CN212316698U - Concrete bridge guardrail construction platform device - Google Patents

Concrete bridge guardrail construction platform device Download PDF

Info

Publication number
CN212316698U
CN212316698U CN202020797273.4U CN202020797273U CN212316698U CN 212316698 U CN212316698 U CN 212316698U CN 202020797273 U CN202020797273 U CN 202020797273U CN 212316698 U CN212316698 U CN 212316698U
Authority
CN
China
Prior art keywords
bridge guardrail
framework
skeleton
concrete bridge
construction platform
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Active
Application number
CN202020797273.4U
Other languages
Chinese (zh)
Inventor
伍明顺
马勇军
凌杰
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
China Railway 12th Bureau Group Co Ltd
China Railway 12th Bureau Group Electrification Engineering Co Ltd
Original Assignee
China Railway 12th Bureau Group Co Ltd
China Railway 12th Bureau Group Electrification Engineering Co Ltd
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by China Railway 12th Bureau Group Co Ltd, China Railway 12th Bureau Group Electrification Engineering Co Ltd filed Critical China Railway 12th Bureau Group Co Ltd
Priority to CN202020797273.4U priority Critical patent/CN212316698U/en
Application granted granted Critical
Publication of CN212316698U publication Critical patent/CN212316698U/en
Active legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Refuge Islands, Traffic Blockers, Or Guard Fence (AREA)
  • Bridges Or Land Bridges (AREA)

Abstract

The utility model relates to a concrete bridge guardrail construction platform device, belonging to the technical field of concrete bridge guardrail construction tools; the device comprises a workbench, a counterweight table and a framework which is bent into an inverted U shape by two parallel reinforcing steel bars, wherein the workbench is welded and fixed with one side of the framework, the counterweight table is welded and fixed with the other side of the framework, each horizontal reinforcing steel bar in the framework is provided with at least two top pulleys, each vertical reinforcing steel bar in the framework is provided with at least two side pulleys, the device is arranged on a bridge guardrail, and the top pulleys and the side slipping wheels can be clamped on the bridge guardrail and can transversely move on the bridge guardrail; the utility model discloses the security is higher, the dismouting is swift, the transportation is convenient, has certain spreading value, use value and economic value.

Description

Concrete bridge guardrail construction platform device
Technical Field
The utility model relates to a concrete bridge guardrail construction platform device belongs to concrete bridge guardrail construction tool technical field.
Background
In modern construction, in the construction of a plurality of highway bridges and railway bridges, the installation of a cable hanger is one of essential procedures. In site construction, the bridge drilling work has no reserved construction work platform, the bridge drilling on the construction site is difficult, the efficiency is low, and the construction cost is high. At present, a common solution is to use a hanging basket, constructors are in the hanging basket to carry out bridge drilling, but the hanging basket has a safety operation risk, and the hanging basket is inconvenient to disassemble, assemble and move.
SUMMERY OF THE UTILITY MODEL
The utility model relates to a concrete bridge guardrail construction platform device has overcome the not enough of prior art existence, provides a simple structure, safe effectual portable construction platform.
In order to solve the technical problem, the utility model discloses a technical scheme be: the utility model provides a concrete bridge guardrail construction platform device which characterized in that: including the workstation, counter weight platform and the skeleton of bending into the type of falling U by the reinforcing bar of two parallels, one side welded fastening of workstation and skeleton, the opposite side welded fastening of counter weight platform and skeleton, be equipped with two at least top pulleys on each horizontal reinforcement in the skeleton, be equipped with two at least side pulleys on each vertical reinforcing bar in the skeleton, the device sets up on bridge railing, top pulley and sideslip wheel can block on bridge railing to lateral shifting can be on bridge railing.
Furthermore, the workbench comprises a bottom surface frame, guardrails are arranged around the bottom surface frame, and bearing wood boards are arranged on the bottom surface frame.
Furthermore, the outer side of the counterweight table is connected with the vertical steel bars in the framework through inclined rods.
Further, the diameter of the reinforcing steel bars in the framework is 16 mm.
Compared with the prior art, the utility model following beneficial effect has.
Compared with the common hanging basket, the utility model has higher safety, rapid disassembly and assembly, convenient transportation, simple structure and convenient operation, and well ensures the construction safety; in personnel configuration, 8 people can be configured by 1 original construction, and the number of the people is reduced to 2, so that the manpower is greatly reduced, and the method has certain popularization value, use value and economic value.
Drawings
Fig. 1 is a front view of the present invention.
Fig. 2 is a top view of the present invention.
Fig. 3 is a schematic view of the operation of the present invention.
In the figure, 1-workbench, 2-counterweight table, 3-framework, 4-top pulley, 5-side pulley, 6-pulley bracket, 7-diagonal rod, 8-guardrail and 9-bridge guardrail.
Detailed Description
The present invention will be further described with reference to the accompanying drawings.
As shown in fig. 1 and fig. 2, the utility model relates to a concrete bridge guardrail construction platform device, including workstation 1, counter weight platform 2 and the skeleton 3 of bending into the type of falling U by the reinforcing bar of two parallels, one side welded fastening of workstation 1 and skeleton 3, counter weight platform 2 and skeleton 3's opposite side welded fastening, be equipped with two top pulleys 4 on each horizontal reinforcement in the skeleton 3, be equipped with two side pulleys 5 on each vertical reinforcement in the skeleton 3, the device sets up on bridge guardrail 9, top pulley 4 and side pulley 5 can block on bridge guardrail 9, and can lateral shifting on bridge guardrail 9.
As an implementation mode, the workbench 1 comprises a bottom surface frame, the periphery of the bottom surface frame is provided with guardrails 8, and the bottom surface frame is provided with bearing wood boards. The outer side of the counterweight table 2 is connected with vertical steel bars in the framework 3 through an inclined rod 7, and the bottom of the counterweight table 2 is also provided with a wood plate. The diameter of the reinforcing steel bar in the framework 3 is 16 mm, and the requirement of bearing can be met. The width of the horizontal steel bar in the framework 3 is set according to the actual thickness of the cement guardrail.
To the working process and principle of the utility model further explain: as shown in FIG. 3, in order to ensure smooth pushing of the device during construction, the left and right side wheels are slightly larger than the thickness of the bridge guardrail. The constructor stands in the workbench 1, and the counterweight table 2 is provided with a counterweight (such as a generator and a cement block) heavier than the weight of the constructor. Constructor disposes 2 safety belts, and 1 disposes on workstation 1's guardrail 8, and 1 passes through the bolt to be fixed on the hole in the bridge guardrail in addition, and when needs continue to advance, cooperation personnel promote the platform device to advance on the bridge in addition, treat that the platform is stable to be changed the bolt to near bridge guardrail department, continue the operation of this department.
Adopt the utility model discloses a following problem should be noted when the device carries out contact net upper portion construction:
1. the weight used for the counterweight is determined according to the weight of a person entering the operation platform, and is preferably more than 30% of the weight of the operator, so that the stability of the device is ensured, and the sliding of the pulley is flexible.
2. Before the constructors can work safely, 2 safety belts must be tied respectively.
3. After the construction operation of a certain position is finished, the constructor stops the operation and can push the workbench tightly.
4. The safety bolt tied at the guardrail of the bridge needs to adopt a closed loop, and the inserting depth of the bolt is guaranteed when the safety bolt is inserted into the guardrail.
The embodiments of the present invention have been described in detail with reference to the accompanying drawings, but the present invention is not limited to the above embodiments, and various changes can be made without departing from the spirit of the present invention within the knowledge of those skilled in the art.

Claims (4)

1. The utility model provides a concrete bridge guardrail construction platform device which characterized in that: including workstation (1), counter weight platform (2) and by skeleton (3) of the two parallel reinforcing bars of bending into the type of falling U, workstation (1) and one side welded fastening of skeleton (3), the opposite side welded fastening of counter weight platform (2) and skeleton (3), be equipped with two at least top pulleys (4) on each horizontal reinforcement in skeleton (3), be equipped with two at least side pulley (5) on each vertical reinforcement in skeleton (3), the device sets up on bridge guardrail (9), top pulley (4) and sideslip wheel (5) can block on bridge guardrail (9), and can be in bridge guardrail (9) lateral shifting.
2. The concrete bridge guardrail construction platform device of claim 1, wherein: the workbench (1) comprises a bottom surface frame, guardrails (8) are arranged around the bottom surface frame, and bearing wood boards are arranged on the bottom surface frame.
3. The concrete bridge guardrail construction platform device of claim 1, wherein: the outer side of the counterweight table (2) is connected with vertical steel bars in the framework (3) through inclined rods (7).
4. The concrete bridge guardrail construction platform device of claim 1, wherein: the diameter of the steel bar in the framework (3) is 16 mm.
CN202020797273.4U 2020-05-14 2020-05-14 Concrete bridge guardrail construction platform device Active CN212316698U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202020797273.4U CN212316698U (en) 2020-05-14 2020-05-14 Concrete bridge guardrail construction platform device

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202020797273.4U CN212316698U (en) 2020-05-14 2020-05-14 Concrete bridge guardrail construction platform device

Publications (1)

Publication Number Publication Date
CN212316698U true CN212316698U (en) 2021-01-08

Family

ID=74023997

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202020797273.4U Active CN212316698U (en) 2020-05-14 2020-05-14 Concrete bridge guardrail construction platform device

Country Status (1)

Country Link
CN (1) CN212316698U (en)

Similar Documents

Publication Publication Date Title
CN212316698U (en) Concrete bridge guardrail construction platform device
CN207277192U (en) Portable overhanging lifting platform for crash barrier template construction
CN209384619U (en) A kind of hanging basket device that can be walked safely on foundation pit reinforced concrete
CN209702166U (en) A kind of sound barrier plate simply installs equipment
CN106639328A (en) Concrete beam steel reinforcement framework construction device and method
CN108824214A (en) A kind of fast-type high-speed rail Bridge Pier Construction hanging basket mounting platform and application method
CN201339311Y (en) Turning plate device of hanging rack
CN212454217U (en) Fixed steel lattice of segmentation is cat ladder component for post
CN209854554U (en) Supplementary car of installing and removing of template
CN211499700U (en) Construction protection handling frame
CN206768613U (en) For the U-shaped beam of auxiliary erection urban rail and the moving hanging basket of tensioning bent cap
CN208981152U (en) A kind of fast-type high-speed rail Bridge Pier Construction hanging basket mounting platform
CN210564332U (en) Movable safety steel cat ladder
CN208087100U (en) A kind of simple purlin vehicle type hanging apparatus
CN207932952U (en) Detachable hoisting gate frame
CN219032955U (en) Bridge anticollision wall template construction work platform
CN218090542U (en) Bridge breast board construction equipment
CN206091266U (en) Outrigger steel cat ladder for construction
CN215671188U (en) Temporary reinforcing structure for hoisting prefabricated part
CN212105086U (en) Simple climbing device capable of transferring scaffold
CN204715723U (en) Light hanging basket
CN219138315U (en) Construction platform for hanging basket downwards
CN218147873U (en) Trolley for repairing concrete guardrail of bridge
CN108316160A (en) Large-tonnage highway ramp spells wide beam construction method and its construction equipment
CN219508371U (en) External embedded part of highway bridge guardrail and pipeline mounting rack

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant