CN2122897U CN 92224037 CN92224037U CN2122897U CN 2122897 U CN2122897 U CN 2122897U CN 92224037 CN92224037 CN 92224037 CN 92224037 U CN92224037 U CN 92224037U CN 2122897 U CN2122897 U CN 2122897U
Authority
CN
China
Prior art keywords
platform
enclosure
construction equipment
template
chimney
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Granted
Application number
CN 92224037
Other languages
Chinese (zh)
Inventor
白洪义
张晶
邹玉英
黄天维
颜庆祥
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
INST OF ELECTRIC POWER CONSTRUCTION MINISTRY OF ENERGY SOURCE
Original Assignee
INST OF ELECTRIC POWER CONSTRUCTION MINISTRY OF ENERGY SOURCE
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by INST OF ELECTRIC POWER CONSTRUCTION MINISTRY OF ENERGY SOURCE filed Critical INST OF ELECTRIC POWER CONSTRUCTION MINISTRY OF ENERGY SOURCE
Priority to CN 92224037 priority Critical patent/CN2122897U/en
Publication of CN2122897U publication Critical patent/CN2122897U/en
Granted legal-status Critical Current

Links

Images

Landscapes

  • Forms Removed On Construction Sites Or Auxiliary Members Thereof (AREA)

Abstract

The utility model relates to construction equipment for a chimney. The platform of the construction equipment for a chimney is fixedly connected at a tower crane on the center. A hydraulic cylinder is arranged on the platform, and the climbing and folding expanding action of the hydraulic cylinder can be controlled. When the platform climbs along a tower body, a door frame is driven, and the door frame and a template are connected by a bolt and a nut. The template follows the platform to upwards slide along a cylinder wall. The weight of the platform of the construction equipment for a chimney is supported by the tower crane, which ensures that the platform can not float, incline, and twist, and thus, the quality of a chimney is markedly enhanced.

Description

Construction equipment for chimneys
The utility model relates to a kind of chimney construction equipment, belongs to the technical field of chimney construction machinery.
Present domestic steam power plant single-machine capacity constantly increases; Environment Protection Policy also proposes corresponding requirement to this; because of the structure of chimney also changes; the manual building method of the construction of chimney, silo one class building; spacious day more for a long time; all can not meet the demands with the construction speed aspect in quality, adopt plant equipment and technology to construct and also have many shortcomings, demand urgently improving.
Chimney construction equipment both domestic and external, mainly be to adopt sliding formwork and Ti Mo dual mode, carrying mould is divided into again and manually turns over mould and electric mould-lifting, be that uniform many hydraulic jack (quantity is decided on the chimney diameter) jack synchronously upwards promotes along the bar that climbs around chimney, drive template sliding lifting, penetrating beam by the width of cloth also rises platform, no matter be to put forward mould and slide plate mode, its common drawback is that platform easily drifts about, and reverses, tilt, make the physical dimension of chimney, the all difficult control of profile, during construction, personnel transport up and down with hopper, safety is relatively poor in the operation, platform adjust and the feeding time long, thereby speed of application is still slow, concrete to the platform afterwards by manually being pushed to working face, the operation number is more, and mechanization degree is poor.
The purpose of this utility model is the chimney construction device that a kind of novelty will be provided, and it can overcome above-mentioned shortcoming.
The purpose of this utility model is to realize like this, employing center tower crane, platform is by the body of the tower support, platform drives template system and can upwards climb along body of the tower, template can be thrown off with the concrete chimney barrel, the contracture oil cylinder is housed on the platform top, and the oil cylinder that vertically climbs is equipped with in the platform bottom, and the platform upper and lower all have last climbing frame and following climbing frame to be fixed on above the body of the tower, the leading screw screw also is housed, so that platform is moved up and down along the tower crane body of the tower, and its hydraulic system is to be received above the oil cylinder by oil pipe by the variable pump one way valve, and unnecessary oil returns fuel tank by safety valve and oil filter, body of the tower adopts and adheres to bar, with adhere to rod bearing, the servicing unit that adjusting nut is formed is supported between barrel and the body of the tower, make body of the tower keep correct center, the quality of chimney is guaranteed, and platform can not take place floating, tilts or reverses.Full peace is reliable in the operation.
The schematic diagram of Fig. 1 chimney construction equipment
The schematic diagram that Fig. 2 platform is connected with template
Fig. 3 platform climbs and contracture assembling schematic diagram
Fig. 5 platform is faced platform
Fig. 6 platform vertical view
Fig. 7 tower crane center levelling servicing unit schematic diagram
Fig. 8 climbing forms schematic diagram
Fig. 9 chimney wall thickness levelling figure
Now in conjunction with the accompanying drawings the structure of chimney construction equipment is described in detail:
Fig. 1 is the schematic diagram of chimney construction equipment, center tower crane (1) is contained in the center of the chimney of desire construction, be fixed on above the basis, platform (2) is contained in above the body of the tower of center tower crane (1), make tower crane (1) be positioned at the center of platform (2), platform (2) can be along the lifting of body of the tower direction, platform (2) is connected with door frame (6), door frame (6) is used bolt (7) again, nut (8) is connected with climbing forms (3), it between the template (3) barrel (4) of chimney, construction elevator is equipped with in the bottom of tower crane (1), therefore the constructor can rise to platform thus and gets on, the load of platform (2) is all born with tower crane, so that platform does not have is floating, and tendencies such as inclination.
Fig. 2 is the schematic diagram that platform is connected with template, and platform (2) is connected with door frame (6), and door frame (6) is connected with template (3) with pin bolt (7) nut (8).
Fig. 3 is that platform climbs and the assembling of contracture radially schematic diagram, climbing frame (10) and following climbing frame (11) are housed on body of the tower (9), at climbing frame (10) up and down, 2 leading screws (12) respectively are housed (11), (13), screw (14) is housed on the last climbing frame (10), following climbing frame (11) is equipped with screw (15), radially contracture oil cylinder (17) is equipped with on platform top (16), be distributed in above the platform along width of cloth beam, its plunger (19) is connected with door frame (6), the both sides of door frame (6) bolt template (3), just in time barrel (4) between the template (3), the oil cylinder that vertically climbs (18) is equipped with in platform bottom (21), and the upper end of its plunger (20) links to each other with platform top (16).
Last climbing frame (10) down climbing frame (11) all is separately fixed at above the body of the tower, and platform upper and lower (10), (11) are along body of the tower (9) and move up and down, and is hung in up and down on the climbing frame by leading screw, and its step of climbing is as follows:
1, climb in platform top
Climb in platform top, the oil cylinder that vertically climbs is that fixed point promotes platform top (16) rising with platform bottom (21) just, radially contracture oil cylinder (17) also moves simultaneously, carry out the contracture action on request, the 4 rhizoid thick sticks of platform top (16) rise equal height by the via hole of last climbing frame with the nut on it.
2, platform top is fixed
To go up 4 nut screwing clampings on the climbing frame (10), platform top is hung on the climbing frame (10).
3, the platform bottom promotes
The oppositely logical oil of the oil cylinder (18) that vertically climbs is that fixed point is mentioned platform bottom (21) with platform top (16), and the bottom leading screw passes down the via hole of the frame that climbs simultaneously, makes nut rising same distance.
4, the platform bottom is fixed
To descend 4 nut screwing clampings on the climbing frame (11), platform bottom (21) is connected on down on the climbing frame (11), at this moment finish the action of once climbing, after the action of repeatedly climbing, leading screw on the climbing frame can unscrew last climbing frame top nut to the position of using up, and will go up climbing frame and rise to next fixed point and go up jack panel again after fixing and make down climbing frame continue as stated above to climb again with leading chain, fixing, so just can carry out the next one action of climbing.
Fig. 4 is that platform climbs and the Hydrauservo System figure of contracture, oil filter (21) and oil cleaner screen (22) are housed in the fuel tank, oil filter (21) joins with oil pipe with safety valve (24), the other end of safety valve (24) is received switch (25) and pressure meter (26) again, one of oil cleaner screen (22) terminates to plunger type variable capacity pump (23), receive an one way valve (27) again, one way valve (27) is received contracture oil cylinder (17) and the vertical oil cylinder that climbs (18) respectively with oil pipe.
Starting switch (25) and variable pump (23), oil flows to 2 oil cylinders through one way valve (27) in the oil sump, and unnecessary oil can return fuel tank (28) through safety valve (24) and oil filter (21).
Fig. 5 is the elevation of platform, Fig. 6 is the vertical view of platform, center tower crane (1) is positioned at middle position, all around with center steel ring (30), along with radial equipartition many radiation beams (31) being arranged on steel ring (30) circle, the beam upper berth is with bed board (32), radiation beam (31) bottom is welded with several platform steel rings (33), spend blue bolt (34) to fasten pull bar (35), the two ends of pull bar (35) are fixed in bottom the radiation beam and above the steel ring (30), angle is suitable with 9 ° between the general radiation beam (31), and the edge of radiation beam (31) also is welded with railing steel ring (36).
Fig. 7 is the servicing unit schematic diagram of tower crane center levelling; in work progress; because chimney height is big, body of the tower regular meeting rocks, for guaranteeing the quality of chimney; just around body of the tower, increase some servicing units and align its center; adhere to bar (37) one ends and be supported in built-in fitting (38), be connected in supporting seat (40) by adjusting nut (39) again, supporting seat (40) is fixed on above the body of the tower (9); because the supporting role of adhering to bar (37) can make tower crane keep its correct center.
Fig. 8 is the schematic diagram of climbing forms, between fixed form (41) and the traveling formwork (45) contracture template (44) is housed, and activity enclosure (46) and fixedly enclosure (3) are joined, and door frame column (42) is adjacent with fixedly enclosure (43).
Fig. 9 is the schematic diagram that the chimney wall thickness is adjusted, door frame (6) top links to each other with the radiation beam (31) of platform (2), activity enclosure holding device (47) is equipped with in door frame (6) both sides, template (3) also can hang on above the activity enclosure (46), rotate that its leading screw just can hold out against or relaxation exercise enclosure (46), below at holding device (47) also has fixedly enclosure adjusting device (48), same device is also arranged at template (3) bottom, activity enclosure (46) and activity enclosure holding device (47) join, and fixedly enclosure (42) and fixedly enclosure adjusting device (48) join.
Compared with prior art, here this construction equipment for chimneys has my advantage:
1, platform climbs by the central tower suspender belt is moving, bears its weight load by tower crane, and platform can run-off the straight, and floating reverse etc. guarantees the chimney quality.
2, platform can radial contraction, improves the chimney geometric accuracy.
3, operating personnel's safety in the construction, operating environment is good.
4, accelerate speed of application.

Claims (5)

1, a kind of chimney construction equipment, it is characterized in that platform (2) is contained in above the center tower crane (1), platform (2) is connected with door frame (6), and door frame (6) is connected with bolt (7), nut (8) and climbing forms (3), is chimney wall (4) between the template (3).
2, construction equipment according to claim 1, it is characterized in that on the body of the tower (9) of tower crane climbing frame (10) and following climbing frame (11) being housed, leading screw (12), screw (14) are housed on the last climbing frame, leading screw (13), screw (15) are arranged on the following climbing frame, radially contracture oil cylinder is equipped with on platform top (16), its plunger (19) links to each other with door frame (4), and platform bottom (21) are equipped with the oil cylinder that vertically climbs (18), and its plunger (20) joins with platform top (16).
3, construction equipment according to claim 1, it is characterized in that the oil cylinder (18) that platform climbs joins by oil pipe and one way valve (27) with the vertical oil cylinder that climbs (28), receive oil cleaner screen (22) by plunger type variable capacity pump (23) again, oil filter (21) is connected with oil pipe with safety valve (24).
4, construction equipment according to claim 1, it is characterized in that template is made up of fixed form, traveling formwork, contracture template, between its fixed form (41) and the traveling formwork (45) contracture template (44) is housed, activity enclosure (46) and fixedly enclosure (43) are joined, and door frame column (42) is adjacent with fixedly enclosure (43) again.
5, construction equipment according to claim 1, it is characterized in that door frame (6) both sides are equipped with activity enclosure holding device (47), template (3) hangs on above the activity enclosure (46), fixedly enclosure adjusting device (48) is equipped with in holding device (47) below, activity enclosure (46) is connected with activity enclosure holding device, and fixedly enclosure (42) is connected with fixing enclosure levelling device (48).
CN 92224037 1992-06-09 1992-06-09 Construction equipment for chimneys Granted CN2122897U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN 92224037 CN2122897U (en) 1992-06-09 1992-06-09 Construction equipment for chimneys

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN 92224037 CN2122897U (en) 1992-06-09 1992-06-09 Construction equipment for chimneys

Publications (1)

Publication Number Publication Date
CN2122897U true CN2122897U (en) 1992-11-25

Family

ID=4966593

Family Applications (1)

Application Number Title Priority Date Filing Date
CN 92224037 Granted CN2122897U (en) 1992-06-09 1992-06-09 Construction equipment for chimneys

Country Status (1)

Country Link
CN (1) CN2122897U (en)

Cited By (5)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101832049B (en) * 2009-03-13 2011-07-06 中冶成工上海五冶建设有限公司 Concrete-structured conjoined cylindrical shell construction device and method therefor
CN102677890A (en) * 2012-04-23 2012-09-19 中化二建集团第三安装工程有限公司 Chimney building formwork lifting device and construction method
CN103590648A (en) * 2013-11-28 2014-02-19 中国二十二冶集团有限公司 Chimney sliding lifting platform construction method and construction device
CN113882664A (en) * 2021-10-19 2022-01-04 中国二十冶集团有限公司 Cylindrical structure construction device
CN117627342A (en) * 2024-01-26 2024-03-01 山西一建集团有限公司 Chimney lining construction mold turning inner formwork construction platform and construction method

Cited By (7)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN101832049B (en) * 2009-03-13 2011-07-06 中冶成工上海五冶建设有限公司 Concrete-structured conjoined cylindrical shell construction device and method therefor
CN102677890A (en) * 2012-04-23 2012-09-19 中化二建集团第三安装工程有限公司 Chimney building formwork lifting device and construction method
CN102677890B (en) * 2012-04-23 2014-05-21 中化二建集团第三安装工程有限公司 Chimney building formwork lifting device and construction method
CN103590648A (en) * 2013-11-28 2014-02-19 中国二十二冶集团有限公司 Chimney sliding lifting platform construction method and construction device
CN113882664A (en) * 2021-10-19 2022-01-04 中国二十冶集团有限公司 Cylindrical structure construction device
CN117627342A (en) * 2024-01-26 2024-03-01 山西一建集团有限公司 Chimney lining construction mold turning inner formwork construction platform and construction method
CN117627342B (en) * 2024-01-26 2024-04-19 山西一建集团有限公司 Chimney lining construction mold turning inner formwork construction platform and construction method

Similar Documents

Publication Publication Date Title
CN207260542U (en) A kind of scaffold that can be lifted
CN208792758U (en) A kind of huge column climbing apparatus
CN214882985U (en) Bridge assembled rapid construction platform
CN114592504B (en) Deviation-preventing construction device for deep pile foundation reinforcement cage pouring process
CN2719998Y (en) Climbing device of hydraulic automatic climbing imitation system
CN114232970B (en) Method for installing super high-rise self-elevating attached overhanging type interlayer material transfer platform
CN2122897U (en) Construction equipment for chimneys
CN112591628B (en) Lateral tower crane supporting device and using method
CN110565937A (en) Door type integral lifting steel platform
CN1020120C (en) Mould-raising technology for poured-in-place wall without climibing rack and its mould
CN112875530A (en) Support monitoring device and method for super high-rise construction tower crane
CN111877728A (en) Lifting type movable operation platform for steel structure overhanging construction
CN217205572U (en) Steel construction stair strutting arrangement
CN112593696B (en) Lateral supporting device of integral steel platform and using method
CN115387716A (en) Adjustable steel ladder
CN214095914U (en) Skid positioning device of truss reinforced concrete prefabricated slab
CN211257773U (en) Door type integral lifting steel platform
CN2218221Y (en) Hydraulic propulsion lifting scaffold
CN215160645U (en) Bridge crane girder installation positioner
CN212076311U (en) Container side plate maintenance equipment
CN215886146U (en) Tower crane mounting seat with movable corner
CN2033034U (en) Electric mould-lifting device for face headframe
CN2367512Y (en) Automatic column-free lifter for automobile
CN220580545U (en) Angle-adjustable sloping plate bracket jacking
CN212359071U (en) Lifting operation platform for construction of inclined column decorative surface layer

Legal Events

Date Code Title Description
C06 Publication
PB01 Publication
C14 Grant of patent or utility model
GR01 Patent grant
C19 Lapse of patent right due to non-payment of the annual fee
CF01 Termination of patent right due to non-payment of annual fee