CN212371483U - Connecting structure for reactor vessel - Google Patents

Connecting structure for reactor vessel Download PDF

Info

Publication number
CN212371483U
CN212371483U CN202022195969.2U CN202022195969U CN212371483U CN 212371483 U CN212371483 U CN 212371483U CN 202022195969 U CN202022195969 U CN 202022195969U CN 212371483 U CN212371483 U CN 212371483U
Authority
CN
China
Prior art keywords
welding
connecting pipe
groove
welded
bevel
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202022195969.2U
Other languages
Chinese (zh)
Inventor
孟令奇
张文杨
张敏
张茂龙
费大奎
张炎
罗庆
苏琦
白桦
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Harbin Research Institute of Welding
Shanghai Electric Nuclear Power Equipment Co Ltd
Original Assignee
Harbin Research Institute of Welding
Shanghai Electric Nuclear Power Equipment Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Harbin Research Institute of Welding, Shanghai Electric Nuclear Power Equipment Co Ltd filed Critical Harbin Research Institute of Welding
Priority to CN202022195969.2U priority Critical patent/CN212371483U/en
Application granted granted Critical
Publication of CN212371483U publication Critical patent/CN212371483U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Abstract

The utility model discloses a connection structure for reactor vessel, include: the inner connecting pipe is positioned in the reactor container, and the inner side wall of the inner connecting pipe is provided with an annular first groove; an annular second groove is formed in the inner side wall of the outlet connecting pipe, one end of the outlet connecting pipe is welded with the inner connecting pipe, and the other end of the outlet connecting pipe penetrates through the reactor container and extends out of the reactor container; after the outlet connecting pipe is welded to the inner connecting pipe, the first bevel and the second bevel form a third bevel; the utility model provides a connection structure for reactor vessel and be applicable to 360 all-position automatic argon arc welding single face welding double-sided forming's welding process of pipe inner wall butt joint, combine welding machine tungsten utmost point touching groove lateral wall automatic searching function to make the tungsten utmost point accurately aim at the welding seam, adopt groove and specific welding process that technological parameter is wide in range to obtain good welding seam quality, reduce the welding defect that the human factor leads to, productivity gain.

Description

Connecting structure for reactor vessel
Technical Field
The utility model relates to a nuclear power field, concretely relates to a connection structure for reactor vessel.
Background
The thorium-based molten salt reactor is the main reactor type of the molten salt reactor in six reactor types of the international forum of the fourth generation nuclear energy system, and is considered to be one of the safest reactor technologies in the future. The energy produced by the fission of 1 kg of thorium is equivalent to the heat produced by burning 3500 tons of standard coal, so that the fuel efficiency of thorium is very high. The all-position butt TIG inner welding (non-consumable electrode gas shielded arc welding) is adopted for field installation of the inlet and outlet connecting pipes of the novel thorium-based molten salt reactor vessel and the internal connecting pipes of the heat exchanger, the depth of a welding line is 411mm, and the position of the butt welding line is shown in figure 1. The external space of the product structure is limited, so that the pipe cannot be welded externally; because the inner diameter of the pipe is small, a high-temperature-resistant molten pool observation system cannot be additionally arranged inside the pipe, only blind welding can be carried out on an inner hole, a molten pool cannot be observed in the welding process, welding parameters cannot be adjusted in real time, the process difficulty is greatly increased, and a groove and a welding process which can deal with group misalignment and gaps and have wide process parameter windows are designed for solving the problems in the prior art.
SUMMERY OF THE UTILITY MODEL
An object of the utility model is to provide a connection structure for reactor vessel combines during the automatic function of looking for of welding machine tungsten utmost point touching groove lateral wall can make the tungsten utmost point accurate alignment welding seam, adopts groove and specific welding process that technological parameter is wide in range to obtain good welding seam quality, reduces the welding defect that the human factor leads to, productivity gain.
In order to achieve the above purpose, the utility model adopts the following technical scheme:
a connection structure for a reactor vessel, comprising:
the inner connecting pipe is positioned in the reactor container, and the inner side wall of the inner connecting pipe is provided with an annular first groove;
an annular second groove is formed in the inner side wall of the outlet connecting pipe, one end of the outlet connecting pipe is welded with the inner connecting pipe, and the other end of the outlet connecting pipe penetrates through the reactor container and extends out of the reactor container;
and after the outlet connecting pipe is welded to the inner connecting pipe, the first bevel and the second bevel form a third bevel.
Optionally, the third groove is a U-shaped groove, a V-shaped groove or a Y-shaped groove.
Optionally, a filling weldment is arranged in the third groove.
Optionally, the filler weldment includes a first bead that is welded to the junction of the inner nozzle and the outlet nozzle.
Optionally, the filler weldment includes a number of second beads welded to the first groove and a number of third beads welded to the second groove.
Optionally, the filler weldment includes a number of fourth passes welded to the first groove, a number of fifth passes welded to the second groove, and a number of sixth passes welded between the fourth passes and the sixth passes.
Optionally, the filler weldment includes a number of seventh passes welded to the first groove, a number of eighth passes welded to the second groove, a number of ninth passes welded to the second groove, and a number of tenth passes welded between the seventh and tenth passes.
Compared with the prior art, the utility model discloses one of following advantage has at least:
the utility model provides a connection structure for reactor vessel and be applicable to 360 all-position automatic argon arc welding single face welding double-sided forming's welding process of pipe inner wall butt joint, combine welding machine tungsten utmost point touching groove lateral wall automatic searching function to make the tungsten utmost point accurately aim at the welding seam, adopt groove and specific welding process that technological parameter is wide in range to obtain good welding seam quality, reduce the welding defect that the human factor leads to, productivity gain.
Drawings
FIG. 1 is a schematic structural diagram of a conventional product;
fig. 2 is a schematic structural view of a welded groove in an embodiment of the present invention;
FIG. 3 is a schematic view of a backing weld zone in an embodiment of the present invention;
fig. 4 is a schematic view of the welding subareas of the filling welding odd-numbered layers in an embodiment of the present invention;
FIG. 5 is a schematic view of an even-numbered welding division of the filling weld according to an embodiment of the present invention;
fig. 6 is a schematic view of a weld bead distribution according to an embodiment of the present invention.
Detailed Description
The present invention will be described in further detail with reference to the embodiments shown in fig. 1 to 6. The advantages and features of the present invention will become more apparent from the following description. It is to be noted that the drawings are in a very simplified form and are not to precise scale, which is merely for the purpose of facilitating and distinctly claiming the embodiments of the present invention. To make the objects, features and advantages of the present invention more comprehensible, please refer to the attached drawings. It should be understood that the structure, ratio, size and the like shown in the drawings attached to the present specification are only used for matching with the content disclosed in the specification, so as to be known and read by those skilled in the art, and are not used for limiting the limitation of the implementation of the present invention, so that the present invention does not have the essential significance in the technology, and any modification of the structure, change of the ratio relationship or adjustment of the size should still fall within the scope of the technical content disclosed in the present invention without affecting the function and the achievable purpose of the present invention.
It is noted that, herein, relational terms such as first and second, and the like may be used solely to distinguish one entity or action from another entity or action without necessarily requiring or implying any actual such relationship or order between such entities or actions. Also, the terms "comprises," "comprising," or any other variation thereof, are intended to cover a non-exclusive inclusion, such that a process, method, article, or field device that comprises a list of elements does not include only those elements but may include other elements not expressly listed or inherent to such process, method, article, or field device. Without further limitation, an element defined by the phrase "comprising an … …" does not exclude the presence of other like elements in a process, method, article, or field device that comprises the element.
Referring to fig. 1 to 6, the present embodiment provides a connection structure for a reactor vessel, including:
the inner connecting pipe 1 is positioned in the reactor vessel, and the inner side wall of the inner connecting pipe is provided with an annular first groove 3;
an annular second groove 4 is formed in the inner side wall of the outlet connecting pipe 2, one end of the outlet connecting pipe is welded with the inner connecting pipe 1, and the other end of the outlet connecting pipe penetrates through the reactor vessel and extends out of the reactor vessel;
and when the outlet connecting pipe 2 is welded to the inner connecting pipe 1, the first bevel 3 and the second bevel 4 form a third bevel 5.
In this embodiment, the third groove 5 is a U-shaped groove, a V-shaped groove or a Y-shaped groove.
In this embodiment, a filling weldment is arranged in the third groove.
In this embodiment, the filler weldment comprises a first bead which is welded to the junction of the inner nozzle 1 and the outlet nozzle 2.
In this embodiment, the filler weldment includes a plurality of second beads welded to the first groove 3 and a plurality of third beads welded to the second groove 4.
In this embodiment, the filler weldment includes a plurality of fourth beads welded to the first groove 3, a plurality of fifth beads welded to the second groove, and a plurality of sixth beads welded between the fourth beads and the sixth beads.
In this embodiment, the filler weldment includes a plurality of seventh beads, a plurality of eighth beads, a plurality of ninth beads, and a plurality of tenth beads, and the seventh bead is welded to the first groove, the tenth bead is welded to the second groove, and the eighth beads and the ninth beads are welded between the seventh beads and the tenth beads.
On the other hand, the utility model also provides a welding process who is applied to foretell reactor vessel's connection structure, include:
respectively preprocessing the first groove and the second groove 4, cleaning the peripheries of the first groove 3 and the second groove 4 by adopting alcohol or acetone, cleaning the surfaces of the grooves and the outer walls of the pipes, and cleaning the surfaces and edges to be welded without water stain, oxides, oil stain and slag and other foreign substances which possibly influence the welding quality; assembling a test piece and a gas back protection tool at the groove, controlling the gap and the misalignment of a groove group within 1mm, ensuring that no misalignment exists at an overhead welding position and a vertical downward welding position, and ensuring that the misalignment is located at a flat welding position as much as possible.
Introducing a set amount of protective gas, introducing 99.99% pure argon before welding, wherein the gas flow is 10-40L/min, and the gas introduction time is more than or equal to 5 min.
And spot welding the joint of the inner connecting pipe 1 and the outlet connecting pipe 2 to fix the relative position between the inner connecting pipe 1 and the outlet connecting pipe 2, wherein the first groove 3 and the second groove 4 form a third groove 5, the welding grooves are subjected to non-wire-added positioning spot welding every 90 degrees, the spot welding current is 60A, the arc length is 2mm, and the spot welding time is 1.5-2 s.
Backing welding is carried out on the joint of the inner connecting pipe 1 and the outlet connecting pipe 2, a welding gun is inserted into the pipe by a movable welding machine and is aligned with the center of a welding seam (the contact position of the inner connecting pipe 1 and the outlet connecting pipe 2), the diameter of a tungsten rod of the welding gun is phi 3.2mm, the length of the tungsten rod is 13-20 mm, the angle of the welding gun is adjusted to 0 degree in the figure 2, the machine head walks once along the welding seam of a workpiece according to a set welding procedure, the distance between the welding gun, a tungsten electrode, a wire feeding nozzle and the groove is checked, and all parts are adjusted to proper positions.
In this embodiment, the backing weld specifically includes: starting arc starting welding from O degrees, and welding from a first area to a sixth area along a preset direction to receive an arc, wherein a polar coordinate system is established by taking any point in the axial direction of the inner connecting pipe 1 or the outlet connecting pipe 2 as a pole and taking a connecting line from the pole to the lowest point of the third groove 5 as a polar axis, the first area is 0-beta, the second area is beta-90 degrees, the third area is 90-180 degrees, the fourth area is 180-270 degrees, the fifth area is 270-360 degrees, the sixth area is 0-beta, and the beta is 3-10 degrees.
Referring to fig. 3, the backing weld zone starts from 0 ° to start the arc welding, and the arc welding starts from one zone to six zones in the counterclockwise direction, and the arc welding position should be within the range of the angle β. The welding direction may also be clockwise, in which case the welding sector is opposite to that of fig. 3; during backing welding, after the groove at two sides contacted by the tungsten electrode is automatically found to the central position, the distance between the tungsten rod and the workpiece is adjusted and confirmed through an endoscope; welding parameters are shown in a table 1, and during welding, non-swing straight-forward welding is adopted, and the welding process is as follows: the second zone is transited from the horizontal welding to the vertical upward welding stage, so that the welding current and the welding speed can be properly increased; when three areas are vertically welded to the overhead welding position, the wire feeding speed and the welding current need to be properly reduced; the wire feeding speed and the welding current are properly increased from the overhead welding stage to the vertical downward welding stage in the fourth zone and the fifth zone; when the welding reaches six zones, the arc-stopping part covers the welding bead at the arc-starting part as much as possible. Cooling the welding line to room temperature, and observing the backing weld through an endoscope to form the welding line; visual inspection and liquid penetration inspection (outer wall) of the weld seam was performed after backing weld.
TABLE 1 backing weld welding parameters
Partition sequence number A II III Fourthly Five of them Six ingredients
Partition angle 0°~β β~90° 90°~180° 180°~270° 270°~360° 360°~(360°+β)
Welding speed (mm/min) 70~90 70~100 80~100 70~90 70~90 70~90
Wire feed speed (mm/min) 250~400 300~500 200~350 250~400 250~400 250~400
Peak current (A) 110~130 120~160 110~150 120~160 120~160 120~160
Base value current (A) 55~80 60~90 60~90 60~90 60~90 60~90
Arc voltage (V) 9~11 9~11 9~11 9~11 9~11 9~11
And performing filling welding on the inner adapter tube 1 and the outlet adapter tube 2, wherein a weld bead formed by the filling welding is filled into the third bevel 5.
In this embodiment, the filling welding tool includes:
s101, starting arc welding from an angle gamma 1, and performing arc closing from a first area to a sixth area along the welding direction, wherein the arc closing position is located in a beta angle range;
s102, starting arc welding from an angle- (gamma 2+ beta), and performing arc-ending from a first area to a sixth area along the welding direction, wherein the arc-ending position is located in a beta angle range;
s103, repeating the step S101 and the step S102 for a plurality of times.
In figure 4, gamma 1 is 15-30 degrees, beta is 3-10 degrees; in figure 5, gamma 2 is 15-30 degrees, and beta is 3-10 degrees.
And (3) welding and partitioning:
referring to fig. 4, the first layer of the filling weld starts from the angle γ 1 and is arc-welded from the first zone to the sixth zone along the welding direction, and the arc-welding point is located within the angle β.
Referring to fig. 5, in order to avoid the arc starting and closing position of the first layer and reduce welding deformation, the second layer of the filling welding is arc-started from the angle- (γ 2+ β), and the arc is closed from the first area to the sixth area along the welding direction, and the arc closing position is located within the range of β;
the third layer of the filling welding is consistent with the first layer of the subarea, the fourth layer of the filling welding is consistent with the second layer of the subarea, and the like of the subsequent filling layer.
The welding direction may be clockwise, in which case the weld zone is opposite to that of fig. 4 and 5.
In the welding process, multilayer multi-pass non-swing welding is adopted, a filling welding seam row is shown in figure 6, welding passes of the side wall are firstly welded during welding of each layer, and then welding passes between the welding passes of the side wall are welded.
When filling welding, firstly finding out the central position of the welding seam, and adjusting the welding seam to the position of the welding seam to be welded under the assistance of an endoscope. After welding, repair welding can be carried out through corresponding remelting parameters if the side wall of the welding seam is not fused or the layers are not fused through an endoscope;
the welding parameters are shown in the table 2, and the welding process is as follows:
the second zone is transited from the horizontal welding to the vertical upward welding stage, so that the welding current and the welding speed can be properly increased; when three areas are vertically welded to the overhead position, the wire feeding speed and the welding current need to be properly reduced, and the welding speed needs to be increased; the wire feeding speed and the welding current are properly increased from the overhead welding stage to the vertical downward welding stage in the fourth zone and the fifth zone; when the welding reaches six zones, the arc-stopping part covers the welding bead at the arc-starting part as much as possible.
TABLE 2 Filler weld parameters
Figure DEST_PATH_GDA0002818496160000061
And (4) polishing the welding track joint and the arc pit area smoothly, and removing the bad tissues, oxides and impurities of the arc pit. And after polishing, residues are cleaned in time, and welding slag fragments cannot exist in a deposited area.
While the present invention has been described in detail with reference to the preferred embodiments thereof, it should be understood that the above description should not be taken as limiting the present invention. Numerous modifications and alterations to the present invention will become apparent to those skilled in the art upon reading the foregoing description. Accordingly, the scope of the invention should be limited only by the attached claims.

Claims (7)

1. A connection structure for a reactor vessel, comprising:
the inner connecting pipe is positioned in the reactor container, and the inner side wall of the inner connecting pipe is provided with an annular first groove;
an annular second groove is formed in the inner side wall of the outlet connecting pipe, one end of the outlet connecting pipe is welded with the inner connecting pipe, and the other end of the outlet connecting pipe penetrates through the reactor container and extends out of the reactor container;
and after the outlet connecting pipe is welded to the inner connecting pipe, the first bevel and the second bevel form a third bevel.
2. The connection structure for a reactor vessel according to claim 1, wherein the third bevel is a U-bevel, a V-bevel, or a Y-bevel.
3. The connection structure for a reactor vessel according to claim 1 or 2, wherein a filler weldment is provided in the third bevel.
4. A connection structure for a reactor vessel according to claim 3, wherein said filler weldment includes a first bead welded to the junction of said inner nozzle and said outlet nozzle.
5. A connection structure for a reactor vessel according to claim 4, wherein said filler weldment includes a plurality of second beads welded to said first groove and a plurality of third beads welded to said second groove.
6. A connection structure for a reactor vessel according to claim 5, wherein said filler weldment includes a number of fourth passes welded to said first bay, a number of fifth passes welded to said second bay, and a number of sixth passes welded between said fourth passes and said sixth passes.
7. A connection structure for a reactor vessel as recited in claim 6, wherein said filler weldment includes a plurality of seventh beads, a plurality of eighth beads, a plurality of ninth beads, and a plurality of tenth beads, said seventh beads being welded to said first bay, said tenth beads being welded to said second bay, said eighth beads and ninth beads being welded between said seventh beads and said tenth beads.
CN202022195969.2U 2020-09-30 2020-09-30 Connecting structure for reactor vessel Active CN212371483U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202022195969.2U CN212371483U (en) 2020-09-30 2020-09-30 Connecting structure for reactor vessel

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202022195969.2U CN212371483U (en) 2020-09-30 2020-09-30 Connecting structure for reactor vessel

Publications (1)

Publication Number Publication Date
CN212371483U true CN212371483U (en) 2021-01-19

Family

ID=74172273

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202022195969.2U Active CN212371483U (en) 2020-09-30 2020-09-30 Connecting structure for reactor vessel

Country Status (1)

Country Link
CN (1) CN212371483U (en)

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112059465A (en) * 2020-09-30 2020-12-11 上海电气核电设备有限公司 Connecting structure for reactor container and welding process
CN113770491A (en) * 2021-10-11 2021-12-10 哈尔滨焊接研究院有限公司 Repair welding method for TIG (tungsten inert gas) inner welding of all-position butt joint of pipelines
CN115041788A (en) * 2022-06-20 2022-09-13 天津职业技术师范大学(中国职业培训指导教师进修中心) Argon tungsten-arc welding process for automatically welding base and branch pipe

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN112059465A (en) * 2020-09-30 2020-12-11 上海电气核电设备有限公司 Connecting structure for reactor container and welding process
CN113770491A (en) * 2021-10-11 2021-12-10 哈尔滨焊接研究院有限公司 Repair welding method for TIG (tungsten inert gas) inner welding of all-position butt joint of pipelines
CN115041788A (en) * 2022-06-20 2022-09-13 天津职业技术师范大学(中国职业培训指导教师进修中心) Argon tungsten-arc welding process for automatically welding base and branch pipe

Similar Documents

Publication Publication Date Title
CN212371483U (en) Connecting structure for reactor vessel
CN112658443B (en) Manual argon tungsten-arc welding process method for steel-aluminum connector
CN106975826B (en) Automatic welding process for butt joint of nickel-based alloy heat exchange tubes
CN107052517B (en) Automatic butt welding process for low-alloy steel and nickel-based alloy dissimilar steel heat exchange tubes
CN102528237A (en) Welding process for carbon steel process pipeline
CN105195872A (en) Double-sided submerged arc back-chipping-free welding technology for pipeline steel
EP2098324A1 (en) Welded butt joints on tubes having dissimilar end preparations
CN112059465A (en) Connecting structure for reactor container and welding process
CN205254438U (en) Butt joint pipe fitting laser welding device
CN105880815B (en) A kind of tube sheet corner joint auxiliary welding device and welding method
JP5692413B2 (en) Multi-electrode electrogas arc welding method for thick steel plate and multi-electrode electrogas arc circumferential welding method for steel pipe
JP4757696B2 (en) UOE steel pipe manufacturing method
CN107813034A (en) A kind of flux-cored wire gas protects vertical-up welding process
CN106944723A (en) A kind of low-alloy steel heat exchanger tube docking automatic soldering technique for filling melting ring
CN102744499A (en) Double-side double-arc welding process for root layer of pipeline
CN107052536B (en) Automatic butt welding process for low alloy steel heat exchange tubes without filler
US20150128881A1 (en) Method for manufacturing boiler water walls and boiler with laser/arc welded water walls
CN111037065A (en) Welding method for inner hole welding of tube plate of small-aperture heat exchange tube
CN106001971A (en) Automatic 2G-welding-position narrow-gap welding method for steam turbine valve thick-wall connection tube
CN106825877A (en) stainless steel square tube welding process
US6410876B1 (en) Method for orbital welding of small-, medium-, and large-diameter pipes
CN107671398B (en) SAW automatic welding process method for narrow groove of thick-wall pipe and welding head
CN115302051A (en) Manual tungsten electrode argon arc welding process method for super dual-phase steel process pipeline
CN114226925A (en) Stainless steel workpiece butt deep-melting argon arc welding method
CN111037063A (en) Manual seamless deep-melting TIG (tungsten inert gas) welding process for SA-312TP304L stainless steel

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant