23, pulling connecting strip 23 will filter and collect box 4 and pull out, to the dust clearance of filtering and collecting the inside of box 4, reinstallation can use.
The above descriptions are only preferred embodiments of the present invention, but the scope of the present invention is not limited thereto, and any person skilled in the art should be considered to be within the scope of the present invention, and the technical solutions and the utility model concepts of the present invention are equivalent to, replaced or changed.

Claims (6)

1. An air cooling device for a building construction site comprises a bottom plate (1) and is characterized in that, the top fixedly connected with power supply control equipment of bottom plate (1), the top fixedly connected with water tank (2) of bottom plate (1), be provided with dust in water tank (2) and filter the collection structure, be provided with refrigerator (6) in water tank (2), the top fixedly connected with suction tube (7) of water tank (2), suction tube (7) internal rotation is connected with air suction shaft (8), the outside fixed cover of air suction shaft (8) is equipped with air suction fan (9), one side intercommunication of water tank (2) has air blowing tube (16), air blowing tube (16) internal rotation is connected with air blowing axle (17), the outside fixed cover of air blowing axle (17) is equipped with air blowing fan (18), the top fixedly connected with double-axis motor (11) of water tank (2), air suction shaft (8) and air blowing axle (17) all with double-axis motor (11) looks adaptation.
2. The air cooling device for the building construction site according to claim 1, wherein a transverse shaft (15) and a first bevel gear (13) are fixedly mounted on two output shafts of the double-shaft motor (11) respectively, a vertical shaft (12) is vertically and rotatably connected to the air blowing cylinder (16), a second bevel gear (14) is fixedly mounted on the top of the vertical shaft (12), the first bevel gear (13) is meshed with the second bevel gear (14), a first bevel gear is fixedly mounted at the bottom of the vertical shaft (12), a second bevel gear is fixedly mounted on the outer side of the air blowing shaft (17), and the first bevel gear is meshed with the second bevel gear.
3. The air cooling device for the construction site as claimed in claim 2, wherein one end of the transverse shaft (15) extends into the air suction cylinder (7) and is fixedly provided with a driving gear, a driven gear is fixedly sleeved outside the air suction shaft (8), the driving gear is meshed with the driven gear, the bottom of the air suction cylinder (7) is communicated with the air guide pipe (24), and the outside of the air suction cylinder (7) is fixedly communicated with a plurality of air suction pipes (10).
4. The air cooling device for the building construction site as claimed in claim 1, wherein the power supply control equipment comprises a protection box (19), a battery (21) and a controller (20), a box door is rotatably connected to the protection box (19), and the battery (21) and the controller (20) are both arranged in the protection box (19).
5. The air cooling device for construction sites according to claim 1, dust filters and collects structure and includes two guide (3), filter and collect box (4) and connecting strip (23), the through-hole has been seted up to one side of water tank (2), filter and collect box (4) and through-hole swing joint, a plurality of filtration pores of crossing have been seted up on the bottom inner wall of filter collection box (4), two guide (3) are fixed mounting respectively on the both sides inner wall of water tank (2), filter and collect box (4) and two guide (3) sliding connection, two guide (3) are U type structure, connecting strip (23) and one side fixed connection of filter collection box (4), the outside cover of filter collection box (4) is equipped with the sealing washer, sealing washer and through-hole sealing connection, connecting strip (23) and water tank (2) fixed connection.
6. The air cooling device for the building construction site according to claim 1, wherein four universal wheels (22) are arranged at the bottom of the bottom plate (1), brake pads are arranged on the four universal wheels (22), a water filling port (5) is arranged at the top of the water tank (2), a water discharging port is communicated with one side of the water tank (2), and a pushing handle is obliquely arranged at the top of the bottom plate (1).
CN202020479918.XU 2020-04-03 2020-04-03 Air cooling device for construction site Active CN212390540U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020479918.XU CN212390540U (en) 2020-04-03 2020-04-03 Air cooling device for construction site

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020479918.XU CN212390540U (en) 2020-04-03 2020-04-03 Air cooling device for construction site

Publications (1)

Publication Number Publication Date
CN212390540U true CN212390540U (en) 2021-01-22

Family

ID=74257012

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020479918.XU Active CN212390540U (en) 2020-04-03 2020-04-03 Air cooling device for construction site

Country Status (1)

Country Link
CN (1) CN212390540U (en)

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113182725A (en) * 2021-06-01 2021-07-30 诺冠自动化科技南通有限公司 Manometer pipe tail welding machine

Cited By (1)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113182725A (en) * 2021-06-01 2021-07-30 诺冠自动化科技南通有限公司 Manometer pipe tail welding machine

Similar Documents

Publication Publication Date Title
CN211612090U (en) Dust collector for building
CN209861413U (en) PLC electric cabinet with automatic heat dissipation and dust removal functions
CN212390540U (en) Air cooling device for construction site
CN111952848A (en) Outdoor high-low voltage power distribution cabinet
CN209544878U (en) A kind of dust control by ventilation power distribution cabinet
CN209791110U (en) Central dust removal equipment
CN114797304B (en) Dust collector for construction
CN112276430B (en) Electric welding with good thermal diffusivity
CN215428052U (en) Building site dust collector for building engineering
CN115224619A (en) Formula of sinking prevents destroying power distribution cabinet
CN214177756U (en) Heat dissipation type electronic load cabinet
CN214148922U (en) Novel tube array surface cooler capable of recovering heat
CN209978284U (en) Ventilation unit is used in workshop that suitability is strong
CN110579078B (en) High-efficiency cold-hot exchange equipment
CN203501372U (en) No-clean full heat fresh air ventilation machine
CN115069614B (en) Cleaning device for ancient city wall and application method of cleaning device
CN216295574U (en) Smoke dust collecting device
CN216397381U (en) Air shower device based on dust removal workshop is clean efficient
CN216323857U (en) Cleaning device for ammonia water waste heat utilization refrigerating unit
CN216667899U (en) Wisdom mill workshop ventilation unit that possesses high-efficient dust removal function
CN220524222U (en) Ventilation assembly of air conditioning equipment
CN218669700U (en) Box air compressor of environmental protection
CN212720368U (en) Air heat source pump for centralized heat supply
CN210798827U (en) Fire control construction perforating device
CN214393654U (en) Surface treatment equipment for adsorber processing

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
TR01 Transfer of patent right
TR01 Transfer of patent right

Effective date of registration: 20210608

Address after: 242000 Guquan street, Guquan Town, Xuanzhou District, Xuancheng City, Anhui Province

Patentee after: Anhui Xuangu Construction Engineering Co.,Ltd.

Address before: 266000 building 6, No.4, Taiwan Road, Shinan District, Qingdao City, Shandong Province

Patentee before: Wang Zhangjun