CN212254105U - Prism support for accurate and rapid lofting of total station - Google Patents

Prism support for accurate and rapid lofting of total station Download PDF

Info

Publication number
CN212254105U
CN212254105U CN202021383964.6U CN202021383964U CN212254105U CN 212254105 U CN212254105 U CN 212254105U CN 202021383964 U CN202021383964 U CN 202021383964U CN 212254105 U CN212254105 U CN 212254105U
Authority
CN
China
Prior art keywords
lofting
prism
total station
rod
rotating head
Prior art date
Legal status (The legal status is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the status listed.)
Expired - Fee Related
Application number
CN202021383964.6U
Other languages
Chinese (zh)
Inventor
陈健
郑加柱
隋铭明
史晓云
Current Assignee (The listed assignees may be inaccurate. Google has not performed a legal analysis and makes no representation or warranty as to the accuracy of the list.)
Nanjing Forestry University
Original Assignee
Nanjing Forestry University
Priority date (The priority date is an assumption and is not a legal conclusion. Google has not performed a legal analysis and makes no representation as to the accuracy of the date listed.)
Filing date
Publication date
Application filed by Nanjing Forestry University filed Critical Nanjing Forestry University
Priority to CN202021383964.6U priority Critical patent/CN212254105U/en
Application granted granted Critical
Publication of CN212254105U publication Critical patent/CN212254105U/en
Expired - Fee Related legal-status Critical Current
Anticipated expiration legal-status Critical

Links

Images

Landscapes

  • Conveying And Assembling Of Building Elements In Situ (AREA)

Abstract

The utility model discloses a prism support for accurate and rapid lofting of total station, which comprises a telescopic leg, a base, a connecting rod, a rotating head and a telescopic rod, wherein the connecting rod is fixedly connected right above the base, round bubbles are arranged on the base, and the rotating head can be inserted in the connecting rod in an external mode and can rotate; the telescopic link is connected with the rotating head and is provided with a length scratch, and the tail end of the telescopic link is provided with a prism rod fastener. When adopting the total station lofting, the lofting personnel rough determination of handheld prism pole waits behind the lofting point position, settles the utility model discloses the prism support adjusts the expansion bracket leg and makes the base put level, goes into the prism pole buckle with lofting prism pole card, rotates the rotating head and makes the prism aim at the total station sight, according to the lofting point offset distance that total station operating personnel gave, according to the length of scale regulation expansion link on the telescopic link, makes the accurate quick setting in of prism pole wait the lofting point position, has effectively practiced thrift the lofting time, guarantees the precision of lofting point simultaneously.

Description

Prism support for accurate and rapid lofting of total station
Technical Field
The utility model relates to a mapping equipment technical field, more specifically say, relate to a prism support that is used for accurate quick laying out of total powerstation.
Background
In engineering survey application, the plane position of a building (structure) designed by drawing paper needs to be calibrated in the field, the work is called lofting, lofting by adopting a total station is a common means in engineering practice, and lofting by adopting the total station is generally carried out in two modes, namely polar coordinate lofting and coordinate lofting, wherein the coordinate lofting is the most common mode.
When the total station coordinate method is adopted for lofting, firstly, the station is arranged and oriented, after the coordinates of the point to be lofted are input, the position of the lofted point is obtained, according to the direction of collimation of the total station, the lofting personnel is instructed to arrange the lofting prism rod in the sight line direction of the total station to measure the distance between the prism and the measuring station, obtaining lofting distance deviation according to the theoretical distance between a lofting point and a survey station, enabling lofting personnel to hold a prism rod to move back and forth along the sight line direction of the total station until the distance deviation is zero, in order to accurately determine the position of the lofting point, the total station needs to measure the distance from the prism to the measuring station once when the lofting personnel moves the position, and the lofting personnel can report the distance deviation of the lofting point, and the lofting personnel can repeatedly adjust the moving direction and the moving distance according to the instruction, and the level of the bubbles on the prism rod is kept, a great deal of time is wasted in the process, and the lofting precision is influenced.
SUMMERY OF THE UTILITY MODEL
To the problem that exists among the prior art, the utility model aims to provide a prism support for accurate quick lofting of total powerstation, its portable, simple structure, when adopting total powerstation lofting, the lofting personnel of handheld prism pole roughly confirm treat the lofting point position after, settle the utility model discloses prism support, adjust the expansion bracket leg and make the base set level, insert the prism pole in the prism pole buckle, rotate the rotating head and make the prism aim at the total powerstation sight, according to the lofting point skew distance that total powerstation operating personnel given, adjust the length of expansion rod, make the accurate quick lofting point position of waiting of being in of prism pole, effectively practiced thrift lofting time, guarantee the precision of lofting point simultaneously.
In order to achieve the above object, the utility model provides a following technical scheme:
the utility model provides a prism support that is used for accurate quick laying out of total powerstation, includes expansion bracket leg, base, connecting rod, rotating head, telescopic link, its characterized in that: the connecting rod rigid coupling is directly over the base, the rotating head can the extrapolation in the connecting rod to can rotate, open the rotating head side has the bolt hole and is provided with fastening bolt.
Preferably, the base is provided with round air bubbles, and the base is flatly placed by adjusting the telescopic bracket legs.
Preferably, the telescopic rod is multi-section telescopic, each section of telescopic rod is provided with length scales, the minimum scale is millimeter, and the total length of the telescopic rod after being completely stretched is 50 cm.
Preferably, the swivel head is rotatable 360 degrees about the connecting rod.
Preferably, the tail end of the telescopic rod is provided with a prism rod buckle, and the buckle is made of plastic materials and has certain elasticity.
Preferably, the prism rod buckle is a U-shaped opening, the size of the opening is consistent with the diameter of the lofting prism rod, and the prism rod can be clamped in the U-shaped opening.
The utility model has the advantages that:
1. the total station positioning device is simple in structure, the direction of the prism is adjusted through the rotating head to align to the sight of the total station, the position of a to-be-lofted point can be quickly found according to the scale on the telescopic rod, and lofting time is saved.
2. The scale on the telescopic rod is accurate to millimeter, and the plane position accuracy of the lofting point can be ensured.
3. The operation method is simple, non-professional personnel can assist in lofting, and the operation is convenient.
Drawings
In order to more clearly illustrate the embodiments of the present invention, the drawings used in the embodiments will be briefly described below.
Fig. 1 is a schematic view of the present invention.
Fig. 2 is a schematic structural diagram of the present invention.
Fig. 3 is an enlarged schematic view of a portion a in fig. 2 according to the present invention.
The reference numbers in the figures illustrate: 1. the device comprises telescopic frame legs, 2 parts of a base, 3 parts of round bubbles, 4 parts of a connecting rod, 5 parts of a fastening bolt, 6 parts of a rotating head, 7 parts of a telescopic rod, 8 parts of a prism rod buckle, 9 parts of a prism rod and 10 parts of a prism.
Detailed Description
The technical solutions in the embodiments of the present invention will be described clearly and completely with reference to the accompanying drawings in the embodiments of the present invention, and it is obvious that the described embodiments are only some embodiments of the present invention, not all embodiments. Based on the embodiments in the present invention, all other embodiments obtained by a person skilled in the art without creative work belong to the protection scope of the present invention.
A prism support for accurate and rapid lofting of a total station comprises telescopic support legs (1), a base (2), a connecting rod (4), a rotating head (6) and a telescopic rod (7); the connecting rod (4) is fixedly connected right above the base (2); the rotating head (6) can be externally inserted in the connecting rod (4) and can rotate, and a bolt hole is formed in the side face of the rotating head and provided with a fastening bolt (5); the base (2) is provided with a round bubble (3) for flatly placing the base; the telescopic rods are multi-section telescopic, length scales are arranged on each section of telescopic rod, and the minimum scale is millimeter; the end of the telescopic rod is provided with a prism rod buckle which is a U-shaped opening, and the lofting prism rod can be clamped into the U-shaped opening.
When adopting the total powerstation laying-out, the laying-out personnel is according to the azimuth and the distance deviation instruction that instrument operating personnel gave, handheld prism pole is along total powerstation sight direction back-and-forth movement, after the rough determination waits the laying-out position, settles the utility model discloses the prism support, adjust the expansion bracket leg and make the base put level, insert the prism pole in prism pole buckle, rotate the rotating head and make the prism aim at the total powerstation sight, screw the fastening bolt, prevent the rotating head to rotate, according to the newest laying-out point skew distance that total powerstation operating personnel given, adjust the length of expansion rod according to the scale on the telescopic link, make the accurate quick laying-out point position of waiting of being in of prism pole, mark this position subaerial, accomplish the laying-out.
Although the present invention has been described in detail with reference to the foregoing embodiments, it will be apparent to those skilled in the art that modifications may be made to the embodiments or portions thereof without departing from the spirit and scope of the invention.

Claims (5)

1. The utility model provides a prism support that is used for accurate quick laying out of total powerstation, includes expansion bracket leg (1), base (2), connecting rod (4), rotating head (6), telescopic link (7), its characterized in that: connecting rod (4) rigid coupling is directly over base (2), rotating head (6) can the extrapolation in connecting rod (4) to can rotate, the rotating head side is opened there is the bolt hole and is provided with fastening bolt (5), telescopic link (7) meet with rotating head (6).
2. The prism support for accurate and fast lofting of a total station according to claim 1, wherein: the base (2) is provided with a round bubble (3) for flatly placing the base.
3. The prism support for accurate and fast lofting of a total station according to claim 1, wherein: the telescopic rod (7) is multi-section telescopic, each section of telescopic rod is provided with length scales, and the minimum scale is millimeter.
4. The prism support for accurate and fast lofting of a total station according to claim 1, wherein: the end of the telescopic rod (7) is provided with a prism rod buckle (8), and the used material is a plastic material and has certain elasticity.
5. The prism support for accurate and fast lofting of a total station according to claim 4, wherein: the prism rod fastener (8) is a U-shaped opening, and the lofting prism rod can be clamped into the U-shaped opening.
CN202021383964.6U 2020-07-14 2020-07-14 Prism support for accurate and rapid lofting of total station Expired - Fee Related CN212254105U (en)

Priority Applications (1)

Application Number Priority Date Filing Date Title
CN202021383964.6U CN212254105U (en) 2020-07-14 2020-07-14 Prism support for accurate and rapid lofting of total station

Applications Claiming Priority (1)

Application Number Priority Date Filing Date Title
CN202021383964.6U CN212254105U (en) 2020-07-14 2020-07-14 Prism support for accurate and rapid lofting of total station

Publications (1)

Publication Number Publication Date
CN212254105U true CN212254105U (en) 2020-12-29

Family

ID=73979680

Family Applications (1)

Application Number Title Priority Date Filing Date
CN202021383964.6U Expired - Fee Related CN212254105U (en) 2020-07-14 2020-07-14 Prism support for accurate and rapid lofting of total station

Country Status (1)

Country Link
CN (1) CN212254105U (en)

Cited By (2)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113217782A (en) * 2021-04-30 2021-08-06 中国一冶集团有限公司 Extension type measuring instrument support for building construction
CN113654515A (en) * 2021-08-16 2021-11-16 自然资源部第一大地测量队(自然资源部精密工程测量院、陕西省第一测绘工程院) Peak top measuring target

Cited By (3)

* Cited by examiner, † Cited by third party
Publication number Priority date Publication date Assignee Title
CN113217782A (en) * 2021-04-30 2021-08-06 中国一冶集团有限公司 Extension type measuring instrument support for building construction
CN113217782B (en) * 2021-04-30 2022-08-19 中国一冶集团有限公司 Extension type measuring instrument support for building construction
CN113654515A (en) * 2021-08-16 2021-11-16 自然资源部第一大地测量队(自然资源部精密工程测量院、陕西省第一测绘工程院) Peak top measuring target

Similar Documents

Publication Publication Date Title
CN212254105U (en) Prism support for accurate and rapid lofting of total station
CN108590202B (en) Top plate positioning and line drawing device and method for construction site
CN106907973B (en) Portable tree breast height diameter measuring device and method
CN104875543A (en) Art painting framing proportion perspective correcting machine
CN206514792U (en) The auxiliary conditioning unit of bone setting angle is indulged on a kind of curved outside plate of hull
CN212843527U (en) River-crossing leveling device adopting precise triangular elevation method
CN214747981U (en) Civil engineering basis location pay-off
CN210774058U (en) Device for assisting GPS-RTK in accurate and rapid lofting
CN217195297U (en) Marine line type segmentation marking device
CN105904888A (en) Multi-function teaching ruler
CN216770407U (en) Adjustable rapid fixed-point tool for house measurement
CN206186622U (en) Multifunctional drawing compasses
CN108225292A (en) A kind of mixing pile construction setting-out Fast Fixed-point device
CN210892904U (en) Polygonal measuring folding ruler capable of expanding angle
CN2213981Y (en) Engineering lofting apparatus
HK81391A (en) Gauge compass
CN220922398U (en) Template cutting scale
CN209196460U (en) The scale bipod in adjustable feet orientation
CN208505190U (en) A kind of positioning measuring device for stage+module lateral in subway tunnel
CN207991548U (en) A kind of mixing pile construction setting-out Fast Fixed-point device
CN213108804U (en) Construction management auxiliary tool for survey and drawing
US3919777A (en) Angle trisector
CN206124558U (en) Multifunctional protractor
CN205504361U (en) Leveling sighting rod foot rest
CN214843274U (en) Transverse lengthening device for GPS-RTK centering rod

Legal Events

Date Code Title Description
GR01 Patent grant
GR01 Patent grant
CF01 Termination of patent right due to non-payment of annual fee
CF01 Termination of patent right due to non-payment of annual fee

Granted publication date: 20201229

Termination date: 20210714